HomeMy WebLinkAboutSUN VALLEY BLK 1 LT 4Sun Volley
Block 1
Lot 4
#078-111-10
MOA has confirmed that the septic system has
not been installed.
MUNICIPALITY OF ANCHORAGE
On -Site Water & Wastewater Program
PO Box 196650 4700 Elmore Road
Anchorage, Alaska 99519-6650 Phone: (907) 343-7904 Fax: (907) 343-7997
http://www.muni.org/onsite
On -Site Water & Wastewater System Permit
Permit Number: OSP241241
Work Type: WellSeptic Initial
Tax Code Number: 07811110000
Site Legal Address: SUN VALLEY BLK 1 LT 4 G:0859
Site Mailing Address: 3083 HILAND RD, Eagle River
Owner: EVERSON KENNETH L & M INGRID
Design Engineer: FORGE ENGINEERING
This permit is for the construction of:
Effective Date:
Expiration Date:
Lot Size in Sq Ft
Total Bedrooms:
8/26/2024
8/26/2025
272344
Q Disposal Field Q Septic Tank ❑ Holding Tank ❑ Privy Q Private Well ❑ Water Storage
All construction shall be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80)
3. The wastewater code requires inspections during the installation. The engineer shall notify the Development
Services Department per AMC 15.65. Provide notification by calling (907) 343-7904 (24/7).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
shall be either:
a. Opened and Closed on the same day, or
b. Covered, sealed, and heated to prevent freezing
Special Provisions:
3
A test hole is required prior to construction of the absorption field, in the location shown on the site plan, to
confirm minimum separation to impermeable soil and seasonal high groundwater, as well as percolation
rate. Construction may proceed at your own risk prior to 7-day groundwater monitoring. If results require
a design change, construction shall stop pending approval of a change order. Please submit results with
the inspection report (or change order, if required).
The water line alignment is to be shown on the record drawing.
Received By:
i
Issued By:
Date:
Date: F� t-���
MUNICIPALITY OF ANCHORAGE
mom
Community Development Department
Phone. 907 -343-7904
Development Services Division Fax: 907-343-7997
On -Site Water & Wastewater Program
ON -SITE SEWER/WELL PERMIT APPLICATION ;r
Parcel 1. D. 078-111 -10
Property owner(s) Kenneth & Ingrid Everson Day phone
Mailing address 2301 Hiland Road, Eagle River, Anchorage, AK, 99577
Site address
�� 3083 Hiland Road, Eagle River, Anchorage, AK, 99577
Legal description (Sub'd., Block & Lot) Sun Valley, Block 1 Lot 4
Legal description (Township, Range & Section)
Lot Size - 272,344 _Sq. Ft. Number of Bedrooms 3
APPLICATION IS FOR:
APPLICATION IS AN:
TYPE OF DWELLING:
(N all that apply)
Absorption Field
RX
Initial RX
Single Family (SF) RX
(w/wo AD U)
Septic Tank
N
Upgrade R
Duplex ❑
(D)
Holding Tank
R
Renewal R
Multiple Dwellings ❑
Privy
❑
(SF and/or D)
Private Well
FX]
Water Storage
R
THIS APPLICATION INCLUDES A VARIANCE / WAIVER REQUEST FOR:
Distance:
I certify that the above information is correct. I further certify that this is in accordance with
applicable Municipal Codes.
(Signature of property owner or authorized agent)
Permit/Rush Fees:. '3 / -?-
Date of Payment:
Receipt Number:
Permit No. 0 S
Waiver Fees:
Date of Payment:
Receipt Number:
Waiver No.
Permit App_'-'- '. :':c ,
August 5, 2024
MOA Development Services, On-Site Water & Wastewater Program
4700 Elmore Rd
Anchorage, AK 99507
Subject: Sun Valley, Block 1 Lot 4 – 3083 Hiland Road
Septic system design
Dear On-Site Services Engineer:
The owner of the above lot intends to build a 3-bedroom home on the property, so we are
submitting this permit application for the construction of a new well and septic system. The
attached site plan identifies the location of the home as well as the propo sed well, septic location
and alternate site. No conflicts exist between this proposed system and any other well or septic
system, whether on this lot or adjacent lots.
The ground surface on the lot slopes from the east to the west. The slopes are pretty uniform at
between 25-30%. Although the trench will be built on steep slopes, it meets the criteria of
15.65.210.B.4.a.i-iv, including the vertical separation distances measured from the appropriate
sides of the trench. The profile demonstrates the required separation distances.
As the home site has moved from an older design with test holes, we are using the test holes in the
file to design the system, with a new test hole specified to be dug prior to installation. The file is
unclear exactly which of the two test holes are which. We have designed using the deeper of the
two test holes and will ensure the new test hole dug demonstrates adequate vertical separation to
impermeables and groundwater.
Wells on this and adjacent lots are shown. The new system will be a minimum of 100’ from all
wells and surface water, and more than 5’ away from the septic tank. The alternate site is located
more than 6’ away. Please refer to the attached test hole logs, plan and profile pages for the septic
design. If this design is followed, there will be no adverse impacts to adjacent properties.
Sincerely,
Benjamin Schiller, PE
Municipality of Anchorage
On-site Water and Wastewater
REVIEWED FOR CODE COMPLIANCE
OSP241241, Curtis Townsend, 08/26/24
SUN VALLEY, BLOCK 1 LOT 4 c,
1',
oF�
Benja i Schiller
' �'F�• CE 2592
9/26/2124
SUN VALLEY, BLOCK 1 LOT 4 P-1
DESIGN FACTORS: SYSTEM REQUIREMENTS:
450 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM
PERK RATE: 5.8 MIN/IN 1000-GAL SEPTIC TANK
APPLICATION RATE: 0.8 GPD/SF
450 GPD / 0.8 GPD/SF / 5' WIDE * 0.58 RED FACTOR [3' DEEP] = 65.6' LF TRENCH REQUIRED
(66' LF SPECIFIED)
BOTTOM OF TRENCH: 11' BELOW GRADE ON UPHILL SIDE
FLOW LINE ELEVATION: 8' BELOW GRADE (7.0' ON DOWNHILL SIDE)
n11
PROVIDE ADDITIONAL FILL TO
ACCOUNT FOR SETTLEMENT
:XTILE FABRIC
FORATED PVC (HOLES DOWN)
=1ELD ROCK
�5 i
TYPICAL TRENCH SECTION
(NO SCALE)
NOTES:
1. GRADE AREA OVER TRENCH TO DRAIN AWAY
2. PROVIDE 3' OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2'
WITH 2" OF INSULATION
3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER
THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY
E N G I N E E R I N G
m
.. �
..........
• ' • • • • • Benja ' Schiller '
9F� • CE 12592
9 26 2024 , . •�V , w
PROF
z
w
CL
w
(1)
0 0 w
z w 0
< U) <
(.9 0
CJ
z IL
0
U)
w
w
U)
O
0
.441
z
<
(D
f
z
1,
I"
<
44f
w
F—
CL
o
w
W U)
N
F—
w
<
cV
z
w
0
rr
LU
C.)
m
z
0
w
Lij
LL-
C)
Uw
)
U)
0
ro y
c)
w
0-
0
-i
U)
SOILS LOG AND PERCOLATION TEST
ENGINEERING
LEGAL DESCRIPTION: SUN VALLEY B I L4
PERFORMED FOR: CRAIG TAYLOR
DATE: 9 / 16 / 24 PARCEL ID#: 0 7 8-111-10
DEPTH TEST HOLE
(feet)
DATE
READING
START TIME
NET TIME
(MINUTES)
WATER O
(INCHES)
NET DROP
(INCHES)
9/16
1
1:00
30
1 16
616
5 6
2
1:30
30
1 16
66
5 6
3
2:00
30
1 1s
6 3
5 3
PERCOLATION RATE: 5.8 (MIN/INCH)
NO WAS WATER ENCOUNTERED?
- IF YES @ WHAT DEPTH?
16' DEPTH TO WATER AFTER MONITORING
9 / 2 5 / 24 DATE OF MONITORING
COMMENTS: USCS SOIL CLASSIFICATION WAS VISUALLY DETERMINED
SITE PLAN
TECHNICIAN: M. JAKUBISIN
MUNICIPALITY OF ANCHORAGE
Development Services Department Phone: 907-343-7904
On-Site Water & Wastewater Section Fax: 907-343-7997
Mailing Address: P. O. Box 196650 * Anchorage, Alaska 99519-6650 * www.muni.org
Septic System Owner-installer Agreement
The On-site Water and Wastewater Section (On-site) may issue an approval for a homeowner
to perform work on an on-site wastewater disposal system to serve that individual's owner-
occupied, single-family or duplex home if the homeowner meets and agrees to the following
requirements:
1.The property owner and excavation equipment operator may perform work on no more
than one owner-installation project in a 12-month period.
2.Owner’s projected active involvement with the installation:
_______________________________________________________________________
_______________________________________________________________________
3.The name of the excavation equipment operator: ________________________________
4.I agree that there will be no monetary compensation for installation services rendered.
5.The name of the inspecting engineer: _________________________________________
6.I agree to discuss the following items with the inspecting engineer:
a.Permit design criteria and specifications.
b.Inspection requirements set forth in AMC 15.65.070.
c. Advance notice given to the On-site Water & Wastewater Section for all required
municipal inspections (AMC 15.65.070A).
7.I agree to have the project-specific On-site Wastewater Disposal System Permit available
at the construction site for the duration of all related work.
8.I agree that if the system is an advanced wastewater treatment system (AWWTS), I will
obtain additional installation instructions and approval from the equipment distributor.
As owner of (legal description) ___Sunvalley Lot 4 Block 1______ I agree that the
information above is true and accurate.
Owner’s printed name: _________________________
Owner’s signature: _________________________ Date: ________________
0 4� I -+.e
Magor Mark Begich
Ah iicipality of Anchorage. o
•
P.U. Ka 1'Ni(4i(1 • .b:dum:gc,.11asha r1519b6650 • Tdgdronc (3X)7) 34.4-RWI1 • rns (1977) a4.4•!f^_lNl °
47(X) 13ml-mw Strccl • :lnchomge. Mashn W65(17 s • c r .
w1:w.munLorg
Building Safet}, Division
April 20, 2005
Alison D. Butler
3083 Hiland Road
Anchorage, AK 99516
Subject: On -Site Water and/or Wastewater Permit.
Permit Number: SW040045
Legal Description: Sun Valley Block I Lot 4
Dear Ms. Butler:
An On -Site Water/Wastewater Permit, number SW040045, issued by this office for a single-family
system, expired on April 06, 2005. The permit was valid for 365 calendar days. '
If this was a well permit and the well has been drilled, a well log must be sent to this office for
documentation of the installation and to close the permit.
If this permit was for a wastewater disposal system, an original as -built inspection report must be sent to
this office for review, approval and documentation. This as -built inspection report must be signed by
the licensed Professional Engineer who inspected the installation of the system. As -built inspection
reports are required to be submitted within 30 days of the completion of the system.
If no system was installed under this permit, and you are still planning to install a well or wastewater
disposal system, a new permit must be obtained from this office. A new permit for a second year may
be issued for a fee of $115.00 if the renewal application is received on or before the expiration date of
the original permit.
When applying for anew permit, the fees are: $460.00 for a wastewater permit and $175.00 for a well
permit.
If you have any questions, please call this office at 343-7904.
Sincerely,
od;� -
Daniel J. oth
Program Manager
On -Site Water and Wastewater Program
Enc: Copy of permit
Community, Security, Prosperity
MUNICIPALITY OF ANCHORAGE
Development Services Department
On -Site Water & Wastewater Program
4700 South Bragaw Street
P.O. Box 196650, Anchorage, AK 99519-6650
(907) 343-7904
ON-SITE WASTEWATER DISPOSAL SYSTEM I WATER SUPPLY PERMIT
Initial
Date Issued: Apr 06, 2004
Expiration Date: Apr 06, 2005
Permit Number: SW040045 Parcel ID: 078-111-10
Legal Description: -SUN VALLEY SUBDIVISION BLOCK 1 LOT 4
Design Engineer: 0070 KND Engineering
Owner Name: ALISON D BUTLER
Owner Address: 3083 HILAND ROAD
ANCHORAGE. AK 99516 -
Site Address: 3083 HILAND ROAD
Lot Size: 272344 SO. FT.
Total Bedrooms: 3 Permit Bedrooms: 3
This permit is for the construction of:
Q Disposal Field ❑✓ Septic Tank ❑ Holding Tank ❑ Privy ❑✓ Private Well ❑ Water Storage
All construction must be In accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations (18AAC80 ).
3, The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling
(907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and closed on the same day.
B. Covered, sealed, and heated to prevent freezing.
Received By.
Issued By:
Date: / y
Date:4A
Municipality of Anchorage
--` Development Services Department ;;-
Building Safety Division
" - On -Site Water and Wastewater Program
4700 South Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650
www.ci.anchorage.ak.us
(907) 343-7904
ON-SITE SEWER/WELL PERMIT APPLICATION
FOR A SINGLE FAMILY DWELLING
Parcel I.D. ���—� 1 I Permit Number SW 040045
Property owner(s) Lep'_-; rllqtnm D -ion Dayphone 694-8565
. ... il.�iliZ�7G�d • .. ..� .. -
Legal description (Lot, Block & Sub'd
Legal description (Section, Township & Range) __5l.) D ----> L1i k _& t1(1y r?
Lot Size Z� __;L1Lf Acres Sq.Ft. Number of Bedrooms 3
II�IIIi1�13L�L� �L�I�II>3��7:�
Sewer Only
❑
Well Only
❑
Sewer and Well
®
Water Storage
❑
Sewer Upgrade
❑
THIS PROPERTY CONTAINS:
Hot Tub
❑
Jacuzzi
❑
Swimming Pool
❑
Water Softening Unit
❑
Therapy Pool
❑
certify that the above information is correct. I further certify that this application Is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes.
of property owner or authorized agent)
Permit Fees: ( 9 17 51 -Y 9V 0 Waiver Fees: _
Date of Payment: D�fB�by Date of Payment:
Receipt Number: 14 Receipt Number:
(Rev. 121)0) t �r
INKINM ENGINEERING, INC.
20441 PTARMIGAN BLVD.
EAGLE RIVER, AK 99577-8736
(907)696-8111
March 31, 2004
Municipality of Anchorage
Development Services Department
On -Site Water & Wastewater Program
P.O. Box 196650
Anchorage, AK 99519-6650
Subject: New sewer/well permit — Sun Valley, Block 1, Lot 4
Gentlemen:
The owner has requested we proceed forward to obtain a septic permit on the subject
lot. On November 18, 2002 two test holes were performed for the proposed system.
The results of these tests are attached. The general slope of this lot is from north to
south at a grade of approximately 20-4070.
We have designed our system utilizing the existing testholes that were excavated for
the proposed 3 -bedroom house. The lot will be served by an individual well, located on
the southern portion of the lot. We propose to install one 5' wide shallow trench.
Water was not encountered during the excavation or during monitoring.
There are no public or private wells within 200' of our proposed system location except
as noted. There is no surface water within 100' of the proposed system and there are no
known curtain drains within 50'. We do not expect there to be any adverse effect on
adjacent lots by the development of this system.
If you have any questions, please contact me at 696-6111 /FAX 696-8111.
Respectfully submitted,
KHD Engineering, Inc.
Attachments: On -Site Well and Sewer Application
Wastewater Absorption System Details/Site Plan
Soils Log/Percolation Test
Owner/ Contractor Specs
WELL & WASTEWATER DISPOSAL SYSTEM DETAILS/SITE PLA
SUN VALLEY SUBD. BLOCK 1, LOT 4
NO PUBLIC WELLS WITHIN YBD' Or
PROPOSED SYSTEM.
NO PRIVATE WELLS WITHIN PW OE
PROPOSED SYSTEM EXCEPT AS NOTED.
NO SEPTIC SYSTEMS WITHIN PW OE
PROPOSED WELL EXCEPT AS NOTED.
%� °F. A9s 1
% ��� �
,............, ......
- wonc,rt—e. u rry /
CE 711 / a
1 \ AtbFesstoK�/
DESIGN DETAILS
3 BDRM X 150 GPD = 450 GPD
450 GPD/1.2 GPD PER SO. FT. (1.95 MIN/IN.)= 375 SO. FT
(375/5'(W)) X .58<RF) (3.0' GRAVEL) = 43.5 FT. TRENCH
USE 1 TRENCH - 44 (L) X 5' (W) X 3.0'(D)
Total depth of system Is 6.0' from original grade.
Total depth of gravel below distribution pipe Is 3.0'
IN1LL*1
1. USE A 1000 GALLON SEPTIC TANK, INSULATE IF (4' OF COVER.
2. INSULATE TRENCHES WITH 2' HD BURIAL FOAM.
3. CONTRACTOR WILL ENSURE MINIMUM 2% SLOPE INTO SEPTIC TANK.
4. ADDITIONAL FILL WILL BE ADDED OVER SYSTEM TO ACHIEVE
MIN. 3' COVER IF REQUIRED.
5. CONTRACTOR WILL ENSURE ALL SEPARATIONS TO ADJACENT
WELLS, SEPTICS, LOT LINES, FOUNDATIONS AND ALL OTHER SETBACKS.
PREPARED FOR:
LEE'S CUSTOM DESIGN
11517 OLD GLENN HWY
EAGLE RIVER, AK. 99577
(907) 694-8565
FIELD BOOKS
00' MDfY` SEWAF
Su"R,a SEWAF
ASdXIT: SEWAF
Dw RE:
ACRD FIE: none r
CDWPIITOX
DRAW VBG
CHECREa KMD
DATE' 03/30
DR'a SWO85
.Ae No: 02084
Scale, 1'= 100'
PAGE 1 OF 2
ENGINEERING
20441 PTARMIGAN BLVD.
EAGLE RIVER, AK 99577-8736
111
WASTEWATER DISP❑SAL SYSTEM DETAILS
SUN VALLEY SUBD. BLOCK 1, LOT 4
1
261'
TO NORTH
PROPERTY
K N p LINE
TH04-1
C®
20-25%
tt t., � ' I L,
S
., 20-25% I 30'
PROPOSED
1000 t'�
PREPARED FOR:
LEE'S CUSTOM DESIGN
11517 OLD GLENN HWY
EAGLE RIVER, AK. 99577
(907) 694-8565
/. ,.... .-�
FIELD BOOKS
CE -7116 4� imHomr. SEWARD DRAWN:
S—ac: SEWARD aca[0: KnaD
1 \•' • ....... • •'/ "soar. WARD o"m 03/30
�' tESS10,0� M M. CM SWO8`
"0"D ^U` 02084.DWG '108 "°'` 02084
273'
TO EAST
PROPERTY
LINE
'I•' I•z l�) I•' c�� �� F I��
Scale, 1'= 20'
PAGE 2 OF 2
lL11\1 LU-) ENGINEERING
20441 PTARMIGAN BLVD.
EAGLE RIVER, AK 99577-8736
-611
I1
IK.NfD ENGINEERING, INC.
do
Gross
Time
r*
20441 PTARMIGAN BLVD.
Net
Drop
EAGLE RIVER, AK 99577-8736
11/18/02
SOILS PERCOLATION TEST
Performed for: Lee Raymond Date
Project: Sun Valley Bl, L4 TEST HOLE # 02-1
Depth
15-
16-
17-
18-
19-
20-
ORG/OL -black/red overburden
GP/SP — med dense, brown,
trace of silt, w/ cobbles to 1',
damp.
moisture & silt increasing
B.O.H.
HOLE PRESOAKED
PRIOR TO TEST
SEE ATTACHED SITE PLAN
FOR HOLE LOCATION
OF •,A`gs',it
L►i� ••••'F9 +1
CC7tlWA.-
_��1.
Was Ground water encountered? NO What depth? NA
Depth to water after monitoring? DRY Date? 11/25/02
Reading
Date
Gross
Time
Net
Time
Depth to
Water
Net
Drop
1
11/18/02
1:00
-
6"
-
2
1:10
10 min
11/16"
55/16"
3
•
1:11
6"
-
4
1:21
10 min
13/16"
53/16"
5
•
1:22
6"
-
6
1:32
10 min
1"
5"
7
1:33
-
6"
-
8
1:43
10 min
11/16"
415/16"
9
•
1:43
-
6"
-
10
1:54
10 min
11/16"
415/16"
11
1S5
6"
-
12
2:05
10 min
11/16"
415/16"
•
Water
Added
Percolation Rate 2.02 (min/in) Perc Hole Diameter 6"
Test Run Between 4 feet and 5 feet
I, Kenneth M. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in
effect on this date.
ITM ENGINEERING, INC.
20441 PTARMIGAN BLVD.
EAGLE RIVER, AK 99577-8736
SOILS PERCOLATION TEST
Performed for. Lee Raymond Date
Project: Sun Valley Bl, L4 TEST HOLE # 02-1
Depth
(Feet)
13-
14-
15-
16-
17-
18-
19-
20-
ORG/OL -black/red overburden
GP/SP — med dense, brown,
trace of silt, w/ cobbles to 1,
damp.
B.O.H.
HOLE PRESOAKED
PRIOR TO TEST
CE 7116
SEE ATTACHED SITE PLAN
FOR HOLE LOCATION
Was Ground water encountered? NO What depth? NA
Depth to water after monitoring? DRY Date? 11/25/02
Reading
Date
Gross
Time
Net
Time
Depth to
Water
Net
Drop
1
11/18/02
1:00
-
6"
-
2
1:10
10 min
11/16'
55/16"
3
•
1:11
6"
-
4
1:21
10 min
12/16"
54/16"
5
•
1:22
-
6"
-
6
132
10 min
14/16"
52/16"
7
133
-
6"
-
8
1:43
10 min
14/16"
52/16"
9
1:41
-
6"
-
10
1:54
10 min
13/16"
53/16"
11
1:55
6"
-
12
2:05
10 min
14/1+2/:16-:
•
Water
Added
Percolation Rate 1.95 (min/in) Pere Hole Diameter 6"
Test Run Between 3 feet and 4 feet
I, Kenneth M. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in
effect on this date.