Loading...
HomeMy WebLinkAboutSHANGRI-LA LT 10hangri La Lot 10 #020�043�28 Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program. 4700 Bragaw St. P.O. Box 196650 Anchorage. AK 99519-6650 Page I of 'S Wtvw.d.anchorage.ak.us (907) 343-7904 ON-SITE WASTEWATERDISPOSAL SYSTEM AND/OR WELL INSPECTIONREPORT Permit Number: SWO60082 PID Number: 020-043-28 Nan* Tom and Amber Allen Wastewater System: lZlNew 0 Upgrade Aftes. 16420 Sandpiper Drive ABSORPTION FIELD P� 907-229-1822 of 8�' 5 0 OW T� 16 S� Tniotch 0 BW (3 M.,-4 Cl owwo�. LEGAL DESCRIPTION sod A't" T" Depin Intrt on" 9nixte. 12 Gm*,, West 6.42/East 6.29 Ft. Bxx* LN 10 Shangr1a DWh w P" wim In,on wrwi glotto Gw� dWh 1*noth West 2.42/East 2.29 Ft. 4.0 Ft T�q Fantle soctxxt FA ocx;oci ot�o ong" grocie Gwwol Longm 2.0 Ft. 83.5 Ft. Well: 0 New El Upgrade o' h� C9 on&%� Dwtwnxtw�wws 5.0 R. 2 30.4 Ft. ckww"w (R.I., & a. cjr T" DWh: r40 T" sbqx� ow. P" wowwi Private 1565 Ft. 1 F1 (83.5 x 5)/0.5 to 835 F? I ASTM 3034 Dnomr. Dow Dniwt. swicwalo`L� W.~ Do* InwW. Alpine Drilling and Enterprises 6-19-06 1 20 Ft BTH Construction. LLC 16-17-07 ywi,J 0.50 P� SM .1 Ca" H..ght � G� TANK GM1557 Ft.1 2.0 Ft. SEPARATION DISTANCES 0 Septic 0 Holding [3 S.T.E.P. [3 Other. To Septic Absorption Lift Holding lubhuPovote coi�ty From �� Tank Field Station Tank Sotwe� Line Anchorage Tank and Welding 11500 Go wel >100' >100* NIA NIA >25' M.1onoi Steel, 110 -gauge � a cort'arwwnl. 2 solace wat. 'too. >100* N/A N/A LIFT STATION LM Low 79.2' 25Z WA NIA Got -F� .1 wow` ".81 F�t. 10.7' 11.61 NIA N/A 77�_� in. C~ Otto, NIA N/A NIA N/A peitantmi b,. Ranwriks I 0-ga septic lank was installed to allow for additional cover BENCH MARK over tank 9 required. 4' of rigid Insulation placed over tank Top of lower foundation stem wall and 2* of rigid Insulation over drainfields and connecting piping. 100.00 Ft. Property owner will install topsoil and seeding in 2007. F. Robert Associates EnAj?�WVmp 111 Inspections performed by: Bell and Dates: 11 6-15-07 4", OF A 14 flit 2nd 6-17-07 ....... .. Development Services Department Approval .10 Conditional Approval. JZZ- 7__Of'�Date: 0 7 M* . 4 9 Z11 0 ------ ...... . ........ �O Of C I �7,0 letel & —IL -0,7 11111LAN T. KAJM.N J % a - 10068 Reviewed and approved by: Date: I - 0 -7 (R� 01%) c;ir — — — — — — — — — — — — - — — — — — — — — — — — — — — — — — — — 50' HORIZONTAL SEPARA11ON NOT PRACTICAL SEE ATTACHED SLOPE INTERSECTION WORKSHEET FOR VERIFICATION OF ADEQUATE SEPARATION. BTH TH#2 SEE SOILS LOG ATTACHED. S89*57'08"E 35% S OPE RESERVE SAME DE AS 00 0 04 LLJ I cl, 0 z io TH WATER WELL SEE WELL LOG 30.4' LOT 4 WELL RADIUS 26.9' -4-- - - d--------------- N87 -26'41"E 2 ��l ALL LOCATIONS — — — — — — — SITE -PLAN ==� CASTALDI LAND SURVEYING. LLC DURING THEIR AS -MILT SLJRVEY,.� GEG TH1 IHE SVANO TIE DISTANCES WERE TAKEN BY M CONSTRUCTIO4 NTH A FIBERGLASS TAPE 4 _E G.,T+q j- 4<N D T H HrH CONSMIMOMf LLC P.O. BOX 110358 ANCHORAGE. ALASKA 99511 PHONE: 336-3447 ATTACHED. WIDE JX 84.5' LONt WITH 4* �.C.. DRIV� u" i5dQ–'QAl. �b-GA SEPTIC TANK c"I Lo 1-4 24.0 49.5 p 0 0 3&0 43.0 1&0 61.5 21.5 52.5 24.0 49.5 3&0 410 3&0 43.0 36.5 4&0 49.0 6&5 56.0 70.0 41.5 33.5 39.5 30.5 -".*- _Wz- 7'& 5 51.0 ur 41-16% � ........... BRIAN t HARTEN NO. IOD68-CE 4� AS -BUILT LOT 10 SHANGRI-LA SUBDIVISION SEPTIC SYSTEM SITE PLAN NOR. ATE; 04/04/2007 1 GRIDS: 3239 SCALE: Ml" -4V F Sw VER. TS OWER; TOM AMD AMOER ALLF7 SHEET 7��Df 8 LOT 10 SHANGRI-1 A SUBDIVISION — DESIGN CRITERIA - HOUSE SIZE: 4 BEDROOMS (DESIGN FOR 5) TANK SIZE REOURED: 1,500 CAL SOILS PERCOLATION RATE. 4.10 MIN/INCH 0'i* wy :I � I X, I - NU w -Y.A - & OXI50) - 625 SF 1.2 TRENCH LENGTH J=_V - 125 LF 5' WIDTH TRENCH TO UTILrlE Qr OF WASHED ROCK BELOW DISTRIBUTION PIPE. THEREFORE A LENGTH REDUCTION FACTOR SHALL BE APPLIED. TRENCH LENGTH - M LF X 0.50 . GZ5 LF SAY 65.0 LF —815 LF AS CONSTRUCTED 5 WIDE MONITORING TUBE (TYPICAL) MT CO h5 FEET WOE WEST TRENCH REFER TO SHEET1 EANOUT 4/B ACTUALI (TYPICAL) TRENCH LAYOUT. $15 LF —0.0 LF - PLAN VIEW NO - NATURAL GROUND ELEVATION EL - ELEVA71ON NG -94.07 lzlomlj4llil SILT BARRIER —EL -91.17 — EL -90.67 " """—EL -811.57 5 FEET WDE EAST TRENCH " — EL -60.47 TEST HOLF (8TH #1) WIDETRENCHWATER APPUCATIONRATES I ' N/A LS PERC RATE I -r MIN/IN 1-5 YE0 �(SF) ��AW U-11 N/A 1-5 1.2 1 125 (125) 2 250 3 375 4- 500 5 " 625 6-15 0.8 1 - lae (laa) 2 - 375 3 - 563 4- 750 5- 938 18-30 0.6 1 - 250 (250) 2- &)0 3. 750 4- IDDO 5- 1250 31-60 0.45 1 - 333 (333) 2 - 667 3- 1000 4- 1333 5 - 1567 >60 N/A 0 FILTER MAn to I - 150 (150) 2- 300 3- 450 4- 600 5- 750 4" 40 PSI MIND BOARD CAM OVER TANK, 2� OVER FIELD 15M 10—CA SEPTIC TANK C_ BRIAN T. HARTEN .. NO 10068-m TEMPORARY BENCH MARK: TOP OF LOWER FOUNDATION WALL ASSUMED ELEVATION: 100.00 49P#orfssto,0� m.� BOTTOM OF TESTHOLE ELEVATION - 80.47 AS -BUILT H7 -H CONSTRUMON, LLC LOT 10 SHANGRI-LA SUBDIMSION P.O. BOX 110358 SEPTIC DESIGN AND TRENCH DETAILS ANCHORAGE. ALASKA 99511 PHONE: 336-3447 SCALE: HOR. NTS DATE: 04/04/2007 1 GRIDS: SW 3239 VER. NTS SHEET 5, f,,,' [IMER: 70M AND AMBER ALLEN ,-o 8 UNSUBDIVIDED UNSUBDIVIDED S89*57'47'E 785.69 (REC) I S89*57*47"E 533.56 (REC) . . . . . . . S89*57*08'E 785.60 (MEA) . . . . . . . . I S8958*36"E 533.01 (MEA) 09 51. 6 2�4�5,11 227 80' 2 TIM '0 \1 t�.7, y _ 4 4 — — — — 217 76' 9 w f f S89� WE. 58 le L Sandpipe Drive 205,94' 215." 2ZZ23' 157.47' SEPTIC SYSTEM 0 0 IMPROVEMENTS,,. 7 8 EUBJECT PROPERTY �— I 5— 3EDRO HOUS� 75 82'— 78�51-2 _N87'26 WE 25106" w 0 14 30' 12\ 15 VACANT L� CONSTRUCTION 21, to L9 L4 Is \207.69' U., Net Shan Cl cis 20j.fiv 27 265. 20 C2 21 OF A14\\, 19 ........ lb 9 BRIAN T. HARTEN 0, 00 IV TIN! ci oil No. I 0068 -CE I[w PROFESSIO 7 A� m lr12'W .41 255.74' 18 AS -BUILT 97-H CONSTRUCrIGN, LLC LOT 10 SHANGRI—LA SUBDIVISION P.O. BOX 110358 OVERALL SITE PLAN ANCHORAGE. ALASKA 99511 SCALE: NOR. *' Iw DATE: 04/04/2007TGRI—DS SW 3239 [CANER: ISHEET 2 f17 0 PHONE: 336-3447 41 VER. TS TOM AND AMBER ALLEN 1 8 23.0' 74.7' (PERP. DISTANCE) 35% EXIS 25% SLOPE LINE DRAWN FROM A POINT 2.5' ABOVE THE INVERT OF THE DISTRIBUTION PIPING CLOSEST TO THE SLOPE, EASTERLY DRAINFIELD, SHOWN, WESTERLY TRENCH IS FARTHER BACK). 74.7 FEET IS GREATER THAT THE MINIMUM HORIZONTAL DISTANCE OF 35 FEET ALLOWED BY THIS METHOD, THEREFORE THIS SYSTEM IS IN COMPLICANCE WITH MOA STANDARDS. ol *c') *49L H ....... ......... .... OMAN I HAR NO. I 8 -CE AS -BUILT RTH CL7,VS7-RL1Cr1L7iV, Uc LOT 10 SHANGRI-LA SUBDIMSION P.O. BOX 110358 SLOPE SEPARATION DIAGRAM ANCHORAGE. ALASKA 99511 PHONE: 336-3447 SCALE: HOR. -TOATE, 04/04/21X JOWNER: TOM AND AMBER ALLEN VER I . IEET 2- 3- 4- 12- 13- 14 — Is— is— IT— Is- 10- 20— Municipality of Anchorage Development Services Department Sulding Safety Dwion On -She Water and Washmater PmWw 4700 South Bragi%v St. 49LH P.O. Box 1WO50 Anctiontge. AK 9951 %4650 d anchorage sk us '.Fze� . (907) 343�71?04 V, - 1, - 13FJAN T. MARTEN ;X01 Soils Log - Percolation Test III NO. 10068—CE TEST HOLE BTH #1 Pwlonned For. TOM AND AMBER ALLEN Doe Pedonned: L"ADesalption, LOT 10, SRANGRI LA SUBDIVISION _ T�". Range, Section: Slope Site Plan VEGETATION GM – SILTY GRAVELS (LESS SILT W/ DEPTH) GP – SANDY GRAVEL W/ LARGE COBBLES LENSES OF CLEAN SAND THROUGHOUT BOTTOM OF HOLE BEDROCK EL=80.47' WAS GROUND WATER NO GROSS TIME ENCOUNTERED? FINISH DEPTH NET DROP IF YES.ATWHAT DEPTH? N/A 10 MIN DEPTHTOWATER N/A 3' AMR MONITORING? 10" 20 MIN DATE: 04-18 06 2 3/4" DATE START DEPTH GROSS TIME NET TIW FINISH DEPTH NET DROP 04-11-06 10" 10 MIN 10 MIN 7' 3' 10" 20 MIN 10 MIN 7 1/4" 2 3/4" 10" 30 MIN 10 MIN 7 1/4 2 3/4" 10" 40 MIN 10 MIN 7 3/8" 2 5/8" 10- 50 MIN 10 MIN 7 1/2- 2 1/2- 10" 60 MIN 10 MIN 7 9/16" 2 7/16" PERCOLATION RATE 4*1U MINIINCH TEST HOLE Dw 6 (INCHES) TEST RUN SErAEEN 5e0 FT AND 6. 0 FT A FOUR HOUR PRESOAK WAS PERFORMED: 9 YES EINO COMMENTS: THIS DATA IS FOR EXCLUSIVE USE BY BTH CONSTRUCTION, LLC TO DEMONSTRATE THE VIABILITY OF THE SUBJECT PROPERTY TO SUPPORT AN ON—SITE SEPTIC SYSTEM. PERFORMED BY: BTH CONSTRUCTION, U -C 1. BRIAN T. MARTEN. CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: APRIL 11, 2006 'q- /q 2- 3- 4— lo— ll — 12- 13- 14 — 15— le 17 18- 19- 20— Municipality of Anchorage Development Services Department BUI*V SaWy DMion On -S#* W�w and Wad� Program 47M S&,M Brag" SL P.O. B" 19OW Anchmp. AK MID -114550 %,nw d anchonogo sk MM 343-7904 Soils Log - Percolation Test TEST HOLE BTH #2 OF Aj"\j C'�*49TH' MAN T. HARTEN NO. IM68-CE lxlep ......... 4� Pedonrad Fw. TOM AND AMBER ALLEN D,.p.WW: JUNE 14, 2006 1.0901D-0-1 LOT 10, SHANGRI LA SUBDIVISION _ Towrnhp.Rnrkge.Sedkn: Slope Site Plan VEGETATION BROWN LOAM GM – SILTY GRAVELS (LESS SILT W/ DEPTH) BOTTOM OF HOLE PERCOLATION TEST AT BON a WAS GROUND WATER K/A P RC ENCOUNTERED? NETTIMF FINISH DEPTH N/A IFYES.ATWMATDEPTHr? 10" DEPTH TO WATI 10 MIN AFTER MONTORM 3 1/2" DATE: N/A EJT ONLY 2-5% DATE START DEPTH GROSS InMr NETTIMF FINISH DEPTH NETDROP 06-14-06 10" 10 MIN 10 MIN 6 1/2" 3 1/2" low 20 MIN 10 MIN 7- 3 - ion 30 MIN 10 MIN 7 1/4 2 3/4" 100 40 MIN 10 MIN 7 3/8" 2 5/8" 10. 50 MIN 10 MIN 7 1/2- 2 1/2- 10" 60 MIN 10 MIN 7 1/2- 2 1/2 - PERCOLATION RATE 4wO MINIINCH TEST HOLE DIA. 6 (INCHES) TEST RUN BETWEEN 5*0 FT AND 6oO FT A FOUR HOUR PRESOAK WAS PERFORMED: CKYES RNO COMMENTS: THIS PERCOLATION TEST WAS TO PROVE UNIFORMITY OF SOILS AND TO DEMONSTRATE ADEQUATE AREA FOR A RESERVE DRAINFIELD UTILIZING THE ORIGINAL DESIGN PARAMETERS. PERFORMED BY: BTH CONSTRUCTION. LLC 1, BRIAN T. HARTEN. CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: JUNE 14, 2006 %1% Rober plit lassoot 801 West Fireweed Lane * AnChorage, Alaska 99503-1801 (907) 274-5257 a FAX (907) 272-7531 June 19, 2006 Municipality of Anchorage Development Services Department Building Safety Division On-Sitc Water & Wastewater Program 4700 South Bragaw Street P.O. Box 196650 Anchorage, AK 99519-6650 RE: Septic System Inspection Report - Lot 10 of Shangri La Subdivision Dear On -Site Services Engineer F. Robert Bell and Associates was retained by BTFI Construction, LLC to provide third party inspection services on the installation of the septic system on Lot 10 of Shangri La Subdivision. Three inspections were performed by F. Robert Bell and Associates: The first inspection took place on June 15, 2006. Brian flarten, P.E., the contractor and design engineer, had realigned the drainfield trenches from their original design to better accommodate the relatively flat location and broke the trenches into two runs, one 40 feet in length and the second 45 feet in length. Note this is 20 LF more than the original design required. The 1500 -gallon, 10 -gauge septic tank had been installed, but not backfilled. The drainfield trenches had been excavated, the monitoring tubes were installed and installation of septic rock commenced after our inspection. The second inspection took place on June 16, 2006. Both trenches had been filled with washed rock and the drainfield piping was installed. Washed rock was placed 2 to 4 inches above the top of the piping, geotcxtile silt barrier was in place on top of the washed rock. The final piping from the septic tank to the drainfield was being completed. A final inspection of the completed piping was performed on June 17, 2006. All piping, the drainfields and the septic tank were insulated with 2" of direct -bury board foam prior to backfill. Through all three inspections, we found the construction to be in compliance with the plans and specifications as approved by the MOA for this project. Workmanship and quality of construction were more than adequate. If you have any questions regarding our inspection services, or this correspondence, please feel free to contact me. Regards, �irisBuk (For Frank R. Bell, P.E.) F. Robert Bell and Associates FEB -23-2007 04:12A FROM: TO:3437997 P.1/1 Dowoww" GWVN" tow"w" oullft Ad"Y chbl" ox'she wolw is wait"aw Prortan 4700 Lovow UPW P-0. bw Milo Afthowe"o, AN "8104M Pump linstallation Log My -393-071Y7 Woo DAfts ro f4mitiowl 114ftd jiloollflation VIM of Illuol Lageltmovirtpol" olock lu wXaw&&AWnw -i--ir o V1 CL X lol Pump lablif1hpa adow T" Owd c"bal Y5,7, hit ftwombollml- ftw-6r�u— I ftMvbbw:16-6:30Q pomp viso .2..hp rhbwA&qftrftrUlbq*s /A fan ?Idea AdvFtwMo=fteIv,.v-sXnw, #1�dor3f- e-ol ro La Pti vo P O -e I/ w4a oftwoded Up" Cft'Vf a No malthed orf bblorbcdowl c"Mrs"Ill CALL FOR SERWOE Complete Water System evvica — AARow PUMP & Will StRvicEp LLC SAIAN WILLE ANCwRAor EAGLE RIVER (007134&WS5 (007) 022-M Attodot I Tkspmvpbwtdl w lW pmj& j pwo bb4naggja Igo is M wWa, fte ofp6aV IWW,Ojm ALPINE DRILLING & ENTERPRISES Permit Number: #SW060082 Date of Issue: 5-08-0 Parcel Identification Number: 020-043-28 Date Started: 6-16-06 Date Completed: 6-19-06 Is well located at approved permit location? E Yes El No Legal Description: Shangri-la Lot 10 Prop" Owner Name & Address: Thomas & AmberAllen 13300 Venus Way Anchoraaa. Alaska 99515 Borehole Data: Soil Type, Thickness & Water Strata Depth (ft) From To Method of Drilling ED air rotary [:] cable tool Casing type: steel stick-up 0 2 Wall T'hickness: .250 inches cobbly gravelly silt 2 11 Diameter: 6 inches Depth: �LQ feet bedrock if 565 Liner Type: Dvc Diameter: 4 inches Depth: 565 feet Casing stickup above ground: 2 feet Static water level (from ground level): 20 feet Pumping level:_L50 feet after — hours pumping.5 gpm Recovery Rate: .5 gpm Method of Testing: -p2mg test Well Intake Opening Type: [:] Open End E Open Hole El Screened Stan — feet Stopped _ feet El Perforations Start _ feet Stopped _ feet Grout Type: bentonite granules Volume: I Depth: 0 feet Stopped ? feet —Start Pump: Intake Depth _ feet Pump size — hp Brand Name Well Disinfected Upon Completion? ED Yes [-I No Method of Disinfection: Lhlorine tablets Comments: well was hydrofraced-see pump lestfor updatedflow rafe Well Driller: Alpine Drilling & Enteiptises PO Box 110496 city 99511 zip Attention: The well driller shall provide a well log to the property owner within 30 days of completion and the property owner or the well driller shall provide a well log to the Development Services Department within 60 days of completion. MUNICIPALITY OF ANCHORAGE Development Services Department On -Site Water& Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM I WATER SUPPLY PERMIT Initial Date Issued: May 08. 2006 Expiration Date: May 08, 2007 Permit Number: SW060082 Parcel ID: 020-043-28 Legal Description: SHANGRI-LA LOT 10 Design Engineer: 0836 BRIAN T. HARTEN Site Address: NHN SANDPIPER DRIVE Owner Name: THOMAS & AMBER ALLEN Lot Size: 47491 SQ. FT. Owner Address: 13300 VENUS WAY Total Bedrooms: 5 Permit Bedrooms: 5 ANCHORGE. AK 99515 - This permit Is for the construction of: M-' Disposal Field E Septic Tank E] Holding Tank [] Privy Private Well E] Water Storage All construction must be In accordance with: 1. The attached approved design. 2. AJI requirements specified In Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ). 3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered. sealed, and heated to prevent freezing. Received By. Date: '54-0(4 Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program 4700 Bragaw Street P.O. Box 196650 Anchorage, Alaska 9951M50 www.muni.orglonsite (907) 343-7904 ON-SITE SEWERIWELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Parcell.D. 62cmA22< �F Dav ohone .22 q - t'9A;X Property owner(s) aK Mailingaddress IS%C'b Vr-ooS W&L4 Zip Code Site address — 0 RU SCAAAQ*%�!C�_ Ot�- Zip Code C19 5 t ( 60 Legal description (Sub'd., Block & Lot) ;.67- 16 5VAM6C_f - 64 - Legal description (Township, Range & Section) Lot Size_AI,4a I Sq. Ft. THIS APPLICATION IS FOR (Z all that apply): Absorption Field Upgrade Septic Tank Renewal Holding Tank Privy El Private Well V Water Storage El Number of Bedrooms 4 THIS APPLICATION IS AN: Initial Upgrade Renewal I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. 4117 / A3 ('n (Signature of property owner or authorized agent) PermittRush Fees: I'l 7;r Waiver Fees: . Date of Payment: 441101, Date of Payment: Receipt Number 'PrA Receipt Number (Rev. 11/05) V V BTH CONSTRUCTION9 LLC ExCAVATION & ENGINEERING P.O. Box 110358 *Anchorage, AK 99511-0358 PhonalFax.*336-3447 e E-mail. bth@gci.net May 7,2006 Municipality of Anchorage Development Services Department Building Safety Division On -Site Water & Wastewater Program 4700 South Bragaw Street P.O. Box 196650 Anchorage, AK 99519-6650 RE: Design Submittal Correction Lot 10 Shangri La Subdivision Dear On -Site Services Engineer Attached please find a new sheet 3 of 5 of the design drawings for the above referenced property. The septic tank was incorrectly called out as a 1250 gallon tank on the original submittal. I have corrected the drawing to reflect the 1500 gallon tank that we intend to install. If you have any questions or comments regarding this submittal, please feel free to contact me at 230-3992. Regards, Brian T. Harten, P.E. BTII Construction, LLC BTH CONSTRUCTION9 LLC ExCAVATION & ENGINEERING P.O. Box 110358 9 Anchotage, AK 99511-0358 Phon&Fax.336-3447 * E-mail., bth@gci.net April 18, 2006 Municipality of Anchorage Development Services Department Building Safety Division On -Site Water & Wastewater Program 4700 South Bragaw Street P.O. Box 196650 Anchorage, AK 99519-6650 RE: Well and Septic System Design Lot 10 Shangri-1A Subdivision Dear On -Site Services Engineer: General I have been retained by Tom and Amber Allen to provide Civil Engineering services for the design and construction of a residential water and wastewater system on the above referenced property. The subject property is being developed for a 4 -bedroom, single-family home, which may be remodeled at a future date to include a fifth bedroom. Therefore the wastewater system has been designed to accommodate five bedrooms. This water and wastewater design is consistent with the lot development plan submitted to your department during the approval process for the Shangri-La Subdivision. See attached Figure I for a copy of this plan. Soils See the attached soils log which details soil classifications, groundwater observations and percolation rates found in the test hole performed on the subject property. Additionally, the original subdivision development testhole data has been attached to show consistency in the soils found on the subject property. Drainfield Desien Percolation tests provided a percolation rate of 4.10 minutes per inch for Lot 10. We are proposing a conventional, 5 - wide shallow trench system for the wastewater treatment on Lot 10. Deep Trench Design: Number of Bedrooms: 5 Design Flow: 150 GPD/BR X 5 BR= 750 GPD Max. Application Rate: 1.2 GPD/SF Absorption Area Required: 625 SF Total Depth: 7.5 Feet Effective Depth: 4.0 Feet Width: 5.0 Feet Trench Reduction Factor: 0.5 Trench Length: 62.5 minimum, Say 65.0 LF Please refer to the attached design drawings for site layout and details of the proposed septic improvements. Surface Waters There are no adjacent surface waters within 100 feet of the proposed well and septic improvements. Lot 10 Shangri-La Subdivision Water and Wastewater Design Submittal ApH118.2006 Page 2 of 2 Topriaraphy The subject property is sloping from south to north with average slopes of 15-20%. However, there is a slope across a portion of the front (north end) of the lot that was created during the road construction. This slope has a grade of 35%. It was found impractical to keep the wastewater disposal system (primary and reserve) greater than 50 horizontal feet away from this slope, so an alternate method was used to determine the practical horizontal separation required from this slope. Please refer to design sheet 5 of 5 for a detailed analysis of our proposed slope separation. The calculations show that the proposed replacement system, the field closest to the slope, has a theoretical horizontal separation of 86 feet, much greater than the 35 feet minimum established by this method. Additionally, the type and percolation rate of the soils found on the subject property are not of the type that would allow lateral migration and subsequent "day lighting" of the wastewater effluent anywhere along the slope in question. Groundwater and Bedrock No groundwater was encountered during testhole excavation or subsequent monitoring. Bedrock was encountered at a depth of 14.5 feet during testholc excavation. Our design keeps a minimum vertical separation distance of seven (7) feet from the bottom of the proposed trench to the bedrock layer. Closing The development of this property will not preclude the adjacent properties capacity to construct future water or wastewater systems. I am unaware of any adverse impacts this installation would have on any existing adjacent wells or septic systems. Additionally, this design is consistent with the overall lot layout approved by your department for development of the lots within the Shangri-La Subdivision (see Figure 1.) If you have any questions or comments regarding this design, please feel free to contact me at 230-3992. Regards, Brian T. I larten, P.E. BTII Construction, LLC UNSUBDIVIDED S89*57*47'E 785.69 (REC) S89'57*08*E 785.60 (MEA) i I T T 7 —"a 7�6 41 15 U., E. 2 1,,7 7A -- — — — — — — — 257 76— �, Sa UNSUBDIVIDED S89*57'47"E 533.56 (REC) S89*58'36'E 533.01 (MEA) P It Awsl`,n� 2,� er PROPOSED SEPTIC rEM IMPROVEMENTS 9 VACANT A� rzf 19 N41TE: c S TOPO MAP DOES NOT �EPICT CHANCES FROM THE MIC�l IPMnM nr CI tQnl%A-Zli �OADS AND LOT DEVEL0PMEN*"— t 18 SM CONSMICTIOM LLAC P.O. BOX 110358 ANCHORAGE. ALASKA 99511 PHONE; 336-3447 IL 0 b 20 ,-:o� Z$Y 1 / 3v 3,.: r I HOUSE 3v 3c 12 �o VACANT Ni ,bl U '%Xxx 21 OF AZ X, :'*49!-H . ... ............. BRIAN T. HARTEN NO. 10068—CE X\ -to PROFESSIO LOT 10 SHANGRI—LA SUBDIVISION OVERALL SITE PLAN SCALE: NOR. 1* -150* "8�06 GRID SW .... 'SHEET 12ATE' OL VER. NTS OlhNER. TOM AND A�UR LALIF. I �,-o' 5 14 NeN toom OWFMLCnCN (m N207,e A� rzf 19 N41TE: c S TOPO MAP DOES NOT �EPICT CHANCES FROM THE MIC�l IPMnM nr CI tQnl%A-Zli �OADS AND LOT DEVEL0PMEN*"— t 18 SM CONSMICTIOM LLAC P.O. BOX 110358 ANCHORAGE. ALASKA 99511 PHONE; 336-3447 IL 0 b 20 ,-:o� Z$Y 1 / 3v 3,.: r I HOUSE 3v 3c 12 �o VACANT Ni ,bl U '%Xxx 21 OF AZ X, :'*49!-H . ... ............. BRIAN T. HARTEN NO. 10068—CE X\ -to PROFESSIO LOT 10 SHANGRI—LA SUBDIVISION OVERALL SITE PLAN SCALE: NOR. 1* -150* "8�06 GRID SW .... 'SHEET 12ATE' OL VER. NTS OlhNER. TOM AND A�UR LALIF. I �,-o' 5 IV E UN 3DIVI 8 4 7 69 (R 89*57'47"E 33 3*1 1 a 5 60 IE S89*58'36" 5 E 11 245 21* 76 :4 2, 1 08- e A 21b .23' 15. JE u L) )p o S5,- 'y 67 6 n2k lo OE 0 SION 0 44 17-W LOT 10 SHANGRI-LA SUBMASION HTH CONSTRUCTION, 1.1-C OVERALL SITE PLAN AND TOPOGRAPHY P.O. BOX 110358 ANCHORAGE, ALASKA 99511 PHONE: 336-3447 SCALE: NOR. '*- I so* JDATE: 04/18/06 JGRIOS Sw 32.39 SHEET 2 f VER. NTS I OMER: TOM AND AMBER ALLEN I- - - - - - - - - - - - I ------- : -------- - - - - - - - - - - - - A \ TOP OF 35% SLOPE TO ROAD. 50' HORIZONTAL SEPARA11ON NOT PRACTICAL. SEE ATTACHED SLOPE INTERSECTION WORKSHEET FOR VERIFICATION OF ADEdUATE SEPARATION. LOT 4 WELL RADIUS ---------- F H C�' GEG TH1 ....... ............... GEG TH2 . . ... z .... ;;IAN T HARTEN - ,p 10 -.4 NO N8—CE BRIAN T. HARTEN NO. 10068—CE "'0 Es,� F ROFESSIO'A�' Ad� D T H HTH CONSTRUACTIGN, L1.0 LOT 10 SHANGRI-LA SUBDIVISION SEPTIC SYSTEM SITE PLAN P.O. BOX 110358 ANCHORAGE. ALASKA 99511 PHONE: 336-3447 SCALE: HOR. 1'-40' ��CJRIDS: SW .3239 SHEET 3 VER. NTS JOWNER: TOM AND AMBER ALLEN ��f 5 .THw . IS 35% SLOPE I SO LOG A -TACHED. — — — — — — — — — — — — — — — — — R 0 ED VIMTRYT i )-RA—INF—IEL—D 5' WID X 5 LONG 2 2' WITH E FIECTIVE G ?AVEL RESERVE DRAINFIELD INST. RA L TO SLOPE CONTOURS. SAME DESIGN PARAMETERS 8.0, S PRIMARY SYSTEM. 92.8' A�C. 6*.b': 00 0) 0) 0) 6 ci 0 c"I < 0: PROPOSED 1500 GAL SEPTIC TANK Lo 0 C44 Lo 0 b 0 PROPOSED 4 -BEDROOM 0 Q. KND TH RESIDENCE z b 0 b z PROPOSED RESIDENTIJL WATER WELL LT — — — — — — — — N—R —7'2-6 * 4-1 'T 2 ---------- F H C�' GEG TH1 ....... ............... GEG TH2 . . ... z .... ;;IAN T HARTEN - ,p 10 -.4 NO N8—CE BRIAN T. HARTEN NO. 10068—CE "'0 Es,� F ROFESSIO'A�' Ad� D T H HTH CONSTRUACTIGN, L1.0 LOT 10 SHANGRI-LA SUBDIVISION SEPTIC SYSTEM SITE PLAN P.O. BOX 110358 ANCHORAGE. ALASKA 99511 PHONE: 336-3447 SCALE: HOR. 1'-40' ��CJRIDS: SW .3239 SHEET 3 VER. NTS JOWNER: TOM AND AMBER ALLEN ��f 5 LOT 10 sHANcgI-LA SU13DIMS ON - DESIGN CRITERIA, HOUSE SZE: 4 BEDROOMS (DESIGN FOR 5) TANK SIZE REQUIRED: 1.500 CAL SOILS PERCOLATION RATE' 4.10 MTNANCH ABSORPTION AREA - (0 BEDROOMSXISO '79ERLWAPPLICATION Rg;g/ (5)(150) - 525 SF 1.2 TRENCH LENGTH - _ULF - 125 LF 5' WDTH TRENCH To UMUZE 48' OF WASHED ROCK BELOW DISTRI13LMON PIPE, THEREFORE A LENGTH REDUCTION FACTOR SHALL BE APPLIED. TRENCH LENGTH - 125 LF X 0.50 - GZ5 LF SAY 65,0 LF MONITORING TUBE VADE (TYPICAL) F 2 REFER TO SHEET 0 3 FOR ACTUAL I AREA (SF) I BY f/8ED TRENCH LAYOl IT CLEANOUT (TYPICAL) WIDE TRENCH WATER APPLICATION RATES �l I 'TRENCH SOILS PERC RATE MINAN I GPD/SF (SF/BED) I AREA (SF) I BY f/8ED �l n/m 1-5 1.2 1 125 (125) : 2 250 3- 375 4 - 500 5 - 6251 6-15 0.8 1 - 188 (188) 2- 375 3 - 563 4 - 750 5 - 935 16-30 0.6 1 - 250 (250) 2 - 500 3 - 750 4 - 1000 5- 1250 31-60 0.45 1 - 333 (333) 2 - 667 3- 1000 4 - 1333 5 - 1607 >60 N/A 0 FILTER MArL 1.0 1 - 150 (150) 2 - 300 3- 450 4- 600 65.0 LF 5 - 750 PLAN VIEW MT C �FINAL GRADE. MOUND TO PREVENT WIDE DRAJNFIaD LENGTH =K PONDING AFTER SETTLEMENT AND TO REDUCTIONFACTOR - RIF PROVIDE 36* OF EARTHEN COVER. DEPTH OF CAAVEL S -WIDE LENGTH anow PIPE (IN) REDUCTION FACTOR --0.0 SILT 12 0.87 ig�u Rl" is 0.78 BARRIER 24 0.70 w NATIVE BACKFILL 30 0.54 --3.0 36 0.58 --3.5 4, FEET \—PROVIDE 2" 40 PSI DIRECT BURY � SEPTIC BOARD FOAM INSULATION IF EARTHEN kTCK COVER IS LESS THAN 36". --7.5 OF.. 5 FEET WIDE *c�. 4 9 LH Of . ......... BRIAN T. HAR NO. 1 8- -14.5 BEDROCK P90FESSI HrH CONSMUCRON? I.I.0 LOT 10 SHANGRI-LA SUBDIMSION SEPTIC DESIGN AND TRENCH DETAILS P.O. BOX 110358 ANCHORAGE, ALASKA 99511 JDATE: 04/18/06 PHONE: 336-3447 SCALE: NOR. NIS — I— iEET 4 of VER. NIS rOWNER TOM AND AMBER ALLEN 5 - 86.0' - 23.0' �__ (PERP. DISTANCE) 35% SLOPE EXISTING GRADE 25% SLOPE LINE DRAWN FROM A POINT 2.5' ABOVE THE INVERT OF THE DISTRIBUTION PIPING CLOSEST TO THE SLOPE (RESERVE DRAINFIELD, SHOWN, PRIMARY TRENCH IS FARTHER BACK). 86.0 FEET IS GREATER THAT THE MINIMUM HORIZONTAL DISTANCE OF 35 FEET ALLOWED BY THIS METHOD, THEREFORE THIS SYSTEM SHALL BE IN COMPLICANCE WITH MOA STANDARDS. OF '%\X AZ4 it co*491 -H BRIAN I HARTEN NO. IOD68-CE lxz-9 .......... PROFESS101" HTH CONSMIMOVo LIX LOT 10 SHANGRI-LA SUBDIMSION SLOPE SEPARATION DIAGRAM P.O. BOX 110358 ANCHORAGE. ALASKA 99511 DATE: 04/18/06 PHONE: 336-3447 SCALE: HOR. 1*- 30' EET 5 VER. r-30' JOYMER; TOM AND AMBER ALLEN . ��f 2- 3- 4- 7- 8- 9- 10- 11- 12- 13- 14— is- 16- 17— IS- 19- 20— Municipality of Anchorage Development Services Department BUNN So" Dwsim 0"" wow ww waawwaw Progmin 47M S&.M Bmpw SL P.O. Bm 19WW k0wa". AK MI"M �.d.wKhorsp�skm (WI) 3434904 Soils Log - Percolation Test TEST HOLE BTH #1 OF `XXI ec 4 BRIAN T. HARTEN -P NO. ID068—CE PROFEW Pw1omwdFw. TOM AND AMBER ALLEN OwpU,,d: APRIL 11, ZUUb LOT 10, SHANGRI LA SUBDIVISION_ Towratip.Rarge.Sectm: VEGETATION BROWN LOAM GM — SILTY GRAVELS JLESS SILT W/ DEPTH) GP — SANDY GRAVEL W/ LARGE COBBLES LENSES OF CLEAN SAND THROUGHOUT BOTTOM OF HOLE BEDROCK 2=2 WAS GROUND WATER ENCOUMMRED? NO GROSS TIME LU N/A (L IF YES. AT WHAT DEPTH? 9 DEPTH TO WATER N/A 03 AFTER MONIT 10 MIN DATE: 04-18 06 Sfte Plan SEE ATTACHED SITE PLAN 2-5% DATE START DEPTH GROSS TIME MET TIME FINISH DEPTH NETDROP 04-11-06 10" 10 MIN 10 MIN 7. 3- 10" 20 MIN 10 MIN 7 1/4" 2 3/4" 10" 30 MIN 10 MIN 7 1/4 2 3/4" 10" 40 MIN 10 MIN 7 3/8" 2 5/8" 10" 50 MIN 10 MIN 7 1/2" 2 1/2" 10" 60 MIN 10 MIN 7 9/16" 2 7/16" PERCOLATION RATE 4w10 MINIINCH TEST HOLE CIA. 6 (INCHES) TEST RUN BETWEEN 5oo FT AND 6-0 Fr A FOUR HOUR PRESOAK WAS PERFORMED: CKYES [—]NO COMMENTS: THIS DATA IS FOR EXCLUSIVE USE BY BTH CONSTRUCTION, LLC TO DEMONSTRATE THE VIABILITY OF THE SUBJECT PROPERTY TO SUPPORT AN ON—SITE SEPTIC SYSTEM. PERFORMEDBY:BTH CONSTRUCTION, LLC 1. BRIAN T. HARTEN CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: APRIL 11, 2006 BTH CONSTRUCTION9 LLC ExCAVATION & ENGINEERING P.O. Box 110358 *Anchorage, AK 99511-0358 PhonelFax.-336-3447 * E-mail: bth@gci.net Single Family On-site Wastewater Disposal System Construction and Material Specifications Subject Property: Lot 10, Shangri-La Subdivision Date: April 18, 2006 General. 1. The scope of the project includes the procurement and installation of a 5-bedroorn on-site wastewater disposal system at the location depicted on the attached site plan drawings. The scope of work also includes the installation of a new 1,500 gallon, 2 -compartment septic tank, a 5 -wide drainfield comprised of I trench, 5 feet wide x 65 feet long, 7.5 feet deep with 4 feet of septic rock below the distribution piping. The location of the drainfield is shown on the attached site plan drawings. The total depth of the field will be 7.5 feet below existing ground. All components of the proposed septic system must be constructed a minimum of 100 feet from any surface water or water wells in the area. A minimum of 4 feet of earthen cover is required over the septic tank and a minimum of 3 feet of earthen cover is required over the drainfield. In addition to the required earthen cover, 2' thick, 40 psi, direct bury board foam shall be installed directly over all installed piping. Drainfield shall be installed parallel to slope contours. 2. Construction shall be in accordance with the approved site plan and design drawings and any special provisions noted on the Municipal well and/or septic permit. All materials, components, workmanship and construction practices shall comply with the Municipality of Anchorage's latest ordinances regarding wells and septic systems, as well as MOA, Development Services Department, On-site Water and Wastewater Program (DSD) policies. 3. The contractor is responsible for obtaining all underground utility locates, layout of the proposed system and verifying and maintaining all required separation distances to lot lines, surface water, wells, steep slopes, etc. 4. The property owner shall be responsible for final grading any depressions formed from settlement of the backfill material. The property owner is also responsible for revegetation of all areas disturbed by septic system installation activities. 5. Contractors installing wastewater disposal systems must be certified to do so by the MOA DSD, On -Site Water and Wastewater Program. Property owners installing their own systems must receive advanced approval from MOA DSD prior to system installation activities. 6. The contractor shall ensure that ALL materials being used are in compliance with the most current guidelines established by the Municipality of Anchorage. Please refer to oStandards and Specifications for Component Parts and Materials Used in Construction of On -Site Wastewater Disposal Systems', dated December 2000, as provided by MOA DSD, On -Site Water and Wastewater Program. Septic Tank Installation: A new septic tank, of the size specified in the design drawings, shall be procured from a qualified manufacturer/supplier if the existing septic tank is found to be defective. Construction shall include Lot 10 Shangri-La Subdivision April 18. 2W6 Page 2 of 4 two 4" diameter cleanouts, for pumping access. In the case of Advantex Treatment Systems, refer to the attached design drawings for the size and type of tank to be installed. Installation of these systems will follow the installation procedures outlined in the Advantex installation manual. 2. The burial rating of the tank shall be adequate for the actual burial depth encountered. 3. The tank shall be level and sufficiently bedded to prevent settling or shifting of the tank. 4. AM standpipes on the tank shall extend a minimum of 12 inches above the final grade. 5. Tanks installed with less than 4 feet of cover shall be insulated. See general note 1. 6. The sewer service line from the house to the tank shall have a minimum slope of 2% unless prior approval is obtained from the engineer. 7. The inlet and outlet lines form the tank shall be bedded in drainrock or the soil shall be adequately compacted to prevent future settlement of the soil. 8. Septic tank inlets, outlets and cleanouts shall be fitted with watertight couplings (Femco, Caulder, or equal.) 9. A clean-out shall be installed 1 to 4 feet from foundation. 10. Post tank clean -outs shall be installed per MCA requirements. Does not apply to pressurized lines. 11. In areas with high groundwater, the septic tank shall be sufficiently anchored to resist buoyant forces when there is not adequate soil cover to resist the uplift force. The contractor shall refer to the engineer for direction regarding this matter. 12. The tank backfill shall be graded sufficiently to ensure positive drainage away from the tank. 13. All holding tanks and lift stations shall have an audible and visible alarm inside the residence being served. 14. All lift stations shall be wired in compliance with all MOA guidelines and the Uniform Electrical Code. A municipal electrical permit and inspections must be obtained in areas where required by the MOA. 15. The contractor shall verify that the septic tank/lift station water well, 150' from any class 'C' well and 200' from separation distances must also be maintained. Drainfield Construction: is a minimum of 100'frorn any residential any community water wells. Additional The drainfield shall be constructed per the dimensions outlined in the design drawings. If any discrepancies are noted, contact the Engineer immediately for clarification. 2. All drainfield trenches shall be installed parallel to slope contours. 3. The bottom of all trenches shall be within 2* of level. If the sidewalls or bottom of the excavation become smeared, they must be raked or scarified prior to placement of drainfield filter sand or septic rock. Lot 10 Shangri-La Subdivision Apfillft,=6 Page 3 of 4 4. A minimum of 2 feet of accepting soils is required below the drainfield rock for a 5' wide trench. The contractor shall verify this condition prior to placement of the septic rock. All pockets of unacceptable materials shall be removed and replaced. 5. The trench or bed must be a minimum of 5 feet from the test hole excavation. 6. All distribution piping must be installed level with the perforations facing downward, atop a level bed of drainfield rock. Septic rock shall then be placed atop the distribution piping to provide a minimum of 2 inches of cover above the piping. The septic rock shall not be Opyramided" over the top of the pipe, but shall be installed level across the entire width and length of the trench or bed. . 7. A silt barrier or geotextile fabric must be placed between the drainfield rock and the native backfill. Installation of rigid board foam DOES NOT eliminate the need for the silt barrier. The silt barrier shall cover the entire drainrock surface. 8. Monitor tubes must be 4" in diameter and installed in the locations depicted on the design drawings. The portion of the monitoring tube below the septic rock must be perforated and the portion above the septic rock shall be solid. The monitoring tube shall extend a minimum of 12" above finished grade. 9. Backfill over the final gravel layer must not be less than 2 feet. Insulation must be installed when the backfill depth is less than 3 feet. 10. Drainfield trench backfill shall be mounded to prevent depressions from forming due to subsequent settlement of the backfill material. Grade areas adjacent to the drainfield to direct surface runoff away from the absorption trench. 11. The contractor shall verify that the drainfield is a minimum of 100' from any residential water well, 150' from any class 'C' well and 200' from any community water wells. Additional separation distances must also be maintained. Material Specifications: 1 . The contractor shall ensure that ALL materials being used are in compliance with the most current guidelines established by the Municipality of Anchorage. Please refer to "Standards and Specifications for Component Parts and Materials Used in Construction of On -Site Wastewater Disposal Systerne, dated December 2000, as provided by MOA DSD, On -Site Water and Wastewater Program. This document details the basic standards and specifications for the following septic system components: Septic tanks. Lift Stations. Holding Tanks. Pipe Materials. Insulation. Inspections: 1. A minimum of two inspections are required by the Municipality of Anchorage. These inspections must be conducted under the supervision of a Professional Engineer licensed to practice in the State Lot 10 Shangri-La Subdivision April 18, 2006 Page 4 of 4 of Alaska. The first inspection must take place upon completion of the excavation for trenches, beds or pits and before the installation of any filter sand or drainrock. A septic tank may be set in place, but may not be backfilled. A tank may be set in place, but cannot be backfilled. The second inspection must be conducted after the placement of the filter sand, drainrock, monitoring tubes, standpipes, cleanouts, filter fabric and insulation. No backfill should be in place at the time of inspection. 2. The contractor shall provide a legible copy of all field notes relating to system layout and construction to the Engineer for use in preparing the record drawings for the proposed septic system. 3. The contractor shall coordinate all inspections with the Engineer. A minimum of 24 hours notice is required prior to start of construction. If necessary, a pre -construction meeting will be held on-site. MIAN T. KARM CE - 10068 --7 IVY"= �;Mw Q m m rn rn OD rn ::I o MOO 11 w FRO IQ 8 -0 X 0 10.000 SF. rri SEPTIC FIELD > RESERVE AREA 10,000 SF. SEPTIC FIELD RESERVE AREA' t.i 00 rn 0 �j 22 0 Cc 00 ivy -5.8171V1,5t0Aj 7-65rw-6445-5. 4,67- t 6 -54AN4'el - e-4 FIELD OBSERVATION REPORT r-o�"JWGGKOUP DATE: June4,2002 TO: Jim Cross. P E Program Manager, On-sde Wastewater Systems Planning, Development & Public Works 4700 S Bragaw St Anchorage. AK 99519 Date of Site Visit- May 15 - 28.2002 Weather. Clearto Cloudy. 55-656F Site Conddions- Morst areas. pockets of snow melting rapidly CwWucted by: G McConnell, D Martin OBJECTIVES. Document groundwater depths in test hole monitoring tubes located at each of the 22 proposed lots (see toils report, Sept 2000. KND Engineering) FINDINGS: Groundwater depths were measured starting 15 May 2DO2 'The configuration of the new subdivision layoutwas revised inMarch2002to satisfythe slopeto size raquwementforR-IOSL zoning Lots 9.12. 20, and 22 did not have test holes due to the realignment of property lines The existing test hole at Lot 6 was located at the edge of a partially excavated hole where silt from the upper soil layer was allowed to run into the hole over time, precipitation carried silt into the hole and monitoring tube. creating a seat and both were filled with water On May 16. 2002, now test holes where dug for Lots 6. 9. 12, 20. and 22 using a tacked excavator Monitoring tubes (4 -inch perforated drainpipe) were installed at each hole and depths and soil types were recorded All the new test holes showed soils consisting of gravels and sand with traces of silt and some cobbles at depth No silt layers where found and the percolation rates are expected to be similar to those found at the other 22 test holes Groundwater levels were monitored until May 28. 2002 and the measured depths are listed in the table enclosed Test holes am listed by now lot location along with the original lot number (KNO report) �00F tit A Sincerely, %Greg c Civil Engineer ...CE 10163 - Groundwater Depths/ Soil Profiles! Map Attachments Table 1/1 SOILS for Farl Ford Lot 9 Shangrila 4w - TEST Date Performed usfu5/E)u TM HOLE # 00-6 Depth (Fert) SEE A'ITACIIIEDsm, PLAN ORC - rootEut I FOR HOLE LOCATION GP —soft, brown sandy gravel cobbley W&sQ.=dw&tffenco=Wed? NO %hat depth? NA SP-densebrown saM gravel Depth to water after vwnftnng? 118' Dat97 08/14/00 Reading Date Gross Net Depth to Net Time Time Water Drop 1 8/10100 1100 9. GP- dense brown sandy gravel 2 1105 5 nun 314/16" 52/16w Large cobbles 3 1106 9. 4 1111 5 trun 313/160 5311V Weathered rind very dam 5 1112 9. 6 1117 Smm 415/160 41/16' 3 O.H Bedrock 7 111$ 9. 8 1123 Smiri 41/160 415116w 9 0 1124 9. - 20 1129 5 nun 41/160 425/160 21 1130 9. - 12 1135 5mm 4 1/160 415/16" Water Added percolation Rate _= (min1m) Perc Hole Dm%etu--E— HOLErRESOAKED MORTOTEST Test Run Between 3 feet and 4 feet ermeth M Duffus, certify that this test was performed In accordance with all State and Mwuctpal gwdehnes in ct on this date Z14 ndkM" TOM Hoke Dug In Now Location Measured Depth Meseured Depth OfT*Btplpo SHANMLA SUBOMSION (ket) Lot No PAcorded Depth 128 Now Lot No (KND We Newt) of Test Hole 14? Qw) 148 1 1 120 lill 2 2 162 ISO 3 3 150 I ? 4 4 120 140 5 5 ISO 63 4. We 100 71 7 150 Ila a 90 100 We 100 100 -40 10 2 Ila so I 1 10 100 83 I r rig 100 70 13 13 92 75 14 14 Ila t2s 15 21 so 90 158 22 so so IS 20 140 02 11 Is go 100 Is 17 so 145 10 15 100 I I 2V we 100 21 12 145 zr We 109 ndkM" TOM Hoke Dug In Now Location Measured Depth Meseured Depth OfT*Btplpo Surface to GrourAwater (ket) (KNO Ropmt Aug 20M) 128 No Water 14? Nowffw 148 Nowater lill Nowster ISO NoWater I ? 140 140 water 63 Nowater 71 Ila lie 100 NoWater 100 so No Water 83 85 70 Nowater 75 Nowstar t2s NoWster 90 Nowater so Nowster 02 NoWOW 100 145 Nowstor I I 3/4 414 SHOORIIA SUBMISIC)" N" 0"4h No LotN* Obbyem CWowd Surfeco to High GrOurod"fill' 1~2 "4byn 214tay-02 224UP02 234UY-02 244A*y.02 284ilair42 I 1 119 122 123 123 125 125 NO WaIllf 2 2 No WSW NoWelor NoWater Nowatef Nowsw No Water NoWater 3 3 Nowater NO Water M water Nowater No Water No Water Noweler 4 93 97 so 100 102 103 108 4 5 5 Nowater Nowaler NOW&W No WSW wwater NoWater NoWatar 8. rbra x No Water Nowster NoWetar No Wow NoWater No Water 7 7 t4oW&tof NO water NOWIW No Water NOWAter Nowaw No Water a so 63 so as as 72 70 rim x NOWSW No Water NoWmter No Water WW*tw NoWater to 9 x 23 95 go 25 so 98 10 47 67 so 73 73 77 ir Illa x 48 45 48 51 so 53 03 83 83 as Be No Water Nowsw 13 13 14 14 Nowater NoWiter Nowitter Nowatef 140 Water No Water NOWSW Is 21 48 45 48 52 53 56 a 0 22 41 71 73 No Water No Water Nowsw Nowater Ise Is 20 at 85 as 92 95 96 103 17 Is No Water Nowsw No Water Nowater No Water No Water NoWeler Is 17 No Water NoWater Nowater Nowater No Water No Water No Water 19 Is 46 46 62 53 54 5 a 21r Will x 57 so so 52 55 as 21 12 lie 128 133 135 138 140 Tram x Nowater NOW&W Nowsw Nowater No Water No wow 22, Iva CaWe Tied Notes Dug In Neer LOCWW 414 Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program P.O. Box 196650 4700 Bragaw Street Anchorage, AK 99519-6650 www.muni.org/onsite (907) 343-7904 CERTIFICATE OF ON-SITE SYSTEMS APPROVAL FOR A SINGLE FAMILY DWELLING . Parcel I.D. 020-043-28 1. GENERAL INFORMATION COSA k-0 -7 0 0 S! 3 Expiration Date: :7 — zz-- 0 Complete legal.description LOT 10 SHANGRI-LA SUBDIVISION Location.(site address) rren'f PForZ,,Czr(s) Mailing address Lending agency Mailing address Real Estate Agent Mailing Address 16420 SANDPIPER DRIVE TOM AND AMBER ALLEN Day phone 229-1822 16420 SANDPIPER DRIVE. ANCHORAGE, AK 99516 Day phone Day phone Unless otherwise requested, COSA will be hold by DSD torpickup. 2. NUMBER OF BEDROOMS: 3. TYPE OF WATER SUPPLY: Individual Well El Individual Water Storage El Community Class _Well 13 Public Water System TYPE OF WASTEWATER DISPOSAL: Individual On-site R1 Individual Holding Tank Community On-site Public Sewer The Municipality of Anchorage Development Services Department (DSD) Issues Certificates of On -Site Systems Approval (COSA) based only upon th ' e representations given In paragraph 4 by an independent professional civil engineer registered in the State of Alaska. Certificates of On -Site Systems Approval are required for the transfer of title (except between spouses) for properties served by a single-family on-site wastewater disposal and/or water supply system. DSD also Issues COSAs upon request to homeowners. Certificates of On -Site Systems Approval are valid for 90 days from the date of issue for properties served by a private or Class C well and may be reissued with new water sample results. (Certificates may be reissued for a period of up to one year'with valid water samples.) Certificates are valid for one year for properties served by Class A or B wells or a public water system. The Municipality of Anchorage is not responsible for errors or omissions In the professional engineer's work. 4. STATEMENT OF INSPECTION BY ENGINEER As certified by my seal affi xed hereto and as of the validation date shown below, I verify that my investigation, based on procedures outlined in the Certificate of On -Site Systems Approval Guidelines for this application. shows that the on-site water supply and/or wastewater disposal system is (are) safe, functional and adequate for the number of bedrooms and type of structure indicated herein. I further verify that based on the information obtained from the Municipality of Anchorage files and from my Investigation and Inspection, the on-site water supply and/or wastewater disposal system is(are) in compliance with all applicable Municipal and State codes, ordinances, and regulations in effect at the time of installation. Name of Firm BTH CONSTRUCTION. LLC Phone 907-336-3447 Address P.O. BOX 11035&,AIJ1CHORAGE,AK995I1 APSIL4,2007 ErIgineer's Printed Nam6'BRIAN T. HARTEN Date OF A4 L"'t", MANT.WTM :0,0 5. DSD SIGNATURE .4.0 01�-. CE -10068 4 r bedrooms. —AzApproved fo o.. Disapproved. 441111 *for[ . S . so*";�� Conditional approval for _ bedrooms. with the following stipulations: Attachments: COSA Checklist x Arsenic Advisory Septic System Advisory Maintenance Agreements Well Flow Advisory Supplemental Engineer's Report Nitrate Advisory Other By: Original Certificate Date: h,4� �� (R� 1IMS) Municipality of Anchorage Development Services Department Building Safety Division On -Site Water & Wastewater Program 4700 Bragaw Street P.O. Box 196650 Anchorage. AK 995 1 "650 www.muni.org/onsite (907) 343-7904 CERTIFICATE OF ON-SITE SYSTEms APPROVAL CHECKLIST Legal Description: LOT 10 SKANGRKA Parcel ID: 020443-28 A. WELL DATA Well type EEIVATE If A. B, or C provide PASID # Well Log (YIN) YES Date completed 6-19-06 Sanitary seal (YIN) �LES Wires property protected (Y/N) YES Total depth 565 ft. Cased to 12._ft. Casing height (above ground) 24 In. FROM WELL LOG INSPECTION Date of test 6-19-M Static water level 20 Well production 0.5 g.p.m. in. WATER SAMPLE RESULTS: Coliform L_oolonies/100 mL Nitrate ND mg/L Other bacteria 10 colonies/100 mL Arsenic: 16.4 mgA Date of sample: 2-20-07 Collected by: BRIAN T. HARTEN, RE_ B. EEM46VWTANK DATA Tank Type/Material STEEL. 10 -GA Date installed 6,15-06 Tank size 1500 gal.. Number of Compartments 2 Foundation 0eanbut (yM�YES Depression over tank (Y/N) 1�0 Date 6f 0'u'mping NIA WIN Pumper C. A dikki6N FIELD DATA SS 13841"IledG-17-06' Soll rating (g.p.d./W or fe/bdrm) L2 Cleanouts (Y/N) YES High water alarm (Y/N) N/A System type 5 -WIDE Length 5 . ft. Width 5.0 - ft. Gravel below pipe 4.0 Total dep I th L42 ft. Eff. absorption area�vmonitoring tube YES Depression over field NO Date Of adequacy test N/A NEW Results (Pass/Fail) Fraltltepllii-�ho�nfield before test _in. get Elapsed Time: For gal. Now depthjn. Absorption rate >=_g.p.d. treatment (past 12 mo.) (Y/N & type) If yes, STATnION a D te Ize in gallon ,: Manholel ate installed ize In gallons Man I we "Pump on" level at In. 'Purn High water alarm level at _in. In. M Cycles tested Mae" alarm uirements? E. SEPARATION DISTANCES SEPARATION DISTANCES FROM WELL ON LOT TO: Septic tank/IXVAW on lot >IW on adjacent lots >1 W Absorption field on lot >1001 On adjacent lots >I 00' Public sewer main >75- Public sewer manholelcleanout >1 00' Sewer /septic service line >25' Holding tank >100' Animal containment areas WA Manurelanimal excrete storage areas >1001 SEPARATION DISTANCES FROM SEPTIC/HOLDING TANK ON LOT TO: Building foundation 10*7' Property line 792 Absorption field 15.8' Watermain >101 Water service line 52.5' Surface water >1 00' Wells on adjacent lots >1W SEPARATION DISTANCE FROM ABSORPTION FIELD ON LOT TO: Properly line 25.2' Building foundation I 1 .8' Water main >10' Water Service line 53' Surface water >IW Driveway. parkinglvehiole storage 30 81 Curtain drain >50' Wells on adjacent lots >I W F. COMMENTS: del�,.rwc 7rgO fAh� 4 UVMQC-J-P*nQAl G. ENGINEER'S CERTIFICATION I Certify that I have determined through field inspections and review of Municipal records that the above systems are in conformance with MCA COSA guidelines in effed on this data. Engineer's Printed Name BRIAN T. HARTEN, P.E. Date APRIL 4. 2007 "'Q0 COSA Fee $ Date of Paym!ent 0 7 , Receipt Number 3 7 (Rev, 11/06) Waiver Fee $ Date of Payment Receipt Number 1111111m T. PAM CE - 10068 Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Prograni 4700 Bragaw Street P.O. Box 196650 Anchorage, AK 99519-6650 www.muni.org/onsite (907) 343-7904 Arsenic Advisory Certificate of On -Site Systems Approval # 070083 A Certificate of On -Site Systems Approval inspection and test of potable water was recently conducted on the well water supply on Block , Lot 10 of Shangri-La Subdivision. This inspection revealed an arsenic concentration of 16.4 micrograms per liter (ug/L) for the property's well water sample. The Environmental Protection Agency (EPA) has established a maximum contaminant level (MCL) of 10.0 ug/L for public drinking water systems. While private wells are not subject to this regulation, EPA standards are based on existing health information and can therefore be used to gauge the relative quality of water from private wells. information on arsenic is available from the On -Site Water and Wastewater Program website (www.muni.org/onsitc) or at 343-7904. This advisory must be attached to all copies of the subject Certificate of On - Site Systems Approval. q Wife"Iii:1 SGS Ref.# 1070805001 All Dateirrimes are Alaska Standard Time Client Name BT1 I Construction Printed Daterrime 03/16/2007 9:02 Proj"t Name/# Lot 10 Shangri-La Collected Datefrime 02/2612007 17:30 Client Sample ID Lot 10 Shangri-La PressureTank Received Date/Time 02/27/2007 9:56 Matrix Drinking Water Technical Director Stephen C. Ede Sample Remarks: Parametcr Results POL Units Method Allowable Container ID Limits Prep Analysis Date Date Init Nitrate -N ND 0.100 mg/l. EPA 353.2 B 02/29107 JDS Nitfite-N ND 0.100 mg/L EPA 353.2 B 02/29107 IDS Metals Departzratnt Hardness as CsCO3 53.7 5.00 mg/l. SN120 2340B C 03/07/07 03/10/07 TK Private Individual Analysis Aluminum 411 20.0 ug/L EP200.8 C 03/07/07 03/10107 TK Antimony 19.0 a 1.00 ug/L EP200.8 C (0) 03/07107 03/10/07 TIC Arsenic 16.4 * 5.00 ug/L EP200.8 C (<10) 03107107 03/10107 TK Barium 73.7 3.00 ug/L EP200.8 C (<2000) 03/07/07 03/10107 TK Cadmium ND 0.500 ug/L EP200.8 C (<5) 03/07107 03/10/07 TK Calcium 14100 500 ug/L EP2DO.8 C 03107/07 03/10107 TIC Chromium ND 1.00 ugfL EP200.8 C (<100) 03/07/07 03/10/07 TK Copper 14.8 1.00 ugfL EP200.8 C (<1300) 03/07/07 03/10/07 TIC Iron $51 250 ugIL EP200.8 C (<300) 03/07107 03/1 Qt07 TK Lead 1.01 0.200 ug/L EP200.8 C (<15) 03/07/07 03/10107 TK Magnesium 4480 50.0 ug/L EP200.8 C 03/07107 03/10107 TK Manganese 22.5 1.00 ugfL EP200.8 C (<50) 03107/07 03/10107 TK Phosphorus ND 200 ug/L EP200.8 C 03107/07 03/10107 TK Chloride 1.03 0.100 mg(L EPA 300.0 B (<250) 02/29107 02128107 JDS Fluoride 0.424 0.100 mg(L EPA 300.0 B (<2) 02129/07 02129107 JDS Potassium ND 500 ug/l. EP200.8 C 03/07/07 03/la'07 TK Selenium ND 5.00 ug/L EP200.8 C (<50) 03107/07 03/10107 TK Sodium 599DO 500 ug/L EP200.8 C (<250000) 03107/07 03110(07 TK Silicon 4380 200 ug/L EP200.8 C 03107107 03/10/07 TK Silver ND 1.00 ug(L EP200.8 C (< 100) 03/07/07 03/10107 TK Sulfate 34.3 OADO mg(L EPA 300.0 B (<250) 02/28/07 02128/07 IDS Thallium ND 1.00 ugfl. EP200.8 C (<2) 03/07/07 03/10107 TK wqim�j SGS ReEN 1070805001 Client Name BTU Construction Project Name/# Lot 10 Shangri-La Client Sample iD Lot 10 Shangri-La PressurcTank Alatrix Drinking Water All Datestfrinnei are Alaska Standard Time Printed Dateffime 03/1612007 9:02 Collected Datefrime 02/2612007 17:30 Received Daterrime 02/27/2007 9:56 Technical Director Stephen C. Ede Parameter Results PQL Units Mcchod Container ID Allowable Limits Prep Analysis Date Date Init Private individual Analysis Total Dissolved Solids 218 10.0 mgfL SM20 2540C D (<5DO) 03/05107 ACIF Zinc ND 5.00 ug(L El200.8 C (<5000) 03/07/07 03/10107 TK Nickel ND 2.00 ug/L EP200.8 C (< 100) 03107/07 03/10107 TK 11CO3 Alkalinity 153 10.0 mg/L S%120 2320B D 03105/07 KP CO3 Alkalinity ND 10.0 mgIL SM20 2320B D 03/05/07 KP Of I Alkalinity NO 10.0 mgfL Sh,120 2320B D 03105/07 KP Conductivity 360 1.00 urnhos/cm SN120 25 1 OB D 02127/07 ACIF pil 8.35 0.100 pf I units EPA 150.1 D (6.5-8.5) 02/27/07 ACIF Alkalinity 157 10.0 mgfL SM20 2320B D 03/05107 KP Total Coliform 10 OB. No Coli col/100mL SM20 9222B A (<]) 02/27/07 llKG