Loading...
HomeMy WebLinkAboutPARADISE VALLEY BLK 10 LT 4A Block 10 j--mm 20-414-25 MUNICIPALITY OF ANCHORAGE On -Site Water & Wastewater Program PO Box 196650 4700 Elmore Road Anchorage, Alaska 99519-6650 Phone: (907) 343-7904 Fax: (907) 343-7997 http://www.muni.org/onsite On -Site Water & Wastewater System Permit Permit Number: OSP251366 Work Type: WellSeptic Initial Tax Code Number: 02041425000 Site Legal Address: PARADISE VALLEY BLK 10 LT 4 G:3538 Site Mailing Address: 5920 Bulgaria DR, Anchorage Owner: ULMER SCOTT A TRUST Design Engineer: AK BUILT CONSTRUCTION & DESIGN LLC^ This permit is for the construction of: Q Disposal Field Z Septic Tank ❑ Holding Tank ❑ Privy Effective Date: Expiration Date: Lot Size in Sq Ft: Total Bedrooms: .: 11111 DelmrtInent 10/28/2025 10/28/2026 r,� Non -Public Q Water Well ❑ Water Storage All construction shall be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80) 3. The wastewater code requires inspections during the installation. The engineer shall notify the Development Services Department per AMC 15.65. Coodinate with On -Site staff regarding preferred method. 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather shall be either: a. Opened and Closed on the same day, or b. Covered, sealed, and heated to prevent freezing Issued To: AK BUILT CONSTRUCTION & DESIGN LLC^ Issued By: Curtis Townsend Date: 10/28/2025 Date: 10/28/2025 4 MUNICIPALITY OF ANCHORAGE Development Services Department Phone: 907-343-7904 On -Site Water & Wastewater Section ON -SITE SEPTIC/WELL PERMIT APPLICATION Parcel I.D. 02041425000 Property owner(s) Eric Orzel Mailing address Site address NHN Bulgaria Drive Legal description Paradise Valley Block 10 Lot 4 Number of Bedrooms 4 Engineering Firm AK Built Construction & Design, LLC Building Permit Number APPLICATION IS FOR: (Z all that apply) Disposal Field Septic Tank Holding Tank ❑ Privy ❑ Well Water Storage ❑ Day phone 5865309266 _ Not Applicable r_1 APPLICATION IS AN: Initial Upgrade ❑ Renewal ❑ THIS APPLICATION INCLUDES A WAIVER REQUEST FOR: Distance: Permit/Rush Fees: Waiver Fees: Date of Payment: Date of Payment: Permit No. k) Waiver No. May 2025 PO Box 771203, Eagle River, AK 99577 – Phone: (907) 854-9115 Page 1 of 3 AK Built Construction & Design, LLC General Contracting - Engineering - Project Administration October 24, 2025 Municipality of Anchorage Development Services Department On-Site Water and Wastewater Section PO Box 196650 Anchorage, AK 99519 RE: Paradise Valley Block 10 Lot 4 – Septic System & Well Construction A permit is requested to install an Advanced Wastewater Treatment System (AWWTS) septic tank and conventional soil absorption system, as well as a private well, for the subject property. The proposed system will serve a proposed 4-bedroom, single-family home. This design is for a 4-bedroom structure. Wells The subject property is not currently served by a water well. Neighboring parcels are served by private water wells. There are no neighboring wells within 100’ of the designed septic system. The neighboring parcels that share a property line with the subject property are vacant. The proposed on-lot private will is within 100’ but maintains at least 50’ of separation from the proposed septic system. Soils AK Built Construction & Design, LLC (AK Built) performed test hole excavations and percolation testing on October 9th, 2025. Three test holes were excavated. TH-01 was excavated to five feet below ground surface; soils were visually classified as silt with a six-inch sand seam coincident with groundwater at two feet below ground surface. TH-02 was excavated to ten feet below ground surface; excavated overburden overlaid the test hole location from the driveway cut on the property, followed by silty sand and sandy silt layers. No groundwater was encountered in TH-02. A percolation test was conducted at five and a half feet to six feet below ground surface and resulted in a percolation rate of 10.2 minutes per inch. Groundwater was monitored at least seven days later, and TH-02 was found to be dry. TH-03 was excavated eight feet below ground surface; the organic soil layer was previously removed so no overburden was present, the remainder of the test hole visually appeared to be primarily silt with a silty sand seam collocated with the groundwater level. Groundwater in TH-03 was observed at four feet below ground surface and monitored at least seven days later at 3.7 feet below ground surface. An application rate of 5 gallons/day/square foot shall be used for a conventional pit, deep trench or wide trench wastewater system utilizing Category III AWWTS. Wastewater disposal systems The designed wastewater disposal system is a wide trench system with 6” of sewer rock below the pipe invert. The designed system has the following characteristics. # Bedrooms: 4 Daily Design Flow: 600 gallons/day Tank Size: 1,500 gallons (Advantex AX20 is the basis of design) Percolation Rate: 10.2 minute/inch Soil Rating: 5 gallons/day/square feet (AWWTS CAT III) Field Area Required: 120 square feet Municipality of Anchorage On-site Water and Wastewater REVIEWED FOR CODE COMPLIANCE OSP251366, Curtis Townsend, 10/28/25 PO Box 771203, Eagle River, AK 99577 – Phone: (907) 854-9115 Page 2 of 3 AK Built Construction & Design, LLC General Contracting - Engineering - Project Administration System Type: Wide Trench Width: 5 feet Minimum Length: 24 feet Designed Length: 45 feet Designed Field Area: 225 square feet Maximum Excavation Depth (from existing ground) Allowed: 4 feet Replacement wastewater disposal systems A replacement wastewater disposal system design is provided for the subject parcel. The replacement wastewater disposal system is a wide trench system with 6” of sewer rock below the pipe invert. The designed system has the following characteristics. # Bedrooms: 4 Daily Design Flow: 600 gallons/day Tank Size: 1,500 gallons (Advantex AX20 is the basis of design) Percolation Rate: 10.2 minute/inch Soil Rating: 5 gallons/day/square feet (AWWTS CAT III) Field Area Required: 120 square feet System Type: Wide Trench Width: 5 feet Minimum Length: 24 feet Designed Length: 45 feet Designed Field Area: 225 square feet Maximum Excavation Depth (from existing ground) Allowed: 4 feet Existing disposal site There is no existing disposal site located on the subject parcel. Neighboring parcels with existing disposal sites do not impact the subject parcel and the proposed system will not negatively impact neighboring parcels. Drainage The southwest property line parallels Potter Creek. The proposed septic system is at least 100 feet away from Potter Creek surface waters. There is a drainage easement along the southeast property line. There are no signs of visible surface water located along the drainage easement. Topography The designed system is in the north quadrant of the property. The surrounding property slopes up- gradient to the northeast and slopes down-gradient to the southwest. Steep slopes exist at least 50 feet from the designed system, as shown in the plans. The proposed wide trench system is installed on a slope greater than 25% percent but less than 46%. The maximum excavation depth shall be measured from the up-hill side of the trench. Maximum trench width is five feet. Natural vegetation within 50 feet down- gradient of the disposal field shall remain undisturbed. Exposed slopes down-gradient of the disposal field shall be stabilized with an erosion control matting or hydroseed incorporating a tackifier. The distribution pipe invert is less than 36-inches below original ground as measured from the downhill side of the trench, PO Box 771203, Eagle River, AK 99577 – Phone: (907) 854-9115 Page 3 of 3 AK Built Construction & Design, LLC General Contracting - Engineering - Project Administration therefore a one foot filter sand layer shall be placed below the disposal field to ensure the filter sand is placed at least 36-inches below the top of the native organic layer and ensure effluent distribution is conveyed to the specified receiving soils. The disposal largely meets the requirement of being 100 feet up-gradient from any slope exceeding 46%. Much of the down-gradient slope is less than 46% but a few isolated sections of slope are steeper than 46% and within 100 feet of the proposed disposal field, as seen in the site plan. It is not believed that the designed system will result in daylighting effluent. The designed system does not have probable adverse impacts to adjacent properties. If you have any questions, please contact me. Sincerely, Robert Colles, PE AK Built Construction & Design, LLC Project Manager/Managing Member 907-854-9115 rlcolles@akbuilt.net 10/24/2025 TH TH TH W PARADISE VALLEY BLOCK 10 LOT 3 PARADISE VALLEY BLOCK 10 LOT 4 PARADISE VALLEY BLOCK 10 LOT 5 PARADISE VALLEY BLOCK 9 LOT 28 PARADISE VALLEY BLOCK 9 LOT 29 PARADISE VALLEY BLOCK 9 LOT 27 PARADISE VALLEY BLOCK 10 LOT 6 B U L G A R I A D R I V E P R O P O S E D 4 - B E D H O U S E TH-01 TH-02 TH-03 PROPOSED PRIVATE WELL R50' R100' MOA APPROVED AWWTS CAT III SEPTIC TANK 1,500-GAL ADVANTEX AX20 W/ PUMP VAULT SERVES AS THE BASIS OF DESIGN VEGETATION 50' DOWN-GRADIENT SHALL REMAIN UNDISTURBED. DISTURBANCE TO BE REVEGETATED WITH EROSION CONTROL MATTING OR HYDROSEED WITH TACKIFIER. P O T T E R C R E E K 100' SETBACK FROM POTTER CREEK 10' D RAI N A G E EAS E M E N T 5' x 45' WIDE TRENCH WITH 6" EFFECTIVE DEPTH RESERVE FIELD; 5' x 45' WIDE TRENCH WITH 6" EFFECTIVE DEPTH SLOPES 25% TO 46% SLOPES >46% 6 4 0 6 4 5 6 5 0 6 5 5 6 6 0 6 6 5 6 7 0 6 7 5 6 8 0 6 8 5 6 9 0 6 9 5 7 0 0 7 0 5 7 1 0 715 7 2 0 7 2 5 7 3 0 7 3 5 FI L E P A T H : C : \ U s e r s \ c o l l e \ O n e D r i v e - A K B u i l t C o n s t r u c t i o n & D e s i g n \ A K B u i l t - F i l e H u b \ P r o j e c t s \ 0 0 8 1 . 0 1 N H N B u l g a r i a D r i v e S e p t i c D e s i g n \ A C A D \ 0 0 8 1 . 0 1 - S i t e P l a n . d w g PL O T D A T E : 1 0 / 2 4 / 2 0 2 5 AK BUILT CONSTRUCTION & DESIGN, LLC PO BOX 771203 EAGLE RIVER, AK 99577 (907)854-9115 CERTIFICATE OF AUTHORIZATION #204451 PA R A D I S E V A L L E Y BL O C K 1 0 L O T 4 NH N B U L G A R I A D R I V E AN C H O R A G E , A K 9 9 5 1 6 PR O J E C T N O : 0 0 8 1 . 0 1 ER I C O R Z E L 3OF 10/24/2025 DATE: SHEET TITLE: ROBERT COLLES, PE No. CE-163739REGISTEREDPROFESSIONALENGINEER 10/24/2025 1 SITE PLAN Feet 0 15 30 NOTE: 1. THE EXISTING LOT IS VACANT. ONSITE COMPONENTS ARE DESIGNED BASED UPON PROPERTY OWNER PROVIDED INFORMATION. SITE GRADING IS SUBJECT TO CHANGE AND WILL REQUIRE NOTIFICATION TO THE ENGINEER TO VERIFY SYSTEM LAYOUT PRIOR TO CONSTRUCTION. Municipality of Anchorage On-site Water and Wastewater REVIEWED FOR CODE COMPLIANCE OSP251366, Curtis Townsend, 10/28/25 SYSTEM DESIGN: 1. DESIGNED AWWTS SYSTEM IS FOR PARADISE VALLEY BLOCK 10 LOT 4. MUNICIPALITY OF ANCHORAGE (MOA) PARCEL ID 02041425000. 2. DESIGNED SYSTEM WILL SERVE A PROPOSED 4-BEDROOM, RESIDENTIAL HOME. 3. TEST HOLES WERE EXCAVATED TO COLLECT SOIL, PERCOLATION, AND GROUND WATER DATA FOR THE DESIGNED SYSTEM. SEE SOILS REPORTS. 4. SEPTIC TANK CAPACITY IS A MINIMUM OF 1,000-GALLONS PLUS 250-GALLONS FOR EACH BEDROOM OVER THREE. 4.1. SEPTIC TANK SHALL BE A 1,500-GALLON ADVANTEX AX20 UNIT. A PUMP VAULT SHALL BE UTILIZED TO ACCOMPLISH PRESSURE DISTRIBUTION. 5. DISPOSAL FIELDS SHALL BE DESIGNED TO ACCEPT 150-GALLONS OF WASTEWATER PER BEDROOM PER DAY. 5.1. DESIGN FLOW = 150 GPD/BDRM x 4 BDRM = 600 GPD. 6. THE MINIMUM EFFECTIVE ABSORPTION AREA OF A DISPOSAL FIELD SHALL BE CALCULATED USING THE WASTEWATER APPLICATION RATE CORRESPONDING TO THE PERCOLATION RATE IN ANCHORAGE MUNICIPAL CODE (AMC) 15.65 TABLE 6. 6.1. PERCOLATION RATE = 10.2 MIN/IN. 6.2. APPLICATION RATE = 5 GPD/SF (PER AMC 15.65 TABLE 6) FOR A WIDE TRENCH UTILIZING A CATEGORY III AWWTS. 6.3. MINIMUM EFFECTIVE ABSORPTION AREA = 600 GPD / 5 GPD/SF = 120 SF 7. DISPOSAL FIELD SHALL BE A WIDE TRENCH SYSTEM. 7.1. TRENCH WIDTH (W) = 5 FT 7.2. EFFECTIVE DEPTH (D) = 0.5 FT 7.3. MINIMUM FIELD LENGTH (L) = (ABSORPTION AREA / W) = (120 SF / 5 FT) = 24 FT 7.4. MINIMUM FIELD SIZE IS 24-FEET LONG. USE WIDE TRENCH, 45-FEET LONG. 7.5. MAXIMUM EXCAVATION DEPTH ALLOWED IS 4-FEET. MATERIALS SPECIFICATIONS: 1. WASTEWATER DISPOSAL SYSTEM COMPONENTS AND MATERIALS SHALL BE APPROVED BY THE MOA IN ACCORDANCE WITH THE CURRENT EDITION OF MOA'S PUBLICATION "STANDARDS AND SPECIFICATIONS FOR COMPONENT PARTS AND MATERIALS USED IN CONSTRUCTION OF ON-SITE WASTEWATER DISPOSAL SYSTEMS". 2. COMPONENTS INCIDENTAL TO THE SEPTIC SYSTEM INCLUDING BUT NOT LIMITED TO PIPING, FITTINGS, PUMPS AND VALVES THAT ARE LISTED OR LABELED BY A MOA APPROVED ACCREDITED THIRD PARTY LISTING AGENCY FOR THE INTENDED USE DO NOT REQUIRE THE MOA SUBMITTAL/APPROVAL PROCESS. 3. SEPTIC TANKS SHALL BE CONSTRUCTED FROM DURABLE, CORROSION-RESISTANT MATERIALS, INCLUDING CONCRETE, FIBERGLASS, OR PLASTIC. SEPTIC TANKS CONSTRUCTED FROM STEEL SHALL BE COATED ON BOTH THE INTERIOR AND EXTERIOR WITH AN APPROVED POLYURETHANE LINING OR SUPERIOR MATERIAL. 4. ALL SEPTIC TANKS SHALL BE FITTED WITH WATERTIGHT COUPLINGS, APPROVED BY MOA, AT THE PUMP-OUT ATTACHMENTS AND ON THE INLET AND OUTLET OF THE TANK. 5. A SEPTIC TANK SHALL HAVE A 20" MINIMUM DIAMETER MANWAY RISER SERVING THE FIRST COMPARTMENT. THE RISER, INCLUDING THE COVER, SHALL BE INSULATED WITH 4" MINIMUM INSULATION EXTENDING 48" BELOW GRADE OR TO THE TANK INSULATION. THE INSULATION SHALL BE OF AN APPROVED TYPE SUITABLE FOR BELOW GRADE APPLICATIONS. EXPOSED INSULATION ABOVE GRADE SHALL BE PROTECTED FROM UV DAMAGE. THE RISER LID SHALL BE SECURED TO PREVENT UNINTENDED ACCESS. 6. PIPE AND FITTINGS SHALL BE IN ACCORDANCE WITH NOTE 1 AND "PIPE AND FITTINGS MATERIAL" TABLE. 7. PIPES USED IN GRAVITY DISPOSAL SYSTEMS SHALL BE 4" IN DIAMETER. 8. CLEAN OUTS SHALL BE LONG SWEEP. 9. SEWER ROCK/DRAIN ROCK SHALL BE COARSE, WASHED AGGREGATED THAT MEASURES 12" TO 2" IN DIAMETER WITH NO MORE THAN 1% PASSING THE No. 200 SIEVE. 10. BEDDING MATERIAL FOR SEPTIC TANKS SHALL BE PER MANUFACTURER'S REQUIREMENTS. 11. FILTER FABRIC USED AS A SILT BARRIER IN THE CONSTRUCTION OF ABSORPTION FIELDS SHALL BE A PERMEABLE GEOTEXTILE APPROVED FOR THE APPLICATION. 12. INSULATION USED IN THE CONSTRUCTION OF SEPTIC SYSTEMS FOR THE PURPOSES OF FREEZE PROTECTION OF DISPOSAL FIELDS AND SEPTIC SYSTEM COMPONENTS SHALL BE MINIMUM TYPE IV EXTRUDED OR EXPANDED POLYSTYRENE, 25 PSI COMPRESSIVE STRENGTH. PIPE AND FITTINGS MATERIAL PIPE TYPE OR ASTM DESIGNATION APPROVED AS PERFORATED DISPOSAL FIELD PIPE OR SOLID COLLECTOR PIPE APPROVED AS CLEAN OUT OR STANDPIPE CAST IRON **YES YES ASTM D3034 (PVC)YES YES ASTM F789 (PVC)YES YES ASTM D1785 (PVC)**YES YES ASTM D2665 (PVC)**YES YES ASTM D2751 (ABS)YES NO* ASTM D2661 (ABS)**YES YES ASTM F628 (ABS)**YES YES ASTM F810 (HDPE)YES NO * D2751 MAY BE APPROVED AS STANDPIPE MATERIAL IF THE MINIMUM WALL THICKNESS IS 0.18", SDR 23.5. ** UNDERGROUND DWV PIPE MATERIALS LISTED IN UPC TABLE 701.1 (2012). CONSTRUCTION SPECIFICATIONS: 1. SEPARATION DISTANCES AS IDENTIFIED IN THE "SEPARATION DISTANCES" TABLE SHALL BE MAINTAINED. NOTIFY THE ENGINEER OF DISCOVERIES MADE DURING CONSTRUCTION THAT IMPACT SEPARATION DISTANCE REQUIREMENTS. 2. FLAG AND SURVEY ALL PROPERTY LINES, WELL RADII, AND EXISTING FIELD SEPARATIONS PRIOR TO START OF CONSTRUCTION. 3. LAYOUT ALL FIELD COMPONENTS AND LOCATIONS PRIOR TO START OF CONSTRUCTION. NOTIFY THE ENGINEER IF CONFLICTS EXIST. 4. GROUNDWATER MONITOR TUBES SHALL REMAIN IN PLACE UNTIL CONSTRUCTION BEGINS. ABANDON GROUNDWATER MONITOR TUBES BY CUTTING ONE FOOT BELOW GRADE AND ABANDON IN PLACE. IF THE GROUNDWATER MONITOR TUBE IS WITHIN FIVE FEET OF THE DISPOSAL FIELD, REMOVE THE GROUNDWATER MONITOR TUBE IN IT'S ENTIRETY. 5. TANKS WITH TWO TO FOUR FEET OF COVER SHALL BE INSULATED WITH A MINIMUM OF 2" OF APPROVED INSULATION PLACED IMMEDIATELY ABOVE THE TOP OF THE TANK. TANKS SHALL NOT HAVE LESS THAN TWO FEET OF COVER. INSULATION SHALL EXTEND 12" BEYOND THE EDGE OF TANK FOR EVERY 1" OF INSULATION PROVIDED. 6. A SEPTIC TANK SUBJECT TO BUOYANCY FORCES SHALL BE ANCHORED OR BALLASTED AS REQUIRED TO PREVENT FLOTATION REGARDLESS OF THE LIQUID LEVEL IN THE TANK. 7. A SEPTIC TANK SHALL HAVE A 4" MINIMUM STAND PIPE PROVIDING ACCESS TO OTHER COMPARTMENTS NOT SERVED BY THE MANWAY RISER. 8. PROVIDE AIR TIGHT CAPS ON ALL CLEAN OUTS AND MONITORING TUBES. 9. PROVIDE A BUILDING CLEAN OUT INSTALLED ONE TO FOUR FEET FROM THE BUILDING FOUNDATION. IF NOT PRACTICAL, A DOUBLE CLEAN OUT SHALL BE INSTALLED ON THE UPSTREAM SIDE OF THE SEPTIC TANK WITHIN TEN FEET OF THE INLET. 10. A DOUBLE CLEAN OUT SHALL BE PROVIDED WITHIN TEN FEET OF THE SEPTIC TANK OUTLET. THE OPPOSING CLEAN OUTS SHALL BE ORIENTED SUCH THAT THE CLEAN OUT CLOSEST TO THE TANK SHALL BE TO CLEAN THE LINE AWAY FROM THE SEPTIC TANK, AND THE CLEAN OUT FURTHEST FROM THE TANK SHALL BE ORIENTED TO ALLOW CLEANING TOWARD THE SEPTIC TANK. THE CLEANOUTS SHALL BE LOCATED ON UNDISTURBED SOIL. A PRESSURE SYSTEM DOES NOT REQUIRE A DOUBLE CLEAN OUT. 11. SINGLE SEGMENTS OF SUBSURFACE DISPOSAL FIELDS SHALL NOT EXCEED 100 FEET IN LENGTH. 12. THE LONG AXIS OF A DISPOSAL FIELD SHALL FOLLOW THE CONTOURS OF THE ORIGINAL GROUND. 13. THE HORIZONTAL SEPARATION DISTANCE BETWEEN THE CLOSEST EDGES OF WORKING OR DECOMMISSIONED SUBSURFACE DISPOSAL FIELDS, OR SEGMENTS OF SUBSURFACE DISPOSAL FIELDS, SHALL BE AT LEAST TWICE THE DEPTH OF THE DRAIN ROCK BELOW THE LEVEL OF THE DRAINPIPE, BUT NOT LESS THAN SIX FEET. 14. THE BOTTOM OF THE TRENCH SHALL BE LEVEL WITHIN 4". THE BOTTOM OF A WIDE TRENCH OR BED DISPOSAL FIELD SHALL BE LEVEL WITHIN 2" BEFORE PLACEMENT OF DRAIN ROCK. 15. AFTER EXCAVATION HAS EXPOSED THE DESIGNATED INFILTRATIVE SURFACE, ANY NATIVE SOIL THAT IS SMEARED SHALL BE SCARIFIED TO IMPROVE ITS POROSITY BEFORE PLACEMENT OF DRAIN ROCK. 16. PERFORATED DISTRIBUTION PIPE USED IN A SUBSURFACE DISPOSAL FIELD SHALL BE LAID LEVEL AND BEDDED WITH DRAIN ROCK EXTENDING A MINIMUM OF 2" ABOVE THE TOP OF THE DISTRIBUTION PIPE, AND LEVEL ACROSS THE ENTIRE WIDTH OF THE DRAIN FIELD. 17. NON-PRESSURIZED SUBSURFACE DISPOSAL FIELD PIPING SHALL HAVE A 4" DIAMETER CLEAN OUT CONNECTED TO BOTH ENDS OF EACH PERFORATED SEGMENT. CLEANOUTS WITHIN 20 FEET AND IN LINE WITH THE DOUBLE CLEAN OUT DOWNSTREAM OF THE SEPTIC TANK MAY BE OMITTED. 18. AT LEAST ONE 4" DIAMETER MONITORING TUBE SHALL BE INSTALLED IN EACH SEPARATE DISPOSAL FIELD SEGMENT TO ALLOW MEASUREMENT OF THE FLUID LEVEL IN THE DISPOSAL FIELD. MONITOR TUBES SHALL NOT BE CONNECTED TO THE DISTRIBUTION PIPE NETWORK. THE PORTION OF A MONITOR TUBE EXTENDING DOWN FROM THE LEVEL OF THE HORIZONTAL DISTRIBUTION PIPES TO THE BOTTOM OF THE DRAIN ROCK SHALL BE PERFORATED. THE PORTION OF THE MONITOR TUBE ABOVE THE HORIZONTAL DISTRIBUTION PIPES SHALL BE NON-PERFORATED. MONITOR TUBES SHALL BE LOCATED AT ALL ANGLE POINTS OF DISPOSAL FIELDS TO MARK THE LOCATION OF THE ABSORPTIONS SYSTEM. PRESSURIZED TRENCH DISPOSAL FIELDS THAT DO NOT HAVE CLEAN OUT PIPES SHALL HAVE A MONITOR TUBE WITHIN ONE FOOT OF EACH END OF INDIVIDUAL TRENCH SEGMENTS. PRESSURIZED BED DISPOSAL FIELDS THAT DO NOT HAVE CLEAN OUT PIPES SHALL HAVE A MONITORING TUBE WITHIN ONE FOOT OF EACH CORNER OF THE BED. 19. AN APPROVED PERMEABLE GEOTEXTILE SILT BARRIER SHALL BE INSTALLED COVERING THE ENTIRE TOP SURFACE OF THE DRAIN ROCK PRIOR TO BACKFILL. 20. THE DISPOSAL FIELD COVER SHALL BE A MINIMUM OF TWO FEET DEEP, OVER THE TOP OF THE DRAIN ROCK. IF THE DISPOSAL FIELD COVER IS LESS THAN THREE FEET, THE DISPOSAL FIELD SHALL BE INSULATED WITH 2" OF APPROVED RIGID BOARD INSULATION. MINIMUM SOIL COVER OVER THE INSULATION SHALL BE ONE FOOT. INSULATION SHALL EXTEND 12" BEYOND THE EDGE OF TANK FOR EVERY 1" OF INSULATION PROVIDED. 21. THE FINISH GRADE OVER A SUBSURFACE DISPOSAL FIELD SHALL BE MOUNDED A MINIMUM OF 6" ABOVE ADJACENT GROUND TO PREVENT THE FORMATION OF A DEPRESSION AFTER THE BACKFILL HAS SETTLED. 22. UPON COMPLETION OF CONSTRUCTION ALL CLEAN OUTS AND MONITOR TUBES SHALL BE ABOVE FINAL GRADE A MINIMUM OF TWO FEET, A MAXIMUM OF 4 FEET, BE WATER TIGHT, AND LOCATED BY SWING-TIE MEASUREMENTS TO ALLOW YEAR-ROUND LOCATION AND ACCESS. AWWTS SEPARATION DISTANCES SEPTIC TANK SOIL ABSORPTION SYSTEM PROPERTY LINE 5 FEET 5 FEET WATER MAIN/WATER SERVICE LINE 10 FEET 10 FEET BUILDING FOUNDATION 10 FEET 10 FEET DECKS/STAIRS >30" ABOVE GRADE 5 FEET 10 FEET SURFACE WATER 50 FEET 50 FEET PRIVATE WELL 50 FEET 50 FEET PUBLIC WATER SUPPLY SEE 18 AAC 80 SEE 18 AAC 80 >25% SLOPE >10' TALL -35 FEET >25% SLOPE <10' TALL -25 FEET SUBSURFACE DRAIN -GREATER OF 10 FEET OR TWO TIMES GRAVEL DEPTH SOIL ABSORPTION SYSTEM -GREATER OF 6 FEET OR TWO TIMES GRAVEL DEPTH WATER TABLE -2 FEET IMPERMEABLE LAYER -4 FEET INSPECTIONS: 1. AN ON-SITE WASTEWATER DISPOSAL SYSTEM SHALL NOT BE BACKFILLED, COMPLETED, OR USED UNTIL THE ENGINEER HAS INSPECTED AND TAKES NO EXCEPTION TO THE INSTALLATION. 2. NOTIFY THE ENGINEER 48 HOURS IN ADVANCE OF ANTICIPATED CONSTRUCTION. 3. THE ENGINEER WILL MEET WITH THE CONTRACTOR PRIOR TO CONSTRUCTION TO DISCUSS THE FOLLOWING, 3.1. PRECONSTRUCTION MEETING TO DISCUSS CONSTRUCTION PROCEDURES AND DESIGN REQUIREMENTS. 3.2. VERIFY SITE CONDITIONS CONFORM TO THE DESIGN PLANS AND PERMIT. 3.3. VERIFY THE PROJECT LAYOUT CONFORMS TO THE DESIGN PLANS AND PERMIT. 4. THE ENGINEER SHALL PERFORM A BOTTOM OF HOLES INSPECTION FOR THE SEPTIC TANK AND DISPOSAL FIELD. 5. THE DISPOSAL FIELD REQUIRES THE FOLLOWING INSPECTIONS, 5.1. AFTER EXCAVATION OF ALL NATIVE MATERIAL HAS BEEN COMPLETED, BUT PRIOR TO PLACEMENT OF FILTER SAND AND/OR DRAIN ROCK. THE PURPOSE OF THIS INSPECTION IS TO ALLOW VERIFICATION THAT THE NATIVE MATERIAL CONFORMS TO THE SOILS LOG AND THE EXCAVATION IS TO THE CORRECT DEPTH. 5.2. AFTER THE PLACEMENT OF FILTER SAND, IF UTILIZED. 5.3. AFTER THE PLACEMENT OF DRAIN ROCK, AND INSTALLATIONS OF DISTRIBUTION LINES, CLEAN OUTS, AND MONITOR TUBES, BUT PRIOR TO PLACEMENT OF INSULATION, SILT BARRIER, OR BACKFILL. 5.4. AFTER THE SYSTEM HAS BEEN BACKFILLED TO VERIFY FINAL GRADING AND THE LOCATION OF ALL STAND PIPES. 6. THE SEPTIC TANK REQUIRES THE FOLLOWING INSPECTIONS, 6.1. AFTER THE TANK IS SET IN PLACE WITH DISTRIBUTION PIPES AND CLEAN OUTS INSTALLED, BUT PRIOR TO BACKFILL. 6.2. AFTER THE TANK HAS BEEN BACKFILLED TO VERIFY FINAL GRADING, ELECTRICAL EQUIPMENT INSTALLATION, AND THE LOCATION OF ALL STAND PIPES. 2 SPECIFICATIONS FI L E P A T H : C : \ U s e r s \ c o l l e \ O n e D r i v e - A K B u i l t C o n s t r u c t i o n & D e s i g n \ A K B u i l t - F i l e H u b \ P r o j e c t s \ 0 0 8 1 . 0 1 N H N B u l g a r i a D r i v e S e p t i c D e s i g n \ A C A D \ 0 0 8 1 . 0 1 - N o t e s . d w g PL O T D A T E : 1 0 / 2 4 / 2 0 2 5 AK BUILT CONSTRUCTION & DESIGN, LLC PO BOX 771203 EAGLE RIVER, AK 99577 (907)854-9115 CERTIFICATE OF AUTHORIZATION #204451 PA R A D I S E V A L L E Y BL O C K 1 0 L O T 4 NH N B U L G A R I A D R I V E AN C H O R A G E , A K 9 9 5 1 6 PR O J E C T N O : 0 0 8 1 . 0 1 ER I C O R Z E L 3OF 10/24/2025 DATE: SHEET TITLE: ROBERT COLLES, PE No. CE-163739REGISTEREDPROFESSIONALENGINEER 10/24/2025 TH TH TH W 45' 5' 10' 45' 5' 24.6' 24.7' 10' R50' R100' FOUNDATION CLEAN OUT AWWTS SEPTIC TANK, CAT III SIZED FOR 4 BEDROOMS 1 14 " Ø SCHEDULE 40 PVC 1 14" Ø SCHEDULE 40 PVC 18" Ø DRILLED HOLES, 24" OC MONITOR TUBEMONITOR TUBE TH-03 TH-02 TH-01 5' x 45' WIDE TRENCH 6" EFFECTIVE DEPTH RESERVE FIELD, 5' x 45' WIDE TRENCH 6" EFFECTIVE DEPTH VEGETATION 50' DOWN-GRADIENT OF DISPOSAL FIELD SHALL REMAIN UNDISTURBED 100' SURFACE WATER OFFSET FROM POTTER CREEK 10' DR A I N A G E EA S E M E N T 10'UTILITY EASEMENT GRAV EL ACCES S PROPOSED PRIVATE WELL PROPOSED 4-BED HOUSE PARADISE VALLEY BLOCK 10 LOT 4 PARADISE VALLEY BLOCK 10 LOT 5 655 660 665 670 675 6 80 6 8 5 690 695 700 705 710 715 7 20 72 5 680 682.5 685 687.5 690 692.5 695 680 682.5 685 687.5 690 692.5 695 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+65 ELEV:685.46 ELEV:686.46 ELEV:686.96 MONITOR TUBE, ONE PER END ORIGINAL GROUND SEE SAS SECTION DETAIL ELEV:689.97 ELEV:689.73ELEV:690.07 COMBINATION WYE & 18 BEND CLEAN OUT SEWER 2.67' MIN 2" 0.5' GEOTEXTILE, SEPARATION PERFORATED PIPE MOA SEWER ROCK 2" INSULATION BOARD FILL MOA FILTER SAND ORIGINAL GROUND 4' MAX 1' 3 SEPTIC SYSTEM FI L E P A T H : C : \ U s e r s \ c o l l e \ O n e D r i v e - A K B u i l t C o n s t r u c t i o n & D e s i g n \ A K B u i l t - F i l e H u b \ P r o j e c t s \ 0 0 8 1 . 0 1 N H N B u l g a r i a D r i v e S e p t i c D e s i g n \ A C A D \ 0 0 8 1 . 0 1 - S e p t i c . d w g PL O T D A T E : 1 0 / 2 4 / 2 0 2 5 AK BUILT CONSTRUCTION & DESIGN, LLC PO BOX 771203 EAGLE RIVER, AK 99577 (907)854-9115 CERTIFICATE OF AUTHORIZATION #204451 PA R A D I S E V A L L E Y BL O C K 1 0 L O T 4 NH N B U L G A R I A D R I V E AN C H O R A G E , A K 9 9 5 1 6 PR O J E C T N O : 0 0 8 1 . 0 1 ER I C O R Z E L 3OF 10/24/2025 DATE: SHEET TITLE: ROBERT COLLES, PE No. CE-163739REGISTEREDPROFESSIONALENGINEER 10/24/2025 SOIL ABSORPTION SYSTEM PROFILE NOTES: 1. GROUNDWATER IS EXPECTED IN THE VICINITY OF THE SEPTIC TANK AND PUMP VAULT. GROUNDWATER ANCHORING IS REQUIRED. AT TIME OF CONSTRUCTION, COORDINATE WITH THE ENGINEER TO DETERMINE GROUNDWATER LEVEL AND DESIGN OF CONCRETE DEADMAN ANCHORS. 2. UNIFORMLY GRADE SITE UPON COMPLETION OF SEPTIC SYSTEM INSTALLATION. MOUND MATERIAL TO ALLOW FOR SETTLEMENT OF DISTURBED AREAS AND TO MEET MINIMUM SOIL COVER REQUIREMENTS. GRADE SLOPES AT 2H:1V. SLOPES ARE TO BE SEEDED AND STABILIZED WITH AN EROSION CONTROL MAT OR HYDROSEED UTILIZING A TACKIFIER. 3. COORDINATE SEPTIC SYSTEM CONSTRUCTION WITH HOUSE CONSTRUCTION. CHANGES TO SITE GRADING MAY REQUIRE ADJUSTMENT TO THE SEPTIC SYSTEM DESIGN. NOTIFY THE ENGINEER OF CHANGES. TYPICAL CLEANOUT TYPICAL WIDE TRENCH TRENCH Feet 0 10 20 THTH TH ERIC ORZEL PARADISE VALLEY BLK 10 LT 4 10/9/25 SEC. 11, T11N, R3W, SM ROBERT COLLES, PE 10/21/25 TH-01 NO PERCOLATION TEST OR GROUNDWATER MONITORING CONDUCTED X X YES AK BUILT OL ML BOH Robert Colles, PE No. CE-163739REGISTEREDPROFESSIONALENGINEER 10/21/2025 N/A N/A N/A N/A 2' N/A N/A ML SP DUE TO SHALLOW GROUNDWATER CONDITION. Municipality of Anchorage On-site Water and Wastewater REVIEWED FOR CODE COMPLIANCE OSP251366, Curtis Townsend, 10/28/25 THTH TH ERIC ORZEL PARADISE VALLEY BLK 10 LT 4 10/9/25 SEC. 11, T11N, R3W, SM ROBERT COLLES, PE 10/21/25 APPARENT OVERBURDEN OVER TEST HOLE FROM DRIVEWAY CUT. X X NO AK BUILT OVERBURDEN BOH Robert Colles, PE No. CE-163739REGISTEREDPROFESSIONALENGINEER 10/21/2025 1 2 3 10/9/25 10/9/25 10/9/25 -19 13 16" 3 13 16" -19" 3" -18 1516" 2 1516" 10.2 6" 5.5 6 N/A NONE 10/20/25 0:30 0:30 0:30 TH-02 WATER REFILLED BETWEEN READINGS. OL ML W/SAND SM W/GRAVEL THTH TH ERIC ORZEL PARADISE VALLEY BLK 10 LT 4 10/9/25 SEC. 11, T11N, R3W, SM ROBERT COLLES, PE 10/21/25 NO PERCOLATION TEST PERFORMED. TH-02 HAS BETTER SOIL X X YES AK BUILT SM Robert Colles, PE No. CE-163739REGISTEREDPROFESSIONALENGINEER 10/21/2025 N/A N/A N/A N/A 4' 3.7' 10/20/25 TH-03 ML W/SAND CHARACTERISTICS. OVERBURDEN HAS BEEN STRIPPED IN THIS LOCATION. BOH ML MUNICIPALITY OF ANCHORAGE ADVANCED WASTEWATER TREATMENT SYSTEM MAINTENANCE AND REPAIR AGREEMENT THIS MAINTENANCE AND REPAIR AGREEMENT, herein the "AGREEMENT" made and entered into as of this 27 Day of October of 2025 , by and between herein the "OWNER," and the Municipality of Anchorage, herein the "MUNICIPALITY", in accordance with Anchorage Municipal Code (AMC) 15.65.365. In consideration of the mutual covenants contained herein, the parties to this Agreement agree as follows: 1. Advanced Wastewater Treatment Systems. The Municipality grants permission to the Owner to utilize and operate an Advanced Wastewater Treatment System (AWWTS), described as located at (legal description) Paradise Valley Block 10 Lot 4 2. Maintenance, Repairs and Alterations. ,(Owner is required to read, understand and initial each section) " jTh-oughout the term of this Agreement, the Owner shall enter into a service agreement with an AWWTS service and maintenance provider approved by the Municipality or the manufacturer's representative. The AWWTS shall be maintained in a satisfactory condition capable of performing as designed and producing treated septic effluent in ---accordance with the equipment's approval for operation in the Municipality. z : It shall be the responsibility of the Owner during the term of this Agreement to pay for all repair(s), maintenance, adjustment(s), replacement costs, and inspection costs. This includes an annual maintenance fee (typically $400 to $600). �*f Owner agrees that only maintenance and repair personnel approved by the Municipality or the manufacturer's representative will inspect and make any necessary maintenance, repairs or permitted alterations to the system. Owner acknowledges that regular maintenance of an AWWTS reduces the potential failure of the system, which could include sewage backup and costly repairs or drainfield replacement. (rev. 05/18/2018) Page I of 3 f Owner acknowledges that the Municipality may request records of maintenance and repairs from the manufacturer's representative or maintenance provider. Owner acknowledges that the fine for failing to maintain and repair an AWWTS may be assessed in accordance with AMC 14.60.030. 'Owner agrees to grant the Municipality reasonable access to test and inspect the AWWTS. The Municipality will give at least 24-hour notice. -Owner agrees that any sale or transfer of title of the property will not occur without a new Certificate of On -Site Systems Approval. .i Owner agrees that the AWWTS installation and maintenance requirements as provided by the AWWTS vendor/installer and approved by the Municipality are the governing guidelines for the construction, maintenance and repair of the Owner's AWWTS. 'Owner agrees to maintain remote monitoring of the AWWTS as required by the �.. AWWTS approval. 3. Term. The term of this Agreement shall begin oil the date of approval by the Municipality to operate the installed system, or upon transfer of title, and shall continue while the AWWTS is operational or until title is transferred. 4. Nonwaiver. The failure of the Municipality at any time to enforce a provision of this Agreement shall in no way constitute a waiver of the provisions, nor in any way affect the validity of the Agreement or any part hereof, or the right of the Municipality thereafter to enforce every provision hereof. 5. Amendment. This Agreement shall only be amended by authorized representatives of the Owner and Municipality. Any attempt to amend this agreement by either an unauthorized representative or unauthorized means shall be void. 6. Jurisdiction: Choice of Law. Any civil action arising from this Agreement shall be brought in the Superior Court for the Third Judicial District of the State of Alaska at Anchorage. The laws of the State of Alaska shall govern the rights and obligations of the parties under this Agreement. 7. Severability. Any provisions of this Agreement decreed invalid by a court of competent jurisdiction shall not invalidate the remaining provisions of the Agreement. (rev. 05/18/2018) Page 2 of 3 OWNER: (signature) Date ' LIT (print name) STATE OF ALASKA } } ss. THIRD JUDICIAL DISTRICT } The foregoing instyument was acknowledged before me tliis;C �.. day of D , 20 ` , by, KlrrQ ��' NOTARY PUBLIC FOR A My Commission expires: _ ry MARIA ViTUCCI Notary Public • State of Michigan County of Oakland My Commission Expires Jun 2a 2027 Acting in the County of UL MUNICIPALITY: By: (signature) Date: ii 2 $ 2 Cly (print name) Title: Cm t-- (rear. 05/18/2018) Page 3 of 3