Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AUTUMN RIDGE LT 3
Autumn Ridge Lot 3 #015-054-06 Municipality of Anchorage Page 1 or 3 Development Services Department On -Site Water and Wastewater Program 4700 South Bragaw Street P.O. Box 196650 Anchorage, AK 99519-6650 www.ci.anchorage.ak.us (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT Permit Number. SW030064 PID Number: 015.054-06 Name' Wastewater System: New Northwood Homes Inc. Address: P.O. Box 92301 Anchorage, AK 99509 ABSORPTION FIELD Phone: Number of Bedrooms: Deep Trench 694-5890 Four 4 Soil Rating: Total Depth from original grade: LEGAL DESCRIPTION .6 GPD/Fe 12 Ft. Block: Lot: Subdivision: Depth to pipe bottom from original grade: Gravel depth beneath pipe: 3 Autumn Ride 4 Ft. 8 Ft. Township: Range: Section: Fill added above original grade: Gravel Length: 1.2 Ft. 63 Ft. Gravel width: Number "lines; Distance behveen lines: Well: New 3 Ft. 1 Ft. Classification (Private, A, B, C): Total Depth: Cased to: Total absorption area: Pipe Material: Private 241 241 1,008 FF ASTM 3034 PVC Driller. Date Drilled- Static Water Level: Installer. Date Installed- nstalled:AI ine Drilling12120/03 Alpine 1185 FL Sanders & Sanders 512212003 Yield: Pump Set at: Casing eight Above Ground: TANK 20 GPM Ft. >2 Ft. SEPARATION DISTANCES ® Septic ❑ Holding ❑ S.T.E.P. ❑ Other: To Septic Absorption Lift Holding ubliclPrivate an a urer:c. Anchorage Tank =1,250 y in ons: From Tank Field Station Tank Sewer Line well >100, >100, NIA NIA >25' Stena: Steel number ompanments: Two (2) >100' >100' NIA NIA LIFT STATION — NONE ON. LOT Surface Water >5' >10, NIA NIA iz manuracturer. Let Line Gal. >5' >10' NIA NIA -Pump on eve at "Pump eve a: High"ter alarm a: Foundation in. in. in. None Noted Pump Make &Model Electrical Inspections performed by: Curtain Drain Remarks: BENCH MARK Location ana uesaiption: Finished Floor. sumeo evaion: 100.0 Ft. Engineer's Stamp tip ....................qS ♦i Inspections performed by: MEA Dates 1e 5/2212003 ? 49th ♦� ........ .........00 z"d 5/2212003 ........... ....................... ..0 Department of Health and Human Services approval c MI�HAEL'E. ANDERSC":`�% 1♦QST:, No. CE -4381 .•'��''� RevOewed and approved by: � ate: ♦♦♦11#�o "ROFESS\�Pi��• Municipality of Anchorage DEVEOPMENT SERVICES DEPARTMENT 4700 South Bragaw Street Anchorage, AK. 99519-6655 - 343-7904 On -Site Wastewater Disposal System or Well Inspection Report Permit Number: SW030064 10' CEA ESMT. (MISC. BK. 72, PG. 236) 16' DUFFER NDSCAPE ESMT. --I--- 20' X 33' ACS 'SVT. -- -- -' (BK. 3702, PG. 742) :N S1 S Four Bedroom Home GRAVEL DRIVE n Well PLAN AS -BUTT SCALE V = 40' ZIEMLAK CIRCLE Page 2 of 3 PID No. 015-054-06 A B �- S1 12.0 21.2 O C4 38.3 56.3 °" M7 47.6 25.0 _ C5 36.3 52.1 0� Afternate Site ®TH25A M1 OTH26A C5 } :N S1 S Four Bedroom Home GRAVEL DRIVE n Well PLAN AS -BUTT SCALE V = 40' ZIEMLAK CIRCLE Page 2 of 3 PID No. 015-054-06 Municipality of Anchorage Page 3 of 3 DEVEOPMENT SERVICES DEPARTMENT 4700 South Bragaw Street Anchorage, AK. 99519-6655 - 343-7904 On -Site Wastewater Disposal System or Well Inspection Report Permit Number: SW030064 92.05 PID No. 015-054-06 N ? = N U F- S U U PROFILE AS -BUILT - Scale: 1" = 10' Municipality of Anchorage Department of Health and Human Services 825 1" Street P.O. Box 196650 Anchorage, Alaska 99519-6650 Rick Mystrom http://v. ".ci, anchorage.ak. us Mayor Permit Number: #SW 030064 Date of Issue: 4-03-03 Parcel Identification Number: 015-054-06 Date Started: 12-15-03 Date Completed: 12-20-03 Is well located at approved permit location? ® Yes ❑ No Legal Description: Autumn R Lot 3 Property Owner Name & Address: Northwood Homes Inc. PO Box 92301 Anchoranp Alaska 99.529 Borehole Data: Soil Type, Thickness & Water Strata Depth (ft) From To Method of Drilling ® air rotary ❑ cable tool Casing type: steel stick-up 0 2 Wall Thickness: .250 inches organics & silt 2 3 Diameter: 6 inches Depth: 241 feet gravelly silt 3 12 Liner Type: cobbly gravelly silt gravelly silt 12 93 93 142 Diameter: inches Depth: feet Casing stickup above ground: 2 feet Static water level (from ground level): 185 feet Pumping level: 241 feet after 2 hours pumping 20 gpm silty cobbly gravel 142 210 gravelly silt 210 219 silty sandy gravel H2O 219 241 Recovery Rate: 20 gpm Method of Testing: airlift Well Intake Opening Type: ® Open End ❑ Open Hole ❑ Screened Start feet Stopped feet ❑ Perforations Start feet Stopped feet Grout Type: bentonite granules Volume: 1 Depth: Start 0 feet Stopped ? feet Pump: Intake Depth feet Pump size hp Brand Name Well Disinfected Upon Completion? ® Yes ❑ No Method of Disinfection: chlorine tablets Comments: Well Driller: Alpine Drilling & Enterprises PO Box 110496 Anchorage Alaska 99511 Attention: The well driller shall provide a well log to the property owner within 30 days of completion and the property MUNICIPALITY OF ANCHORAGE Znc� rJ VVI Development Services Department On -Site Water & Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM /WATER SUPPLY PERMIT Initial Permit Number: SW030064 Date Issued: Apr 03, 2003 Expiration Date: Apr 02, 2004 Parcel ID: 015-054-06 Legal Descnpfron: Autumn Ridge Lot 3 Design Engineer: 0014 Anderson Engineering Site Address: PO Box 92301 Owner Name: Northwoods Homes, Inc. Lot Size: 40318 SQ. FT. Owner Address: PO Box 92301 Total Bedrooms: 4 Permit Bedrooms: 4 Anchorage , A 99509 - This permit is for the construction of: ❑✓ Disposal Field ❑✓ Septic Tank ❑ Holding Tank ❑ Privy ❑✓ Private Well ❑ Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ). 3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. ,_/ 21/G 3 Received By: Issued By: SC E Fa G /NE6EIe 15 4AfAF A.,nC0 PAF Si 6 A, 04 T -&D S12 Date: °/-2- 6,7 - // ���? L Date: 4 D' 03 Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program 4700 South Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 www.cl.anchorage.ak.us (907)343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Parcel I.D. e)l 5-- OSL/- of Permit Number SWO30064 Property owner(s) Northwoods Homes, Inc. Day phone 694.5890 Mailing address (1) P.O. Box 92301 Anchorage, AK 99509 Mailing address Legal description (Lot, Block & Sub'd.) Lot 3, Autumn Ridge Subdivision Legal description (Section, Township & Range) Lot Size 40,318 Acres/Sq.Ft. THIS APPLICATION IS FOR: Code Number of Bedrooms Four (4) Sewer Only ❑ Well Only ❑ Sewer and Well ® Water Storage ❑ Sewer Upgrade ❑ THIS PROPERTY CONTAINS: Hot Tub ❑ Jacuzzi ❑ Swimming Pool ❑ Water Softening Unit ❑ Therapy Pool ❑ I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. E (Signature of property owner or authorized agent) Permit Fees: 5-50 Waiver Fees: Date of Payment: 3 -ye, -®3 Date of Payment: Receipt Number: Receipt Number: (Rev. 12100) MEMO DATE: 512112003 TO: Dan Roth WITH: MoA/On-Site Water and Wastewater FROM: Mike Anderson SUBJECT: Lot 3, Autumn Ridge Subdivision Permit No. SW030064 A conflict exists between the well on Lot 5, Autumn Ridge Subdivision and the proposed primary and alternate absorption systems for Lot 3, Autumn Ridge Subdivision. We have therefore moved the location of the septic system to the back of the house as shown on the attached Site Plan. Two additional test holes have been placed with results similar to those achieved on the test holes in the front of the lot. Water monitoring will continue for the next week. The trench, however, will be constructed tomorrow. We have revised the trench design for 10' effective depth and a total length of 50'. The well location has been moved to the northeast corner of the lot to allow placement of the new trenches at the revised location. The impact to Lot 2, Autumn Ridge will be minimized by the movement of the well. The proposed location for the well on Lot 2 is also at the back of the lot and will shadow the protective radius of the well on Lot 3. The revised location of the septic system and well will not impact systems currently in place on surrounding lots or proposed in the future. Please review the attached documentation and advise if additional information is required. _ (ec?-tc 2.—r�a._23e2 — BUFFER — — — — 10' BER LANDSCAPE E8MT. _7-- 20' . '30' ACS ESMT. _ — ( 702, Pc. 742) el Loc tJ � y vht N a �0.-�H 25A 1� 50 0 \. 3 P7RbGED BN \ i FIN. FLR, 394' EL. a 403' R� >s �S g �SF o ' 49th `V N R :,MICHAEL E. ANDERSON ,S C SITE PLAN SCALE 1" 440' rtog0,0p . 384' 1 A.C. DRWE 1 39� ZIEMLAK CIRCLE LOT 3, AUTUMN RIDGE SUBDIVISION DESIGN FACTORS: SYSTEM REQUIREMENTS: Four Bedroom House Deep Trench System Perc. Rate: 29 Min./Inch 1,250 Gallon Septic Tank Application Rate: .6 GPD/SF 10' Drainfield Rock 4 Bedrooms X 150 GPD/.6 GPD/SF (Application Rate) =1,000 SF Absorption Area 1,000 SF/20 SF/LF = 50 LF Trench Length THEREFORE: Construct a 50' Long x T Wide x 10' Effective Depth Absorption Trench. Flow Line Elevation Trenches e2'Below Original Ground Well al Depth to be 12'Below Existig Ground. Maintan100'Se arrati6n From nLot Provide 3' of Cover Over Trench and 4' Over Septic Tank or Provide 2" Insulation and 2' of`Cover. Natural Backfill 1'6" Geotextile Fabric 6" 4" Perforated PVC (Holes Down) Drainfield Rock 0 TYPICAL DEEP TRENCH SECTION ♦�..•••■•�.,� (NO SCALE) ♦ .0F .......... NOTE: Grade Area Over Trench to Drain Away. • S, Minimum 6' Separation From Bedrock.„? 49th ............. ...... Minimum 4' Separation From Groundwater. Minimum 200' Separation From Wells in the Area w "”' ••""... • ............ Minimum 100' Separation From Surface Water or Streams. j `; M °"aE` e ""oeaso" No. ceras, Minimum 100' Separation From Well on Lot. ��'Ja'•.• ^ Municipality of Anchorage Development Services Department 4700 South Bragaw Street Anchorage, AK 99519-6650 SOILS LOG - PERCOLATION TEST PERFORMED FOR: Northwood Homes DATE PERFORMED: 5/20/21103 LEGAL DESCRIPTION: 3 IiL17-VMAI /i/4&,r,-Township,Range, Sections i O*P-TH I SLOPE SITE PLAN 25A WAS GROUND WATER ENCOUNTERED? tj ONE M ,.YES, AT WHAT DEPTH? P E! MW 1 W [late =9 NIMIMMM■MEMO I ------------- �OMMMMOMWNMWMMMMMMN� M IMMM '?,*,MICHAEL E. ANDERSON 2- /X- E-4381 3- Tj 16- - 4- 18-7 5- 6- 7 r�8 1 9- 10- A4 t4t 4t, ZX" 12- W IV* " 49 -T -H �' d''", 13 .......... z . ...... ........... ......... 25A WAS GROUND WATER ENCOUNTERED? tj ONE M ,.YES, AT WHAT DEPTH? P E! MW 1 W [late =9 NIMIMMM■MEMO I ------------- �OMMMMOMWNMWMMMMMMN� M IMMM '?,*,MICHAEL E. ANDERSON 14- mmimnz� E-4381 16- 17- 18-7 39- 20 25A WAS GROUND WATER ENCOUNTERED? tj ONE M ,.YES, AT WHAT DEPTH? P E! MW 1 W [late =9 NIMIMMM■MEMO I ------------- �OMMMMOMWNMWMMMMMMN� M IMMM M!-- � mmimnz� AMNON" LPERCOLATION RATE "— (minute inm) PERG HOLE DIAMETER TEST RUN BETWEEN — 7 FT AND FT COMMENTS PERFORMED BY:. CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE-- 5/21/2003 • Municipality of Anchorage Development Services Department 4700 South Bragaw Street Anchorage, AK 99519-6650 SOILS LOG -PERCOLATION TEST PERFORMED FOR: Northwood Homes DATE PERFORMED: 5120I2GO3 LEGAL DESCRIPTION: 4-0-7-3 --�7JrYA2AI A/6& /Township, Range, Section: EPTH S6vrc, Slit PLAN 10 7 2 �M TH 26A 3- 4- 4 5- 569 6- 7- 9- 10 / WAS GROUNDWATER ' 4 04 ENCOUNTERED? NO OF A "'r S °®SIF: vJ ATWHAT O 12 49L ? E .. ..... .. i ... b Water Aller 13 /' 1'-L E. ANDERSON ®t : tonal? 14 -. sCE-4381 a �W Gross Net ® l ° Rea e • ding Date Depth to Net Time Time Water Drop 15PROFES16 SION4®�r® 17 ✓ I is- 19 - 20 81920 PERCOLATION RATE (minutesllnch) FERC HOLE DIAMETER - TEST RUN BETWEEN. FT AND FT . COMMENTS Id tical Soilsas Other Te9t Holes on Lot PERFORMED BY_ RIJ' � I _Michael E- .MAIDr SQiTIFYTHAT THIS TEST WAS PERFORMED YN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE DATE 5/21/2003 March 25, 2003 Municipality of Anchorage Development Services Department On -Site Water and Wastewater Program 4700 South Bragaw Street Anchorage, AK 99519-6650 Subject: Lot 3, Autumn Ridge Subdivision Septic System Design and Permit Application Impacts to Adjacent Properties Dear Onsite Services Engineer: The owner of Lot 3, Autumn Ridge Subdivision intends to construct a four-bedroom home on the lot. We are therefore requesting a permit be issued for the construction of a new well and septic system to serve the new home on the property. The attached Site Plan and backup documentation identify the location and configuration of the new septic system and the parameters used in the design. Also identified on the plans are the well location, alternate site, test hole locations and well and septic systems on the surrounding lots. Drainage arrows are also shown and current drainage patterns will be maintained after construction. The test holes placed near the location of the proposed and alternate absorption trenches indicated tight silty gravel with a percolation rate that varied between 7 and 40 minutes per inch. No ground water was found during placement of the test holes and none was noted during the monitoring period. We are therefore proposing to place a new 1,250 -gallon septic tank with a new 63' long by 3' wide absorption trench with 8' of gravel beneath the distribution pipe. We have averaged the percolation rates and are using an application rate of .6 gallons per day per square foot. The total depth of the trench will be 11' below the surface with the distribution pipe at 3' below the surface. The ground surface on the lot slopes as shown on the site plan from north to south. The absorption trench will be constructed parallel with the slope as much as possible in conformance with Municipal requirements. All components of the new septic system will be constructed a minimum of 100' from any surface water in the area and 10' from water service lines. If the system is constructed in accordance with our design the following statements apply: The system, if constructed as designed, will have no adverse impact on the wells in the area or those to be constructed in the future. Lot 3, Autumn Ridge March 25, 2003 Page Two 2. The system, if constructed as designed, will have no adverse impact on existing septic systems in the area or those to be constructed in the future. 3. The system, if constructed as designed, will have no adverse impact on reserve space, either surface or subsurface, on any lots located in the area. 4. The system, if constructed as designed, will have no adverse impact on drainage patterns in the area. The current drainage pattern will be maintained. �Sincerely, Michael E. Anderson, P.E. Attachments .49th MICHAEL E. ANDERSON NO. CE -4381 4Atr .. A 4A0.9 - 39@.9 + DWCATE TO R.O.W. 6,824 s .ft ss9.s - - 2 Lar 1 I 45,474 sq.ft. 1,412 .ft. I o j p 40 \o -27 3A6��. ,w♦<,r 1jr d� gb'.. I�'.. i \ 40,381 sq.ft. n,. TH-12 n ce me an,o>, 9N_ 6 ZI EMLAK 40,196 sq.ft. P{-14 T 714-15 / 2 �.; -17 i 41 2 s \ U 0 1 I 10 1 P�-l-4as.s 7m-1 4 711 40,516 sq. t. 899. �TM�Q_ 3' 99 1II1 I Trees 40,19 20 BAND I i X10. RIVE W Y HRU OT 2 + .9 r \ ties 93sq.ft /* 9 �1 S 49 t GV •••••�° {, q. MICHAEL E. ANDERSON or `�\�.�J,l�.•. No. CE -4381 •,.••-i2a�TM ti P 9� �,OFESSI, �i���;,'�-..�\`\ `�\ 01 ^► 6ARAG'f" 409.3 . \\ I YSTEM PLAN\\ G\E1X' r. 394' 30' ACS ESMT, 3702, PG. 742) 405' Proposed ed Lyell Four Bedroom Home FIN. FLR. A.C. TH 26 8�g I UP.. Z 399' ZIEMLAK CIRCLE SITE PLAN SCALE 1" = 40' ABBOTT ROAD 0 un N 89'59'00"E 152.97' 10' CEA ESMT. (MISC. BK. 72. PG. 236) 10' BUF CAP 30' ACS ESMT, 3702, PG. 742) 405' Proposed ed Lyell Four Bedroom Home FIN. FLR. A.C. TH 26 8�g I UP.. Z 399' ZIEMLAK CIRCLE SITE PLAN SCALE 1" = 40' LOT 3, AUTUMN RIDGE. SUBDIVISION DESIGN FACTORS: SYSTEM REQUIREMENTS: Four Bedroom Home Deep Trench System Perc. Rate: 7 - 40 Min./Inch 1,250 Gallon Septic Tank Avg. Application Rite: .6 GPD/SF 8' Drain Field Rock 4 Bedrooms X 150 GPD /.6 GPD/SF = 1,000 SF of Absorption Area 1,000 SF/16 SF/LF - 62.5 LF Trench Length Rock Beneath the Distribution Absorption teral Distributrion Lateral to Be Wide ddl31 8' of Drainfield Ground . Total Depth of the Trench to Be 11' Below Existing Surface. CoveeriOve St Existing Tank a Minimum of 4' or 2" of Insulation and 2' of Cover. Cover Over Trench 31. 2.6" Sackfill- I A 6" GeorLctile Fabric 4" Perforated PVC 810" Schedule 40 • Drainfield Rock TYPICAL DEEP TRENCH SECTION L 49th ... •°• (NOSCALE) 0� NOTE: r ............................ ............... a Grade Area Over Trench to Drain Away. , �' Mic AE E. 1.NOERsou Minimum 6' Separation From Bedrock. �i s°•. No. CE -4381 2 Minimum 10' From Lot Line. Minimum 4' Separation From Groundwater. ♦�� F�Fo"" •••• .....•"°� :�• Minimum 100' Separation From Wells In the Area. ��011,1��`s*���:� Minimum 10' Separation From Water Service Line. Municipality of Anchorage Department of Health & Human Services 825 L Street, Anchorage, AK 99502-0650 SOILS LOG - PERCOLATION TEST Performed For: Bob Klein Legal Description: Lot 3 Art 1mn Ride Date Performed: 9�_,.ivision r- --� SLOPE r sir: of 11 12 13 14 15) 16 1 I I OG/PT 51 1 SWGM ;•'• 49th GV •°' IAEL E. ANDERSON NO. CE -4381 12/4/99 18u Bottom of Hole 19.. Perc. Rate: 46 Min./Inch Pere. Hole Diameter: 6" Test Run Between 4 Ft. and 5 Ft: Comments: Percolation Cavity Presoaked Prior to Testing. Performed By: A. Hatala i, Michael E Anderton Certify That This Test Was Performed In Accordance With All State and Municipal Guidelines in Effect On This Date: 1/20/00 Was Groundwater Trace Encountered? No Cobbles . If Yes, What Depth? - Depth. to Water After Monitoring None Date: 1/22/00 18u Bottom of Hole 19.. Perc. Rate: 46 Min./Inch Pere. Hole Diameter: 6" Test Run Between 4 Ft. and 5 Ft: Comments: Percolation Cavity Presoaked Prior to Testing. Performed By: A. Hatala i, Michael E Anderton Certify That This Test Was Performed In Accordance With All State and Municipal Guidelines in Effect On This Date: 1/20/00 Municipality of Anchorage Department of Health & Human Services 825 L Street, Anchorage, AK 99502-0650 SOILS LOG - PERCOLATION TEST Performed For: Bob Klein Date Performed: Legal Description: Lot 3: Autumn Ridge'Subdivislon (SLOP' E� 1 OG/PT I I E Ls SWGM Was Groundwater Trace Encountered? No. Cobbles if Yes, What Depth?_ Depth to Water After Monitoring None Date: 1/22100 f 49th xr ',6V n ; MICHAEL E. ANDERSON NO. CE -4381 _pAA 12/4/99 e Gross Time Net Time Depth To Water Net Drop 1 6 Dec 11:19 2.88" 2 .. 11:49 30 7.25" 4.37" 3 11:50 3" . 4 12:20 30 7.37" 4.37" 5 12:21 2.5" 6 12:51 '30 6.87" 4.37" Reading Dat 19 Pero. Rate: 7 MinAnch Pere. Hole Diameter: '6" Test Run Between 4 Ft. and 5 Ft. Comments: Percolation Cavity Presoaked Prior to Testing. Performed By: A. Harala. 1, Michael F. Anderson . Certify That This Test Was Performed . In Accordance With All State and Municipal Guidelines In Effect -On This Date: 1/20/00 A ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION AND MATERIAL SPECIFICATIONS SUBJECT: LOT 3, AUTUMN RIDGE SUBDIVISION GENERAL: The scope of this project includes the procurement and placement of a new 1,250 -gallon septic tank at the location shown on the site plan and the construction of a new 63' long by 3' wide by 8' effective depth absorption trench also shown on the Site Plan. The total depth of the trenches will be 11' below existing ground and the distribution pipe will be placed at 3' below the surface. All components of the new absorption trench and septic tank must be constructed a minimum of 100' from the well on the lot and on adjacent lots. A minimum of 4' of cover is required over the septic tank and 3' over the absorption trench. In lieu of cover 2" of direct bury insulation and 2' of cover may be placed. 2. Construction shall be in accordance with the approved site plan, design drawings, Municipal Permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 3. The Contractor shall be responsible for obtaining all underground utility locates and for the layout of the septic system and verification of the location of all lot lines. 4. Unless specifically agreed otherwise, the contractor shall be responsible for final grading areas subsequently depressed from soil settling. Property owner shall be responsible for revegetation of affected areas unless specifically agreed otherwise. 5. Contractors installing wastewater disposal systems must be certified by the Municipal Department of Health and Human Services for system installations. Owners installing their own systems must receive prior approval from D.H.H.S. before beginning system installation. SEPTIC TANK INSTALLATION A new 1,250 -gallon septic tank must be procured from a certified septic tank manufacturer. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. 3. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank. 4. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 5. Tanks installed without 4' of cover shall have a minimum of 2" of direct burial insulation. Lot 3, Autumn Ridge Subdivision March 25, 2003 Page 2 of 3 6. A foundation cleanout shall be installed one to four feet from the building foundation. Two cleanouts are required between the tank and the drainfield. 7. Final grading over the tank shall be such that a positive slope exists away from the septic tank. DRAINFIELD CONSTRUCTION: 1. The drainfield shall be constructed to the dimensions shown on the design. The bottom of the trench shall be within 2" of level. 2. Distribution piping must be placed level with perforations down atop a level bed of drainfield rock. Rock should then be placed over the pipe to provide a minimum of 2" of cover. 3. A silt barrier or geotextile fabric must be placed between the drainfield rock and the natural soil backfill 4. Monitor tubes must be 4" in diameter and installed at the locations shown on the design. The portion below ground must be perforated. 5. Contractor shall verify the septic tank and drainfield are a minimum 100' away from any private water wells in the area, 150' from a Class "C" Well or 200' from any community well. 6. Direct bury insulation must be placed over the distribution system if less than 3' of backfill depth is available. Finish grade over the trench must be mounded to prevent settlement or depressions. 7. Grade area surrounding the absorption trench to drain away. 8. A minimum 2' of accepting soil is required below the drainfield rock for a 5' wide trench. Contractor shall verify this condition prior to placement of the rock. All pockets of unacceptable materials must be removed and replaced. MATERIAL SPECIFICATIONS: 1. Septic tanks must be constructed by a municipally approved septic tank manufacturer. 2. The following pipe materials are approved for use in septic system installations in the Municipality of Anchorage: Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and ASTM D2662 or A.B.S. (perforated and solid). 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Co. Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Fernco, or equal). Lot 3, Autumn Ridge Subdivision March 25, 2003 Page 3 of 3 5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed between the final drain rock layer and the native soil layer. 6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the #200 sieve. INSPECTIONS: Municipal Ordinance requires a minimum of two inspections. These inspections must be conducted under the supervision of a professional engineer registered in the State of Alaska. The first inspection must be conducted after the excavation of trenches, beds or pits and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled. The second inspection must be conducted after the placement of the geotextile fabric, gravel, distribution piping, standpipes, cleanouts and insulation. No backfill should be in place at the time of inspection. Contractor shall provide a copy of all field survey layout and construction notes for use in preparing the certified as -built of the completed system. P � '� ba s s w � ,... ' a. Y MUM r o A •, p 1 �� � .gym _ • _ � nW �_.. t?i'�PF 9.4., �,4.: m.'a a_ r a... � �... a a _a: •-:. _a •: Y" m ��'_.: : .. O • is 6 up 1110, i .ate R ••• :• i •Y •::• • • QrR ;» ... __. • a s,.. M �%'��ii° _ - ' . o . • . a - s ♦.o_.- �a � as r A i a Y. � � w .. � • <r :C � ® o v • Municipality of Anchorage Development Services Department 4700 South Bragaw Street Anchorage, AK 99519-6650 SOILS LOG - PERCOLATION TEST PERFORMED FOR: Northwood Homes DATE PERFORMED: 5/20/2003 LEGAL DESCRIPTION: Z-� . /`V7VIt4A A/46-,,rTownship, Range, Section: gt-2TH SLOPE, SITE PLAN (FEE 1 2 m M 3 TH 25A or�vc. V ' 6 `f Vvte� G!dw�� 9 10 j 77 12 / 13 14 75 / 76 � l ' 17 WAS GROUND WATER ENCOUNTERED? IF YES, AT WHAT DEPTH? Depth to Wats After / Monitoring? _�_ S / L O P E Dale 20 k C#— PERCOLATION RATE —r! (minu%e inch) PERC HOLE DIAMETER n L TEST RUN BETWEEN —� FT AND �' FT COMMENTS 7�5� Ga(/ V✓D�j �i I'�S oY�tc� PERFORMED BY:. 1 CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE DATE 5/21/2003 TH 26A WAS GROUND WATER ENCOUNTERED? IF YES-. AT WHAT DHPTH? kplh to Water Aller Monitoring? No S L O P E Gale: SITE PLAN Reading Date EPTH EE�TY / b�/ 1 Net Drop «l 2 Municipality Anchorage 0 • of .ry, pJJUOv eae'ea....Joaa00oe0Yn Development Services Department 0 o g$pCp@AEL E. ANDERSON o OF 4700 South Bragaw Street Anchorage, AK 99519-6650gG or a ICE - 4381 SOILS LOG - PERCOLATION TEST 4 .11 Northwood Homes - %'kJ20/2003 PERFORMED FOR: DATE PERFORMED: LEGAL DESCRIPTION: % 3 /�U%7I/K/i� 4466/,Township. Range, Section: TH 26A WAS GROUND WATER ENCOUNTERED? IF YES-. AT WHAT DHPTH? kplh to Water Aller Monitoring? No S L O P E Gale: SITE PLAN Reading Date EPTH EE�TY / b�/ 1 Net Drop «l 2 3- 4 4 5- 6- 678 7- 8-- 12- 1213 13- 14- 141516 15- 16- 17 17 ✓/ 18 . 1 19 b TH 26A WAS GROUND WATER ENCOUNTERED? IF YES-. AT WHAT DHPTH? kplh to Water Aller Monitoring? No S L O P E Gale: SITE PLAN Reading Date Gross Time Net Time Depth to Water Net Drop 20 �� - PERCOLATION RATE (minutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN FT AND FT COMMENTS Identical Soilsasother Test Holes on Lot. PERFORMED BY:. // p� ( Michael E. AnderGMIFY THAT THIS TEST WAS PERFORMED IN 5/21/2003 ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE 0 Municipality of Anch On -Site Water and Wastewater Pi (907) 343-7904 Certificate of On -Site Systems 0 Parcel I.D. 015-054- 000 1. GENERAL INFORMATION Complete legal description Autumn Ridge Lot 3 Location (site address) 5370 Abbott Road Expiration Date: oZ'! S A Current Property owner(s) Eugene & Charlene Hampton Day phone Mailing address 9338 Autumn Ridge Circle, Anchorage, AK 99507 Real Estate Agent Katie Likkel 2. TYPE OF DWELLING: Fx] Single Family (w/wo ADU) ❑ Duplex ❑ Multiple Dwellings (Single Family and/or Duplex) 3. NUMBER OF BEDROOMS: 4 Day phone 315-9512 4. TYPE OF WATER SUPPLY: TYPE OF WASTEWATER DISPOSAL: Individual Well Individual 0 Individual Water Storage ❑ Holding Tank ❑ Community Class Well ❑ Community ❑ Public Water System ❑ Public Sewer ❑ WaiverNariance request for: n Distance: Received by: t)Pi1 i'llA/(t /'Di'1 Q / Date: COSA to be released to the engineer, unless otherwise requested by the engineer. COSA Fee $ 52 CO' DC) Waiver Fee $ Date of Payment (t/I'OI,A (a Date of Payment Receipt Number �1 �I f T Receipt Number COSA# OSG(�t5 f3 Waiver# 5. STATEMENT OF INSPECTION BY ENGINEER As certified by my seal affixed hereto and as of the validation date shown below, I verify that my investigation, based on procedures outlined in the Certificate of On -Site Systems Approval Guidelines for this application, shows that the on-site water supply and/or wastewater disposal system is (are) safe, functional and adequate for the number of bedrooms and type of structure indicated herein. I further verify that based on the information obtained from the Municipality of Anchorage files and from my investigation and inspection, the on-site water supply and/or wastewater disposal system is(are) in compliance with all applicable Municipal and State codes, ordinances, and regulations in effect at the time of installation. Name of Firm Anderson Engineering Address PO Box 240773, Anchorage, AK 99524 Engineer's Printed Name Benjamin Schiller Phone 522-7773 Date 11-10-2016 6. DSD SIGNATURE ° ° s System #1 Approved for bedrooms .� ,( Vc System #2 Approved for bedrooms .�toe° a •12591 Disapproved Conditional approval for bedrooms, with the following stipulations: Original Certificate Date: I I- 1 /L-. The Municipality of Anchorage Development Services Division (DSD) issues Certificates of On -Site Systems Approval (COSA) based only upon the representations given in paragraph 5 by an independent professional civil engineer registered in the State of Alaska. The Municipality of Anchorage is not responsible for errors or omissions in the professional engineer's work. 7. ATTACHMENTS: COSA Checklist X Nitrate Advisory Septic System Advisory Arsenic Advisory Well Flow Advisory Other COSA blue sheet ! . •• c If more than 1 septic system is on the lot: COSA Checklist # _of Structure served by this system Certificate of On -Site Systems Approval Checklist Legal Description: Autumn Ridge Sub, Lot 3 A. WELL DATA Well type Private If A, B, or C provide PWS ID # Date completed 12-20-03 Sanitary seal (Y/N) Y Total depth 241 ft. Cased to 241 ft. Date of test Static water level Well production FROM WELL LOG 12-20-03 185 20 WATER SAMPLE RESULTS in Coliform 0 colonies/100 mL Nitrate 0.601 mg/L Arsenic ND ug/L Date of sample: 11-4-2016 B. SEPTIC/HOLDING TANK DATA Tank Type/Material Septic / Steel Tank size 1250 gaL Number of Compartments 22 Parcel ID: 015-054-06-000 Well Log (Y/N) Y Wires properly protected (Y/N) Y Casing height (above ground) 25 in. AT INSPECTION 10-11-2016 185.0 ft. 8.0 g.p.m. Collected by: Anderson Engineering Date installed 5/22/03 Cleanouts (Y/N) Y Foundation cleanout (Y/N)-Y Depression over tank (Y/N) N High water alarm (Y/N) Date of pumping 6/10/15* Pumper Around the Clock Pumping N *No Sludge Found in Tank During Probing. C. ABSORPTION FIELD DATA Date installed 5/22/03 Soil rating (g.p.d./ft2 or ftz/bdrm) 0.6 gpd/ft2 System type Trench Length 63 ft. Width 3 ft. Gravel below pipe 8 ft. Total depth 12 ft. Eff. absorption area 1 OOH ftz Monitoring tube Y Depression over field N Date of adequacy test 11-8-2016 Results (Pass/Fail) Pass For 4 _bedrooms Fluid depth in absorption field before test 48 in. Water added 600 gal. New depth 58 in. Elapsed Time: 1 440 min. Final fluid depth 47 in. Absorption rate >=600 g p d Any rejuvenation treatment (past 12 mo.) (Y/N & type) N If yes, give date D. LIFT STATION Date installed "Pump on" level at Datum Size in gallons in. "Pump off' level at E. SEPARATION DISTANCES WELL ON LOT TO: Cycles tested Septic tank/lift station on lot >100' Absorption field on lot >100' Public sewer main >75' Sewer /septic service line >25' Animal containment areas >50' in. Manhole/Access (Y/N) _ High water alarm level at Meets alarm & circuit requirements? On adjacent lots > 100' On adjacent lots > 100' Public sewer manhole/cleanout >100' Holding tank >75' Manure/animal excrete storage areas >100' SEPTIC/HOLDING TANK ON LOT TO: Building foundation >51 Property line >51 Water main >10' Water service line >10' Wells on adjacent lots > 100' ABSORPTION FIELD ON LOT TO: Property line > 10, Building foundation >10 Water Service line >10' Surface water >100' Curtain drain None Noted Wells on adjacent lots >100' F. COMMENTS G. ENGINEER'S CERTIFICATION I certify that I have determined through field inspections and review of Municipal records that the above systems are in conformance with MOA COSA guidelines in effect on this date. Engineer's Printed Name Benjamin Schiller, P.E. Date 11-10-2016 COSA brown sheet 10-10-12.doc Absorption field >5' Surface water >100' Water main >10' Driveway, parking/vehicle storage > 10, �,�.®mae44 t1 �.• NJCHAEL E. ANDERSON : w p t CE -4381 20 Ca 0 644ea� P®0®� in. ABBOTT_ ROAD____________ m m M 0 oPgr��or qC`A��4 SURVEYORDEREDBY >� LAURAHALVERSON@ a 49 TH ,¢DO REMAXPROPETPUES Sew 1.16 fig D THE INFORMATION HEREON I5 FOR THE USE OF LENDING INSTITUTIONS SPECIFICALLY TO SHOW ANY SHANEA.HOLT.' OQ CONFLICTS BETWEEN EXI5TIN9 STRUCTURES AND PLATTED LOT LINES AND/OR EASEMENTS, AND IS lO e, LS -6914 j O NOT TO BE USED FOR POSITIONING ADDITIONAL 57RUCTURE5, IMPROVEMENTS, OR FENCELINES. �p40'R/esslonal RooEASEMENTSOF INDICATED) NAN THOSE HEREON(UNLESSINDI a NOTE', TY LINES IN I OR THAT MAN APPEAR ADDITIONAL ON THIS DRV WING ARE NOT TO BE USED TO DETERMNE PROPER�OpppO�� ANY L SSW HEREON NAY BEAPNALIMPROVEN,E TOE ANY PAVING SHOWN HEREON MAY BE APPRO%IMATE DUE TO EXCESSIVE SNOW AND/OR ICE. CIRCLE __ AS -BUILT SURVEY 1" = 40' NO CORNERS SET THIS DATE rI HEREBY CERTIFY THAT I HAVE PERFORMED A SURVEY OF THE FOLLOWING DESCRIBED PROPERTY LOT 3, AUTUMN RIDGE SUB. ANCHORAGE RECORDING DISTRICT, ALASKA, AND THAT THE VISIBLE IMPROVEMENTS SITUATED THEREON ARE WITHIN THE PROPERTY LINES AND NO VISIBLE ENCROACHMENTS EXIST OTHER THAN NOTED. DATED AT ANCHORAGE, ALASKA THIS _8TH DAY OF OCTOBER . 2016. HOLT LAND SURVEYING 9309 &ROVER DRIVE ANLHORAGE,AK 99507 13426, FB 179-26 345-5513 iCLCW Nadi Municipality of Anchorage Development Services Department *AE Building Safety DivisionOn-Site Water and Wastewater Program 4700 South Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 www.ci.anchorage.ak.us (907)343-7904 CERTIFICATE OF HEALTH AUTHORITY APPROVAL FOR A SINGLE FAMILY DWELLING Parcel I.D. 1315.05406 HAA# N— Expiration Date: & 1. GENERAL INFORMATION Complete legal description Lot 3 Autumn Ridge Subdivision Location (site address or directions) Ziaa+laksir�fe"q X38 Auntirna.) fc-LO66 (sLYG1� �Q56 Current Property owner(s) Northwood Homes. Inc. _ Day phone 694.5890 Mailing address Lending agency P.O. Box 92301 Anchorage AK 99509 Day phone Mailing address Real Estate Agent Day phone Mailing Address _ Unless otherwise requested, HAA will be held by DSD for pickup. 2. NUMBER OF BEDROOMS; _ Four 4 3. TYPE OF WATER SUPPLY: Individual Well Individual Water Storage ❑ Community Class Well ❑ Public Water System ❑ TYPE OF WASTEWATER DISPOSAL: Individual On-site Individual Holding tank ❑ Community On-site ❑ Public Sewer ❑ The Municipality of Anchorage Development Services Department (DSD) Issues Certificates of Health Authority Approval (HAA) based only upon the representations given in paragraph 5 by an independent professional civil engineer registered in the State of Alaska. Certificates of Health Authority Approval are required for the transfer of title (except between spouses) for properties served by a single family on-site wastewater disposal and/or water supply system. DSD also issues HAAs upon request to homeowners. Certificates of Health Authority Approval are valid for 90 days from the date of issue for properties served by a private or Class C well and may be reissued with new water sample results less than 30 days old., (Certificates may be reissued for a period of up to one year with valid water samples.) Certificates are valid for one year for properties served by Class A or B wells or a public water system. The Municipality of Anchorage is not responsible for errors or omissions in the professional engineer's work. 4. STATEMENT OF INSPECTION BY ENGINEER As certified by my seal affixed hereto and as of the validation date shown below, I verify that my investigation, based on procedures outlined in the Health Authority Approval Guidelines for this application, shows that the on- site water supply and/or wastewater disposal system is(are) safe, functional and adequate for the number of bedrooms and type of structure indicated herein. I further verify that based on the information obtained from the Municipality of Anchorage files and from my investigation and inspection, the on-site water. supply and/or wastewater disposal system is(are) in compliance with all applicable Municipal and State codes, ordinances, and regulations in effect at the time of installation. Name of Firm Anderson Engineering Phone 522-7773 Address P.O. Box 240773 Anchorage, AK 99524 Engineer's Printed Name Michael E. Anderson, P.E. Date 6/29/2004. 5. DSD SIGNATURE Approved for Disapproved. bedrooms. Conditional approval for bedrooms, with the following stipulations: Additional Comments Attachments: HAA Checklist X Maintenance Agreements Septic System Advisory Supplemental Engineer's Report Well Flow Advisory Other By � Original Certificate Date:_ (Rev. 12100) D IN � ©� «M =POW t x*t + `O `9 *e' 9 h freld inspections ahtl i 49th above systems are in a�v` nes in effect on this date s x 1 MICHAEL & ANDERSON" W : No, CE-4381 �i Waiver Fee $ Date of Receipt Number 07-16-04 12:20PM FROM-CT&E ESI, SGS ENV SERVICES F -bu Sample Remarks: 9075615301 T-110 P.02/02 F-245 All Dates/Times are Alaska Standard Time Printed Date/Time 07/16/2004 13:12 Collected Date/Time 07/14/2004 12:40 Received Date/Time 07/14/2004 12:55 Technical Director Ste he C. Ede Released Results P L Units Method Container ID Allo able SII Prep Analysis Pazzmeter Q Li its Date Dare Init Waters Department Nitrate -N 0.100 U 0.100 mg/L EPA 300.0 B (<=1 ) % 07/14/04 JIB Microbiology Laboratory Total Coliform 91 col/lOOmL SM20 9222B PRELiNiil°vARY - A (<=1 07/14/04 DKC SGS Ref.# 1044202001 Client Name Anderson Engineering Project Name/# Lot 3 Autumn Ridge Client Sample ID Lot 3 Autumn Ridge Matrix Drinking Vater Sample Remarks: 9075615301 T-110 P.02/02 F-245 All Dates/Times are Alaska Standard Time Printed Date/Time 07/16/2004 13:12 Collected Date/Time 07/14/2004 12:40 Received Date/Time 07/14/2004 12:55 Technical Director Ste he C. Ede Released Results P L Units Method Container ID Allo able SII Prep Analysis Pazzmeter Q Li its Date Dare Init Waters Department Nitrate -N 0.100 U 0.100 mg/L EPA 300.0 B (<=1 ) % 07/14/04 JIB Microbiology Laboratory Total Coliform 91 col/lOOmL SM20 9222B PRELiNiil°vARY - A (<=1 07/14/04 DKC 7— 6-04; 1:27PM; SGS Re£# Client Name Project Name/# Client Sample ID Matrix Sample Remarks: 1043777001 Anderson Engineering Lot 3, Autumn Ridge Lot 3, Autumn Ridge Drinking Water ;907 5615301 # 2/ 3 Laboratory Analysis Report All Dates/Times are Alaska Standard Time Printed Date/Time 07/06/2004 8:42 Collected Date/Time 06/29/2004 15:00 Received Date/Time 06/29/200.4 15:15 Technical Director Stephen C. Ede Releas Allowable Prep Analysis Parameter Results. PQL Units Method Container ID Limits Date Date Init Waters Department Nitrate -N 0.100 U 0.100 mp/L EPA 300.0 B (<=10) 06/30/04 JJB Microbiology Laboratory Total Coliform 0 OB, No Coli coU100mL SM20 9222B A (<=1) 06/29/04 DKC U&L Lnrirnnnmatal SmlGc.s Inc.Lahoratory Division 200 West Potter Drive, Anchorage, AK 99518-1605 t(907)562-2343 f(907)561-5301 www.sgsenvironmental.com Member O the SGS G,ovp (Societe Generale de Surveillance) ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 5224779 FAX MEMORANDUM DATE: August 19, 2004 TO: Jeff Poet FROM: Mike Anderson, P.E. SUBJECT: Lot 3, Autumn Ridge Subdivision Certificate of Health Authority Approval The surveyor's as -built submitted with the Certificate of Health I Authority Approval application shows two wells on the lot. The well to the east,was properly abandoned just after the as -built was completed. Alpine Drilling performed all work in accordance with the procedures outlined in the Municipal Ordinance for well abandonment. Only one functioning well is now on the lot. Please let me know if you have additional questions