ON-SITE WASTEWATER DISPOSAL SYSTEM PERMIT
Initial
Date Issued: Oct 01,2001
Expiration Date: Oct 01, 2002
Permit Number: SW010411
i Lega Description: SKYHILLS PH 3 BLK 3 LT 33 ~
Design Engineer: 0014 Anderson Engineering
Owner Name: Eric & Eileen Behr
Owner Address: 920 E 72nd Ave
Anchorage, AK 99518- ·
Parcel ID: 011-122-65
Site Address:
Lot Size: 45103 SQ. FT.
Total Bedrooms: 4 Permit Bedrooms: 4
This permit is for the construction of:
[] Disposal Field ~-~ Septic Tank
r-~ Holding Tank [] Privy [~ Private Well [~ Water Storage
All construction must be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ).
3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling
(907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and closed on the same day.
B. Covered, sealed, and heated to prevent freezing.
Date:
Date: /~,~ '-' O//-"O/
Municipality of Anchorage
Development Services Department
Building Safety Division
On-Site Water and Wastewater Program
4700 South Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650
www.ci.anchorage.ak.us
(907) 343-7904
ON-SITE SEWER/VVELL PERMIT APPLICATION
FOR A SINGLE FAMILY DWELLING
Parcel I.D. 011-122-65
- Permit Number
Property owner(s) Eric and Eileen Behr
Mailing address (1) 920 E. 72.d Avenue Anchoraqe~ AK 99518
Mailing address (2). ,'. Zip Code
Legal description (Lot, Block & Sub'd.) Lot 33, Block 3, Skyhills Subdivision Phase III
Legal description (Section, Township & Range)
Lot Size 45,103 SF ; Acres/Sq. Ft. Number of Bedrooms Four
Day phone 561-8115
THIS
THIS
APPLICATION IS FOR:
Sewer Only (~ Well Only r-'l
Sewer and Well i'-I Water Storage []
Sewer Upgrade []
PROPERTY CONTAINS:
Hot Tub ~ Jacuzzi []
Swimming Pool [--] Water Softening Unit []
Therapy Pool ~
I certify that the above information is correct. I further certify that this application is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes.
(Signature of properly owner or authorized agent)
Permit Fees:
Date of Payment:
(Rev. 12/00)
Waiver Fees:
Date of Payment:
Receipt Number:
September 20, 2001
Municipality of Anchorage
Development Services Department
On'Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject:
Lot 33, Block 3, Skyhills Subdivision Phase III
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 33, Block 3, Skyhills Subdivision Phase III intends to construct a four-
bedroom home on the property. We are therefore requesting a permit be issued for the '
construction of a new septic system to serve the new home. The.attached Site Plan
and backup documentation identify the location and configuration of the new septic
system and the parameters used in the design. Also identified on the plans are the
location of the water service on the lot and the test hole locations. Existing drainage
patterns are shown and will not be altered by the development of the lot. A
sedimentation basin will eventually be constructed on this lot at the drainage easement
shown. All components of the septic system will be a minimum of 100' from this basin.
The subdivision is currently served by the Municipal Water System.
.:
Two test holes were placed near the location of the new absorption trench. These
holes indicated fine sand with some silt. Percolation tests in the material resulted in
rates of 1.25 minutes per inch. No groundwater was found during placement of the test
holes, and none was noted during the monitoring period. We are therefore proposing to
place a deep absorption trench system with 7' of gravel beneath the distribution pipe.
The total depth of the trench will be 11'. The distribution pipe will be placed at 4' below
the ground surface. The total length of the new absorption trench will be 36'.
The ground surface on the lot slopes as shown on the attached Site Plan with only
minor slopes near the proposed septic system site. The majority of the lot slopes
toward the drainage sedimentation pond at the north end of the lot. The new
absorption trench will be constructed on a fairly fiat surface in conformance with
Municipal requirements and parallel to ground contours where possible. All
components of the new septic system will be constructed 100' from the sedimentation
basin.
If the system is constructed in accordance with our design the following statements
apply:
1. The system, if constructed as designed, will have no adverse impact on the wells
Lot*33, Block 3, Skyhills Phase III
September 20, 2001
Page Two
in the area or those to be constructed in the future. The subdivision is currently
served by the Municipal water system.
The system, if constructed as designed, will have no adverse impact'on existing
septic systems in the area or those to be constructed in the future.
The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely,
Michael E. Anderson, P.E.
Attachments
HIDDEN HILLS SUBD.--'-T--~
o.. / $89'54'50"W 539.78'(R) ~
,.36
98.63'
DEDIC~
TO
V
PROJEC
VACANT
~ '~ ' 24 AREA MAP
~ 1"= '~oo' Jl
2~? 41.347 \ ~ ........ ,.,,,,
,_o ~, ~' ,~ z'
~0 I
~ ~e~=oo~ '/ ~~ ·
~ ~ome. ~ .AIde.gate ~ I .
· ~e~_. :' / . 'Ii - . 1 '. :~~l":
LOT 33, BLOCK 3, SKYHILLS SUBDIVISION
PHASE ill
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Four Bedroom Home Deep Trench System
Perc..Rate: 1.25 Min./Inch 1,250 Gallon Septic Tank
Avg. Application Rate: 1.2 GPDISF 7' Drain Field Rock
4 Bedrooms X 150 GPD 11.2 GPDISF = 500 SF of Absorption Area
500 SFI14 SF/LF = 35.7 LF Trench Length
Therefore: Construct An Absorption Trench 36' in Length by 3' Wide With 7' of Drainfield
Rock Beneath the Distribution Lateral. Distribution Lateral to Be Placed 4' Below Existing
Ground. Total Depth of Trench to Be 11' from Existing Surface. Mound Over Trench if
Necessary to Provide Minimum Cover of 3'.
NatUral
Backfill
3 ' 6" ' Geotextil~
·. " Fabric
7,0;;
-.! §' I " '
4"' P.erforate~
PVC (Slots Down)
Drainfield
Rock'
NOTE:
TYPICAL DEEP TRENCH SECTION
(NO SCALE)
Grade Area Over Trench to Drain Away.
Minimum 6' Separation From Bedrock.
Minimum 10' Separation From Lot Line.
Minimum 4' Separation From Groundwater.
Minimum 10' Separation'From Water Service on Lot.
Municipality of Anchorage
Department of Health & Human Services '
825 L Street, Anchorage, AK 99502-0650
SOILS LOG - PERCOLATION TEST
Performed Fo'r: Bob Klein
Legal Description: Lot 33. Block 3. Sky_ Hills. Phase III
SLOPE
Fill Area
GM
Some Debris
TESTHOLE NO. 33-3-A
Fine Sand
Some Silt
SP
Was Groundwater
Encountered? No S
If Yet, What Depth?, L
Depth to Water O
After Monitoring None P
Date: 10/10/99 E
Clean Sand
SP
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Date Performed:
SITE PLAN
5%
~ '10%
Reading Date Gross ',let Depth To Net
Time Time Water Drop
1 30-Sep 14:21 .5"
2 14:31 10 8.5" 8"
3 14:32 .5"
4 14:42 10 8.5" 8".
5 14:43 .25"
6 14:53 10 8.25" 8"
19
Bottom of
Hole
Perc. Rate: 1.25 Min./Inch Perc. Hole Diameter: 6"
Test Run Between 7 Ft. and 8 Ft.'
Comments: Percolation Cavity Presoaked Prior to Testing.
Performed By: Ed Sanderson. I, Michael E. Anderson Certify That This Test Was Performed
In Accordance With All State and Municipal Guidelines In Effect On This Date: 10125199
Performed Foi': Bob Klein
Legal Description: Lot 33. Block 3. Sky Hills. Phase III
SLOPE
1
2
3
4
5
6
7
Fill Area
GM
Some Debris
· Municipality of Anchorage ~'~,~;'2
Department of Health & Human Services '~~'~ ~,',~,
825 L Street, Anchorage, AK 99502-0650 ~'%'. ' CE-'4381 .'~',~
SOILS LOG- PERCOLATION TEST '~t.~?o. .."~'~,~
Date Performed:
TESTHOLE NO. 33-3-B
Fine Sand
8
9
10
11
Some Silt
Was Groundwater
Encountered? No S
If Yet, What Depth? L
Depth to Water O
After Monitoring None "P
Date: 10/10/99 E
13
14
15
16
SP
Clean Sand
SP
SITE PLAN
'
.
5%
-<°%
10%
Reading Date Gross Net Depth To Net
Time ' Time Water Drop
1 30-Sep 15:50 .5"
2 16:00 10 8.5" 8"
3 16:01 .5"
4 16:11 10 8.5" 8"
5 16:12 .25" .
6 16:22 10 8.25" 8"
19
Bottom of
Hole
Perc. Rate: 1.25 Min./Inch Perc. Hole Diameter: 6"
.Test Run Between 7 Ft. and 8'Ft.
Comments: Percolation Cavity Presoaked Prior to Testing.
Performed By: E~L~sd3~C,.E.~.~ I, Michael E. Anderson Certify Th~'t This Test Was Performed
In Accordance With All State and Municipal Guidelines In Effect On This Date: ' 10/25199
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 33, BLOCK 3, SKYHILLS SUBDIVISION PHASE III
GENERAL:
The scope of this project includes the procurement and placement of a
new 1,250-gallon septic tank at the location shown on the site plan.
Work also includes the construction of a new 36' long X 3' wide X 7'
effective depth absorption trench at the location shown on the Site
Plan. The distribution line in the trench will be placed at 4' below the
existing ground surface. Total depth of the trench will be 11' below the
existing ground surface. The new septic tank and trench must be
constructed at least 10' from the water service to the lot.
Construction shall be in accordance with the approved site plan,
design drawings, Municipal Permit with any special provisions or
conditions, and all applicable State and Municipal Wastewater
Disposal Regulations.
The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the
location of all lot lines.
Unless specifically agreed otherwise, the contractor shall be
responsible for final grading areas subsequently depressed from soil
settling. Property owner shall be responsible for revegetation of
affected areas unless specifically agreed otherwise.
Contractors installing wastewater disposal systems must be certified
by the Municipal Department of Health and Human Services for
system installations. Owners installing their own systems must receive
prior approval from D.H.H.S. before beginning system installation.
SEPTIC TANK INSTALLATION
1. A new 1,250-gallon septic tank must be procured from an approved
source and installed at the location shown.
2. A septic tank is to be constructed by a certified septic tank
manufacturer. Construction shall include two 4" cleanouts for pumping
access.
3. The septic tank shall be sufficiently bedded to prevent settling or
shifting of the tank.
4. All standpipes on the septic tank shall extend a minimum of 12 inches
above final grade.
5. Tanks installed without 4' of cover shall have a minimum of 2" of direct
budal insulation.
6. A foundation cleanout shall be installed one to four feet from the
building foundation. Two cleanouts are required between the tank and
the drainfield.
Lot 33, Block 3, Skyhills Phase III
September 20, 2001
Page 2 of 3
7. Final grading over the tank shall be such that a positive slope exists
away from the septic tank.
DRAINFIELD CONSTRUCTION:
1. The drainfield shall be constructed to the dimensions shown on the
design. The bottom of the trench shall be within 2" of level.
2. Distribution piping must be placed level with perforations down ato.p a
level bed of draintield rock. Rock should then be placed over the p~pe
to provide a minimum of 2" of cover.
3. A silt barrier or geotextile fabric must be placed between the drainfield
rock and the natural soil backfill.
4. Monitor tubes must be 4" in diameter and installed at the locations
shown on the design. The portion below ground must be perforated.
5. Contractor shall.verify the septic tank and drainfield are a minimum
100' away from any private water wells in the area, 150' from a Class
"C" Well or 200' from any community well.
6. Direct bury insulation must be placed over the distribution system if
less than 3' of backfill depth is available. Finish grade over the trench
must be mounded to prevent settlement or depressions.
7. Grade area surrounding the absorption trench to drain away.
8. A minimum 2' of accepting soil is required below the drainfield rock for
a 5' wide trench. Contractor shall verify this condition prior to
placement of the rock. All pockets of unacceptable materials must be
removed and replaced.
MATERIAL SPECIFICATIONS:
1. Septic tanks must be constructed by a municipally approved septic
tank manufacturer.
2. The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated
and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and
ASTM D2662 or A.B.S. (perforated and solid).
3. Insulation shall be at least 2" thick extruded direct burial polystyrene
(Dow Chemical Co. Styrofoam HI or equal).
4. Septic tank inlets and outlets shall be tiffed with watertight couplings
(Caulder, Fernco, or equal).
Lot 33, Block 3, Skyhills Phase III
September 20, 2001
Page 3 of 3
5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed
between the final drain rock layer and the native soil layer.
6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing
the #200 sieve.
INSPECTIONS:
Municipal Ordinance requires a minimum of two inspections. These
inspections must be conducted under the supervision of a professional
engineer registered in the State of Alaska. The first inspection must be
conducted after the excavation of trenches, beds or pits and before the
installation of any gravel. A septic tank may be set in place, but may not
be backfilled.
The second inspection must be conducted after the placement of the
geotextile fabric, gravel, distribution piping, standpipes, cleanouts and
insulation. No backfill should be in place at the time of inspection.
Contractor shall provide a copy of all field survey layout and construction
notes for use in preparing the certified as-built of the completed system.