HomeMy WebLinkAboutSAND LAKE #2 Block 6 Lots 8-12 & 6-7 Class A State Approvalq. ,a L,i2E- SIS
" S 2- � a
E\A�
0
- Ill i
CONSTRUCTION AND OPERATION CERTIFICATE
ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION
PUBLIC WATER SYSTEM -
APPROVAL TO CONSTRUCT
Plans for the construction of�6��
public water system located
in Alaska, submitted in accordance with 18 AAC 80.100
by have been reviewed.and are
❑ approved.
❑ conditionally approved (see attached conditions)..
BY TITLE DATE -
If construction has not started within two years of the approval date, this certificate is void and new
plans and specifications must be submitted for review and approval before construction.
APPROVED CHANGE ORDERS
Change (contract order no.. Approved by Date
or descriptive reference)
The "APPROVAL TO OPERATE" section must be completed before any water is made available to
the public.
APPROVAL TO OPERATE
The construction of the public
water system was completed on (date). The system is hereby
granted interim approval to operate for 90 days following the completion date.
BY TITLE DATE
As -built plans submitted during the interim approval period, or an inspection by the Department has
confirmed the system was constructed according to the approved plans. The system is hereby granted
final approval to operate.
rITLE
DATE