Loading...
HomeMy WebLinkAboutMARGUERITE HILLS Expired S-11371-1Marguerite Hills 5-11371-1 Expired Comments on Cases due 5/12/2005 Page 2 S11360-1 Lake Center Subdivision No objection S11361-1 East Dimond Center No objection S11368-1 Mt. Baldy Estates Information to satisfy the requirements specified by AMC 21.15, AMC 15.55 and AMC 15.65 must be submitted for each lot within this proposed subdivision. This information must include, but may not necessarily be limited to: 1. Soils testing, percolation testing, and ground water monitoring must be conducted to confirm the suitability for development using on-site wastewater disposal systems. Ground water monitoring must be conducted during high ground water season in either the fall (October) or spring (April -May). 2. Areas designated for the original and replacement wastewater disposal system sites must be identified and must meet all criteria specified in AMC 15.65 including slope and slope setback requirements. Preliminary soils tests indicate that slopes are in excess of 25% in the locations that they were performed by the engineer. New soils tests will need to be submitted to fulfill the above requirements. 3. Topographical information must be submitted delineating total reserve area for each proposed lot. 4. Provide documentation for water availability to serve water wells. S11370-1 Chugach Meadows Subdivision No objection 4 : S 11371-1 Marguerite Hills Subdivision Information to satisfy the requirements specified by AMC 21.15, AMC 15.55 and AMC 15.65 must be submitted for each lot within this proposed subdivision. This information must include, but may not necessarily be limited to: 1. Soils testing, percolation testing, and ground water monitoring must be conducted to confirm the suitability for development using on-site wastewater disposal systems. Ground water monitoring must be conducted during high ground water season in either the fall (October) or spring (April -May). 2. Areas designated for the original and replacement wastewater disposal system sites must be identified and must meet all criteria specified in AMC 15.65 including slope and slope setback requirements. Preliminary soils tests indicate that slopes are in excess of 25% in the locations that Comments on Cases due 5/12/2005 Page 3 they were performed by the engineer. New soils tests will need to be submitted to fulfill the above requirements. 3. Topographical information must be submitted delineating total reserve area for each proposed lot. 4. Provide documentation for water availability to serve water wells. S11372-1 The Highlands and Atwood Estates Subdivision No objection .i Municipality of Anchorage • .. Development Services Department j Building Safety Division MEMORANDUM DATE: May 12, 2005 TO: Jerry Weaver, Jr., Platting Officer, CPD FROM: 0 Daniel Roth, Program Manager, On -Site Water and Wastewater Program SUBJECT: Comments on Cases due May 13, 2005 The On -Site Water & Wastewater Program has reviewed the following cases and has these comments: S10927-4 Marguerite Hills Subdivision Information to satisfy the requirements specified by AMC 21.15, AMC 15.55 and AMC 15.65 must be submitted for each lot within this proposed subdivision. This information must include, but may not necessarily be limited to: 1. Soils testing, percolation testing, and ground water monitoring must be conducted to confirm the suitability for development using on-site wastewater disposal systems. Ground water monitoring must be conducted during high ground water season in either the fall (October) or spring (April -May). 2. Areas designated for the original and replacement wastewater disposal system sites must be identified and must meet all criteria specified in AMC 15.65 including slope and slope setback requirements. Preliminary soils tests indicate that slopes are in excess of 25% in the locations that they were performed by the engineer. New soils tests will need to be submitted to fulfill the above requirements. 3. Topographical information must be submitted delineating total reserve area for each proposed lot. 4. Provide documentation for water availability to serve water wells. S11336-1 Potter View Subdivision No objection, provide a permit to operate a community water system or permission to connect to an existing community water system, whichever is appropriate. S11338-2 Arctic Industrial #4 Subdivision No objection Please fill in the information asked for below. 61 1.3 % 1 JU`, ti 1 '; .r'S -nepon acormna peununers w dtsaose ower aravners on Worm= tone. f-wim to drvuge ower oenencw merest owners may delay processing of dus apphcafion. PROPERTY INFORMATION Property Tax #(000-ooaoo-000): 020 l(a I.23 doo Site Street Address: " fc.,00 gatCr f�hSC PETITIONER` PETITIONER REPRESENTATIVE pFANY) Narne (Last name first) Name last name foul Mailing Address Mailing Address t st.tton A t ji.E SK -A il Gt; t�sK A q Contact Phone: Day: 3,K, , G Night: Contact Phone: Day: 5i.mo, .&�.jj Night: FAX: •y:,-(• -1 t'j (n FAX: 7,2.44WL S E-mail: E-mail: -nepon acormna peununers w dtsaose ower aravners on Worm= tone. f-wim to drvuge ower oenencw merest owners may delay processing of dus apphcafion. PROPERTY INFORMATION Property Tax #(000-ooaoo-000): 020 l(a I.23 doo Site Street Address: " fc.,00 gatCr f�hSC Current legal description: (use additional sheat n necessary) Zoning: - OSI— Acrea e: Aa.o Grid# SYS! 54-4.o # Lots: If Tracts: I Total #parcels: 1 71 I hereby certify that (I am)(1 have been authorized to act for) owner of the property described above and that I petition to subdivide it in conformance with Title 21 of the Anchorage Municipal, Code of Ordinances. I understand that payment of the application fee is nonrefundable and is to aver the costs associated with processing this application, and that it does not assure approval of the subdivision. I also understand that assigned hearing dates are tentative and may have to be postponed by Planning Department staff or the Platting Board, Planning and Zoning Commission, or the Assembly for administrative reasons. , 44Akk tl1 ^w05 Signature (Agents of aufhorization) roposea legal aescnpnon: (use additional sheet in newssary) 1-cr IZAI "—, V6 ; 1_oT ZG, "7 Z -'D, UoC 'LEI PAOLE3U&Cr-1 M ({it -LS 5%36 - Ili - tt r I x,. r Page 2 Aooficabon for Prelimhuy Plat eartmred Me Avalanche Zone: ❑ "C" ❑ "B" ❑ "A" ❑ Blue Zone ❑ Red Zone ❑ 100 year ❑ 500 year 13-2- ❑ "3" RECENTREGULATORYINFORMATION (Eventsawlhaw o=rredinLast 5 yeats for as or portion of site) ❑ Rezoning - Case Number: ❑ Preliminary Plat ❑ Final Plat - Case Number(s): ❑ Conditional Use - Case Number(s): ❑ Zoning variance - Case Number(s): ❑ Land Use Enforcement Action for ❑ Building or Land Use Permit for ❑ Wetlandpermit: ❑ Army Corp of Engineers ❑ Municipality of Anchorage APPLICATION CHECKLIST COMPREHENSIVE PLAN INFORMATION Anchora a 2020 Urban/Rural Services: ❑ Urban Ef Rural Anchorage 2020 West Anchorage Planning Area: ❑ Inside 0 Outside Anchorage 2020 Major Urban Elements: Site is within or abuts: ❑ Major Employment Center ❑ Redevelopment/Mixed Use Area ❑ Town Center ❑ Neighborhood Commercial Center ❑ Industrial Center ❑ Transit - Supportive Development Corridor Vbonal C3Site topography (4 copies minimum) Eagle River-Chugiak-Peters Creek Land Use Classification: ❑ Commercial ❑ Industrial ❑ Parks/opens space ❑ Public Land Institutions ❑ Marginal land ❑ Alpine/Slope Affected ❑ Special Study ❑ Residential at dwelling units per acre Girdwood- Tumagain Arm ❑ Commercial ❑ Industrial ❑ Parks/opens space ❑ Public Land Institutions ❑ Marginal land ❑ Alpine/Slope Affected ❑ Special Study ❑ Residential at dwelling units per acre Me Avalanche Zone: ❑ "C" ❑ "B" ❑ "A" ❑ Blue Zone ❑ Red Zone ❑ 100 year ❑ 500 year 13-2- ❑ "3" RECENTREGULATORYINFORMATION (Eventsawlhaw o=rredinLast 5 yeats for as or portion of site) ❑ Rezoning - Case Number: ❑ Preliminary Plat ❑ Final Plat - Case Number(s): ❑ Conditional Use - Case Number(s): ❑ Zoning variance - Case Number(s): ❑ Land Use Enforcement Action for ❑ Building or Land Use Permit for ❑ Wetlandpermit: ❑ Army Corp of Engineers ❑ Municipality of Anchorage APPLICATION CHECKLIST Fee: Plat: Copies 0 42 (long plats) ❑ 32 (short plats only)$Yzx11 reduced copy Other maps ETAerial photo E!rHousing stock 0 Zoning Mandatory on plat depictions: B'hedestrian walkway ❑ Landscaping required by zoning Property Title: 0 Certificate to Plat required documents unless specifically waived by Platting Officer: Vbonal C3Site topography (4 copies minimum) Waived by oils investigation and analysis reports (4 copies minimum) Waived by Subdivision drainage plan Waived b 2"M (Rev. 05ro2)eI& Please fill in the information asked for below. ,.cµn, u�wmnw� yc,,,,,w,va N anxr,rx arum warw�ma un wyprcmernm aaxm. rain+e to ewuge otner cere,�i merest owners may oeIay processing of this apphcatwn. RIGHT-OF-WAY AND/OR INFORMATION Benefiting Property Tax ftw000 oo 000): ^ PETITIONER' Site Street Address: " E PETITIONER REPRESENTATIVE (IF ANY) Name (last name lvsl Zoning: __ r,L Acrea e: 4�0 Name (Iasi name firs! Mating Aaaress Total # parcels: Mailing Address r F. L� =� r a. � •n �� Contact Phone: Day Night: Contact Phone: Day: +� Night: FAX: r, �.-7 L (P FAX: S2z • 25 E-mail: E-mail:r L� ,.cµn, u�wmnw� yc,,,,,w,va N anxr,rx arum warw�ma un wyprcmernm aaxm. rain+e to ewuge otner cere,�i merest owners may oeIay processing of this apphcatwn. RIGHT-OF-WAY AND/OR INFORMATION Benefiting Property Tax ftw000 oo 000): ^ Site Street Address: " E Description of right-of-way/easement: (use additional Sheet a necessary) A4--) Zoning: __ r,L Acrea e: 4�0 Grid fl Y%4 O /1 Lots: I /I Tracts: Total # parcels: I hereby certify that (I am)(1 have been authorized to act for) owner of the property described above and that I petition to vacate t in conformance with Tice 21 of the Anchorage Municipal. Code of Ordinances. I understand that payment of the application fee is nonrefundable and is to cover the costs associated with processing this application, and that it does not assure approval of the vacation. I also understand that assigned hearing dates are tentative and may have to be postponed by Planning Department staff, the Platting Board, or Planning and Zoning Commission for administrative reasons. 1 , uate Jignature (Agents must provide wrmen proof bf at5`lion) r Accepted by: ".... -. Poster E Affidavit: , .I Fee ' ..... Case Number: rage Z-` NDoncamn ra vacam. cunnmty COMPREHENSIVE PLAN INFORMATION Anchorage 2020 UrbarVRural Services: ❑ Urban El Rural Anchorage 2020 West Anchorage Planning Area: ❑ Inside B Outside Anchorage 2020 Major Urban Elements: Site is within or abuts: ❑ Major Employment Center ❑ Redevelopment/Mixed Use Area ❑ Town Center ❑ Neighborhood Commercial Center ❑ Industrial Center ❑ Transit - Supportive Development Corridor Eagle River-Chugiak-Peters Creek Land Use Classification: ❑ Commercial ❑ Industrial ❑ Parks/opens space ❑ Public Land Institutions ❑ Marginal land ❑ Alpine/Slope Affected ❑ Special Study ❑ Residential at dwelling units per acre Girdwood- Tumagain Arm ❑ Commercial ❑ Industrial ❑ Parkslopens space ❑ Public Land Institutions ❑ Marginal land ❑ Alpine/Slope Affected ❑ Special Study ❑ Residential at dwelling units per acre a mngn of sae atlectea) Wetland Classification: U None U _LI_ U is U A Avalanche Zone: 16t one ❑ Blue Zone ❑ Red Zone Floodplain: ff None ❑ 100 year ❑ 500 year Seismic Zone (Hardinq/Lawson): G3,1" ❑ 02' _ ❑ "3" ❑ "4" ❑ 05" RECENT REGULATORY INFORMATION (Events mar have occurred in last 5 years for an or pon.on of sae) ❑ Rezoning - Case Number: ❑ Preliminary Plat ❑ Final Plat - Case Number(s): ❑ Conditional Use - Case Number(s): is ❑ Zoning variance - Case Number(s): ❑ Land Use Enforcement Action for ❑ Building or Land Use Permit for ❑ Wetlandpermit: ❑ Army Corpof Engineers ❑ Municipality of Anchorage APPLICATION CHECKLIST Fee: Plat: Copies 42 each 8'/2x11 reduced copy Other maps E3"Aerial photo EfHousing stock H Zoning Property Title: ❑ Certificate to Plat Documents to provided unless waived by Platting Officer: ffSite topography (4 copies minimum) Waived by oils investigation and analysis reports (4 copies minimum) Waived by Gl'gubdivision drainage plan Waived b 20000 (Rev. OWYElack a -r».mals,a.a& eK02652nWi r ri• el7u.S- F%p :�a n K S unmarried s.in, of to *Sec. 34.15-030, Ala a Statutes, for and in consideratl n ofuant the Bus of Ten Dollars ($10.00), lawful money of the United States of America, and other valuable consideration in hand paid, the receipt and sufficiency of which is hereby acknowledged, does hereby yr nt, of > /arrant to Gran r - Y?VB ' rla,JACOBS,_ a ran. with all tenements,Lheredltamentsdescribed real property, together and ated in the Anchorage Recording District, Third Judi alances District, tat of Alaska: Lot Two (2), MARGUERITE HILLS, according to the official plat tnersof, filed under Plat No. District the Thirdrecords Judicial1eDistrict Stated of Alaska. SUBJECT to reservations and exceptions in U.S. Patent and/or in Acts authorizing the issuance thereof; real property taxes, it any due; and easements, reservations, covenants and notes on Plat. Grantor, for hinse/f, his heirs, successors and "signs, hereby reserves an access easement of 60 feet for ingress/ogress to the N1/2, Wl/2, "WI/4, Section 12, Township 11 North, Range West Sward Meridian (North 40 acre parcel), Which easement will be for the benefit of the property owners to the north, seat and the south and is not to be construed as a public dedication for maintenance or liability at this time. Said easement is more particularly described as follows: Beginning at the southwest corner of. Lot 2, < Marguerite Hills Subdivision, Thence N 0-02-00 W along the vest boundary of said Lot 2, 411,00 feet to the point of beginning, thence N 89-58- 00 E 101.00 feet, thence N 0-02-00 W, parallel Q4 to the vest boundary of Lot 2, 887.00 feet to a G point on the north boundary of Lot 2, thence Went 60.00 feet along the north boundary of Lot 2, to }1 a point coincident with the east boundary of the 101 telecommunications i electrical easement as shown on Plat 94-79, thence S 0-02-00 E along the easterly boundary of the loo telecommunications i electrical easement as shown on Plat 94-79, 827.00 feet, thence 1 59-58-00 W 42.00 feet to a point on the vest b-andary of Lot 2, thence S 0-02-00 E along the vest boundary of Lot 2, 60.00 feetbackfo the point of beginning. AFM DATED this dL day of , 1994. AeCOMATIOM 04hiii AT 'XW ADDXMXS (Grantee's Signature on Page 2) ?age 1 of 2 - " r w - t - t 111 f"�Y��.•:k':+•'�. TOPOGRAPHIC MAP & DRAINAGE PLAN MARGUERITE HILLS SUBDIVISION LOTS 2A, 2B, 2C9 2D, & 2E Project # 05-023 Lang & Associates, ine Grid: SW 3440 11500 Daryl Avenue Date: April, 2005 Anchorage, Alaska 99515 (907) 522-6476 (907) 5224625 (fax) k2lan2is a.alaska.net pis►+ariss l7kl9itf-� #-'> Mbec'.'ur> Sul- * Veo�.,occ April 11, 2005 Bob Jacobs P.O. Box 111241 Anchorage, AK 99511 ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 522-6779 (FAX) Subject: Proposed Marguerite Hills Subdivision Geotechnical Investigation and Septic System Feasibility Dear Bob: We recently completed a geotechnical investigation and septic feasibility study on a 40 - acre parcel located just east of Mount McKinley Drive in Bear Valley. Our directive was to log test holes and perform percolation tests at locations determined by Joe Burnham and your surveyor, Lang and Associates, Inc. Test holes were placed on the parcel in proximity to the 5 lots proposed for the subdivision. The locations of the test holes were determined based on ease of access. The parcel is located on sloping terrain with a northern exposure and the proposed lots are considered prime view lots. Large trees are found throughout the area and our intent was to limit the damage caused by the tracked backhoe and clearing required to facilitate access. A total of 6 test holes were placed on the parcel. Mr. Burnham excavated the holes with a tracked backhoe to depths ranging in depth from V to 13'. In every case bedrock was encountered at the bottom of each hole. A monitor tube was placed in each hole where appropriate to determine the elevation of groundwater over the coming months. Percolation benches were constructed at various depths, but primarily between 3' and 7' below the surface. A percolation cavity was prepared to determine the absorptive characteristics of the soils encountered in the test holes. The cavity was presoaked in accordance with Municipal requirements and a percolation test performed. The results of the tests are included in the attached documentation. The underlying soil materials encountered in the test holes was fairly consistent and composed primarily of silty gravel (GM) with varying amounts of coarse sand. Silt contents ranged from 15% to 40% from visual observation. The percolation rate of the material was found to be 14 to 60 minutes per inch. No groundwater was found in any of the test holes, but should be monitored through the coming months to determine the high water level. Marguerite Hills Subdivision April 11, 2005 Page 2 The ground surface slope throughout the subdivision is steep and ranges between 20% and 50%. Some areas are available with much less slope, but test holes were not placed in these areas due to access problems and the desire to limit damage to the vegetation and terrain. The proposed lots for this subdivision are large. When building sites are determined areas should be explored to determine actual septic system sites. The Municipal ordinance governing septic systems does not allow construction of a septic system at or near a slope greater than 25%. Bed systems cannot be placed on a slope greater than 10%. An accurate topographic survey of the subdivision will be required to verify the surface slope at the location of the proposed septic systems. Grading will probably be required in the areas proposed for septic systems to assure separation distances from extreme slopes are met. The Municipal ordinance also requires a minimum of 6' separation between bedrock and the bottom of any absorption system. This can be achieved by mounding above original ground using coarse sand and placing the absorption system atop the sand. In summary, soils conditions encountered on the proposed lots are conducive for the placement of individual septic systems. Grading will be required to prepare the septic system sites to insure required separation distances from slopes greater than 25% are met. Sincerely, Michael E. Anderson, P.E. Attachments MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650 SOILS LOG - PERCOLATION TEST '�.'. 49th TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. I, MICHAEL E. ANDERSON CERTIFY THAT TIIIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICiPLE GUIDELINES IN EFFECT ON T1 -]S DATE: 4/11/2005 LEGAL DESCRIPTION- PROPOSED MARGUERITE HILLS SUBDIVISION PERFORMED FOR- Floe JACOB- � DATE: 4/5/2005 PROJECT No PARCEL IDN- TECHNICIAN: A. HARALA DEPTH TEST HOLE # 1 Type of Test: ® Percolation (feet) 1 2 3 READING OG/OL Mt 4 •'. 4/6/05 TEST HOLE PRESOAKED PRIOR TO TESTING: M• 5 9:08 6 :. 2 9:38 7 5.94" SILTY GRAVEL WITH . •�: SOME FRACTURED ROCK 8 5.0" ` 4 GM 9 10:39 30 6.0" 1.0" 5 10:40 5.12" 12 -. a• •� 6 13 30 6.12" 1.0" 14 BEDROCK 51617 15- 16- 17] 18 19 COMMENTS: AEI. E ANDERSON NM CE�3ffl / 20-50% DATE READING Mt Mt DEPERF (INCHES) s 4/6/05 TEST HOLE PRESOAKED PRIOR TO TESTING: M• 20-50% DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPERF (INCHES) INET DROP (INCHES) 4/6/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 9:08 5.12" 2 9:38 30 5.94" .88" 3 10:09 5.0" 4 10:39 30 6.0" 1.0" 5 10:40 5.12" 6 11:10 30 6.12" 1.0" PERCOLATION RATE 30 (MIN/INCH) PERC. HOLE DIA. 6 tWCHES) TEST RUN BETWEEN:3.5 FT. and 4.5FT. WAS GROUND WATER ENCOUNTERED? NO IF YES @ WHAT DEPTH? DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 4/10/05 NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST. MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650 SOILS LOG - PERCOLATION TEST LEGAL DESCRIPTION- PROPOSED MARGUERITE HILLS SUBDIVISION PERFORMED FOR- Bog IAcogs DAIS: 4/5/2005 PROJECT No - PARCEL ID#• TECHNICIAN: A. HARALA .,gouq,' Mf �/• 49th � •.�� � SNICIMEl. E N/OERSDN �'• No. CE- 361 ' 1 JS••. ?e`er DEPTH TEST HOLE #2 Type of Test: ® Percolation (r«p 1 2 3 READING G/OL2 OG/01- NET TIME (MINUTES)WATERNCHES) 4 :..•' S TEST HOLE PRESOAKED PRIOR TO TESTING: z1.. 1., 5 .. 6 :. 2 9:12 7 7.44" SILTY GRAVEL WITH w.••; SOME FRACTURED ROCK 8 6.881' 4 • GM 9 9:43 30 0 10- .5" 5 9:44 11- 1112 6.88" 12 -• a •w 6 13 30 14 BEDROCK 16 17 18 19 SITE PANwmwmwl C y 20-50% E3 TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. 1, MICHAEL E. ANDERSON CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUMCIPLE GUIDELINES IN EFFECT ON THIS DATE: 4/11/2005 READING GROSS TIME (MINUTES) NET TIME (MINUTES)WATERNCHES) D(INCHES) EPTH OF INF,,T DROP S TEST HOLE PRESOAKED PRIOR TO TESTING: z1.. 1., 1 DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES)WATERNCHES) D(INCHES) EPTH OF INF,,T DROP 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 8:42 6.88" 2 9:12 30 7.44" .56" 3 9:13 6.881' 4 9:43 30 7.38" .5" 5 9:44 6.88" 6 10:14 30 PERCOLATION RATE: 60 (NIIN/INCI� PERC. HOLE DIA. 6 INCHES) TEST RUN BETWEEN: 3.5 FT. and—A,5FT. WAS GROUND WATER ENCOUNTERED? NO IF YES @ WHAT DEPTH? DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 4/10/05 COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST. MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650 SOILS LOG - PERCOLATION TEST LEGAL DESCRIPTION' PROPOSED MARGUERITE HILLS SUBDIVISION PERFORMED FOR- Bog JArogg DATE: 4/5/2005 PROJECT No PARCEL ID,-(- TECHNICIAN: A. HARALA DEPTH TEST HOLE #3 Type of Test: ® Percolation Ike) 1 2 SITE OG/OL %•+;' DEPTH of WATER (INCHES) •SILTY 0 3 s GRAVEL WITH 1 •: ">�'.:r+: SOME FRACTURED ROCK 4 GM YN06�t i.:. .ter.. 11:45 5 rg 2.12" 3 BEDROCK 6 5.38" 7 4 8 30 7.5" 9 10- 01112131415 12:17 11- M) 12- 6 12:47 13- 7.5" 2.12" 14- 15--1 1 1 1 AM E. ANDM. No. CE- 341 TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. I. MICHAEL E. ANDERSON CERTIFY THAT TRIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN SITE PAN NET TIME (MINUTES) DEPTH of WATER (INCHES) NET DROP (INCHES) 0 TEST HOLE PRESOAKED PRIOR TO TESTING: s 1 11:15 5.38 YN06�t 1� 11:45 30 rg 2.12" 3 11:46 5.38" 4 s 30 7.5" 2.12" 5 12:17 5.38" M) 6 12:47 30 7.5" 2.12" i TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. I. MICHAEL E. ANDERSON CERTIFY THAT TRIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH of WATER (INCHES) NET DROP (INCHES) 0 TEST HOLE PRESOAKED PRIOR TO TESTING: s 1 11:15 5.38 YN06�t 1� 11:45 30 rg 2.12" 3 11:46 5.38" 4 s 30 7.5" 2.12" 5 12:17 5.38" M) 6 20-50% DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH of WATER (INCHES) NET DROP (INCHES) 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 11:15 5.38 2 11:45 30 7.5" 2.12" 3 11:46 5.38" 4 12:16 30 7.5" 2.12" 5 12:17 5.38" 6 12:47 30 7.5" 2.12" PERCOLATION RATE�(MIN/INCH) FERC. HOLE DIA. CHES) TEST RUN BETWEEN: 3.5 FT. and 4.5FT. WAS GROUND WATER ENCOUNTERED? NO IF YES @ WHAT DEPTHI DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 4/10/05 COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST. EFFECT ON THIS DATE' 4/11/2005 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4700 SOUTH BRAGAW STREET ANCHORAGE. AK 99519-6650 SOILS LOG - PERCOLATION TEST LEGAL DESCRIPTION- PROPOSED MARGUERITE HILLS SUBDIVISION PERFORMED FOR BoR lAcosc DATE: 4/7/2005 PROJECT No PARCEL ID, ,4• TECHNICIAN: A. HARALA EPTH TEST HOLE 44 Type of Test: ® Percolation fm) 1 2 13 READING OG/OL SLOPE NET TIME (MINUTES)(INCHES) 3 DROP (INCHES) SILTY GRAVEL 4 ;r GM 1 w. 5 WAKWIRWI 2 BEDROCK 6 a. 1.44" 7 zw- 8 s 9 10- 011 3:24 30 11- 1.5" 13 14 15 16 17 18 19 t 49th W a. L ANDERSON No. CE-oet oy, 2050 >t DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES)(INCHES) DyEyATERF INET DROP (INCHES) 0 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 w. 6.88" WAKWIRWI 2 .w. UWhUM 30 a. 1.44" .S zw- 2:54 s 4 3:24 30 8.25" 1.5" 5 3:25 oy, 2050 >t DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES)(INCHES) DyEyATERF INET DROP (INCHES) 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:23 6.88" 2 2:53 30 8.31" 1.44" 3 2:54 6.75" 4 3:24 30 8.25" 1.5" 5 3:25 6.75" 6 3:55 30 PERCOLATION RATE• 22 (MIN/INCH) PERC. HOLE DIA,2iNCHES) TEST RUN BETWEEN: 2.5 FT. and--3,5FT. WAS GROUND WATER ENCOUNTERED? NO IF YES @ WHAT DEPTH? DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 4/10/05 COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST. TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. 1, MICHAEL E. ANDERSON CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS DATE' 4/11/2005 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650 SOILS LOG - PERCOLATION TEST LEGAL DESCRIPTION' PROPOSED MARGUERITE HILLS SUBDIVISION PERFORMED FOR: BOB JACOBS DATE: 4/7/2005 PROJECT No' PARCEL ID/9' TECHNICIAN: A. HARALA C DEPTH TEST HOLE #5 Type of Test: ® Percolation (fest) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 I 1 111 OG/01- SILTY G/OLSILTY GRAVEL GM SOME FRACTURED ROCK BEDROCK 4 MIOMCL E MDCRSM No. CE x301 ; AL SITE PAN C C7 TEST PERFORMED BY VETECH ENGINEERING TECHNICAL SERVICE. I, MICHAEL E. ANDERSON CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MIJNICIPLE GUIDELINES BJ EFFECT ON THIS DATE: 4/11/2005 READING GROSS TIME (MINUTES) NET TIME (MINUTES)WATER(INCHES) DEP(INCHES) TH 0P INET DROP 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: i 1 2:12 4.12" 2 2:42 30 4.88" .75" 3 2:43 s 4 3:13 30 4.88" .75" 5 3:14 2050 -0 DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES)WATER(INCHES) DEP(INCHES) TH 0P INET DROP 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:12 4.12" 2 2:42 30 4.88" .75" 3 2:43 4.12" 4 3:13 30 4.88" .75" 5 3:14 4.12" 6 3:44 30 4.88" .75" PERCOLATION RATE' 40 (MIN/INCH) PERC. HOLE DIA,O(INCHES) TEST RUN BETWEEN: 3.5 FT. and 4.5FT. WAS GROUND WATER ENCOUNTERED? NO IF YES @ WHAT DEPTH? DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: 4/10/05 COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST. MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4700 SOUTH BRAGAW STREET ANCHORAGE, AK 99519-6650 SOILS LOG - PERCOLATION TEST LEGAL DESCRIPTION- PROPOSED MARGUERITE HILLS SUBDIVISION PERFORMED FOR, ROR jArQ9S DATE: 4/7/2005 PROJECT No PARCEL IDS{• TECHNICIAN: A. HARALA » PrH TEST HOLE #6 Type of Test: ® Percolation Orem) BEDROCK 6 7 8• 9 10- 11• 12- 13 14 15 16 17 18 SITE OG/OL 1 DEPTH OF WATER (INCHES) p (, 2 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:32 3 SILTY GRAVEL o 4 -Z+.' i` GM 1.69" s 5 ` BEDROCK 6 7 8• 9 10- 11• 12- 13 14 15 16 17 18 20-50g,D DATE SITE PAN s DEPTH OF WATER (INCHES) p (, 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:32 7.12" o 3:02 30 8.81" 1.69" s 3 3:03 7.0 " MJ 4 3:33 30 8.69" 1.69" 5 3:34 7.0" 6 4:04 30 8.69" 1.69" r a 20-50g,D DATE READING GROSS TIME (MINUTES) s DEPTH OF WATER (INCHES) N T DROP INCHES) 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:32 7.12" 2 3:02 30 8.81" 1.69" s 3 3:03 7.0 " MJ 4 3:33 20-50g,D DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH OF WATER (INCHES) N T DROP INCHES) 4/8/05 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:32 7.12" 2 3:02 30 8.81" 1.69" 3 3:03 7.0 " 4 3:33 30 8.69" 1.69" 5 3:34 7.0" 6 4:04 30 8.69" 1.69" PERCOLATION RATE• 18 (MIN/INCH) PERC. HOLE DIA• 6 nNCIIES) TEST RUN BETWEEN`5-FT. and--3,5FT. WAS GROUND WATER ENCOUNTERED? NO IF YES @ WHAT DEPTH?RI DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING: /-/10/05 COMMENTS: NO IMPERMEABLE LAYERS ENCOUNTERED. TEST HOLE PRE SOAKED PRIOR TO TEST. TEST PERFORMED BY VETECII ENGINEERING TECHNICAL SERVICE. 1, MICHAEL E. ANDERSON CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUMCIPLE GUIDELINES IN EFFECT ON THIS DATE' 4/11/2005