Loading...
HomeMy WebLinkAboutT13N R3W SEC 13 LT 8 S2Department of Environmental Conservation Division of Water Engineering Support and Plan Review dec.alaska.gov septic.alaska.gov January 24, 2025 Plan Tracking No.: PA-000528 Steve Pannone, P.E. steve@panengak.com RE: T12N R3W SEC13 Lot 8 S2 1000-gallon concrete septic tank, 150 sf shallow trench drain field Maximum Daily Flow: 150 GPD Conditional Construction Approval Steve Pannone: On 1/15/2025, the Alaska Department of Environmental Conservation (ADEC or Department) received a submittal requesting construction approval for T12N R3W SEC13 Lot 8 S2 located in Anchorage. The information was reviewed in accordance with Wastewater Disposal Regulations 18 AAC 72 and conditional construction approval is granted. Project Description The system is designed to serve commercial facilities with a flow rate of 150 GPD. The approved wastewater treatment and disposal system will include a 1,000-gallon D&S concrete septic tank and a soil absorption system with an area of 150 SF. The absorption system will measure 5 feet in width and 30 feet in length, along with the necessary piping and wiring. The drainage bed will consist of 12 inches of drain rock placed over a 2-feet layer of sand. Effluent from the septic tank will be distributed through a perforated 4-inch diameter SDR 35 PVC pipe. To prevent the mound from freezing, there will be a minimum of 4 inches of rigid foam insulation along with 2 feet of soil cover. Fresh water will be supplied to the facilities by an onsite private well. Construction Approval Conditions 1. The groundwater level may change over time due to seasonal variations. It is necessary to confirm the groundwater levels again during the construction phase to ensure that a minimum separation distance from the drain rock is maintained. Approval to Operate Requirements This construction approval includes a 90 day interim approval to operate provided that construction substantially complied with the approved design drawings. In order to receive final operational approval, please submit the following information within 60 days of the completion of this project: Steve Pannone 2 T12N R3W SEC13 Lot 8 S2 1/24/2025 1. Written request for operational approval that includes a statement regarding any changes made during construction 2. Record drawings prepared (signed and dated) by the engineer responsible for observing the construction of this project (The Department prefers drawings that are no larger than 11” x 17”.) 3. Certification of Construction form complete with signatures from the Owner, Construction Contractor, and Engineer (A copy of this form may be downloaded and printed from the Department of Environmental Conservation website or a copy will be provided upon request. dec.alaska.gov/water/wastewater/engineering/engineered-systems) If the approval to operate requirements cannot be met within 90 days of construction completion, an extension of the interim approval to operate must be requested at least 30 days in advance by addressing item 3 above. Disclaimers Approval of submitted plans is not approval of omissions or oversights by this office or noncompliance with any applicable regulation. The Department's construction approval does not guarantee correctness or the functionality of the design, or waive the owner's responsibility for continued compliance with state regulations. Deviations from approved plans which affect capacity, flow, pressure, operation, compliance, or materials of major system components must be approved by this Department prior to their construction or implementation. This approval is valid for two years from the date of this letter. If the applicant fails to construct, alter, install, or modify the system, the approval is void and plans must be resubmitted for department review and approval according to 18 AAC 72.200. This approval is contingent upon your receipt of any other state, federal, or local authorizations which are required for your project. You are required to obtain all other necessary authorizations before proceeding with your project. This approval does not imply the granting of additional authorizations nor obligate any state, federal, or local regulatory body to grant required authorizations. Informal Reviews and Adjudicatory Hearings A person authorized under a provision of 18 AAC 15 may request an informal review of a contested decision by the Division Director in accordance with 18 AAC 15.185 and/or an adjudicatory hearing in accordance with 18 AAC 15.195 – 18 AAC 15.340. See DEC’s “Appeal a DEC Decision” web page https://dec.alaska.gov/commish/review-guidance/ for access to the required forms and guidance on the appeal process. Please provide a courtesy copy of the adjudicatory hearing request in an electronic format to the parties required to be served under 18 AAC 15.200. Requests must be submitted no later than the deadline specified in 18 AAC 15. If you have questions please contact me at (907) 451-2146 or by e-mail at fayzul.kabir@alaska.gov. Sincerely, Dr. Fayzul Kabir Engineering Associate 1 cc: Vito Ungaro, vito@gci.net PA N N O N E E N G S V C , L L C ( C . I . 1 0 8 8 ) PA N N O N E E N G S V C , L L C ( C . I . 1 0 8 8 ) A SCALE: NTS DRAIN LINE BEDDING DETAIL C SCALE: NTS 1000gal SEPTIC TANK INSULATION DETAIL D SCALE: NTS STANDPIPE SEWER SLEEVE DETAIL B SCALE: NTS DRAIN FIELD INSULATION DETAIL PA N N O N E E N G S V C , L L C ( C . I . 1 0 8 8 ) COMMENTS: Test hole excavated by GROUND BREAKERS, LLC. PERFORMED BY: PANNONE ENGINEERING SERVICES, LLC. I CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDLINES IN EFFECT ON THE DATE OF THIS TEST. ·<1 (min/inch) ·6" ·3 FT AND 4 FT ·SEE ATTACHED SIEVE ANALYSIS RESULTS. SOILS LOG & PERCOLATION TEST PA N N O N E E N G S V C , L L C ( C . I . 1 0 8 8 ) 2.2. SCOPE OF WORK:INSTALL SYSTEM IN ACCORDANCE WITH THE ATTACHED DESIGN AND SPECIFICATIONS. 8.0 FEET 8.0 FEET