ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT
Permit Number: SW040485
PID Number: 051.801.30
N'nnell Homes Inc.
S i
Wastewater System: New
Acdress:
1900 W. Northern Lts. Blvd., Ste. 200
Anch., AK 99517
ABSORPTION FIELD
pnoI e:
""°e as°°°""':
Raised Bed
344.5678
Five 5
Sa Raanp:
Tool Deem Dart ananal yraae:
LEGAL DESCRIPTION
.3 GPDXe
0 FI.
ebek: La: Sebch l :
Deco to ppe Donau apo o gnat pace:
Gravel oaten Denealh P":
The Tablelands
+2 Ft.
.5 Ft.
7ownsmp: Range:
Secwn:
Fm added aopva ag.nai pace:
Grav Lergn:
3-6 Ft.
170 Ft.
Well: AWWU Water System
Gravel w M:
15
re.
Nanw M t
6
Dwance aMaen knas:
5
Ft.
FI.
Ct&W"an (Pnwle. A e. Cl:
TMN Depth:
Cased W:
Taal aeaapttn arse.
P.Pe Mat":
Ft.
Fe.
2,550 Fe
ASTM 3034 PVC
DrMlx
Date Dnaeo:
SISIK water Laws:
namwr.
Dale Weald.
FI.
Pisano's Dirtworks
618.9/2005
Ytt:
PWnp set at:
I
Caanp MAD Grand:
TANK
GPM
FI.
FI
SEPARATION DISTANCES
STEP
To
Septic
Absorption
LIR
Holding
blidPnvale
ectWer'
P ly0 Ga;w s.
From
Tank
Field
Station
Tank
SewerLiro
Anchorage Tank
2,000
we
>200'
>200'
>200'
NIA
>25'
Mat".
Steel
Noon aGantanmenm:
Three (3)
sedaawaler
>100'
>100'
>100'
NIA
LIFT STATION
LMLIne
>5'
>10,
>10,
NIA
We.
250 Gr
a IWN.
AnchorageTanklOrenco
>5'
>1 O'
>5'
N/A
-Plant ai tenet at.
'Pump of Isvel at.
HQh water atrm at..
FaaMettn
42 In.
42 n.
44 In.
None
Noted
Pump Make &Motel
Eranosi nepectd peramec DY
�AenD*^
Orenco
Allied Alaska Electric
Remark"
BENCH MARK
insulation over Lntire Septic System.
LMalgn Mt Dee" tltn:
Finished Floor.
Aawmed Etvanen:
�.:
100.0 F1.
Engineer's Stamp
+ 49th
Inspections performed by: MEA
Dates: k1"e 61812005
%_ ._ A.:
/ 3/
2 n 619/2005
MICHAEL E ANDERSON ' W
Department of fiealth and Human Services approval
No. CE -4381 1.0
♦
Reviewed and approved by:
Date: LDhLe
hye
wed
;s;; .••�
o - �
a I \\\ 3aF S/yM
Z I N
O \�1�yS3 3
>
0
m
Y
0 oq
N 0
o C) m ci
z b tLn.a% z4 1n
w
w J 4�
00, m LTJ
—j4i
oo¢ o m J o
cn
5; =0
u—
_ U)
cw dp
�0 �� i �j.pq
w Lo
°i d " ham•
J
o p L)
'gyp. \\ nii9i3
a •( \ .. i t i rc �•
zo
o fig! ••�6'' P
Z ��� sr •••ls •... _ ,.
Municipality of Anchorage Page 3 of 3
DEVEOPMENT SERVICES DEPARTMENT
4700 South Bragaw Street Anchorage, AK. 99519.6655 - 343-7904
On -Site Wastewater Disposal System or Well Inspection Report
Permit No. SW040485
TBM =
S!
PID No. 051-801-30
2' EPS Insulation
S.T. E.P. 6 - 3/16' Holes Per Lateral
13' Spacing
f
v
S
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650
DEPTII
(r«q
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION: Lot /, block 6, the lablelands
PERFORMED FOR, Spinell Homes
DATE: 6/8/2005 PROJECT No-
PARCEL
o'PARCEL IDS TECHNICIAN: T. Kimbrough
TEST HOLE # 3
ORGANICS/OB SLOPE
2
3 Silty Gravel
with Sand
4 SM
W1
6 BOH
7
8
9
See Site Plan
10 WAS GROUND WATER ENCOUNTERED? Yes
IF YES@ WHAT DEM I? 4' 0%
I 1 DEPTII OF WATER AFTER MONITORING:
DATE OF MONITORING:
13
14
15
16
17
18
19
DATE
READING
G OSS TIME
MINUTES)
NET TIME
(MINUTES)
DEPTH of
WATER
(INCHES)
NET DROP
(INCHES)
TEST HOLE PRESOAKED PRIOR TO TESTING:
PERCOLATION RATE;,_(Io"IINCI I) PERC. HOLE DIA, INCHES)
TEST RUN BETWEEN: FT, and FT.
COMMENTS: SAME MATERIAL AS TEST HOLE NOS. I AND 2. PERCOLATION RATE BETWEEN 30 AND 60
MINUTES PER INCH.
TEST PERFORMED BY ANDERSON ENGINEERING SOILS TECHNICIAN. 1, MICHAEL E. ANDERSON CERTIFY TIIAT
THIS WAS PERFOR\IED IN ACCORDANCE WITII ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE:
fW Jun 15 OS 10:36a Allied Alaska Electric (907) 373-3894 p.1
�l495�r��.Gr OIVRA GT/NG
June 15, 2005
FAX: (907) 522-6779
Anderson Engineering
Attn: Mike Anderson
P.O. Box 240773
Anchorage, AK 99524
Subject: Lift Station Inspections at properties stated below.
This letter is to confirm that the lift stations at:
• Lot 6, Block 6 - Tablelands
• Lot 7, Block 6 - Tablelands
• Lot 10, Block 6- Tablelands
• Lot 6, Block 2 - Glennview North
were wired by a licensed Journeyman Electrician in accordance with the 2002 National Electric
Code requirements.
If you would like any further information, please feel free to call our office at the numbers listed
below.
Thank you.
Sincerely,
ALLIED ALASKA ELECTRIC, L.L.C.
Janette L. Brown,
Vice Presidcnt/CFO
cc: file
P.O. Box 876310, Wasilla, Alaska 99687 (907) 373-3893 ofc / (907)132-8687 cell / (907) 373-3894 jar
ON-SITE WASTEWATER DISPOSAL SYSTEM PERMIT
Initial
Date Issued: Nov 23, 2004
Expiration Date: Nov 23, 2005
Permit Number: SWO40485 Parcel ID: 051-801-30
Legal Description: THE TABLELANDS SUBDIVISION BLOCK 6 LOT 7
Design Engineer: 0014 Anderson Engineering
Owner Name: SPINELL HOMES, INC
Owner Address: 23129 WHISPERING BIRCH DRIVE
CHUGIAK . AK 99567 -
Site Address: 23129 WHISPERING BIRCH DRIVE
Lot Size: 41562 SO. FT.
Total Bedrooms: 5 Permit Bedrooms: 5
This permit Is for the construction of:
❑✓ Disposal Field ❑? Septic Tank ❑ Holding Tank ❑ Privy ❑ Private Well ❑ Water Storage
All construction must be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations (18AAC80 ).
3, The engineer must notify DSD at least 2 hours prior to each Inspection. Provide notification by calling
(907) 343-7904 (24 hours). ( Not required for a Water Supply Permit only).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and dosed on the same day.
B. Covered, sealed, and heated to prevent freezing.
5. The following special provisions.
a.) Depth of absorption trenches shall not exceed 6 feet below original grade.
b.) Groundwater monitoring shall be conducted through construction. Results shall be Included with Inspection
Report.
Received By:
Issued By.
Date: //-Z320 5/
Date:
MUNICIPALITY OFA
DevelopmentServices Department
�
On -Site Water d Wastewater Program
r
Alb
4700 South Bragaw Street
P.O. Box 196650, Anchorage, AK 99519-6650
(907) 343-7904
ON-SITE WASTEWATER DISPOSAL SYSTEM PERMIT
Initial
Date Issued: Nov 23, 2004
Expiration Date: Nov 23, 2005
Permit Number: SWO40485 Parcel ID: 051-801-30
Legal Description: THE TABLELANDS SUBDIVISION BLOCK 6 LOT 7
Design Engineer: 0014 Anderson Engineering
Owner Name: SPINELL HOMES, INC
Owner Address: 23129 WHISPERING BIRCH DRIVE
CHUGIAK . AK 99567 -
Site Address: 23129 WHISPERING BIRCH DRIVE
Lot Size: 41562 SO. FT.
Total Bedrooms: 5 Permit Bedrooms: 5
This permit Is for the construction of:
❑✓ Disposal Field ❑? Septic Tank ❑ Holding Tank ❑ Privy ❑ Private Well ❑ Water Storage
All construction must be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations (18AAC80 ).
3, The engineer must notify DSD at least 2 hours prior to each Inspection. Provide notification by calling
(907) 343-7904 (24 hours). ( Not required for a Water Supply Permit only).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and dosed on the same day.
B. Covered, sealed, and heated to prevent freezing.
5. The following special provisions.
a.) Depth of absorption trenches shall not exceed 6 feet below original grade.
b.) Groundwater monitoring shall be conducted through construction. Results shall be Included with Inspection
Report.
Received By:
Issued By.
Date: //-Z320 5/
Date:
Municipality of Anchorage
Development Services Department
Building Safety Division
_ On -Site Water and Wastewater Program
4700 South Bragaw St
P.O. Box 196650 Anchorage, AK 99519-6650
www.ci.anchorage.ak.us
(907)343-7904
ON-SITE SEWER/WELL PERMIT APPLICATION
FOR A SINGLE FAMILY DWELLING
Parcel I.D. b,51—%6V 30 Permit Number SW
Property owners) Spineil Homes, Inc. Day phone 3445678
Mailing address (1)1900 W. Northern Lights, Suite 200 Anchorage, AK 99517
Mailing address (2)x31 71 Whispering Birch Drive Zip Code
Legal description (Lot, Block & Sub'd.) Lot 7. Block 6. Tablelands Subdivision
Legal description (Section, Township & Range)
Lot Size 41.562 SF Acres/Sq.Ft.
THIS APPLICATION IS FOR:
Number of Bedrooms Five (5)
Sewer Only ® Well Only ❑
Sewer and Well ❑ Water Storage ❑
Sewer Upgrade ❑
THIS PROPERTY CONTAINS:
Hot Tub ❑ Jacuzzi ❑
Swimming Pool ❑ Water Softening Unit ❑
Therapy Pool ❑
certify that the above information is correct. I further certify that this application is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes.
(Signature of property owner or authorized agent)
Permit Fees: 4 en Waiver Fees:
Date of Payment 1 I.1 ri +rj'i Date of Payment
Receipt Number. d Receipt Number.
(Rev. 12=)
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 522-6779 FAX
June 7, 2005
Municipality of Anchorage
Development Services Department
On -Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject: Lot 7, Block 6, The Tablelands Subdivision
Septic System Design and Permit Application
Impacts to Adjacent Properties
Permit Number SW040485
Dear Onsite Services Engineer:
The groundwater at Lot 7, Block 6, The Tablelands Subdivision has unexpectedly risen
and is currently encroaching into the recently constructed absorption trenches. We
therefore propose to replace the existing 1,500 -gallon septic tank with a 2,000 -gallon
STEP Tank and replace the 5' wide absorption trenches with 2 new 84' long by 15' wide
absorption beds. The bottom of the beds will be 1.5' above the existing ground surface,
which is approximately 6' above the apparent water table at this time.
The existing septic system construction permit issued for this lot does not expire until
November 23, 2005. We are proposing to complete this work under this permit and will
provide a certified as -built once the work is complete.
Test holes recently placed on the lot indicated silty gravel with minor amounts of sand in
the area of the absorption trench and alternate site. The accepting soils were tested
and found to have a percolation rate of between 30 minutes per inch and 60 minutes
per inch. The system is designed with an application rate of .3 GPD/SF. A minimum of
3' of cover will be placed atop the beds and a minimum of 4' of cover will be placed
atop the new septic tank.
The ground surface on the lot has no slope from east to west as shown on the Site
Plan. The absorption beds will be constructed parallel with the slope of the ground
surface as much as possible in conformance with Municipal requirements. The new
septic system will be constructed a minimum of 10' from the water service proposed for
the lot and on adjacent lots. It will also be constructed a minimum of 100' from any
Lot 7, Block 6, The Tablelands Subdivision
June 6, 2005
Page Two
surface water in the area.
If the system is constructed in accordance with our design the following statements
apply:
1. The system, if constructed as designed, will have no adverse impact on the wells
in the area or those to be constructed in the future.
2. The system, if constructed as designed, will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
3. The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
4. The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely,
,-,t L 0,4,
Michael E. Anderson, P.E.
Attachments
f 49th A
U7CNAEL E. ANDERSON
Existing Ground
LOT 7, BLOCK 6, THE TABLELANDS
SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
5 Bedroom Home
Perc. Rate: 30-60 Min./Inch
Application Rate: .3 GPD/SF
Raised Bed System
2,000 Gallon STEP Tank
Coarse Sand (As Required)
5 Bedrooms X 150 GPD/.3 GPD/SF = 2,500 SF Absorption Area
2,500 SF/15 SF (Width) = 166.7 LF Bed Length
THEREFORE: Construct 2 - 84' Long x 15' Wide Raised Beds as Shown Below.
Place Distribution Piping at 2' Above Original Ground Surface. Remove Organics and Place
Coarse Sand to Provide 4' Separation From Groundwater (Minimum). Place Insulation
and 2' of Cover Over Bed or Mound Over Bed Minimum of 3'. Place 4' of Fill Over Tank.
.5'
.5'
1.5'
or
As Required
Top 6' of Mound Must Be Topsoiled
and Vegetated to Prevent Erosion.
Natural Backfill
2' Insulation 8 2' Cover (Min.)
O O O
Drainfield Rock
Coarse Sand (See Specification)
As Required for Levelling
In Situ GM Soil
2.5' 5' 5' 2.5'
TYPICAL BED SECTION
1' PVC
(NO SCALE) =�
NOTE: Grade Area Surrounding Bed to Drain Away.
Minimum 6' Separation From Bedrock.
Minimum 4' Separation From Groundwater.
Minimum 200' Separation From Wells in the Area.
Minimum 100' Separation From Surface Water or Streams.
Minimum 10' Separation From Water Service Line. #*-,
Existing
Michael E. Anderson
PRESSURE DISTRIBUTION
CALCULATION
Elevation at Highest Discharge Point
Pressure at Highest Discharge Point
Liquid Level in Tank (Elevation)
Diameter of Holes in Distribution Line
Diameter of Distribution Line
Hole Spacing in Distribution Line
Length of Transport Line
Diameter of Transport Line
Q=12.4dw = 12.4(.1875)(.1875) Y5-
=..9748 GPM/Orifice
_ .9748' 32
= 31.2 GPM
TDH = (100.88) + .0192(31.2)(31.2) +
12'
31.9'
+ 18.7'
.000995(45) (31.2)
(1.5) -f- 87
+ 1.2'
95'
5' Head
88'
.1875" (3/16")
1.0"
13'
15'
1.5"
Therefore 32 Orifices @ 13' Spacing With 31.9' of Total Dynamic Head.
6 Holes Per Lateral
ONSITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 7, BLOCK 6, THE TABLELANDS SUBDIVISION
GENERAL:
The scope of this project includes the removal of the existing 1,500 -
gallon septic tank and the procurement and placement of a new 2,000
gallon STEP Tank at the location shown on the site plan. Work also
includes the removal of the existing piping from the existing absorption
trenches and the replacement with clean coarse sand to the existing
ground surface. Work will then include the construction of 2 new 84'
long by 15' wide absorption beds also shown on the Site Plan. The
distribution pipe for the beds will be placed 1.5' above the surface.
Sand will be required to level the existing ground surface to provide a
level plain for the new beds. All components of the new absorption
beds, existing septic tank and lift station must be constructed a
minimum of 200' from wells in the area and 100' from any surface
water. Insulation will be required atop the trench to prevent freezing.
In lieu of insulation a minimum of 3' of cover must be placed atop the
trench. A minimum of 4' of cover is required over the Lift Station.
2. Construction shall be in accordance with the approved site plan,
design drawings, Municipal Permit with any special provisions or
conditions, and all applicable State and Municipal Wastewater
Disposal Regulations.
3. The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the
location of all lot lines. Contractor is also responsible to verify the
separation distance from the well on this and adjacent lots.
4. Unless specifically agreed otherwise, the contractor shall be
responsible for final grading areas subsequently depressed from soil
settling. Property owner shall be responsible for revegetation of
affected areas unless specifically agreed otherwise.
5. Contractors installing wastewater disposal systems must be certified
by the Municipal Department of Health and Human Services for
system installations. Owners installing their own systems must receive
prior approval from D.H.H.S. before beginning system installation.
SEPTIC TANK/LIFT STATION INSTALLATION
1. The 2,000 -gallon combination septic tank and lift station must be
constructed by a certified tank manufacturer. Construction shall
include an 18" manhole to provide access to the lift station.
Lot 7, Block 6, The Tablelands
June 7, 2005
Page 2 of 4
2. The septic tank shall be sufficiently bedded to prevent settling or
shifting of the tank.
3. All standpipes on the septic tank shall extend a minimum of 12 inches
above final grade.
4. Tanks installed without 4' of cover shall have a minimum of 2" of direct
burial insulation.
5. A foundation cleanout shall be installed one to four feet from the
building foundation. Two cleanouts are required between the tank and
the drain field.
6. Final grading over the tank shall be such that a positive slope exists
away from the septic tank.
DRAIN FIELD CONSTRUCTION:
The drain field shall be constructed to the dimensions shown on the
design. The bottom of the bed shall be within 2" of level.
2. Distribution piping must be placed level with perforations down atop a
level bed of drain field rock. Rock should then be placed over the pipe
to provide a minimum of 2" of cover.
3. A silt barrier or geotextile fabric must be placed between the drain field
rock and the natural soil backfill.
4. Monitor tubes must be 4" in diameter and installed at the locations
shown on the design. The portion below ground must be perforated.
5. Contractor shall verify the septic tank and drain field are a minimum
100' away from any private water wells in the area, 150' from a Class
"C" Well or 200' from any community well.
6. Direct bury insulation must be placed over the distribution system if
less than 3' of backfill depth is available. Finish grade over the trench
must be mounded to prevent settlement or depressions.
7. Grade area surrounding the absorption trenches to drain away.
8. A minimum 2' of accepting soil is required below the drain field rock for
a 5' wide trench. Contractor shall verify this condition prior to
placement of the rock. All pockets of unacceptable materials must be
removed and replaced.
Lot 7, Block 6,
June 7, 2005
Page 3 of 4
The Tablelands
MATERIAL SPECIFICATIONS:
The lift station must be constructed by a municipally approved septic
tank manufacturer. An Orenco 20 OSI 05 HHF-5 pump is
recommended.
2. The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated
and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and
ASTM D2662 or A.B.S. (perforated and solid).
3. Insulation shall be at least 2" thick extruded direct burial polystyrene
(Dow Chemical Co. Styrofoam HI or equal).
4. Septic tank inlets and outlets shall be fitted with watertight couplings
(Caulder, Femco, or equal).
5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed
between the final drain rock layer and the native soil layer.
6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing
the #200 sieve.
FILTER SAND SPECIFICATION:
1. Material for Filter Sand must be classified as a masonry sand and
meet the following gradation:
50% or More Passing the No. 4 Sieve
2% or Less Passing the No. 100 Sieve
1% or Less Passing the No. 200 Sieve
INSPECTIONS:
Municipal Ordinance requires a minimum of two inspections. These
inspections must be conducted under the supervision of a professional
engineer registered in the State of Alaska. The first inspection must be
conducted after the excavation of trenches, beds or pits and before the
installation of any gravel. A septic tank may be set in place, but may not
be backfilled.
The second inspection must be conducted after the placement of the
geotextile fabric, gravel, distribution piping, standpipes, cleanouts and
insulation. No backfill should be in place at the time of inspection.
Lot 7, Block 6, The Tablelands
June 7, 2005
Page 4 of 4
Contractor shall provide a copy of all field survey layout and construction
notes for use in preparing the certified as -built of the completed system.
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 522-6779 FAX
MEMORANDUM
DATE: November 18, 2004
TO: Julie Makela, P.E.
FROM: Mike Anderson, P.E.
SUBJECT: Lot 7, Block 6, Tablelands Subdivision
Septic System Construction Permit
Although we feel Lot 7, Block 1, Glenn View Estates North Subdivision is one of the few
in this area without groundwater problems we have modified the design in accordance
with our previous conversation. The bottom of the absorption trenches has been raised
to 6' below the surface. We are now proposing 5' wide trenches with an effective depth
of 4'. The attached revised sheets are submitted for inclusion with the original design
and permit application. Please let me know if you have further questions or comments.
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 522-6779 FAX
November 5, 2004
Municipality of Anchorage
Development Services Department
On -Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject: Lot 7, Block 6, Tablelands Subdivision
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 7, Block 6, Tablelands Subdivision intends to construct a new five -
bedroom home on the lot. We are therefore requesting a permit be issued for the
construction of a new septic system to serve the new home. The subdivision is
currently served by a community water system. No conflicts exist with adjacent septic
systems or wells and the proposed septic system on this lot. The attached Site Plan
and backup documentation identify the location and configuration of the proposed
septic system and alternate site. The current drainage pattern is identified on the Site
Plan. The drainage pattern will be maintained after development of this lot is complete.
Test holes recently placed on the lot indicated silty sand and gravel in the area of the
absorption trenches. The accepting soils were tested and found to have a percolation
rate of 17 to 60 minutes per inch. The system is designed for the slower percolation
rate. No groundwater was found in either test hole during placement and none was
found during the monitoring period, which included the wettest period of the year.
Our design includes the placement of a new 1,500 -gallon septic tank along with 2 - 84'
long by 5' wide by 4' effective depth absorption trenches to collect and treat the sewage
generated in the house. The bottom of the trench will be 6' below the surface. The
distribution pipe will be 2' below the surface. A flow splitter valve will be placed to
assure even flow to each trench. A minimum of 3' of cover will be placed atop the
trenches and a minimum of 4' of cover will be placed atop the new septic tank.
The ground surface on the lot slopes at shallow grades from east to west as shown on
the Site Plan. The absorption trenches will be constructed parallel with the slope of the
ground surface as much as possible in conformance with Municipal requirements. The
Lot 7, Block 6, Tablelands Subdivision
November 5, 2004
Page Two
new septic system will be constructed a minimum of 10' from the water service
proposed for the lot and on adjacent lots. It will also be constructed a minimum of 100'
from any surface water in the area.
If the system is constructed in accordance with our design the following statements
apply:
The system, if constructed as designed, will have no adverse impact on the wells
in the area or those to be constructed in the future.
2. The system, if constructed as designed, will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
3. The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
4. The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely,
..el�
Michael E. Anderson, P.E.
Attachments
49th
MICHAEL E. ANDERSON
1,, No. CE -4381 t
LOT 7, BLOCK 6, TABLELANDS SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Five Bedroom House 5' Wide Trench System
Perc. Rate: 31-60 Min./Inch 1,500 Gallon Septic Tank
Application Rate: .45 GPD/SF 4' Drainfieid Rock
5 Bedrooms X 150 GPD/.45 GPD/SF (Application Rate) = 1,666.7 SF Absorption Area
1,666.7 SF/5 SF • .5 (Red. Factor) = 166.7 LF Trench Length
THEREFORE: Construct 2 - 84' Long x 5' Wide x 4' Effective Depth Absorption Trenches.
Flow Line Elevation in Trenches to be 2' Below Original Ground Surface. Total Depth to be
6' Below Existing Ground. Provide 4' Cover Over Septic Tank and 3' Cover Over Trenches.
Place Flow Splitter Valve to Insure Even Flow to Each Trench.
3' Cover
Over Trench
Natural
Backfill
1 6"
Geotextile
""14 Fabric
6"1 U4" Perforated
PVC (Holes Down) ,,
4'0" I I �— Drainfield Rock
5'
TYPICAL 5' WIDE TRENCH SECTION
(NO SCALE) ,gyp:•..•• •^"'
NOTE: Grade Area Over Trench to Drain Away. ;' aeon
Minimum 6' Separation From Bedrock. 00 ..... I• ••• •••
Minimum 4' Separation From Groundwater. 07� r'••�`-....
'
Minimum 100' Separation From Wells in the Area. 1 +, 41CM LF MXRw
Minimum 10' Separation From Water Services. 0'•., No, CE4M,
Minimum 100' Separation From Surface Water or Streams. ��•.., . •
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION- LOT 7 BLOCK 6, TABLELANDS S/D
PERFORMED FOR- SPINFI I
DATE:
PARCEL ID
DGPTI I
(fcc0
PROJECT No•M0488
TECHNICIAN: T. L. KIMBROUGH
TEST HOLE #1
SILTY ORGANICS/OB
DRY BROWNISH POORLY
GRADED SANDS W/GRAVELS
GP—SP
MEDIUM COMPACTED
DRY SANDY GRAVELS
GM
:E
SLOPE
SITE PLAN
CURBKEY
Tot THH1
Y
w
$c_ FUTIRE AS9UILT
�0
PERCOLATION RATE;. 42 (MINANCII) FERC. I[OLE DIA. 6 (NCI IES)
TEST RUN BETWEEN. 4.5 FF. and 5.5 FT.
WAS GROUNDWATER ENCOUNTERED? NO IF YES C NI IAT DEPTH''
TOTAL DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 10/29/04
COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. I, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE- 11/2/04
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH OF INET
WATER(INCHES)
(INCHES)
DROPDATE
9/28/041
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
12:05
10.0"
CIIARGE
2
12:35
30
9.25"
0.75"
3
12:35
11.0"
RECHARGE
4
13:05
30
10.375"
0.625"
5
13:05
11.0"
RECHARGE
6
13:35
30
1 10.25"1
0.75"
PERCOLATION RATE;. 42 (MINANCII) FERC. I[OLE DIA. 6 (NCI IES)
TEST RUN BETWEEN. 4.5 FF. and 5.5 FT.
WAS GROUNDWATER ENCOUNTERED? NO IF YES C NI IAT DEPTH''
TOTAL DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 10/29/04
COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. I, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE- 11/2/04
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION. LOT 7, BLOCK 6, TABLELANDS S/D
PERFORMED FOR- SPINFII
DATE: 9/28/2004 PROJECT No•M0488
PARCEL IDS'- TECHNICIAN: T. L. KIMBROUGH
DEPTII TEST HOLE # 2
(tap
1 _- SILTY ORGANICS/OB
2
3
4
5
G
DRY BROWNISH POORLY
GRADED SANDS W/GRAVELS
GP—SP
NET TIME
(MINUTES)
6
NET DROP
(INCHES)
7
8
12:20
MEDIUM COMPACTED
12.0"
CHARGE
DRY SANDY GRAVELS
9
GM
10-
011121314
10.25"
1.75"
11-
I
12-
12.0"
13-
14-
13:20
BOH
10.25"
15
16
13:20
17
RECHARGE
is
13:50
19
10.25"
1.75"
SLOPE
0%
SITE PLAN
CURBKEY
Tot TH1
0
SEE FUTURE ASBU4.T
PERCOLATION RATE;_ 17 OIINANCII) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4.5 PT. and 5.5 FT.
WAS GROUND WATER ENCOUNTERED? NO IF YES e WHAT DE•PTIP
TOTAL DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 10/29/04
COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFOR-MED BY VETECH ENGINEERING TECHNICAL SERVICE. 1, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE: 11/2/04
G
GLOSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH RF
(INCHES)
NET DROP
(INCHES)
T HOLE PRESOAKED PRIOR TO TESTING:
12:20
12.0"
CHARGE
12:50
30
10.25"
1.75"
I
12:50
12.0"
RECHARGE
13:20
30
10.25"
1.75"
13:20
12.0"
RECHARGE
13:50
30
10.25"
1.75"
PERCOLATION RATE;_ 17 OIINANCII) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4.5 PT. and 5.5 FT.
WAS GROUND WATER ENCOUNTERED? NO IF YES e WHAT DE•PTIP
TOTAL DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 10/29/04
COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFOR-MED BY VETECH ENGINEERING TECHNICAL SERVICE. 1, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE: 11/2/04
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 7, BLOCK 6, TABLELANDS SUBDIVISION
GENERAL:
The scope of this project includes the procurement and placement of a new
1,500 -gallon septic tank at the location shown on the Site Plan. Work also
includes the construction of two new 84' long X 5' wide X 4' effective depth
absorption trenches at the location also shown on the Site Plan. The
distribution line in the trench will be placed at 2' below the existing ground
surface. Total depth of the trench will be 6' below the existing ground
surface. A Zabel Flow Splitter Valve must be placed to insure even flow to
each trench. A separation distance of 200' from any well and 100' between
the septic tank and absorption trench and any surface water must also be
maintained. A minimum of 3' of fill is required over the absorption trenches
and 4' over the septic tank. In lieu of the required fill 2" of insulation and 2' of
fill may be placed.
2. Construction shall be in accordance with the approved site plan, design
drawings, Municipal Permit with any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal Regulations.
3. The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the location
of all lot lines. The Contractor must also verify the location of wells in the
area and assure that the separation distances are met.
4. Unless specifically agreed otherwise, the contractor shall be responsible for
final grading areas subsequently depressed from soil settling. Property
owner shall be responsible for revegetation of affected areas unless
specifically agreed otherwise.
5. Contractors installing wastewater disposal systems must be certified by the
Municipal Department of Health and Human Services for system installations.
Owners installing their own systems must receive prior approval from
D.H.H.S. before beginning system installation.
SEPTIC TANK INSTALLATION
A new 1,500 -gallon septic tank must be procured from an approved source
and installed at the location shown.
2. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shall include two 4" cleanouts for pumping access.
Lot 7, Block 6, Tablelands
November 5, 2004
Page 2 of 3
3. The septic tank shall be sufficiently bedded to prevent settling or shifting of
the tank.
4. All standpipes on the septic tank shall extend a minimum of 12 inches above
final grade.
5. Tanks installed without 4' of cover shall have a minimum of 2" of direct burial
insulation.
6. A foundation cleanout shall be installed one to four feet from the building
foundation. Two cleanouts are required between the tank and the drainfield.
7. Final grading over the tank shall be such that a positive slope exists away
from the septic tank.
DRAINFIELD CONSTRUCTION:
1. The drainfield shall be constructed to the dimensions shown on the design.
The bottom of the trench shall be within 2" of level.
2. Distribution piping must be placed level with perforations down atop a level
bed of drainfield rock. Rock should then be placed over the pipe to provide a
minimum of 2" of cover.
3. A silt barrier or geotextile fabric must be placed between the drainfield rock
and the natural soil backfill.
4. Monitor tubes must be 4" in diameter and installed at the locations shown on
the design. The portion below ground must be perforated.
5. Contractor shall verify the septic tank and drainfield are a minimum 1 00'away
from any private water wells in the area, 150' from a Class "C" Well or 200'
from any community well.
6. Direct bury insulation must be placed over the distribution system if less than
3' of backfill depth is available. Finish grade over the trench must be
mounded to prevent settlement or depressions.
7. Grade area surrounding the absorption trench to drain away.
8. A minimum 2' of accepting soil is required below the drainfield rock for a 5'
wide trench. Contractor shall verify this condition prior to placement of the
rock. All pockets of unacceptable materials must be removed and replaced.
Lot 7, Block 6, Tablelands
November 5, 2004
Page 3 of 3
MATERIAL SPECIFICATIONS:
Septic tanks must be constructed by a Municipally approved septic tank
manufacturer.
2. The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated and
solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and ASTM D2662
or A.B.S. (perforated and solid).
3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow
Chemical Co. Styrofoam HI or equal).
4. Septic tank inlets and outlets shall be fitted with watertight couplings
(Caulder, Femco, or equal).
5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed
between the final drain rock layer and the native soil layer.
6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the
#200 sieve.
INSPECTIONS:
Municipal Ordinance requires a minimum of two inspections. These inspections
must be conducted under the supervision of a professional engineer registered
in the State of Alaska. The first inspection must be conducted after the
excavation of trenches, beds or pits and before the installation of any gravel. A
septic tank may be set in place, but may not be backfilled.
The second inspection must be conducted after the placement of the geotextile
fabric, gravel, distribution piping, standpipes, cleanouts and insulation. No
backfill should be in place at the time of inspection.
Contractor shall provide a copy of all field survey layout and construction notes
for use in preparing the certified as -built of the completed system.
Municipality of Anchorage
Development Services Department
• Building Safety Division : `e
Onsite Water and Wastewater Program µ e
4700 South Bragaw St. s A [ T
P.O. Box 196650 Anchorage, AK 99519-6650
www.muni.org/onsite
(907)343-7904
ON-SITE SEWER/WELL SUBMITTAL COMMENT SHEET
To: Anderson Engineering
Legal description: The Tablelands Subdivision, Block 6. Lot 7
The attached paperwork has been reviewed and is being returned for the following reasons:
❑ Original signature or stamp missing on
❑ Calculation error in design. _
❑ Additional soils information needed.
❑ Water monitoring results inadequate.
❑ Discrepancy in Information submitted. _
❑ Topographic information missing or inadequate. _
❑ Incomplete; missing _
❑ Incomplete; missing _
❑ Additional adequacy test information needed.
❑ Water sample unacceptable. _
❑ Measured/proposed distances/dimensions missing. _
❑ Locations of all soils, percolation and water monitoring tests not shown.
® Proposed system too deep for soils information submitted. Proposed system likely too deep,
❑ Well log required.
❑ Omission in narrative. _
❑ Insufficient fill over tank or field._
❑ Other. _
Name of reviewer. Julie Makela. P.E.
Date: 11/10/04
Please supply the necessary information and re -submit your request.
LEAVE THIS FORM ATTACHED TO THE PAPERWORK
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 522-6779 FAX
November 5, 2004
Municipality of Anchorage
Development Services Department
On -Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject: Lot 7, Block 6, Tablelands Subdivision
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 7, Block 6, Tablelands Subdivision intends to construct a new five -
bedroom home on the lot. We are therefore requesting a permit be issued for the
construction of a new septic system to serve the new home. The subdivision is
currently served by a community water system. No conflicts exist with adjacent septic
systems or wells and the proposed septic system on this lot. The attached Site Plan
and backup documentation identify the location and configuration of the proposed
septic system and alternate site. The current drainage pattern is identified on the Site
Plan. The drainage pattern will be maintained after development of this lot is complete.
Test holes recently placed on the lot indicated silty sand and gravel in the area of the
absorption trenches. The accepting soils were tested and found to have a percolation
rate of 17 to 60 minutes per inch. The system is designed for the slower percolation
rate. No groundwater was found in either test hole during placement and none was
found during the monitoring period, which included the wettest period of the year. We
recognize the bottom of the test hole is only 4.5' below the bottom of the proposed
absorption trench. No bedrock has been encountered anywhere in Tablelands
Subdivision, but the test hole will be deepened prior to construction to verify the lack of
bedrock. Our design includes the placement of a new 1,500 -gallon septic tank along
with 2 - 53' long by 3' wide by 8' effective depth absorption trenches to collect and treat
the sewage generated in the house. The bottom of the trench will be 9.5' below the
surface. The distribution pipe will be 1.5' below the surface. A flow splitter valve will be
placed to assure even flow to each trench. A minimum of T of cover will be placed atop
the trenches and a minimum of 4' of cover will be placed atop the new septic tank.
Lot 7, Block 6, Tablelands Subdivision
November 5, 2004
Page Two
The ground surface on the lot slopes at shallow grades from east to west as shown on
the Site Plan. The absorption trenches will be constructed parallel with the slope of the
ground surface as much as possible in conformance with Municipal requirements. The
new septic system will be constructed a minimum of 10' from the water service
proposed for the lot and on adjacent lots. It will also be constructed a minimum of 100'
from any surface water in the area.
If the system is constructed in accordance with our design the following statements
apply:
1. The system, if constructed as designed, will have no adverse impact on the wells
in the area or those to be constructed in the future.
2. The system, if constructed as designed, will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
3. The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
4. The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely, n, n
Yr "' 6 F. �''`�
Michael E. Anderson, P.E.
Attachments
7`7F
j 49th
4MICHAEL E. ANDERSON
\ NO. CE -4381 ,
LOT 7, BLOCK 6, TABLELANDS SUBDIVISION
DESIGN FACTORS:
5 Bedroom Home
Perc. Rate: 31-60 Min./inch
Application Rate: .45 GPD/SF
SYSTEM REQUIREMENTS:
Deep Trench System
1,500 Gallon Septic Tank
8' Drainfield Rods
5 Bedrooms X 150 GPD/.45 GPD/SF (A plication Rate) = 1,666.7 SF Absorption Area
1,666.7SF/16 SF/LF = 104.16 LF Trench Length
THEREFORE: Construct 2 New 53' Long x 3' Wide x 8' Effective Depth Absorption Trenches.
At the Location Shown. Flow Line Elevation in Trenches to be 1.5' Below Original Ground Surface. Total
Depth to be 9.5' Below Existing Ground. Provide 3' of Cover Over Trench and 4' Over Tank or Provide
2" of Insulation and 2' of Cover. Maintain 100' Separation Between Proposed or Existing Wells and the
Septic Tank and Absorption Trench. Place Flow Splitter Valve to Insure Even Flow to Each Trench.
Natural
Backfill
Geotextile
Fabric
6" 4" Perforated
PVC (Holes Down)
8'0" 1 I ,>--t— Oreinfield Rock
TYPICAL DEEP TRENCH SECTION
(NO SCALE)
NOTE: Grade Area Over Trench to Drain Away.
Minimum 6' Separation From Bedrock.
Minimum 4' Separation From Groundwater.
Minimum 200' Separation From Welts in the Area.
Minimum 100' Separation From Surface Water or Streams. .
Minimum 10' Separation From Water Service Line.
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 7, BLOCK 6, TABLELANDS SUBDIVISION
GENERAL:
The scope of this project includes the procurement and placement of a new
1,500 -gallon septic tank at the location shown on the Site Plan. Work also
includes the construction of two new 53' long X 3' wide X 8' effective depth
absorption trenches at the location also shown on the Site Plan. The
distribution line in the trench will be placed at 1.5' below the existing ground
surface. Total depth of the trench will be 9.5' below the existing ground
surface. A Zabel Flow Splitter Valve must be placed to insure even flow to
each trench. A separation distance of 200' from any well and 100' between
the septic tank and absorption trench and any surface water must also be
maintained. A minimum of 3' of fill is required over the absorption trenches
and 4' over the septic tank. In lieu of the required fill 2" of insulation and 2' of
fill may be placed.
2. Construction shall be in accordance with the approved site plan, design
drawings, Municipal Permit with any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal Regulations.
3. The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the location
of all lot lines. The Contractor must also verify the location of wells in the
area and assure that the separation distances are met.
4. Unless specifically agreed otherwise, the contractor shall be responsible for
final grading areas subsequently depressed from soil settling. Property
owner shall be responsible for revegetation of affected areas unless
specifically agreed otherwise.
5. Contractors installing wastewater disposal systems must be certified by the
Municipal Department of Health and Human Services for system installations.
Owners installing their own systems must receive prior approval from
D.H.H.S. before beginning system installation.
SEPTIC TANK INSTALLATION
A new 1,500 -gallon septic tank must be procured from an approved source
and installed at the location shown.
2. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shall include two 4" cleanouts for pumping access.
Municipality of Anchorage
On -Site Water and Wastewater Program
(907)343-7904
CERTIFICATE OF ON-SITE SYSTEMS APPROVAL
Parcel I.D. 051-801-30
1. GENERAL INFORMATION
Expiration Date: 'Z- 20 /16
Complete legal description The Tablelands Block 6 Lot 7
Location (site address) 23129 Whispering Birch Dr, Peters Creek, AK
Current Property owner(s) Lorenz Day phone 229-5643
Mailing address
Real Estate Agent Hope Russo Day phone 301-0701
2. TYPE OF DWELLING:
® Single Family (w/wo ADU)
❑ Duplex
❑ Multiple Dwellings (Single Family and/or Duplex)
FEB 21 2014
3. NUMBER OF BEDROOMS: 'os
4. TYPE OF WATER SUPPLY:
Individual Well ❑
Individual Water Storage ❑
Community Class C Well ❑
Public Water System
TYPE OF WASTEWATER DISPOSAL:
Individual
Holding Tank
❑
Cbmmunity
❑
Public Sewer
❑
Received by: -`--" z � r Date:
i 4S
COSA to be released to the engineer, unless otherwise requested by the engineer.
COSA Fee $ 1540
Date of Payment a( )/q C4_
Receipt Number 65TV2D5'
COSA # O SC4q 0 O 571
Date of Payment
Receipt Number
Waiver
5. STATEMENT OF INSPECTION BY ENGINEER
As certified by my seal affixed hereto and as of the validation date shown below, I verify that my investigation,
based on procedures outlined in the Certificate of On -Site Systems Approval Guidelines for this application,
shows that the on-site water supply and/or wastewater disposal system is (are) safe, functional and adequate
for the number of bedrooms and type of structure indicated herein. I further verify that based on the information
obtained from the Municipality of Anchorage files and from my investigation and inspection, the on-site water
supply and/or wastewater disposal system is(are) in compliance with all applicable Municipal and State codes,
ordinances, and regulations in effect at the time of installation.
Name of Firm NorthRim Engineering Phone 694-7025
Address PO Box 770724 Eagle River
Engineer's Printed Name Steve Eng
6. DSD SIGNATURE
L/ System #1 Approved for
System #2 Approved for
Disapproved.
Conditional approval for
5 bedrooms.
bedrooms.
Date 2/21/2014
bedrooms, with the following stipulations:
Lll D O
By: ��,-�i�� �Gcvta� Original Certificate Date: 'Z-/ Z
The Municipality of Anchorage Devlopment Services Division (DSD) Issues Certificates of On -Site Systems Approval (COSA) based only
upon the representations given in paragraph 5 by an independent professional civil engineer registered in the State of Alaska. The
Municipality of Anchorage is not responsible for errors or omissions in the professional engineer's work.
7. ATTACHMENTS:
COSA Checklist X Nitrate Advisory
Septic System Advisory Arsenic Advisory
Well Flow Advisory Other
COSA blue sheet 9-1-12 tloc
If more than 1 septic system is on the lot:
. COSA Checklist # _of _
Structure served by this system
Certificate of On -Site Systems Approval Checklist
Legal Description:�%tifF %/-1 BLic,�} �//] S' B6
47 Parcel ID: O 518'0130
A. WELL DATA IVA
Well type If A, B, or C provide PWSID #
Well Log (Y/N)
Date completed Sanitary seal (YIN)_
Wires properly protected (YIN)
Total depth ft Cased to ft
Casing height (above ground) in.
FROM WELL LOG
AT INSPECTION
Date of test
Static water level
Well production g.p.m.
g.p.m.
WATER SAMPLE RESULTS:
Coliform colonies/100 mL Nitrate mg1L
Arsenic ug/L Date of sample:
Collected by:
B. SEPTIC/HOLDING TANK DATA
Tank Type/Material _S TFp _S Tc F[_
Date installed
Tank size Z OOa gal. Number of Compartments 2
Cleanouts (Y/N) _
Foundation cleanout (Y/N) Depression over tank (Y/N) LAL
High water alarm (Y/N)
Date of pumping / S / Pumper �f
C. ABSORPTION FIELD DATA
Date installed -sSoil rating (g.p.d./ft2 or ft2/bdrm) 0#3
System typeRQ tS eJ- Bad
Length /70 ft. Width /S ft.
Gravel below pipe 19.5- ft.
Total depth ft. Eff. absorption area 2SSOfl Monitoring tube Depression over field .A.
Date of adequacy test 20 / Results (Pass/Fall) For _5_ bedrooms
Fluid depth in absorption field before test in. Water added ]SU' gal.New depth O in.
Elapsed Time: min. Final fluid depth in.
Absorption rate >_ ,SSa g.p.d.
Any rejuvenation treatment (past 12 mo.) (Y/N & type) Ali) diffik:: If yes, give date
D. LIFT STATION
Date installed Size in gallons Z -S Manhole/Access (YIN)
"Pump on" level at in. "Pump off" level at �_ in. High water alarm level at ` in.
Datum AS d 7 A *+, Cycles tested Meets alarm & circuit requirements?
E. SEPARATION DISTANCES
AC
WELL ON LOT TO: / v A
Septic tank/lift station on lot
Absorption field on lot
Public sewer main
Sewer /septic service line
Animal containment areas
On adjacent lots
On adjacent
Public sewer manhole/cleanout
Holding tank
Manure/animal excrete storage areas
SEPTIC/HOLDING TANK ON LOT TO:
Building foundation S Property line /D Absorption field S f
Water main /Lf'f Water service line /� �f Surface water /0 6
Wells on adjacent lots 20 d "i"
ABSORPTION FIELD ON LOT TO:
Property line /r? "f Building foundation /� f Water main /�Q
Water Service line Y/— 4 —/_Y Surface waterI G6 If- Driveway, parking/vehicle Storage—
Curtain drain 46d/GL Wells on adjacent lots
F. COMMENTS
G. ENGINEER'S CERTIFICATION
I certify that 1 have determined through field inspections and
review of Municipal records that the above systems are in
conformance with MOA COSA guidelines in effect on this date.
Engineers Printed Name
Date
COSA brown sheet_10-10-12.doc
Municipality of Anchorage
Development Services Department
' Building Safety Division
On -Site Water and Wastewater Program
4700 South Bragaw St.
ww P.O. Box 196650 Anchorage, AK 99519650
J ww 7ge.ak.us
(90)343-7904
o• aY
e
S• tTr
C�
`� C- " CERTIFICATE OF HEALTH AUTHORITY APPROVAL
C
FOR A SINGLE FAMILY DWELLING
Parcel I.D. 051.601.30 HAA # OS025�1
Expiration Date: I V4! 0 A?7U p
1. GENERAL INFORMATION
Complete legal description Lot 7, Block 6, The Tablelands Subdivision
Location (site address or directions) 23129 Whispering Birch Drive
Current Property owner(s) Spinell Homes, Inc. Day phone 344.5678
Mailing address
Lending agency
Mailing address
Real Estate Agent
Mailing Address
1900 Northern Lights Blvd. Anchorage, AK 99517
Unless otherwise requested, HAA will be held by DSD for pickup.
2. NUMBER OF BEDROOMS:
3. TYPE OF WATER SUPPLY:
Individual Well
Individual Water Storage
Community Class Well
Public Water System
Five 5
Day phone
Day phone
TYPE OF WASTEWATER DISPOSAL:
❑
Individual On-site
❑
Individual Holding tank
❑
❑
Community On-site
❑
®
Public Sewer
❑
The Municipality of Anchorage Development Services Department (DSD) Issues Certificates of Health Authority
Approval (HAA) based only upon the representations given in paragraph 5 by an independent professional civil
engineer registered in the State of Alaska. Certificates of Health Authority Approval are required for the transfer of
title (except between spouses) for properties served by a single family on-site wastewater disposal and/or water
supply system. DSD also Issues HAAs upon request to homeowners. Certificates of Health Authority Approval are
valid for 90 days from the date of Issue for properties served by a private or Class C well and may be reissued with
new water sample results less than 30.days old. (Certificates may be reissued for a period of up to one year with
valid water samples.) Certificates are valid for one year for properties served by Class A or B wells or a public water
system. The Municipality of Anchorage is not responsible for errors or omissions in the professional engineer's
work.
4. STATEMENT OF INSPECTION BY ENGINEER
As certified by my seal affixed hereto and as of the validation date shown below, I verify that my Investigation,
based on procedures outlined in the Health Authority Approval Guidelines for this application, shows that the on-
site water supply and/or wastewater disposal system is(are) safe, functional and adequate for the number of
bedrooms and type of structure indicated herein. I further verify that based on the information obtained from the
Municipality of Anchorage files and from my investigation and inspection, the on-site water supply and/or
wastewater disposal system is(are) in compliance with all applicable Municipal and State codes, ordinances,
and regulations in effect at the time of installation.
Name of Firm Anderson Engineering Phone 522.7773
Address _ P.O. Box 240773 Anchorage. AK 99524
Engineer's Printed Name Michael E. Anderson, P.E. Date 611512005
5. DSD SIGNATURE
Approved for bedrooms.
Disapproved.
Conditional approval for _rte bedrooms, with the following stipulations:
Six inches of topsoil must be placed on the mound absorption field and
be sufficiently vegetated to prevent erosion. The work shall be completed
no later than 7/31/2005.
HAA Checklist X Maintenance Agreements
Septic System Advisory Supplemental Engineer's Report
Well Flow Advisory Other
BY �D Q_�� h 0` 0,6' Original Certificate Date:It
S
(ra,.. IZW)
E
Municipality of Anchorage
Development Services Department
Building Safety Division
On -Site Water & Wastewater Program
4700 South Brag" St.
P.O. Box 196650 Anchorage, AK 99519-6650
www.ci.anchorage.ak.us
(907)343-7904
HEALTH AUTHORITY APPROVAL CHECKLIST
Legal Description: _ Lot 7. Block 6. The Tablelands Subdivision Parcel ID: 051-801-30
A. WELL DATA
Well type
Date completed _
Total depth ft.
Date of test
Static water level
if A, B, or C provide PWSID #
Sanitary seal (Y/N)_
Cased to ft.
FROM WELL LOG
Well production
WATER SAMPLE RESULTS:
ft.
Well Log (Y/N)
Wires properly protected (YIN)
Casing height (above ground) in.
AT INSPECTION
ft.
Coliform oolonies/100 ml. Nitrate mg.fl. Other bacteria colonies/100 mi.
Date of sample: Collected by:
B. SEPTICIHOLDING TANK DATA
Tank Typeftaterial STEPISteel Date installed OW005
Tank size 2.000 gal. Number of Compartments 3 Cleanouts (Y/N) Y
Foundation cieanout (Y/N) Y Depression over tank (Y/N) N High water alarm (Y/N) Y
Date of pumping Pumper New Construction
C. ABSORPTION FIELD DATA
Date installed 61912005 Soil rating (g.p.d./W or ftz/bdrm).3 GPDISF System type Raised Bed
Length 170 ft. Width J5 ft. Gravel below pipe _.5 ft.
Total depth Q ft. Eff. absorption area 2.550 fF Monitoring tube Y Depression over field N
Date of adequacy test Results (Pass/Fail) For _ bedrooms
Fluid depth in absorption field before test _ in. Water added_ gal. New depth_ in.
Elapsed Time: _ min. Final fluid depth _ in. Absorption rate >= g.p.d.
Any rejuvenation treatment (past 12 mo.) (Y/N & type) _N If yes, give date
D. LIFT STATION
Date installed 61812005 • Size in gallons 250 ManhoWAccess (Y/N) Y
'Pump on' level at 42 in. 'Pump ofr level at!Q in. High water alarm level at 44 in.
Datum Bottom of Tank Cycles tested New Construction Meets alarm & circuit requirements? Y
E. SEPARATION DISTANCES
SEPARATION DISTANCES FROM WELL ON LOT TO:
Septic tank/lift station on lot NIA
Absorption field on lot NIA
Public sewer main NIA
Sewer /septic service line NIA
On adjacent lots NIA
On adjacent lots NIA
Public sewer manhole/cleanout NIA
Holding tank NIA
SEPARATION DISTANCES FROM SEPTIC/HOLDING TANK ON LOT TO:
Building foundation >5' Property line >T Absorption field >S
Water main >10' Water service line >10' Surface water >100'
Wells on adjacent lots >200'
SEPARATION DISTANCE FROM ABSORPTION FIELD ON LOT TO:
Property line >10' Building foundation >10' Water main >10'
Water Service line >10' Surface water. >100' Driveway, parking/vehide storage >5'
Curtain drain None Noted Wells on adjacent lots >2W
F. COMMENTS
G. ENGINEER'S CERTIFICATION �P:.= """"'^l
I candy that I have determined through field inspections and 49th
review of Municipal records that the above systems are in
conformance with MOA HAA guidelines in effect on this date. _ _. rauaa �rmcrrssoi
Engineer's Printed Name Michael E Anderson. P.E. `i `• Na cc -4=
Date 6175105 •e•4a�iSS��
HAA Fee $ S7 'f" % !7V° % via. fi A ft
Date of Payment to, fes, pOS
Receipt Number
(Rev. 12100)
t'n
Fee
Date of Payment
Receipt Number
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 522-6779 FAX
MEMORANDUM
DATE: June 15, 2005
TO: Julie Makela, P.E.
FROM: Mike Anderson, P.E.
SUBJECT: Lot 7, Block 6, The Tablelands Subdivision
Conditional Health Authority Approval
The owner of Lot 7, Block 6, The Tablelands Subdivision intends to place topsoil and
seeding on the newly constructed mounds, but cannot accomplish the task until later
this month. We are therefore requesting a conditional Certificate of Health Authority
Approval be issued so the property can be closed.
Attached is the as -built of the recently reconstructed septic system along with the
Health Authority Checklist and the Certificate of Health Authority Approval. A fee of
$115.00 has been paid for the issuance of the conditional certificate along with the fee
of $175.00 for the rush approval and $57.50 for the engineer review. Please let me
know if you have any questions.
O
N
i
0
N
z
0
m.'
z
0
0
O
70
z
m
N
U)
2
U)
0
I �
m
=N mr7C
C
mCc) M�A0ao
"
N r
O O C
A D
cn
Pto ZZ7
C N
om.
C
r-.
mxcar)0=i'''-°
D 0mo--Do AOm
z amri m� pm;
_mZAz�=aim
O Vl z z m = � '<
�mOzm ZUnm -Xr 0 0
C) n-aoxcnzr"�
m CO N n m A m m N
rn 0O'O�:L7f�nXNmm
C OTNI n-I�CO un.7-
o ;u Z706zr�-'
z't 0,0 0 -i 0 :� X Oo -
C) oZi)GOMOO�„x
�
�Z.
oco=)zzm >-+�
ox o
{ z
rn0 z0N-rz-"rnDoo
nx
-nOZoo1 --4o Fn cn +
e.SILrIIa
b
AFia,'
j a
`
H
f
• M
10
•
♦ goo'••,
♦� O'S •••••
,.
Cj
••
ti
N
O
O
�P
I
N
0