Loading...
HomeMy WebLinkAboutTUXEDNI PARK WEST BLK 1 LT 2Tuxedni* Park West Block 1 Lot 2 #041-022-40 Municipality of Anchorage `-^ , Development Services Department y; Building Safety Division On -Site Water and Wastewater Program, 4700 BragawSt. P.O. Box 196650 Anchorage, AK 99519-6650 Page of www.ci.anchorage.ak.us (907)343.7904 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT Permit Number: SW050115 PID Number: 041.022.40 Nems'. Lees Custom Design Wastewater System: ® New ❑ Upgrade Avasu: NHN Altelled)[iY9. Anchorage. AK 99507 ABSORPTION FIELD Phar NMnw Graadm s 624-W5 4 0 Deep T(&Kh 0 Shs lP TWch 0 Old 0 Mane 0 ovw LEGAL DESCRIPTION SRI .V T° D•Pmhurt ar ""iy O BMXM' LPI'. $IOdw1aM: 1.2 GPDIFT DWh b p" axwn tom apaw Pada. 4.0 FI. Gravel degh wwah pqs. 2 TUXEDNI PARK WEST 2.35.2.47 Fl. 1.53.1.65 TPwrnhq Partite . Ssam'. Fe added aoova "nett pads FI GravN Lrgln varies 1.1.1.68 78 FI. Fl. Well: ® New ❑ Upgrade DfvNYn°"` Nwtwdrws UWanuwwaenrwF CraMralan (Pmaa, A, a. c): TPW DWh. caged m: PRIVATE 5 FI. Tdal aEsaq,dn ar« 2 1 10 FI Pa» MaerW. 1a1 FI. 181 Fl 500+ FI• I D3034 & F810 to « Dale 0,.wd. $IaiP Wali Lava SULLIVAN 6/2105 107 a Slw TWEED Dale aWrlad' FL 619105 Ywa. Pump saa c..nvH..yvAnonGand 30 GFM unknown 2 yOS•D1t� TANK FI. FL SEPARATION DISTANCES ® Septic ❑ Holding ❑ S.T.E.P. ❑ Other. To Septic Absorption Lift Holding PubiiuPlive) •tea apaalY From Tank Field Station Tank Sewer Line PREMIER PLASTICS 1300 Ga 100'+ 1001+ NA NA 25'+ HDPE N, wa canpa«eras. 2 awaaW". 100'+ 1004 NA NA LIFT STATION La Lns 5'+ 3' NA NA Va�W"- Gal Fdu w 5'+ 10'+ NA NA 'P.P al tura 'Poop Pe'rvaa Hon wa'w arrm". N M N c~Dran NA a50'+ NA NA Plane Maka&MPda ErtlrKal vwpxy 'pedanla0 py Ftwr s Tank & Field insulated BENCH MARK "None known Loci1ni 0 Deiap °" Garage Slab 100 FL Inspections performed by: KND Engineering Inc.ngineer's nc• Dates: 1" & 2ne 6/9105 Stamp 3"' 5116106 OF 44 %%1 Development Services Department Approval • �I Conditional Approval Date: „r, •; ,�9+I so Kennem M. o , Reviewed and approved by: c Date: 0 zv Or9F�••S•17 O a�����r ...... (sea owa) :, PROFESSION`' AS -BUILT SYSTEM DETAILS/SITE PLAN TUXEDNI PARK WEST SUBDIVISION, BLOCK 1, LOT 2 SPLITTER CO 1300 GAL. HDPE .419 SEPTIC TANK RESERVE (2) 35'x; A—C=21.5' B—C=64' A—D=25' B—D=63' A—E=36' B—E=58' A—F=54' B—F=26.5' A—G=66' B—G=45' A—H=51' B—H=66' oor doe' MT, j100, THA -3 ifLLV TRENCHES 501 !r .0 TO DRAINnELD TO SPLITTER OF AZ4 %T�A X91 : 9� *�l L EIIt11:1'li 7 / I,CE 7116 " ' oll 0, \lE991 9 8600.c; • \THOS -1 FINAL GRADE SEWER ROCK TRENCH 1 w— FINAL GRADE w;rrs� SEWER ROCK TRENCH 2 3e' — PREPARED FOR: LEE'S CUSTOM DESIGN NHN ATEILER DRIVE ANCHORAGE, AK 99507 907-694-8565 FIELD BOOKS COMPUTED, BOMNomr.— DRA' kind STMING CLd ED, KMD AST` SEWARD DATE 2/25/0 Dw . n1E_ tie¢ 2042 nQ FILE. 05012 AS8.d.g 'TDB No.: 05-012 Permit SW050115 PID#041-022-40 �i T D.5' 1.53' 1 97.3 6.0 Nw T0.5' 1.65' 92.0 1 NTS ABBREVIATIONS BOH - BOTTOM OF TESTHOLE CO — CLEANOUT MT - MONITORING TUBE NTS - NOT TO SCALE Z LLlJ ENGINEERING, INC. 20441 PTARMIGAN BLVD. EAGLE RIVER AK 99577-8736 (907)696-6111/FAX (907)698-8111 www.HNDEn'Ineerin`.com/knden`®Bk.net Certitieb 33ril(ing log by t)0000.dbo SULLIVAN WATER WELLS PA. BOX 670274. Cftl1GIAK, ALASKA OMU • . OWNE R OF LMiD • C r t� ..i JL rf i l LEGAL DAM- P6EMTNULIBER 0 SO /l5 Daleoflm-ft TAXfDENitMMMHUMMt 1241 �0-- IS well baled at apoKwW Qe I b adore ' 6.0ti's :J No Maimd of Drl klW H fr%Atay Li cable loot Depth of wr& /( f CaskVTYM176at- V"nidorass ro�`� taaoreta G " irrhes•deplh /Jr-, teat U}nerType_- suckw nbwe Grouxlt � feet Stec Water Levret /0-4 feel PecowtaLmm--R—C� Wn Melina of TesbW /4 r� / Wd ixntoe *V 0 OperTypm 1pen aid D open hob :tscreO+et. start feet Sipped feet U PerbrAcm Stat fee! Stopped et fe -a .l,r,�_ C g1bl a o x$ p t� �F TAIM A/06 Depttz iom %eL too 02 0 feet Wei DWm*cled Upon Co mpledcn? Mrs D No Me6ndofUmkdectiori GKan•t..Jr -l�O"' oJs•cc3fRorJ .r.ci-e 6R4,+E�L. . cyt 7:16H7 S it T; 61<4,/rl- ctar 6�.4�s�. eu r • :•: �: •< • • • 7—.=• • • • i. S• ASBUILT I HEREBY CERTIFY THAT I HAVE SURVEYED THE FOLLOWING DESCRIBED PROPERTY- T�/�',e�i/' AND THAT NO ENCROACHMENTS EXISGO T EXC!`PT AS INDICATED, IT IS THE RESPONSt31LITY OF THE OWNER TO DETERMINE THE EXISTENCE OF ANY EASEMENTSOR WHICH DO NOTAVENANTSAPPEAR ON, THE RECORDEDIONS SUBDI- VISION PLAT. UNDER NO CIRCUMSTANCES SHOULD EON BE USED FOR CONSTRUCTION OF ENCE LDATA INES, OR FOR ESTA13LISH NG BOUND- ARY LINES. SCALE] , OF A(� �, DATE �o/s�tr i'�� P �`r',4's �' GRID zoyz 0040 ........ ' � FB: ,/' '.Due's Mark S.w /O� yelB � ..'• LS, 6918 .. DRAWN�� 11415 sTAwc We obn Par m C:66T 04 &ViM AID- t4tar I BE Ad jM14)R-. lit' AS-gultr sv9VeyjpaAFr1A/plf I Ry LS . �A ti ' h a v ` w V " i tiic ta'' ac. ASBUILT SEWARD &ASSOCIATES LAND SURVEYING 69 I HEREBY CERTIFY -THAT I HAVE SURVEYED THE SCALE: , FOLLOWING DESCRIBED PROPERTY TiiYEO.Y/.oy�C�6i/�TT/Uly' GolZ�'F:/ DATE= r P�� OF At�s,` AND THAT NO ENCROACHMENTS EkIST EXCf`PT AS •, ,� + INDICATED. IT IS THE RESPONSIBILITY OF THE /o/zs�� �� • • '� OWNER TO DETERMINE THE EXISTENCE OF ANY GRID ••rH EASEMENTS, COVENANTS, OR RESTRICTIONS zoyr '� •.. WHICH DO NOT APPEAR ON THE RECORDED SUBDI- I' VISION PLAT. UNDER NO CIRCUMSTANCES SHOULD FB: / %Doone M•rk S•wud : k j ANY DATA HEREON BE USED FOR CONSTRUCTION io6 y6B US 76918 ` OF FENCE LINES, OR FOR ESTABLISHING BOUND- ARY LINES. DRAW Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program 4700 Bragaw Street P.O. Box 196650 Anchorage, AK 99519-6650 www.ci.anchoragc.ak.us (907)343-7904 Waiver Review Worksheet WR#:060022 PID#:041-022-40 HA/Permit# SW050115 Date Received: May 24, 2006 Legal Description: Tuxedni Park West, Block 1 Lot 2 Engineer. Kenneth M. Duffus, P.E. KND Engineering, Inc 20441 Ptarmigan Blvd. Eagle River, AK 99577 Applicant: Lee's Custom Design Waiver Requested: Lot Line Waiver Criteria: Geology Points: A. Water Table B. Soil Sorption C. Permeability D. Water Table Gradient E. Horizontal Separation Total: Waiver is Granted: X Waiver is not Granted. List Conditions or Reasons for above: Dale: 05/24/06 By:DebDeb Wockenfuss Name of Reviewer ......................................................................... Rec#: 080411 Amount: $J75 Date Paid: 5/24/2006 Municipality Of .Anchorage 1:0. Ik.x 1!N;f.S(1 • Mchomgc, Alaska J!ki19 r�(.i0 • Tchphnnc (007) 3%:l fC1111 •Paz ('.N17) 3i.4t{_'IN) -i �4 / 47a) Bmgaw S(mc( • .lnchomge, MwAa M-507 s aIMmuni.org Mayor Mark i3rgich Building Safct), Mision May 24, 2006 Kenneth M. Duffus, P.E. "D Engineering, Inc 20441 Ptarmigan Blvd. Eagle River, AK 99577 Subject: Waiver Request for Tuxedni Park Nest, Block 1 Lot 2 Waiver Request WRM 060022 Parcel ID # 041-02240 SW050115 Dear Kenneth AT. Duffus, P.E.: Your request for a waiver of the required 10 feet horizontal separation from the absorption field to the property line has been approved. The approved separation distance is 3.0 feet. This waiver approval applies to the existing absorption field to property line separation only. Any future upgrade to the on-site wastewater disposal system will require all separation distances be met or another approval from this department. If there are any further concerns or questions regarding this waiver, please call our office at 343-7904. Sincerely, 9 � Deb Wockenfuws Civil Engineer On -Site Water & Wastewater Program Community, Security, Prosperity MUNICIPALITY OF ANCHORAGE 1�p Development Services Department ��� On -Site Water d Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM I WATER SUPPLY PERMIT Initial Date Issued: May 10, 2005 Expiration Date: May 10, 2006 Permit Number: SW050115 Parcel ID: 041-022-40 Legal Description: TUXEDNI PARK WEST SUBDIVISION BLOCK 1 LOT 2 Design Engineer: 0070 KND Engineering Site Address: NHN ATEILIER DRIVE Owner Name: LEE'S CUSTOM DESIGN Lot Size: 97992 SO. FT. Owner Address: NHN ATEILIER DRIVE Total Bedrooms: 4 Permit Bedrooms: 4 ANCHORAGE. AK 99507 - This permit Is for the construction of: Q Disposal Field ❑✓ Septic Tank ❑ Holding Tank ❑ Privy Q Private Well ❑ Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations (18AAC80 ). 3, The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. 4/1 Joy _ 16Rt^4 tDefe'2^ 1vzo ryJ: ivsi91/Ari0W or- 7)4r .JEcc Lura -/cc c% -m! 40 7-tIE p-opesE.D L-ocAr,&v o/` 5'LP71c ryyrr^. 77./E s IrS7,r - 063ifnr U74LL 13E "A3Ji►IJf J FV/3rHiq 71trtrH oN rN[ ',or. NEN TES TWO"$ 9+461-.fE Received By. Issued baJF OWD 6'70,wpw47rrt ~Q;login'- /}dakfI044L- rELTNo/fg w;t- 6f S✓8m;r7[D Wirth As-&IiLr /alTCc7NJ Rf000fa7. Date: SX/O °J` Date: o Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program K 4700 South Bragaw St. `+ P.O. Box 196650 Anchorage, AK 99519-6650 www.ci.anchorage.ak.us (907) 343-7904 ON-SITE SEWERIWELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Parcel LD 041-022-40 Permit Number SW Property owner(s) Lee's Custom Design Dayphone 694-6364 Mailing address (1) 11517 Old Glenn HM_ Mailing address (2) /U�1✓ i 1-G!L I t?z l vF Zip Code 2602 - 92602 - Legal description (Lot, Block & Sub'da Tuxedni Legal Park West 131, L2 Legal description (Section, Township & Range) Lot Size 97,992 Acre E.:F . Number of Bedrooms _4 THIS APPLICATION IS FOR: Sewer Only ❑ Well Only ❑ Sewer and Well ® Water Storage ❑ Sewer Upgrade ❑ THIS PROPERTY CONTAINS: Hot Tub ❑ Jacuzzi ❑ Swimming Pool ❑ Water Softening Unit ❑ Therapy Pool ❑ I certify that the above information is correct. I further certify that this application Is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. of property owner or authorized agent) Permit Fees: J Date of Payment: Receipt Number: (Rev. 12/00) Uji Waiver Fees: Date of Payment: Receipt Number: KND ENGINEERING, INC. 20441 PTARMIGAN BLVD. EAGLE RIVER, AK 99577-8736 696-6111/FAX (907) 696-8111 May 17, 2006 Municipality of Anchorage Development Services Department On -Site Water & Wastewater Program P.O. Box 196650 Anchorage, AK 99519-6650 RE: TUXEDNI PARK WEST, BLOCK 1, LOT 2 — LOT LINE WAIVER Gentlemen, On May 10, 2005, a permit was issued for a new well and septic on the referenced property. Subsequently the owner drilled the well within 100' of the proposed wastewater system. We contacted your department and received authorization to perform an additional testhole and proceed with the installation. With the exception of a gravity -fed absorption field and increasing the absorption field length with 1.5' of effective sewer rock depth —the system was installed per the permitted design. We have just received the well log and as -built survey from the owner. The as -built survey shows that the system was constructed within 10 feet of the property line. The system is still located within the testhole radius and we do not expect there to be any adverse effect on adjacent lots by the location of this system. We are therefore requesting a waiver to 3.0 feet to lot line at this time. If you have any questions, please contact me at 696-6111 /FAX 696-8111. Respectfully submitted, KND Engineering, Inc. Kenneth f Attachments: Inspection Report & Well/Septic As -Built Soils Log As -Built Survey Well Log P47 -c: .5'119/0( Fir• : / 7S REcAr: 1 08o4i/ L.0T LIA�r 1~n Fre KdV D ENGINEERING, INC. 20441 PTARMIGAN BLVD. EAGLE RIVER, AK 99577-8736 (907)696-6111/FAX (907)696-8111 May 6, 2005 Municipality of Anchorage Development Services Department On -Site Water & Wastewater Program P.O. Box 196650 Anchorage, AK 99519-6650 Subject: New sewer/well permit — Tuxedni Park West, Block 1, Lot 2 Gentlemen: The owner has requested we proceed forward to obtain a septic & well permit on the subject lot. On April 5, 2005 two testholes were performed for the proposed system. The results of these tests are attached. The general slope of this lot is from east to west at a grade of approximately 5-1070. We have designed our system utilizing the existing testholes that were excavated for the proposed 4 -bedroom house. The lot will be served by an individual well, located on the central portion of the lot. We propose to install two 5' wide shallow trenches. Water was encountered during the excavation at 10' in TH05-2, and during monitoring at 8' (TH05-2) and 11' (TH05-1). There are no public or private wells within 200' of our proposed system location except as noted. There is no surface water within 100' of theproposed system and there are no known curtain drains within 50'. We do not expect there to be any adverse effect on adjacent lots by the development of this system. If you have any questions, please contact me at 696-6111 /FAX 696-8111. Respectfully submitted, KH D Engineering, Inc. Attachments: On -Site Well and Sewer Application Wastewater Absorption System Details/Site Plan Soils Logs/ Percolation Tests Owner/Excavator Specs MONITORING TANK TO FIELD JANIF• • • ' : • •% HOLES Lj •0 2.3' SPACING (TYP) 06 ... iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii � •i Tj SOLID FROM HOUSE `r i 7116 1 �4? " X bEEsstO0o PLAN VIEW ►RED FOR: LEE'S CUSTOM DESIGNS 11517 Old Glenn Highway Eagle River, AK 99577 Tel: (907) 694-8565 NG f. 0501ZDWC 1EM ENGINEERING, INC. 20441 PTARMIGAN BLVD. EAGLE RIVER, AK 99577-8736 (907)868-3791/FAX (907)868-3793 WASTEWATER ABSORPTION SYSTEM DETAILS TUXEDNI PARK W., Block 1 Lot 2 m m uJ O p p_j O = > o v -j < FINISHED GRADE INSULATION o FILTER FABRIC Varies L in 2' ��^ 1500 GAL —_ 0_5' S.T.E.P. MIN. SEWER ROCK C14 v0 +j Lift Station I (2) 35' TRENCHES r — WATER MONITORED PRESSURIZED DISTRIBUTION SYSTEM HOLE SPACING DESIGN ® 8' BELO 1. RESIDUAL HEAD - 5' GRADE 2. HOLE SIZE - 3/16' - 1.00 GAL PER HOLE 0 30 PSI 3. 30 GALS (PUMP DELIVERY)/1.00 GALS./HOLE - 30 HOLES 4. 70 LF LATERAL/30 HOLES - 2.3' SPACING PER HOLE BOH 12' 5. ALL HOLES SHALL HAVE CAPS INSTALLED PER MANUFACTURER'S SPEonCATION. MONITORING TANK TO FIELD JANIF• • • ' : • •% HOLES Lj •0 2.3' SPACING (TYP) 06 ... iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii � •i Tj SOLID FROM HOUSE `r i 7116 1 �4? " X bEEsstO0o PLAN VIEW ►RED FOR: LEE'S CUSTOM DESIGNS 11517 Old Glenn Highway Eagle River, AK 99577 Tel: (907) 694-8565 NG f. 0501ZDWC 1EM ENGINEERING, INC. 20441 PTARMIGAN BLVD. EAGLE RIVER, AK 99577-8736 (907)868-3791/FAX (907)868-3793 KINI D ENGINEERING, INC. 20441 PTARMIGAN BLVD. EAGLE RIVER, AK 99577-8736 SOILS PERCOLATION TEST Performed for: Lee's Custom Designs Date Performed: 06/06/05 Project: Tuxedni Park West, Block 1, Lot 2 TEST HOLE u 2005-03 Depth 11- 12- 13- 14- 15- 16- ORG /OL SEE ATTACHED SITE PLAN FOR HOLE LOCATION SP B.O.II. Insitu material suitable as filter. 17- NOTE: Pere Test: Water added several 18- times with rapid absorption— same as other testholes 19- 700 {Vas Ground water encountered? YES What depth? 8.8' Depth to water after monitoring? 8.5' Date? 06/13/05 Reading Date Gross Time Net Time Depth to Water Net Drop 1 6/6/05 1:00 6- - 2 1:02 2 min dry 6- 3 1:03 6" - 4 1:05 2 min dry 6 - 5 SEE NOTE 6 7 8 9 10 11 12 ' Water Added Percolation Rate <I(min/in) Perc Hole Diameter 6" Test Run Between 4 feet and 5 feet 1, Kenneth hi. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in effect on this date. OF RCd V �yaw D ENGINEERING 20141 PTARMIGAN BLVD. '•• EAGLE RIVER, AK 99577-8736 ♦ ,: CE SOILS PERCOLATION TEST Performed for: Lee's Custom Designs Date Performed: 04/05/05 Project: Tuxedni Park West, Block 1, Lot 2 TEST HOLE # 2005-01 1 1 Depth 13- 14- 15- 16- 17- 18- 19- 20- ORG- red/brown overburden W/ organics SWAP - gray sand moisture increasing w/ depth B.O.H. Insitu material suitable as filter. SEE ATTACHED SITE PLAN FOR HOLE LOCATION Was Groundwater encountered? NO Whatdepth? NA Depth to water after monitoring? 11' Date? 05/05/05 Reading Date Gross Time Net Time Depth to Water Net Drop 1 5/12/05 1:00 - 6" - 2 1:02 2 min dry 6" 3 1:03 6" - 4 1:05 2 min dry 6- 5 1:06 - 6" - 6 1:08 2 min dry 6" 7 1:09 6" - 8 1:11 2 min dry 6- 9 1:12 - 6" - 10 1:14 2 min dry 6" 11 1:15 6" - 12 1:17 2 mind 6" ' Water Added Percolation Rate < 1 (min/in) Perc Hole Diameter 6" Test Run Between 4 feet and r feet I, Kenneth M. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in effect on this date. K N D ENGINEERING 20441 PTARMIGAN BLVD. EAGLE RIVER, AK 99577-8736 SOILS PERCOLATION TEST Performed for: Lee's Custom Designs Date Performed: 04/05/05 Project: Tuxedni Park West, Block 1, Lot 2 TEST HOLE 9 2005-02 Depth 13- 14- 15- 16- 17- 18- 19- 20- ORG- red/brown overburden w/ organics SW/sp- w/ 4" gp lense at 4' gray sand moisture increasing w/ depth B.O.H. Insitu material suitable as filter. SEE ATTACHED SITE PLAN:] FOR HOLE LOCATION Was Ground water encountered? YES What depth? 10' Depth to water after monitoring? 8' Date? 05/05/05 Reading Date Gross Time Net Time Depth to Water Net Drop 1 5/12/05 1:00 - 6" 2 1:02 2 min dry 6" 3 1:03 6" - 4 1:05 2 min dry 6" 5 1:06 6" - 6 1:08 2 min dry 6- 7 1:09 - 6" - 8 1:11 2 min dry 6- 9 1:12 - 6" - 10 1:14 2 min d 6" 11 1:15 6" - 12 1:17 2 min dry 6" ' Water Added Percolation Rate <1(min/in) Pere Hole Diameter Test Run Between 4 feet and _ 5 feet I, Kenneth M. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in effect on this date. J.LOd V D ENGINEERING, INC. 20441 PTARMIGAN BLVD. EAGLE RIVER, AK 99577-8736 696-61111 FAX (907) 696-8111 ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION PRACTICES AND MATERIAL SPECIFICATIONS LEGAL DESCRIPTION: Tuxedni Park West, Bl, L2 GENERAL: 1. The scope of this project includes the installation of a septic tank and/or drainfield to serve a single family residence on the referenced property as delineated on the attached Municipality of Anchorage (MOA) permit and site plan. 2. Construction shall be in accordance with the approved site plan and design drawings, MOA permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 3. KND Engineering Inc (KND) assumes no responsibility of the accuraty of the as -built survey provided by the owner or owner's representative. 4. The owner or contractor is responsible to notify the engineec of any discrepancies noted on the design plans or drawingsprior to commencing work. These discrepancies could be, but not limited to, possible encroachments, surface water, varying soils, unplatted easements, types or use of dwellings on or adjacent to property, nearby public wells, etc. 5. The contractor shall be responsible for locating any necessary underground utilities, easements, property lines and surface water. The owner and/or contractor shall ensure, if deemed appropriate, that a registered land surveyor prior to construction flags all setbacks. 6. The contractor shall be responsible for verifying all pertinent separation distances and component layout. 7. Unless specifically agreed otherwise, the property owner shall be responsible for final grading areas subsequently depressed from soil settling. On all leachfield mound systems, the property owner shall be responsible for ensuring a satisfactory vegetation growth over the mounded area. 8. The MOA Development Services Department On -Site Water & Wastewater Program must certify contractors installing wastewater disposal systems. Owners installing their own systems must also receive prior approval from said MOA Department. SEPTIC TANK / HOLDING TANK / LIFT STATION INSTALLATION: 1. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. 2. The septic tank shall be sufficiently bedded with proper material and compacting to prevent damaging, settling or shifting of the tank. 3. All standpipes on the septic tank shall extend a minimum of 12 inches above the final grade. 4. Septic tanks installed with less than 4 foot of cover shall be insulated. The contractor will ensure that the fill over the tank does not exceed the burial depth rating. 5. A foundation cleanout shall be installed one to four feet from the building foundation. In the line between the tank and the leachfield there shall be two adjacent cleanouts (unless an effluent pumping system exists within the septic tank). These cleanouts shall be located on undisturbed soil not more than 10 feet from the tank. The second cleanout, in line, shall be to clean toward the septic tank. 6. Final grading over the septic tank shall be such that a positive slope exists away from the septic tank. n,..o i ,.F'A Reference: Tuxedni Park West B1, L2 Date: 05/05/05 Page: 2 of 3 7. All H.D.P.E. tanks shall have a vertical length of 4 -inch perforated drainpipe besides the tank extending to the bottom of the tank to above grade to monitor ground water. 8. All tanks shall be anchored when there is not enough adequate soil cover to resist buoyancy forces in high -groundwater areas. 9. All holding tanks and lift stations shall have an audible and visual alarm inside the residence. 10. All lift stations shall be wired in compliance with the Uniform Electrical Code and all MOA guidelines. 11. The contractor shall remove the old tank, or abandon it in compliance with the Uniform Plumbing Code. The contractor is solely responsible for the abandonment procedure. ABSORPTION TRENCH/DRAINFIELD INSTALLATION: 1. Excavate the proposed trench to the dimensions shown on the design. The bottom of the excavation shall be within 2 inches of level. If the sidewalls of the excavaction become smeared, they must be raked or scratched (roughed -up) before gravel (sewer rock) placement. 2. Once the sewer rock is installed, the distribution pipe is installed level with the perforations facing downward. Gravel is then to be placed over the distribution pipe to provide a minimum of 2 inches of cover over the pipe. 3. A silt barrier must be installed between the final gravel layer and the native soil backfill. Ensure the silt barrier covers the entire gravel surface before placing backfill. 4. Monitoring tubes shall be four- (4) inch diameter, installed approximately in the locations shown on the design, and extend a minimum of 12 inches above final grade. The portion of the monitoring tube extending through the gravel shall be perforated from the bottom of the trench to the invert of the distribution pipe. This is equivalent to the effective depth of the gravel as noted on the design. S. Backfill over the final gravel layer must not be less than twenty-four inches. Insulation must be installed when the backfill depth is less than thirty-six (36) inches. The finish grade over the trench must be mounded to prevent the formation of a depression after settling. 6. All advanced technology waste water disposal systems (Advantex, Biocycle, Intermittent Dosing Sand Filter, etc...) shall be constructed, installed, maintained and monitored per manufacturer's specifications and MOA requirements. MINIMUM MATERIAL SPECIFICATIONS: 1. A MOA approved septic tank manufacturer must construct any septic tank proposed for installation. 2. The following pipe materials are MOA approved for use in septic system installations: Type of Pipes Perforate EMU Cast Iron Yes Yes ASTM D3034 (PVC) Yes Yes ASTM F810 (HDPE) Yes No ASTM D2662 (ABS) Yes Yes 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Company Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Fernco, or equal). 5. A permeable nontoxic silt barrier (Typar 3401, Mirafi 140N, or equal) must be installed between the final leachfield gravel layer and the native soil backfill. 6. All leachfield gravel (sewer rock) shall be 0.5"-2.5" screened gravel with less than 3% passing the #200 sieve. If deemed necessary, a sieve analysis should be performed. 7. When sand is being used as a filter material, its gradation specification must conform to current MOA or DEC requirements. Reference: Tuxedni Park West BI, t2 Date: 05/05/05 Page: 3 of 3 INSPECTIONS: Typically there will be three (3) inspections required during the installation of the wastewater disposal system. These inspections will occur as follows: 1. The first inspection must be conducted after the excavation of ditches, pits, trenches, or beds and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled before this inspection. 2. The second inspection must be conducted after the placement of the sewer rock, distribution lines, standpipes, and cleanouts, but before the placement of the silt barrier, insulation, or any other backfill. 3. The final inspection is to occur upon final grading of the property. Often there will be more than these 3 inspections required, especially with the installation of multiple trenches, sand filters, pressurized distribution systems, etc. The inspecting engineer is to be contacted at least 24 hours prior to the start of construction. If necessary, a pre -construction meeting will take place on-site. The inspecting engineer will not coordinate, direct or control in any way the contractor's activities. The owner shall contract with the contractor to perform the work outlined in these specifications and attached plans and in accordance with the attached MOA permit. All materials, components, and construction practices shall comply with the MOA's and the State of Alaska's latest ordinances, regulations, or policies regarding wells and septic systems. The failure of the inspecting engineer to notice a material or construction non-compliance does not relieve the contractor of his/her responsibility to correct such deficiency. There will be no contractual arrangement existing between the contractor and KND Engineering Inc. KND shall be the owner's representative and will inspect the work as stated above to document the contractor's activities. Final acceptance of the contractor's work rests with the owner and the MOA. KND shall have no liability to the owner or to others for acts or omissions of the contractor or any other persons performing work on this project or the failure of the contractor to carry out the work in accordance with these construction documents. KND's inspecting engineer will not be responsible for the construction means, methods, and techniques, sequence, procedures or the safety precautions incident to this project. BY PROCEEDING FORWARD WITH THE INSTALLATION OF THE WATER AND/OR WASTEWATER SYSTEM (S), THE PROPERTY OWNER, CONTRACTOR, AND WELL DRILLER ACKNOWLEDGES HAVING READ AND ACCEPTED THESE SPECIFICATIONS.