Loading...
HomeMy WebLinkAboutKENO HILLS #5 BLK 6 LT 6Keno Hills #5 Block 6 Lot 6 #020-171-30 i i Municipality of Anchorage Development Services Department • A. � V j �.4./a n.y. Building Safety Divisionrogram, 4700 S. Bragaw SL On -Site Water and Wastewater P '• '•• ' P.O. Box 196850 Anchorage. AK 99519-6650 Page 1 of 3 www.d,andtorage.ak.us (907) 341790! ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT Permit Number. Seuay02Y9 PID Number. OZo-/7/-3 Hama: , O Tor, { l.aa.el You Wastewater System: ®New ❑Upgrade Aaaaaa: Iv9oa Ath 14^c( 0#-.,AArA 94s -r ABSORPTION FIELD `ify(,! - i'/ r/ 09 ■ Dwo h.wt O sro . T..wr o ea D Lana a otnr. LEGAL DESCRIPTION Eat Rs"` Tar Daq lanaprt papa: Let: 6lr Wave D•pw tp pba tam.Ran W" waft C."Vo aapn li F PW Twmnp: R -w saraae�• Ft. S• 0 Ft. Fe apaq avow prprir paai �� Lwvft /•S Ft• S3 4.39 = 9 2 Well: New ❑ Upgrade C� � Haro.rairs Fr. ow>M.w.ns..„,.n.,: Gawboan Iftnu. A 6. Lk Pv>'. Tar Dom: C«« to ' Tar aeupon ani pto l 1 3 FL Omar 24'6 ft. 20 FL Dar Raw: SW w"L~ 920 F, p -3o Ty IHta•rr • �•oa tchaaetW F AI me r�ra: 7/ 22/0 Y 2 / FL ' /414!%tw Prop TFwek "77 / 2S / o ovno Sr « c+pro Me" ARow aaan: Iv wu Ft. 2 FL TANK SEPARATION DISTANCES 0 septic ❑ rioknng ®S.T.EP. 7o Septic Absorption Oft Molding Mats 0 Other From Tank FreId Station Tank Sewerue nCAOn de 'mink lSfi cr. w« 113 t 136 a 113 F _ ' u F wH« r: S f-tt /� a conoru�nu: 2 $L,t pwara > > 140• > FGv' - LIFT STATION La Lina .^.. IGp' I r . y ^•/ • .. Ga -• ar. M / cr. Q ren co r� Fanpsuon 2y IYZ� ZvF K Va>•Inv at; 2Z /pnwus aurin H: h c,.,rn Dram _ nam rW a ar,ar Rtwnor L:p.Oa. prremw w• Ramaras: M.O. A . Se trc a /vie BENCH MARK e(ifF „ - L ea(Me 5 10, k / w -5 rB P /qcn k FN4n ho % AfWnMa Fatal. eie/ (W 4/ ^�. ^ FL Ins pectionsperformed by: _F(aff-A Teel+ S&'C Dates: 1" 7/l9/o�L I 2na_T/28/0y Development Services Department'Approval a e'newec and aeproved by, \Iy„ Q +a \ `l p� Q A ate: Ul 5lzSXy`1 Engineees Stamp 1 0 07 49TH l r. HEODORE F. iMOORE �• CE -3589 PERMIT NO: SW040249 PID NO: 020-171-30 92 LINEAL FEET OF SOIL ABS. TRENCH w. 5.0' EFF. GRAVEL T.H. #2 0 1500 -GALLON STEP TANK SWING TIES FROM: TO: S.T. C.O. "C" L.S. M.H. "D" TR. M.T. "E" TR. M.T. "F" TR. M.T. "G" TR. M.T. "H" "H•• PAGE 2 OF 3 It , • 39' , 53' T.H. �� RE vcntEn�a� �tl t #3 T4FNCM LrfF • "E" z U x "G.. < i LOT 6, BLOCK 6 KENO HILLS #5 COR. "A" COR. "B" 58' 26' 59.5' 35' 46' 86.5' 84' 118' 43.5' 72' 94' 120' 1 i WELL ; OF A4 "lk, •, s Yr 49TH ray ••' r�� ......................... THEODORc F. MOORE Y �1 • .• C'.-3589 r: �sto LOT 6, BLOCK 6, KENO HILLS S/D #2 SEPTIC SYSTEM INSTALLATION AS -BUILT INSPECTION REPORT FLATTOP TECIMICALSERVICES SCALE:1 =30' 14530 ECI IO STREET DRAWN BY TFM ANCHORAGE, ALASKA 99516 j AUGUST, 2004 I PERMIT NO: SW040249 PID NO: 020-171-30 2" INS. PAGE 3OF3 N 92 LINEAL FEET OF SOIL ABS. TRENCH W. 5.0' EFF. GRAVEL m - � •P ............».».... TMEODOI:E F. MOORE T ^;';�•. CE -3589 �;� 41. ;;�.,,,,.,�y G 2' SOIL COVER 1.25" DIA. 4' SOIL SCHED 40 INV. COVER PVC 5' 5. 4 -ID -30 2" INS. INV. 96.4' INV. 15001,ALLON y ELEV. 95.0' STEP TANK 94.8' BOT. T.H. #3 ELEV. 88.3' M.T. DRY 3/4/04 ` m - � •P ............».».... TMEODOI:E F. MOORE T ^;';�•. CE -3589 �;� 41. ;;�.,,,,.,�y G TOKLFlT ELECTRIC 5G1 0030 P.1 INSPECTION REPORT MUNICIPALITY OF ANCHORAGE, BUILDING SAFETY DIVISION 5500 EAST TUDOR ROAD VOICE 563.3164 INSPFC710m FAX (967)3{S•623S lms:n NA/ tE TOKLAT ELECTRIr` Inlr ADDRESS PERMIT • /��jj ����«v.�l PHONES 61 LOT _ 5-848' �OLOCK �SUDDIVISION17e--V O /// DATE COMMENTS or DIRECTIONS: TYPE OF INSPECTION: ELECTRIC/ NO NONCOMPLIANCE OBSERVED NEX COMMENTS. ��yf REINSPECTION: YES, BELOW I DO NOT CONCEAL UNTIL-REINSPECTEE INSPECTOR I NO l 1 • ,-'//1_ Q DATE: W1iEN CORRECTIOI"RE MADE PLEASE CALL FOR REINSPECTION DO NOT REMOVE THIS NOTICE 70T" F.OI Municipality of Anchorage Department of Health and Human Services B25 "L' Street P.O. Box 196650 Anchorage, Alaska 99519$650 Pock �� http:/Avww.d.anchorage.ak.us Mayor Permit Number. #SW 040249 Date of Issue; 74-04 Parcel Identification Number: 020-171-30 Date Started: 7-22-04 Date Completed: -7-22-04 Is well located at approved permit location? ® Yes ❑ No Legal Description: Keno Hills # 5 Block 6 Lot 6 Property Owner Name & Address: Thomas A. Young 3600 Akula Dr. Anchorage, Alaska 99516 Borehole Data: Soil Type. Thickness & Water Strata Stick up organics &.0t Bedrock RECEIVED AUG 0 a 2004, Depth (ft) From To 0 2 2 7-- 7 246 A.;,-HORAGE ✓;W4 iri-NTALSERVICES DIVISION Attention: The well driller shall provide a well log to the property owner within 30 days of completion and the property . �.�.. . -.1.. .... A-!". - .1.1. -....!J. . -... .4. n_.• .".....1 O tt.. .. _.. f.. od of Drilling ® air rotary ❑ cable tool ng type: steel Thickness: .250 inches eter. ¢ inches Depth: 20 feet r Type: eter: inches Depth: feet g stickup above ground: 2 feet [Recovery c water level (from ground level): 21 feet ing level -_L46 feet after rs pumping L gpm very Rate: L gpm od of Testing; it IiR Intake Opening Type: en End ® Open Hole reened Start feet Stopped feet ❑ Perforations Start feet Stopped feet Grout Type: bentonite # 8 Volume: 1 Depth: Start 0 feet Stopped,? feet Pump: Intake Depth feet Pum size hp Brand Name Well Disinfected Upon Completion? ® yes ❑ No Method of Disinfection: chlorine tablets Comments: Well Driller. Alpine Drilling & Enterprises PO Box 110496 Anchorage Alaska 99511 Attention: The well driller shall provide a well log to the property owner within 30 days of completion and the property . �.�.. . -.1.. .... A-!". - .1.1. -....!J. . -... .4. n_.• .".....1 O tt.. .. _.. f.. MUNICIPALITY OF ANCHORAGE Development Services Department On -Site Water 8 Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM / WATER SUPPLY PERMIT Initial Permit Number: SW040249 Legal Description: ;KENO HILLS #5 BLOCK 6 LOT 6 Design Engineer: 0019 Flattop Technical Services Owner Name: THOMAS A. YOUNG Owner Address: 17900 ASHLAND DRIVE ANCHORAGE. AK 99516 - 'n 19 la( I &ou g19A04 fits Date Issued: Jul 08, 2004 Expiration Date: Jul 08, 2005 Parcel ID: 020-171-30 Site Address: 17900 ASHLAND DRIVE Lot Size: 116305 SO. FT. Total Bedrooms: 3 Permit Bedrooms: 3 This permit is for the construction of. ❑✓ Disposal Field 0 Septic Tank Holding Tank E] Privy Private Well Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specked in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations (18AAC80 ). 3, The engineer must notify DSD at least 2 hours prior to each Inspection. Provide notification by calling (907)343-79G4 (24 hours). ( Not required for a Water Supply Permit only). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. Received By. Date: 7• / U Issued By. [Nif ~ V Date: a o • Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program 4700 South Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 www.ci.anchorage.ak.us (907)343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Property owner(s) t kam CLS L4"W.0 yOUfl�j Day phone _ 3qS-3409% Mailing address (1) 3CpDO rwri I - , c195;� -MSTng address (2) l�iL�a ��G�N��.n-.C- �i. Zip Code 11 Legal description (Lot, Block & Sub'd.) LO + /0 i l k �� w o o S 1S Legal description (Section, Township & Range) Lot Size lll� 3D5 iAc;,;, q.Ft. THIS APPLICATION IS FOR: Number of Bedrooms j Sewer Only ❑ Well Only ❑ Sewer and Well Water Storage ❑ Sewer Upgrade ❑ THIS PROPERTY CONTAINS: Hot Tub ❑ Jacuzzi ❑ Swimming Pool ❑ Water Softening Unit ❑ Therapy Pool ❑ I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. (Signature of properly clwner or ab(horized agent) Permit Fees: � 3Sv Waiver Fees: Date of Payment: re 3 O —O Receipt Number: .-4 61 0 7 (Rev. 12100) Date of Payment: Receipt Number: FLAT�OP'TEG`Hl'IAL C "SERIES Jwgr n .4•.Y+1 Y �'ti rC:IJ,ti,....rw..- �tiN ;moi.,-wi.�.11' r CRTLQ ENVIRONMENTAL ENGLVEERM • ENERGY CONSERVATION 6 A.NALYS IS THEODORE F. MOORE, P.E. 14530 ECHO ST. PH: (907) 345.1355 ANCHORAGE, ALASKA 99516 March 12, 2004 M.O.A. DSD P.O. Box 19-6650 Anchorage, AK 99519 Dear Sirs: The purpose of this letter is to provide the required design narrative in support of our application for a permit to construct wastewater disposal facilities on Lot 6, Block 6, Keno Hills S/D, located at 17900 Ashland Drive. Soils logs, perc test results, a site plan, design drawings and specifications are enclosed for your review. The proposed system will be constructed in the vicinity of test hole # 3. As can be seen from the soil logs, shallow bedrock was encountered in test holes #1 and #2, whereas a silty gravel with a perc rate of less than I minute per inch was found between 1 and 13 feet below ground level in test hole #3. Despite the rapid measured perc rate, the significant silt fraction encountered in most of the GM material should provide adequate filtration of wastewater before it reaches groundwater or bedrock. To allow for the possibility that some of the trench sidewall may encounter siltier soils 1 have conservatively based the design on 0.8 gpd/sq. ft. Thus the proposed 4 -bedroom residence requires a total absorption area of (4 x 150)/0.8 = 750 square feet. The proposed design consisting of 2 parallel 38 -foot long trenches with 5.0 feet of effective gravel has a total absorption area of 760 square feet. The topography of the lot in the area of proposed construction slopes down towards the west at 10% The proposed project will have no significant impact on present or future water supply and wastewater disposal systems serving adjacent properties, nor will it have any significant impact on reserved space -surface and subsurface, or on drainage. Please give me a call at 345-1355 if you have any questions on this submittal. Sincerely, Ted Moore, P.E. LOT 12 i , , , R 100' FROM WELL LOT 13 ' INSTALL 1500 -GALLON ........ STEP TANK LOT 7 SEPTIC AREA 30 -FOOT LONG REPL. TRENCH SIZED FOR ADV. TR. SYST. @ 2.0 GPD=.FT f WELL> 100' CONSTRUCT TWO 38 -FOOT -LONG SOIL \ ABS. TRENCHES w. b.0' EFF. GRAVEL M.T. T.H. Cn'P) #2 1.25" DIA. SCHED 40 PVC T.H. OR HDPE rte• #3 FD C.O.. T T.H #1 4" DIA _ J D-3034 86'.5.......' .... �� ruvvutr � LOT 6, BLOCK 6 KENO HILLS #5 LOT 3, BLOCKo 6 �PARADISE VALLEY �•• AIc c: J f•.:..��:°*f37 -, ttEO^C!E F..10ORE: A CL •`� t NORWAY CIRCLE LOT 4, BLOCK 6 PARADISE VALLEY 8 .............................. 8 , PROPOSED WELL SITE LOT 5 • z i , , a w ,ti x O J , , J z LOT 6, BLOCK 6, KENO HILLS #5 PROPOSED WELL AND SEPTIC SYSTEM SITE PLAN FLATTOP TECIINICALSERVICES I11NCH=60FEET 14530 ECHO STREETI DRAWN BY TFM ANCI IORAGE, ALASKA 99516 MARCH, 2004 NOTE: THIS IS NOT A SURVEYED PLAT. ALL LOCATIONS SHOWN ARE APPROXIMATE. TWO PARALLEL 38 -FOOT LONG SOIL ABS. TRENCHES W. 5.0' — EFF. GVL. BELOW DIST. PIPES •. TN2ODCRE F MOORE • CL • 35d9 � •µf�. •� yr 1.25" DIA SCHED 40 PVC OR HDPE— U 4"DIA. D-3034 15004ALLON FROM HOUSE STEP TANK 1 0 TUBE 15 PLAN VIEW SCALE: 1" =10' MONITOR SOIL COVER ORIGINAL GROUND 3 rf / —2" INSULATION f FILTER FABRIC u ;:;,; ` 1.25" DIA PVC OR HDPE W. 3/16" HOLES @2' r: i' 6 5.3 5 si` 15 -2 1/2" SEWER GVL. OF EXCAVATION CROSS-SECTION "A -A" SCALE: 1" = 5' 10 'IA'. FLATTOP TECHNICAL SERVICES 14530 ECHO ST. I-- ANCHORAGE, ALASKA 99516 TEST HOLE # 3 SOILS LOG - PERCOLATION TEST LEGAL DESCRIPTION: _Lot 6, Block.6, Keno Hills S/D, Unit #5 DATE PERFORMED: __-,February5, 2004 PERFORMED FOR: _._ —Tom and Laurel Young (feet) 1' 2- 3- 4- 5- 6 - 7- 8- 9 10- 11- 12 -" U< _ 14 I 15 -I 17 I 18 19 -I 20 PL GM Silty Gravel Many cobbles 8 boulders Lenses of gray ML SLOPE Depth to Groundwater Date No groundwater 2/52004 M�T_Dry=— 3/4/04_ CgTH �.. . ...................0 r A Tt¢ODORE F. MOORE CE - 3589 `'i,-�",�....• ^,14..,0 SITE PLAN C/ • CENTER P7. � q OF LOT O 10% PE Date Reading CIO& Net Time Percometer i Net Drop Tune (minutes) Reading (inches) 2/5 I_12" Pre-soak— 273F8 _ _ — - ,.2712--L----. - -- -Add water 8 start ! 12:30:10__ 23 3/8 r—_ _ 12:35:10- _5_— 171/2(dry).__.57/8___ -f Add water 1 12:30:25 _-_ .— -233/8_-_ 1 1712(dry):..-_57/8-_, __#2.---12:35:25 ----5-- _;Addwater-_ 12:36 233/8 2:41_—_t_5- 4_ _1712 4-_5718 _ I PERCOLATION RATE <1 (minutes/inch) PERC HOLE DIAMETER —6" -- TEST RUN BETWEEN 3.5 FT AND 4.0 FT COMMENTS:_ Despite rapid measured pert rate, significant sift. fraction in_GM_should provide adequate filtration,_ Because perc test may___ _have encountered somewhat cleaner material than typical of stratum, recommend basing design, on perc rate of 6.15 minutes per-inch.— PERFORMED BY FLATTOP TECHNICAL SERVICES. --')- CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: 3 // Z /C" Flattop 7echnicafSemices 14530 rEefw Street,.Anchorage, AX 99516 None (90) 345-1355 Lot 6, Block 6, Kcno Hills S/D #5 17900 Ashland Drive Wastewater disposal system installation Specifications 1.0 General: 1.1 The scope of the project consists of installing a 1500 -gallon STEP tank that pumps effluent into two parallel 38 -foot long soil absorption trenches containing 5.0 feet of effective sewer gravel. 1.2 Construction shall be as depicted on the approved site plan and design drawings. Minor deviations from these drawings may be allowed or required by the engineer conducting the inspections. All construction procedures and material specifications shall conform to Municipal and State requirements. All separation distances shall be in conformance with Municipal requirements, unless specifically waived. 1.3 The contractor shall be responsible to obtain any necessary utility locates, and to work around any buried utilities. 1.4 The contractor shall provide adequate cover material and rough grading over all system components to ensure that proper drainage is achieved after settlement and that there are no residual depressions. Insofar as possible the contractor shall minimize damage to trees and existing lawn areas. 1.5 Unless specifically agreed otherwise, the homeowner shall be responsible for finish grading after the soil is compacted, as well as placement of topsoil and reseeding all areas disturbed by the construction. 2.0 Septic Tank: 2.1 The new 1500 -gallon, 2 compartment STEP tank shall be Municipally approved and shall be set level on undisturbed soil. Each compartment shall be equipped with a watertight manhole cover and a 4" cleanout. If the tank is buried less than 4 feet, it shall be insulated with 2 inches of approved burial type, rigid insulation. The exact location of the STEP tank will have to be field -determined based on a location where depth to bedrock allows excavation to a sufficient depth for gravity flow from the house to the STEP tank. 2.2 All pipe connections to the tank shall be equipped with waterproof mechanical couplings. The waste line from the residence to the septic tank shall have a minimum slope of 1/4"' per foot. A cleanout shall be installed 1 - 4 feet from the building foundation, with additional cleanouts every 75 feet if applicable. 3.0 Lift station: 3.1 The lift station shall be installed in the second compartment of the STEP tank. The lift station package shall be an "Orenco" system as supplied by Anchorage Tank. 3.2 The contractor shall be responsible to obtain the necessary Municipal electric permit and inspection, and shall provide a copy of the electrical inspector's report to the engineer overseeing the construction of the wastewater disposal system. 3.3 The lift station shall be equipped with a watertight, insulated manhole riser and cover extending a minimum of 6" above final grade with positive surface drainage away from the manhole. The contractor shall be responsible for determining the necessary length of the manhole riser. 3.4 The on, off, and alarm floats shall be set at the elevations specified by the lift station supplier, and their proper operations shall be verified by the contractor. 3.5 The discharge line from the lift station to the soil absorption system shall be 1.25" dia. Sched 40 PVC or HDPE. 4.0 Soil absorption system: 4.1 The soil absorption system shall be constructed by excavating two 38 -foot long trenches to a depth of 6 feet below ground level. The long axis of the excavation shall parallel an existing contour. 4.2 The bottom of the excavations shall be level. Any compacted or smeared surfaces shall be raked to allow proper infiltration. 4.3 A total of 5.3 feet of approved sewer gravel shall be placed in the bottom of the excavation with the perforated distribution pipes laid level such that the pipe inverts are no less than 5.0 feet above the bottom of the sewer gravel. Sewer gravel shall be 0.5" - 2.5" screened gravel, with less than 3% passing the #200 sieve. The distribution pipes shall be 1.25" dia. Sched. 40 PVC or 1IDPE, with 3/16" holes drilled in the bottoms at 2.0 feet on center. All pipe connections in the distribution system shall be glued, and the ends of all pipes capped. 4.4 Monitor tubes shall be of 4" diameter and installed in the locations shown on the design drawings. The portion of the monitor tube extending through the sewer gravel shall be perforated. 4.5 Approved filter fabric shall be placed over the entire top surface of the sewer gravel. A minimum of 2 feet of soil cover is to be placed over the filter fabric. If the soil cover thickness is less than 3 feet, two inches of rigid, burial type insulation is to be placed over the entire top surface of the gravel, in addition to the filter fabric. 4.6 The top surface of the cover material shall be raised a minimum of 6 inches higher than the surrounding terrain to allow for subsequent settlement, and shall be graded to smooth contours. Fill slopes shall be no steeper than 3:1. 4.7 Unless specifically agreed otherwise the homeowner shall be responsible for arranging to have the site finish graded after the backfill material has stabilized, and for placement of adequate topsoil and seed to promote rapid revegetation of all areas disturbed by the construction. 5.0 Inspections: 5.1 A minimum or 4 engineering inspections will be required during the course of the project: (1) initial stakeout with the contractor to establish the location of the system and to discuss the plans, specifications and construction procedures, (2) after the native material has been excavated to expose the infiltrative surface to ensure that it is level and at the right elevation, and conforms with the soil test information, (3) after the sewer gravel is in place and the distribution pipes have been laid and connected up to the septic tank, but prior to placement of insulation or filter fabric, and (4) after rough backfill and grading is complete. The STEP tank requires one inspection after it is set level and the piping connected, but prior to backfill. This inspection may be incorporated with any of the above inspections. 5.2 The installer shall coordinate the timing of the inspections with the engineer sufficiently far in advance to ensure the availability of the engineer.