Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCROSS VIEW ESTATES BLK 2 LT 15Cross View
Estates
Block 2
Lot 15
#015-221-77
Municipality of Anchorage
Development Services Department
Building Safety Division
Onsite Water and Wastewater Program, 4700 Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650 Page of
www.ci.anchorageek.us (907) 343-7904
ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT
Permit Number: SW070020 PID Number: 015-221-17
Name:
Jim McAllen
Wastewater System: ❑✓ New ❑ Upgrade
Address:
11755 Wilderness Drive Anchorage, AK 99516
ABSORPTION FIELD
Phone: 345-6593 Numberof Bedrooms:
Q
V Deep Trends ❑Shallow Trench 0 Bed El Mound ❑Other:
LEGAL DESCRIPTION
Soil Rating:
Total Depth from original Beetle:
.6 GPDXP
12 Ft.
Block 2 Lot 15 Subdivision:
Cross View Estates
Depth to pipe bottom from original grade:
Gravel depth beneath pipe:
q
8 Ft.
Township: Range: Secgon:
Fill added above original grade:
Gravel Length:
1-2 Ft.
73 Ft.
Well: © New ❑ Upgrade
Grovel wiMh:
Number of fines:
Distance behveen litres'
3 Ft
1
Ft.
Claesification (Private, A, B, C):
Total Depth:
Cased to:
Total absorption area:
Pipe Material:
Private
241 Ff.
241 Ft_
1,168 FP
ASTM D3034 PVC
Dinner:
Date Dtllled:
Static Water Level:
Instagec
Data Installed:
Alpine Drilling
4/12/07
181 Ft.
Red Dog Excavating
4/5-6//2007
Yield:
Pump Set at
Casing Height Above Ground'
20 GPM
Ft.
2 Ft
TANK
SEPARATION DISTANCES
® Septic ❑ Holding ❑ S.T.E.P. ❑ Other:
To
Septic
Absorption
Lift
Holding
uoliGFinu to
Manufacture[
Capacity:
From
Tank
Field
Station
Tank
Sewer Line
Anchorage Tank
1,250 Gal.
well
>100,
>100'
N/A
N/A
>25'
MatenaI
Steel
Number of Compartments:
Two (2)
Surface Water
>100'
>100'
N/A
NIA
LIFT STATION
Size:
arafacture,
Lot Line
>5'
>10'
N/A
N/A
I V
Gal,
Foundation
>5'
>10'
N/A
NIA
"Pump on'level at:
"Pump off' level at:
High water alar at:
in.
in.
in.
certain Dram
None
Noted
Pump Make a Model
Electrical Inspections performed by:
Remarks:
BENCH MARK
Location and Description'
NW Corner of Concrete Landing at Base of Back Deck Stairs.
Assumed Elevation:
100.00 Pt
w
Inspections performed by: A. Harala Dates: tat 4/5/07
07. qwlltga
2nd 4/6/07
©=
Development Services Department Approval
e. 4Q TH
Conditional Approval Date:10
4 . „
M1CHA L E AP!'? 2 ON �+ 6i
i
C CE -4581
t '"
Or ;pall a rove b Y
r r�
,..
Reviewed and approved by: at Date: 9 27 O
ey PROF cc)� b� "
(per. 0406)
0:// /Y %4n 4 rvriec e
Permit No.: SM70020
A
51 151' 21
s2 22 T 2!
G 114' 11
C5 52 5' T
M1 15.2' 1'.
M2 788' 7:
Municipality of Anchorage
DEVEOPMENT SERVICES DEPARTMENT Page 2 of 3
4700 Bragaw Street Anchorage, AK. 99519-6655-343-7904
On -Site Wastewater Disposal System or Well Inspection Report
PID No. 015-221-77
2005-171
CROSS VIEW ESTATES SUBDIVISION
LOT 15J59 BLOCK 2
yfRn
PLAN AS -BUILT
SCALE V - 50'
S103Y Saw CWT.
W cart.
Municipality of Anchorage Page 3 of 3
DEVEOPMENT SERVICES DEPARTMENT
4700 South Bragaw Street Anchorage, AK. 99519-6655 - 343-7904
On -Site Wastewater Disposal System or Well Inspection Report
Permit Number. SW070020
PID No. 015-221-77
73' (Trench Length)
49th
93.4
PROFILE AS—BUILT '•0 No � 3R i
�•.'.
No Seale •11.tj'��u: �,�
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
4700 BRAGAW STREET ANCHORAGE, AK 99519-6650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION: LOT 15, BLOCK 2, CROSS VIEW ESTATES SUB.
PERFORMED FOR: JIM MCALLEN
DATE: 4/5/2007 PROJECT No.:
PARCELID#: TECHNICIAN: A. HARALA
Dern[ TEST IIOLE A
(fix0
SITE PLAN
SEE SITE PLAN q
WAS GROUND WATER ENCOUNTERED? NO
IF YES A WHAT DEP
DEPTTi OF WATER AFTER MONITORING: NON[ 2%
DATE OF MONITORING: 9i 1o/O
DATE
READING
OB/OG
1
Dy ATERD
(INCHES)
NE,T DROP
(INCHES)
A
4/5
2
°
3
°
2
2:43
30
4
2.18"
5
e
2.13"
A
6
°
30
7
<.
8
3:16
SILTY SAND
2.38"
•
WITH GRAVEL
9
°
SM
4.50"
2.12"
0
10—
A
A
12
13
•A
14
.
15
A
16
17
•
. a
18
BOH @ 18'
19
SITE PLAN
SEE SITE PLAN q
WAS GROUND WATER ENCOUNTERED? NO
IF YES A WHAT DEP
DEPTTi OF WATER AFTER MONITORING: NON[ 2%
DATE OF MONITORING: 9i 1o/O
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
Dy ATERD
(INCHES)
NE,T DROP
(INCHES)
TEST HOLE PRESOAKED PRIOR TO TESTING:
4/5
1
2:13
2.25"
2
2:43
30
4.50"
2.18"
3
2:45
2.13"
4
3:15
30
4.25"
2.12"
5
3:16
2.38"
6
3:46
30
4.50"
2.12"
PERCOLATION RATE• 14(MIN/INCII) PERC. HOLE DIA 6. " (TNCHES)
TEST RUN BETWEEN:: 4_5 FT. w4-5-5—Fr.
COMMENTS. TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFORMED BY ANDERSON ENGINEERING. 1, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE* 9/26/2007
0 ■
■NIFR : ALPINE DRILLING FAX N0. : 907 345 0202 Sep. 25 2007 06:39PM P1
■
f■
ALPINE DRILLING & ENTERPRISES
Permit Number. 4SW 7g 0020 Date of Issue: 14- 7 Parcel Identification Number: -221-77
Date Started: 4-11-07 Date Completed: 412-07 Is well located at approved permit location? ® 015Yes ❑ No
Legal Description: Cross View Estates Block 2 Lot 15
Property Owner Name & Address: m 5 Allen ss Drive
Anehnrane. Alaska 99516
Borehole Data: Depth (ft)
SoU Type. Thickness & water Strata From To
stick -Up
0
silt
2
gravelly silt
12
sandy silt
45
gravel
81
sandy gravelly silt
97
silty gravel
115
silt
180
silty gravel
201
silty water sand & gravel
238
2
12
45
81
97
115
180
201
238
Method of Drilling M air rotary ❑ cable tool
Casing type: steel
Wall Thickness: .280 inches
Diameter: ¢ inches Depth: 241 feet
Liner Type:
Diameter: inches Depth: feet
Casing stickup above ground: ,Z feet
Static water level (from ground level): 181 feet
Pumping level:_2-4Lfeet after
2 hours pumping 20 gpm
Recovery Rate: 20 gpm
Method of Testing: it '
Y41 Well Intake Opening Type:
M Open End ❑ Open Hole
❑ Screened Start feet
❑ Perforations Start fed
Stopped feet
Ctnnned _feet
Grout Type: bentonit gr -angles Volume: j
n nfh- Start Q feet Stopped ? feet
Pump: Intake Depth feet
a hn Brand Name
Well Disinfected Upon Completion? M Yes ❑ No
Method of Disinfection:hlortn� o tablBts
Comments:
Well Driller. Alpine Drilling 8 Enterprises
p0 Box 110496
Anchorage Alaska 99511
Attention: The well driller shall provide a well log to the property owner within 30 days of completion and the property
to the Development Services Department within 60 days of completion.
owner or the well driller shall provide a well 1
2006-171
CROSS VIEW ESTATES SUBDIVISION
SLOT 15159 BLOCK 2
orwm IONS BASED DN ton mm ik, w (MYI 4S' 1
l.J f4'/TgCc ' C � DRIVE0
���` t.rrsBrh CE
w rt
IC 1RORY OBNI ESlff.
M W CYf.
PrepwW Well 4C. A14T
' � 4
1 ip� #yw �E
T
/
3 \.� Septic canon
Septic Tank n
SR h
6
= eTN r
Altamala
Ste
ST14A
17i2YLEff9ictho Depth
ACsorpOan Trench
- - - - - - - - - — - - - - - - - - - - - - - - - - - -- / - - - - - - - - - - - - -
20' .. DNNII Esw.
------------
10' T. B E CYT.
N 59'W'04'E 50.10' N ww'I5"E 15717
abre' ••••...p�\
%..„...�i•
49thr ....51.....E
i. ..............`..... .............
SITE PLAN • a� :MICHAEL L ANDERSON
•�1�({yrs.,
SCALE V = 50'
Municipality of Anchorage
Development Services Department
Building Safety Division
Onsite Water and Wastewater Program
4700 South Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650
www.cl.anchorage.sk.us
(907)343-7904
ON-SITE SEWER/WELL SUBMITTAL COMMENT SHEET
To: Anderson Enalneerina
Legal description: Cross view Estates. B2 L15
®Permit ❑C.O.S.A. ❑Inspection Report
The attached paperwork has been reviewed and is being returned for the following reasons:
1. Per our conversations on 419 and 518, additional Information Is needed because the system was not installed parallel
to the contours of the slope. Please provide a cross-sectional profile view that shows that the system does not
incroach on the separation distances to ground water or the Impenniable layer.
Name of reviewer: Pgt§k
Date: May 8. 2007
Please supply the necessary information and re -submit your request.
LEAVE THIS FORM ATTACHED TO THE PAPERWORK
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 677-7766 FAX
MEMORANDUM
DATE: April 7, 2007
TO: Deb Wockenfuss
FROM: Mike Anderson, P.E.T'^EO.
SUBJECT: Lot 15, Block 2, Cross View Estates Subdivision
Well and Septic System Permit No. SW070020
The grades shown on the surveyors plot plan were in error at the location of the
proposed septic system and we were unable to ascertain the exact topography of the
ground during the design phase of this project due to the heavy snow cover. The
ground surface slopes from the northwest to the southeast and then to the south. We
have therefore reoriented the absorption trenches as shown on the attached Site Plan.
A test hole and percolation test was completed near the south end of the trench. The
results indicate similar soils and percolation rates as the original test hole. A copy of
the soils log will be forwarded with the septic system as built in the near future.
MUNICIPALITY OF ANCHORAGE
Development Services Department
On -Site Water d Wastewater Program
4700 South Bragaw Street
P.O. Box 196650, Anchorage, AK 99519-6650
(907) 343-7904
ON-SITE WASTEWATER DISPOSAL SYSTEM / WATER SUPPLY PERMIT
Initial
Permit Number: SW070020
Date Issued: Mar 14, 2007
Expiration Date: Mar 13, 2008
Parcel ID: 015-221-77
Legal Description: CROSS VIEW ESTATES BLOCK 2 LOT 15
Design Engineer: 0014 ANDERSON ENGINEERING Site Address: NHN HERITAGE HEIGHTS DRIVE
Owner Name: JIM MCALLEN Lot Size: 51159 SQ. FT.
Owner Address: 11755 WILDERNESS DRIVE Total Bedrooms: 4 Permit Bedrooms: 4
ANCHORAGE. AK 99516 -
This permit Is for the construction of:
❑✓ Disposal Field ❑✓ Septic Tank ❑ Holding Tank ❑ Privy 0 Private Well ❑ Water Storage
All construction must be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations (18AAC80 ).
3, The engineer must notify DSD at least 2 hours prior to each Inspection. Provide notification by catling
(907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and closed on the same day.
B. Covered, sealed, and heated to prevent freezing.
Received
B , Date: __911V4
.' - M /» K .
Municipality of Anchorage
Development Services Department
Building Safety Division
_
On -Site Water and Wastewater Program
4700 Bragaw Street
P.O. Box 196650
Anchorage, Alaska 9951916650
www.muni.org/onsite
(907) 343-7904
ON-SITE SEWER/WELL PERMIT APPLICATION
FOR A SINGLE FAMILY DWELLING
Parcel I.D. 015-221-77
Property owner(s) dim Mcwlen Day phone 345.6593
Mailing address 11755 Wilderness Drive Anchorage, AK Zip Code 99516
Site address Heritage Heights Drive Zip Code 99516
Legal description (Sub'd., Block & Lot) Cross View Estates, Block 2, Lot 15
Legal description (township, Range & Section)
Lot Size 51.159 Sq. Ft.
THIS APPLICATION IS FOR (® all that apply):
Absorption Field M
Septic Tank
Holding Tank
❑
Privy
❑
Private Well
Water Storage
❑
Number of Bedrooms Four (4)
THIS APPLICATION IS AN:
Initial
Upgrade
❑
Renewal
❑
certify that the above information is correct. I further certify that this application is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes.
P�C 64A�
(Signature of propertyf owner or authorized agent)
Permit/Rush Fees: T(�� �'l S� Waiver Fees:
Date of Payment:
Receipt Number.
(Rev. 11/05)
Date of Payment:
Receipt Number.
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 677-7766 FAX
March 6, 2007
Municipality of Anchorage
Development Services Department
On -Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject: Lot 15, Block 2, Cross View Estates Subdivision
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 15, Block 2, Cross View Estates Subdivision intends to construct a
new four-bedroom home on the lot. We are therefore requesting a permit be issued for
the construction of a new well and septic system to accommodate the home. The
attached Site Plan and backup documentation identify the location and configuration of
the proposed well and septic system along with the alternate site. Also identified on the
plans are the existing wells and septic systems on surrounding lots. No conflicts exist
between the proposed septic system and well or septic systems and wells on adjacent
lots. Drainage arrows are shown on the site plan showing the grade and direction of
flow on the lot. The drainage pattern will not be changed as a result of this project.
The test hole was placed on the lot in the area of the absorption trench and alternate
site during the subdivision phase. The log indicates sandy silt to silt (SM -ML). The
percolation rate of the soil was determined to be 6 minutes per inch. No groundwater
was found during the placement of the test hole and none was noted during the
monitoring period. An application rate of .6 gallons per day per square foot was used in
the design of the absorption system. We are proposing to place a new 1,250 -gallon
septic tank and a 72' long by 3' wide by 7' effective depth absorption trench to treat and
dispose of the effluent generated in the house. The elevation of the distribution line in
the absorption trench will be 4' below the surface and the total depth will be 11'. A
minimum of 3' of fill or 2" of insulation and 2' of fill will be placed over the absorption
trench and 4' over the septic tank.
The ground surface on the lot in the area of the septic system slopes to the south. The
new trench will be constructed parallel with the slope as much as possible in
conformance with Municipal requirements. The new septic system will be constructed a
Lot 15, Block 2, Cross Point Estates Subdivision
March 6, 2007
Page Two
minimum of 100' from all wells and any surface water and 10' the proposed and existing
water services in the area.
If the system is constructed in accordance with our design the following statements
apply:
The system, if constructed as designed, will have no adverse impact on the wells
in the area or those to be constructed in the future.
2. The system, if constructed as designed, will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
3. The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
4. The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely,
yy�� £ CLwC'-n
Michael E. Anderson, P.E.
Attachments
LOT 19, BLOCK 1
Vacant
►
LOT 16, BLOCK 2 LOT 14, BLOCK 2
Vacant Vacant
r�
_ 49th .`.•.I
�` „ AREA MAP
....................._........_....._... .
��;MICHAEL E. ANDERSW i
.�� No,
cE-a3eI j'�a SCALE I' = 100'
Q
}
2006-171
CROSS VIEW ESTATES SUBDIVISION
LOT 153S96FOCK 2
OXAMNS USED ON len NGS DM1UY M" w' I
yf R f Mfg DRryE
0
4rrIIar�
..rM.4. N W7r4Y
I
Proposed Watl
raw be.. Q' neo'
k*w
}
.) 1.2so Callon
/.i SapOC Tank
b/ 72' Long N 3' Wide
E Oective Depth
s •TN jrAE.orptiw Trench
utemat.
WoId,
2Y slant 1NVM ESNr.
WCL •EE51rt.
SITE PLAN
SCALE V = 50'
L 1
FORM 0n E w.
w E w.
Id,
LOT 15, BLOCK 2, CROSS VIEW ESTATES SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Four Bedroom Home
Perc. Rate: 6 Min./Inch
Application Rate: .6 GPD/SF
Deep Trench System
1,250 Gallon Septic Tank
T Drainfield Rock
4 Bedrooms X 150 GPD/.6 GPD/SF (Application Rate) = 1,000 SF Absorption Area
1,000 SF/14 SF/LF = 71.43 LF Trench Length
THEREFORE: Construct a 72' Long x 3' Wide x T Effective Depth Absorption Trench at the Location
Shown. Flow Line Elevation in Trench to be 4' Below Original Ground Surface. Total Depth to be
11' Below Existing Ground. Provide 4' Cover Over Septic Tank and 3' Cover Over Absorption
Trench. Maintain 100' Separation from Wells in the Area.
Natural
Backfill
1 Geotextile
3'6" 4 Fabric
6" 4" Perforated
t PVC (Holes Down)
Tty'
3'
TYPICAL DEEP TR
NOTE:
Drainfield Rock
H SECTIOP'
Grade Area Over Trench to Drain Away.
Minimum 6' Separation From Bedrock.
Minimum 4' Separation From Groundwater.
Minimum 100' Separation From Wells in the Area.
Minimum 100' Separation From Surface Water or Streams.
GARNESS ENGINEERING GROUP, Ltd.
CONSULTANTS & GENERAL CONTRACTORS.��
SOIL LOG — PERCOLATION TEST
LEGAL DESCRIPTION: MLRITAGL HILL) ZVyulvulym we; va
PERFORMED FOR: PROFESSIONAL TECHNICAL SERVICES
DEPTH
(feGl) ORGANICS TH 46 PTS 546
1
2
3
4
5
6
7
8
9
10
11
12
13
14
m:,
16
LOAM SOIL CLASSIFICATI
NIS
I NET TIME
(MINUTES)
1 •-
NET DROP
(INCHES)
111111111ML
II�111!11GM%//%CL
—
GCNHH
•
2
IIIIIIIIIMH
SIDCH
%j
�11lIII;
Y.�� •
•.,SC
—
SM/ML
DEPTH TO DATE
GROUNDWATER
DRY 9/1/2005
DRY 9/19/2005
SEE ATTACHED
SITE PLAN
DATE READING
CLOCK
TIME
I NET TIME
(MINUTES)
WATER LEVEL
READING
NET DROP
(INCHES)
9/6/05 1
3:00
—
6-
—
2
3:30
30
0.
6-
3
3:30
—
6-
—
4
4:00
30
1.
5-
5
4:00
—
6-
—
6
4:30
30
1.
5-
19 PERCOLATION RATE •6 (MIN./INCH) PERC. HOLE DIA. 5 (INCHES)
TEST RUN BETWEEN 5 FT. AND 6 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ® YES ❑ NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: CALEB CALL
COMMENTS: - RECOMMEND USING A 0.6 APPLICATION RATE
PERFORMED BY CEG. Ltd. I. JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PE FOR ED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: Iof
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 15, BLOCK 2, CROSS VIEW ESTATES SUBDIVISION
GENERAL:
The scope of this project includes the procurement and placement of a new
1,250 -gallon septic tank at the location shown on the Site Plan. Work also
includes the construction of a new 72' long X 3' wide X 7' effective depth
absorption trench at the location also shown on the Site Plan. The
distribution line in the trench will be placed at 4' below the existing ground
surface. Total depth of the trench will be 11' below the existing ground
surface. The new absorption trench and septic tank must be placed a
minimum of 100' from all private wells and any surface water in the area and
10' from the water service line proposed for the lot. A minimum of 3' of cover
is required over the absorption trench and 4' of cover over the septic tank.
2. Construction shall be in accordance with the approved site plan, design
drawings, Municipal Permit with any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal Regulations.
3. The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the location
of all lot lines. The Contractor must also verify the location of wells in the
area and assure that the separation distances are met.
4. Unless specifically agreed otherwise, the contractor shall be responsible for
final grading areas subsequently depressed from soil settling. Property
owner shall be responsible for revegetation of affected areas unless
specifically agreed otherwise.
5. Contractors installing wastewater disposal systems must be certified by the
Municipal Department of Health and Human Services for system installations.
Owners installing their own systems must receive prior approval from
D.H.H.S. before beginning system installation.
SEPTIC TANK INSTALLATION
1. A new 1,250 -gallon septic tank must be procured from an approved source
and installed at the location shown.
2. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shall include two 4" cleanouts for pumping access.
Lot 15, Block 2, Cross View Estates
March 6, 2007
Page 2 of 3
3. The septic tank shall be sufficiently bedded to prevent settling or shifting of
the tank.
4. All standpipes on the septic tank shall extend a minimum of 12 inches above
final grade.
5. Tanks installed without 4' of cover shall have a minimum of 2" of direct burial
insulation.
6. A foundation cleanout shall be installed one to four feet from the building
foundation. Two cleanouts are required between the tank and the drainfield.
7. Final grading over the tank shall be such that a positive slope exists away
from the septic tank.
DRAINFIELD CONSTRUCTION:
1. The drainfield shall be constructed to the dimensions shown on the design.
The bottom of the trench shall be within 2" of level.
2. Distribution piping must be placed level with perforations down atop a level
bed of drainfield rock. Rock should then be placed over the pipe to provide a
minimum of 2" of cover.
A silt barrier or geotextile fabric must be placed between the drainfield rock
and the natural soil backfill.
4. Monitor tubes must be 4" in diameter and installed at the locations shown on
the design. The portion below ground must be perforated.
5. Contractor shall verify the septic tank and drainfield are a minimum 100' away
from any private water wells in the area, 150' from a Class "C" Well or 200'
from any community well.
6. Direct bury insulation must be placed over the distribution system if less than
3' of backfill depth is available. Finish grade over the trench must be
mounded to prevent settlement or depressions.
7. Grade area surrounding the absorption trench to drain away.
8. A minimum 2' of accepting soil is required below the drainfield rock for a 5'
wide trench. Contractor shall verify this condition prior to placement of the
rock. All pockets of unacceptable materials must be removed and replaced.
Lot 15, Block 2, Cross View Estates
March 6, 2007
Page 3 of 3
MATERIAL SPECIFICATIONS:
Septic tanks must be constructed by a municipally approved septic tank
manufacturer.
2. The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated and
solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and ASTM D2662
or A.B.S. (perforated and solid).
Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow
Chemical Co. Styrofoam HI or equal).
4. Septic tank inlets and outlets shall be fitted with watertight couplings
(Caulder, Femco, or equal).
5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed
between the final drain rock layer and the native soil layer.
6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the
#200 sieve.
INSPECTIONS:
Municipal Ordinance requires a minimum of two inspections. These inspections
must be conducted under the supervision of a professional engineer registered
in the State of Alaska. The first inspection must be conducted after the
excavation of trenches, beds or pits and before the installation of any gravel. A
septic tank may be set in place, but may not be backfilled.
The second inspection must be conducted after the placement of the geotextile
fabric, gravel, distribution piping, standpipes, cleanouts and insulation. No
backfill should be in place at the time of inspection.
Contractor shall provide a copy of all field survey layout and construction notes
for use in preparing the certified as -built of the completed system.
Municipality of Anchorage
Development Services Department
• Building Safety Division
On -Site Water and Wastewater Program
4700 South Bragaw St
P.O. Box 196650 Anchorage, AK 99519-6650
www.muni.org/onsite
(907)343-7904
ON-SITE SEWERIWELL SUBMITTAL COMMENT SHEET
To: Anderson Engineering
Legal description: Cross View Estates, 82 L15
ZD
The attached paperwork has been reviewed and Is being returned for the following reasons:
Original signature or stamp missing on
Calculation error in design. _
Additional soils information needed. _
Water monitoring results inadequate.
Discrepancy in information submitted.
31g107 RecuWA reyab�i/Aj butnof
Topographic information missing or inadequate. _
Additional adequacy test information needed.
e./10u9 h jearAnCG 40 bed roc k. 'e" X C 45•
hb w,71 re de59n,
Water sample unacceptable. _
Measured/proposed distances/dimensions missing.
Locations of all soils, percolation and water monitoring tests not shown.
Proposed system too deep for soils information submitted. _
Well log required.
Omission in narrative.
Insufficient fill over tank or field._
® Other. 1 The site plan shall have a description of the topography, areas of excessive
slope and extent of slopes and surface drainage patterns within 100 feet of 9" Krt of the
system or portion of the lot intended for use for on-site wastewater disposal. AMC
15.65.030 D. Please provide this information on the site plan.
2. Please use the application rate recommended by the_engineer that did the soils/percolation
test or provide your own soils test
Name of reviewer. Deb
Date: 3/8/07
Please supply the necessary information and re -submit your request.
LEAVE THIS FORM ATTACHED TO THE PAPERWORK
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 677-7766 F
March 6, 2007
Municipality of Anchorage''1ti+�ffi''
Development Services Department �� � �` L;Zj _ L
On -Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject: Lot 15, Block 2, Cross View Estates Subdivision
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 15, Block 2, Cross View Estates Subdivision intends to construct a
new four-bedroom home on the lot. We are therefore requesting a permit be issued for
the construction of a new well and septic system to accommodate the home. The
attached Site Plan and backup documentation identify the location and configuration of
the proposed well and septic system along with the alternate site. Also identified on the
plans are the existing wells and septic systems on surrounding lots. No conflicts exist
between the proposed septic system and well or septic systems and wells on adjacent
lots. Drainage arrows are shown on the site plan showing the grade and direction of
flow on the lot. The drainage pattern will not be changed as a result of this project.
The test hole was placed on the lot in the area of the absorption trench and alternate
site during the subdivision phase. The log indicates sandy silt to silt (SM -ML). The
percolation rate of the soil was determined to be 6 minutes per inch. No groundwater
was found during the placement of the test hole and none was noted during the
monitoring period. An application rate of .8 gallons per day per square foot was used in
the design of the absorption system. We are proposing to place a new 1,250 -gallon
septic tank and a 63' long by 3' wide by 6' effective depth absorption trench to treat and
dispose of the effluent generated in the house. The elevation of the distribution line in
the absorption trench will be 4' below the surface and the total depth will be 10'. A
minimum of 3' of fill or 2" of insulation and 2' of fill will be placed over the absorption
trench and 4' over the septic tank.
The ground surface on the lot in the area of the septic system slopes to the south. The
new trench will be constructed parallel with the slope as much as possible in
conformance with Municipal requirements. The new septic system will be constructed a
2006-m
CROSS VIEW ESTATES SUBDIVISION
LOT 15;S9BLOCK 2
C.EVATOS BASED ON Iffn MM OAItM "i eeS' SI
�....J FR�A� f HC CIYTS DRIVE
0
M W2r47'
O
IPropwed Web
raw .,, ILt
�
��� 1.250 Oallan
Septic Tank
e
63'lan0 M 3' Wide
ern■ 6 EHectiw pN
_ STH ADeorp6on TnmcD�
Altate
Site
7
r 4
r
10' STOW D v EW
10' T. A E tsar.
SITE PLAN
SCALE 1' = 50'
O
ia• STEM DAM EDAM
90' OAS t3Mf.
49th
MI04AEL E. ANDERSON
LOT 15, BLOCK 2, CROSS VIEW ESTATES SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Four Bedroom Home Deep Trench System
Perc. Rate: 6 Min./inch 1,250 Gallon Septic Tank
Application Rate: .8 GPD/SF 6' Drainfield Rock
4 Bedrooms X 150 GPD/.8 GPD/SF (Application Rate) = 750 SF Absorption Area
750 SF/12 SF/LF = 62.5 LF Trench Length
THEREFORE: Construct a 63' Long x 3' Wide x 6' Effective Depth Absorption Trench at the Location
Shown. Flow Line Elevation in Trench to be 4' Below Original Ground Surface. Total Depth to be
10' Below Existing Ground. Provide 4' Cover Over Septic Tank and 3' Cover Over Absorption
Trench. Maintain 100' Separation from Wells in the Area.
Natural
Backfill
Geotextile
,ea+�
SOPp,/�_ v. 6 Q 4" Perforated
�° PVC (Holes Down)
3'
TYPICAL DEEP TR
Drainfield Rock
;H SECTION
NOTE: Grade Area Over Trench to Drain Away. a
Minimum 6' Separation From Bedrock. y•
Minimum 4' Separation From Groundwater. kk
Minimum 100' Separation From Wells in the Area.'
Minimum 100' Separation From Surface Water or Streams. �i,
MEL E ANOER
No. c i
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 15, BLOCK 2, CROSS rwESTATffS SUBD DSIO
I]EV
ws-
GENERAL:
The scope of this project includes the procurement and placement of a new
1,250 -gallon septic tank at the location shown on the Site Plan. Work also
includes the construction of a new 63' long X 3' wide X 6' effective depth
absorption trench at the location also shown on the Site Plan. The
distribution line in the trench will be placed at 4' below the existing ground
surface. Total depth of the trench will be 10' below the existing ground
surface. The new absorption trench and septic tank must be placed a
minimum of 100' from all private wells and any surface water in the area and
10' from the water service line proposed for the lot. A minimum of 3' of cover
is required over the absorption trench and 4' of cover over the septic tank.
2. Construction shall be in accordance with the approved site plan, design
drawings, Municipal Permit with any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal Regulations.
3. The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the location
of all lot lines. The Contractor must also verify the location of wells in the
area and assure that the separation distances are met.
4. Unless specifically agreed otherwise, the contractor shall be responsible for
final grading areas subsequently depressed from soil settling. Property
owner shall be responsible for revegetation of affected areas unless
specifically agreed otherwise.
5. Contractors installing wastewater disposal systems must be certified by the
Municipal Department of Health and Human Services for system installations.
Owners installing their own systems must receive prior approval from
D.H.H.S. before beginning system installation.
SEPTIC TANK INSTALLATION
1. A new 1,250 -gallon septic tank must be procured from an approved source
and installed at the location shown.
2. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shall include two 4" cleanouts for pumping access.
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 677-7766 FAX
MEMORANDUM
DATE: March 9, 2007��,®
TO: Deb Wockenfuss
FROM: Mike Anderson, P.E.
SUBJECT: Lot 15, Block 2, Cross View Estates Subdivision
Well and Septic System Permit
The percolation test performed at the location of the absorption trench designed for this
lot indicates a rate of 6 minutes per inch. The engineer, however recommended an
application rate of .6 square feet per bedroom, which seems conservative. We have
revised our design to reflect his recommendation. The trench now has an effective
depth of 8' as opposed to our original design of 6'.
No significant ground slopes are located within 100' of the proposed absorption trench.
We have added slope surface arrows to indicate the direction and slope of the existing
ground in the area. In addition, the surveyor has placed ground surface elevations at
each lot comer. The drop in elevation from the north property line to the south property
line is minimal with only small variations in between.
Please review this data and advise if further information is required prior to issuance of
the permits.
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 677-7766 FAX
March 6, 2007
Municipality of Anchorage
Development Services Department SUP E E DED
On -Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject: Lot 15, Block 2, Cross View Estates Subdivision
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 15, Block 2, Cross View Estates Subdivision intends to construct a
new four-bedroom home on the lot. We are therefore requesting a permit be issued for
the construction of a new well and septic system to accommodate the home. The
attached Site Plan and backup documentation identify the location and configuration of
the proposed well and septic system along with the alternate site. Also identified on the
plans are the existing wells and septic systems on surrounding lots. No conflicts exist
between the proposed septic system and well or septic systems and wells on adjacent
lots. Drainage arrows are shown on the site plan showing the grade and direction of
flow on the lot. The drainage pattern will not be changed as a result of this project.
The test hole was placed on the lot in the area of the absorption trench and alternate
site during the subdivision phase. The log indicates sandy silt to silt (SM -ML). The
percolation rate of the soil was determined to be 6 minutes per inch. No groundwater
was found during the placement of the test hole and none was noted during the
monitoring period. An application rate of .6 gallons per day per square foot was used in
the design of the absorption system. We are proposing to place a new 1,250 -gallon
septic tank and a 63' long by 3' wide by 8' effective depth absorption trench to treat and
dispose of the effluent generated in the house. The elevation of the distribution line in
the absorption trench will be 4' below the surface and the total depth will be 12'. A
minimum of 3' of fill or 2" of insulation and 2' of fill will be placed over the absorption
trench and 4' over the septic tank.
The ground surface on the lot in the area of the septic system slopes to the south. The
new trench will be constructed parallel with the slope as much as possible in
conformance with Municipal requirements. The new septic system will be constructed a
Lot 15, Block 2, Cross Point Estates Subdivision
March 6, 2007
Page Two
minimum of 100' from all wells and any surface water and 10' the proposed and existing
water services in the area.
If the system is constructed in accordance with our design the following statements
apply:
The system, if constructed as designed, will have no adverse impact on the wells
in the area or those to be constructed in the future.
2. The system, if constructed as designed, will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
3. The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
4. The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely,
Michael E. Anderson, P.E.
Attachments
4006-171
CROSS VIEW ESTATES SUBDIVISION
LOT 15159 BLOCK 2
U VAMM MM M IM NCS DAV Y MP)f
hFR ya hn D rvE
N
a
Propwad
AS
row'' °� 'Lk
1.250 ca
Septic Tank
63' Lang • 3' Vide
Try .N 6' Effptlo Tn Dopth
h
Acoaptbn Tnn
*"tomato
Sita
it/
F; -,;:l
]C STOW CPM ew
SITE PLAN
SCALE 1' = 50'
IC 3i DM1 Eswr.
w CAV CWT.
LOT 15, BLOCK 2, CROSS VIEW ESTATES SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Four Bedroom Home
Perc. Rate: 6 Min./Inch
Application Rate: .6 GPD/SF
Deep Trench System
1,250 Gallon Septic Tank
8' Drainfield Rock
4 Bedrooms X 150 GPD/.6 GPD/SF (Application Rate) = 1,000 SF Absorption Area
1,000 SF/16 SF/LF = 62.5 LF Trench Length
THEREFORE: Construct a 63' Long x 3' Wide x 6 Effective Depth Absorption Trench at the Location
Shown. Flow Line Elevation in Trench to be 4' Below Original Ground Surface. Total Depth to be
12' Below Existing Ground. Provide 4' Cover Over Septic Tank and 3' Cover Over Absorption
Trench. Maintain 100' Separation from Wells in the Area.
Natural
Backfill
*M
3'
TYPICAL DEEP TRENCH
NOTE:
(NO
Drainfield Rock
ECTUP'
Grade Area Over Trench to Drain Away.
Minimum 6' Separation From Bedrock.
Minimum 4' Separation From Groundwater.
Minimum 100' Separation From Wells in the Area.
Minimum 100' Separation From Surface Water or Streams:
ONSITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 15, BLOCK 2, CROSS VIEVrE�r•S1J�IV��'
�ISION
GENERAL: �s I�'ED
The scope of this project includes the procurement and placement of a new
1,250 -gallon septic tank at the location shown on the Site Plan. Work also
includes the construction of a new 63' long X 3' wide X 8' effective depth
absorption trench at the location also shown on the Site Plan. The
distribution line in the trench will be placed at 4' below the existing ground
surface. Total depth of the trench will be 12' below the existing ground
surface. The new absorption trench and septic tank must be placed a
minimum of 100' from all private wells and any surface water in the area and
10' from the water service line proposed for the lot. A minimum of 3' of cover
is required over the absorption trench and 4' of cover over the septic tank.
2. Construction shall be in accordance with the approved site plan, design
drawings, Municipal Permit with any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal Regulations.
3. The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the location
of all lot lines. The Contractor must also verify the location of wells in the
area and assure that the separation distances are met.
4. Unless specifically agreed otherwise, the contractor shall be responsible for
final grading areas subsequently depressed from soil settling. Property
owner shall be responsible for revegetation of affected areas unless
specifically agreed otherwise.
5. Contractors installing wastewater disposal systems must be certified by the
Municipal Department of Health and Human Services for system installations.
Owners installing their own systems must receive prior approval from
D.H.H.S. before beginning system installation.
SEPTIC TANK INSTALLATION
A new 1,250 -gallon septic tank must be procured from an approved source
and installed at the location shown.
2. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shall include two 4" cleanouts for pumping access.
CD
CD CY)
titl—
or)CO
M C7
I-- rl-
0 0
CY) CY)
W C M
rn o LL
V �
Q
O
i
U
z
J
1..1.. C U
o a)
L L
- � W
W
U <li
.L
�(/)o6
V) L
c �
E
Q
O
a) cn
00
U
Ln
N
O
N
N
00
Q)
C)
C
O
c0
.Q
x
W
O
0
C)
ti
i
N
N
LOQ
r
0
a)
U
(B
a_
LO
H
J
N
MJM
rW
V )
w
I—
CO
>w
w
U)
/
U)
U
C
O
�F+
Q
U
0
a)
J
LO
C)
Q
U)
cuL-
0 O
U
C
U)
F—
C�
w
2
LU
w
co
ti
LO
Ln
N
N
(1)
W
U)
w
w
F-
U)
06
Z
LU
LU
J
J
O
F-
Y
S�
L
a)
C
0
V
O
Q
c
U
K4
i�
c
O
M
a.
N
C
0
O
`
^
a)
.0
U
O
O
a)
A
u
Eel
I
u
0
0
0
m
`
CL
ami
CL
0
C.
O
3
cn
0
~
coC
O
F-
ca
E
-0
U
L
O
O
O�O
V
0
_
w
N
IC
O
N
m
M
c
_a
Lo -
a
>
0
0
V
E
Q
O
a)
_0
Q
N
>
>
•
N
=
v)
N
3QQ
O
v
Q
E
v
O
w
LL
a)
cu
.a)
ai
O
3
a)
CL
.N
z
U
E
�,
N
>
c
Q.
m
'E
O
O
m
'
a)
c
L
O
C
CL
Q
N
a
O
(D
C
O
L
X
mcC
U)
+'
cn
M
O
Cl)
-O
.Q
O
•,F+
in
N
N
c
G
Q
'a_
O
a
Q
O
0
0
OL
in
a)
v
a)
>
4 -LL
O
s
++
U
O
LL
C
-0
Q
+;
=
c
U
v
N
O
U)
Q
0- Q
`
`�
--
cm
+°
tm
LLI
O
,
a)
cu
E
!C
O
=
N
fC
O
U
Q
O
U=
c.)
L
u
U
Q
.�
>4
U)
C
Q
V 1 _
O (3)
r-_ r%—
CD
`0 0
07 CY)
O
U
a
Q
O
Q
CL
N
/a)
V/
CO
U)
C:
O
^O
W
4—
co
CU
Z
O ,
H �
N
OLL�
Z O
Z
li
w
Z i
'w
C7
TT� �
VJ '
L6
Y O
Q I
' ^ M
V ! 8)
� �cu
C
O O
N C
Q ❑
U > �
O
00 'L >
C
(n C
-1-.a G
CU
N
W = _
O
a) 0) U
CU C,6
C/)O N
U ti ren
O v
�—
Q „ L
a�
U) a o
(6 -t
a^)'
a Q
^^♦♦ Q
Q
o }
c
CL � �
L
O O
U —i U
T
a)
LL
N
(D
U_
N
m
;+r
C
r
N
CY)
N
O
—
Vi
N
_
a�
N
L
C/)U
El
_Q
•�
m
E
Q
U
L
U
.O
E
Q
❑
E
3
U
U
U)
>'
C
A
N
❑
U)
o
c'
(D
E
=3>
o
u)
Lla
of
CY)
a
U
❑
❑U
O
a)
-0
0
a)
U
YLL.
�
co
>
+
M
Q.
a)
~
El
L-
N
L
U)
cu
(1)❑
I^
C
W
V/
L
Q)
N
.>
N
_
CL
2
O
>
WCL
❑■
❑
U
ca
m
CL n.
ma)
a)
�
.I
❑
❑
Q. Op
2
>
N
c
U
_O
�
N R
a
a
O
n
N
~
-�
O
❑
❑
❑
(n
to
�
N
w: O
U.
J
o
❑
�L-
❑
a
w
E d
N
a
w
o
❑
a�
d
T
wv
co
�y/"D
2JQ
n♦
^,
G
LL
11
0
V/
UJ
D
eI
W
w
Cl)
a)
L
v
v_
Z
V/
cn
O
ai
O
LL
LL
L
riL
a)
H
O
O
U
_�
LU
LU
0
(D
n
>,
O
w
CO
a
`m
H
Q
>
a
M >
m
a
N
M
d
L6
CO
wm
0
T
a)
LL
N
(D
Cross View Estates Block 2 Lot 15 015-221-77
2.90
Forge Engineering
8/12/24
8/23/24 (Issac's)
N/A N/A
N/A
Benjamin Schiller, P.E.
(907) 522-7773
MUNICIPALITY OF
Development Services Department
On -Site Water & Wastewater Section
Phone: 907-343-7904
Fax: 907-343-7997
Certificate of On -Site Systems Approval
Parcel I.D. 015-221-77
1. GENERAL INFORMATION
Complete legal description
Expiration Date:
Cross View Estates Sub, Block 2, Lot 15
Location (site address) 5578 Heritage Heights Drive
Current property owner(s) Tyrone & Wanda Maxey Day phone (281) 731-8564
Mailing address
Real estate agent
5578 Heritage Heights Drive, Anchorage, AK 99516
Lisa Hartlieb
2. TYPE OF DWELLING:
❑■ Single Family (w/wo ADU)
❑ Duplex
❑ Multiple Dwellings (Single Family and/or Duplex)
3. NUMBER OF BEDROOMS: 4
Day phone (907) 257-0471
4. TYPE OF WATER SUPPLY:
TYPE OF WASTEWATER DISPOSAL:
Private Well
Private Septic
Q
Water Storage
❑
Holding Tank
❑
Community Well
❑
Community
❑
Public Water System
❑
Public Sewer
❑
Waiver request for:
Distance:
Received by:
Date:
COSA to be released to the engineer, unless otherwise
requested by the engineer.
COSA Fee $ 650
Date of Payment �-/— t lO —
Receipt Number C7 Z 5? J
COSA # 6)5C -,?-1W30
Waiver Fee $
Date of Payment
Receipt Number
Waiver #
5. STATEMENT OF INSPECTION BY ENGINEER
As certified by my seal affixed hereto and as of the validation date shown below, I verify that my investigation, based
on procedures outlined in the Certificate of On -Site Systems Approval Guidelines for this application, shows that the
on-site water supply and/or wastewater disposal system is (are) safe, functional and adequate for the number of
bedrooms and type of structure indicated herein. I further verify that based on the information obtained from the
Municipality of Anchorage files and from my investigation and inspection, the on-site water supply and/or wastewater
disposal system is (are) in compliance with all applicable Municipal and State codes, ordinances, and regulations in
effect at the time of installation. I acknowledge that On -Site staff may visit the site to verify the information submitted.
Name of Firm Forge Engineering Phone (907) 522-7773
Address 1399 W. 34th Ave Suite 101, Anchorage, AK 99503
Engineer's Printed Name Benjamin Schiller
6. DSD SIGNATURE
XSystem #1 Approved for —5-- bedrooms
System #2 Approved for bedrooms
Disapproved
Date 4/9/21
,r.0Fq�ll�1
% * .49 . 9
• benjadrvSchiller
CE 12592 • ��G���
,l\��pROFESSI�NP -�
Conditional approval for bedrooms, with the following stipulations:
0 WAST--VATER
Jr// iIWUhAM
SER��G�c
By; Original Certificate Date: q-/ ( 2
The Municipality of Anchorage Development Services Division (DSD) issues Certificates of On -Site Systems Approval (COSA) based only upon the
representations given in paragraph 5 by an independent professional civil engineer registered in the State of Alaska. The Municipality of Anchorage is
not responsible for errors or omissions in the professional engineer's work.
7. ATTACHMENTS:
COSA Checklist X Nitrate Advisory
Septic System Advisory Arsenic Advisory
Well Flow Advisory Other
COSA Checklist blue sheet
COSA Checklist
Legal Description: Cross View Estates Sub, Block 2, Lot 15 Parcel ID: 015-221-77
If more than 1 septic system on lot: COSA Checklist # of Structure served by this system
A. WELL DATA
Q Well log is filed with Onsite (or attached) Well production at time of test 6.8 gpm
Date drilled 4/12/07 Water storage tank volume N/A gallons
Total depth 241 ft Well disinfected for coliform test? ❑ Yes FE -1 No
Cased to 241 ft 0 Coliform bacteria is Negative
❑■ Sanitary seal is functioning correctly
FE -1 Wires are properly protected
Casing height (above ground) 24 in.
Date of flow test for COSA 4/6/21
Static water level at beginning of test 194 ft.
Comments
B. TANK DATA
Age of tank(s) 14 years
Tank type/material SEPTIC/STEEL
Measured operating fluid level in septic tank 48
0 Standpipes/foundation cleanout per record drawing
Date of pumping 4/21/20 Around the Clock
D. ABSORPTION FIELD DATA DEEP TRENCH
Which system tested (date installed) 4/6/07
0 ALL standpipes present per record drawing
Total measured depth from grade 13.2 ft (max)
Measured depth to pipe invert from grade 5.7 ft (min)
❑ N/A — pressurized field
FE -1 Monitor tubes go to bottom of effective. If not, state
depth into effective 7.5
FE -1 Code -required soil cover over field
❑ System presoaked
(Required if vacant for greater than 30 days prior to
date of test)
Gallons introduced gallons
Comments/Deficiencies:
COSA Checklist yellow sheet
Nitrate 2.31 mg/L ❑ Nitrate less than MRL (ND)
Arsenic ug/L 0 Arsenic less than MRL (ND)
Collected by Forge Engineering
Date of Sample 4/2/21.1-
Comments
/2/21,
C. LIFT STATION
uired maintenance completed
Age of lift sta years
Lift station material
Comments:
Adequacy test date 4/6/21
Results Q Pass For 4 bedrooms
Fluid depth prior to test 52 in
Water added 703 gal
New depth 61 in
Elapsed time 1440 min
Final fluid depth 52 in
Absorption rate '600 gpd
Any rejuvenation treatment (past 12 months)
If yes, enter date
E. SEPARATION DISTANCES
From Private Well on Lot to: (Please enter distances if less than required or if community well)
0✓
Yes
Septic Tank/Lift Station on Lot > 100'
ft
Wells on Adjacent Lots:
Community Sewer Manhole/Cleanout > 100'
0✓
❑✓ Yes
if No
ft
❑✓ Yes
if No
ft
Neighboring Tank > 100' ❑✓ Yes
if No
ft
Private Sewer/Septic Line > 25' [✓ Yes
if No
ft
Absorption Field on Lot > 100' F✓ Yes
if No
ft
Holding Tank > 100' ❑✓ Yes
if No
ft
Neighboring Absorption Fields > 100'
if No
ft
Animal Containment > 50' ✓0 Yes
if No
ft
✓ Yes
if No
ft
Manure/Animal Excreta Storage > 100'
Community Sewer Main > 75' 0✓ Yes
if No
ft
0 Yes
if No
ft
From Septic/Holding Tank on Lot to: (Please enter distances if less than required)
Building Foundations > 10' 0✓ Yes if No ft Surface Water > 100' Yes if No ft
Property Line > 5'
0✓
Yes
if No
ft
Wells on Adjacent Lots:
Absorption Field > 5'
0✓
Yes
if No
ft
Private Wells > 100'✓❑ Yes if No ft
Water Main > 10'
✓0
Yes
if No
ft
Community Wells > 200' Yes if No ft
Water Service Line > 10'
0✓
Yes
if No
ft
If septic tank is under driveway comment below
From Absorption Field on Lot to: (Please enter distances if less than required)
Building Foundation > 10'
Yes
if No
ft
If absorption field is under driveway comment below
Property Line > 10'✓❑
Yes
if No
ft
Wells on Adjacent Lots:
Water Main > 10'✓Q
Yes
if No
ft
Private Wells > 100' Yes if No ft
Water Service Line > 10'
❑✓
Yes
if No
ft
Community Wells > 200' 0✓ Yes if No ft
Surface Water > 100'✓Q
Yes
if No
ft
F. ENGINEER'S COMMENTS
dqbl
G. ENGINEER'S CERTIFICATION ~OF,se co ;Q�`l�
I certify that 1 have determined through field inspections and review j *: • ll -I ,
49
of Municipal records that the above systems are in conformance with .�-: _ • • • . ;�!ll���.VVV,., • ,� , , ��
MOA COSA guidelines in effect on this date. / •�.. ......
. Benla.,' •chiller
��j�Fc • CE 12592 • �`�r�
(, /�lF� • . , 4/9/21 • • ���i
�ll , PROFESSO:.`
COSA Checklist yellow sheet
• '� Municipality of Anchorage
On -Site Water and Wastewater Program
(907)343-7904
Certificate of On -Site Systems Approval
Parcel I.D. 015-221-77
1. GENERAL INFORMATION
ZXL
_F�
APF? "1" 5 2014
Expiration Date: g S
Complete legal description Cross View Estates, Block 2, Lot 15
Location (site address) 5578 Heritage Heights Drive Anchorage, AK 99516
Current Property owners) James & Beth McAllen Day phone 345-4417
Mailing address 5578 Heritage Heights Drive Anchorage, AK 99516
Real Estate Agent
2. TYPE OF DWELLING:
Fx1 Single Family (w/wo ADU)
❑ Duplex
❑ Multiple Dwellings (Single Family and/or Duplex)
3. NUMBER OF BEDROOMS: Four
Day phone
4. TYPE OF WATER SUPPLY:
TYPE OF WASTEWATER DISPOSAL:
Individual Well
0
Individual
Fx I
Individual Water Storage
❑
Holding Tank
❑
Community Class Well
❑
Community
❑
Public Water System
❑
Public Sewer
❑
WaiverNariance request
Received by: Date:
COSA to be released to the engineer, unless otherwise requested by the engineer.
COSA Fee $ 5J' ado �—I
Date of Payment '12SI c�
Receipt Number O&Q 35C')
COSA# OSc](11154
Waiver Fee $
Date of Payment
Receipt Number
Waiver #
5. STATEMENT OF INSPECTION BY ENGINEER
As certified by my seal affixed hereto and as of the validation date shown below, I verify that my investigation,
based on procedures outlined in the Certificate of On -Site Systems Approval Guidelines for this application,
shows that the on-site water supply and/or wastewater disposal system is (are) safe, functional and adequate
for the number of bedrooms and type of structure indicated herein. I further verify that based on the information
obtained from the Municipality of Anchorage files and from my investigation and inspection, the on-site water
supply and/or wastewater disposal system is(are) in compliance with all applicable Municipal and State codes,
ordinances, and regulations in effect at the time of installation.
Name of Firm Anderson Engineering
Phone 522-7773
Address P.O. Box 240773 Anchorage, AK 99524
Engineer's Printed Name Michael E. Anderson, P.E.
Date 4/24/2014
1F �t 4
F-
V TH
6. DSD SIGNATURE1
1 �
6d
t t s9t L
System #1 Approved for bedrooms�tP
System #2 Approved for bedrooms
Disapproved
Fs-.
Conditional approval for bedrooms, with the following stipulat ods =
By:Original Certificate Date: S ✓C
The Municipality of Anchorage Development Services Division (DSD) issues Certificates of On -Site Systems Approval (COSA) based only
upon the representations given in paragraph 5 by an independent professional civil engineer registered in the State of Alaska. The Municipality
of Anchorage is not responsible for errors or omissions in the professional engineers work.
7. ATTACHMENTS:
COSA Checklist X Nitrate Advisory
Septic System Advisory Arsenic Advisory
Well Flow Advisory Other
COSA blue sheets .a e
If more than 1 septic system is on the lot:
COSA Checklist # _of _
Structure served by this system
Certificate of On -Site Systems Approval Checklist
Legal Description: Cross View Est. Sub., Block 2, Lot 15 Parcel ID: 015-221-17
A. WELL DATA
Well type Private If A, B, or C provide PWSID # Well Log (Y/N) Y
Date completed 4/12/07 Sanitary seal (YIN) Y Wires properly protected (Y/N) Y
Total depth 241 ft. Cased to 241 ft. Casing height (above ground) >18 in.
FROM WELL LOG
Date of test 4/12/07
Static water level 181
Well production
20
AT INSPECTION
4/23/14
ft. 182 ft.
g.p.m. 6.3
g.p.m.
WATER SAMPLE RESULTS:
Coliform 0 colonies/100 mL Nitrate 2.08 mg/L
Arsenic N/D ug/L Date of sample: /1/14 Collected by:
B. SEPTIC/HOLDING TANK DATA
J. Anderson
Tank Type/Material Septic/Steel Date installed 4/5/07 .
Tank size 1,250 gal. Number of Compartments 2 Cleanouts (Y/N) Y
Foundation cleanout (Y/N) Y Depression over tank (YIN) N High water alarm (Y/N) N
Date of pumping 12/4/13 Pumper Denali Sewer and Drain Service
C. ABSORPTION FIELD DATA
Date installed 4/6/07 Soil rating (g.p.d./fe or ftz/bdrm) .6 GPD System type Deep Trench
Length 73 ft. Width 3-4 ft. Gravel below pipe 8 ft.
Total depth 13-14 ft. Eff. absorption area 1,168 ft' Monitoring tube Y Depression over field N
Date of adequacy test 4/23/14 ResultsPass/Fail
( )Pass For 4 bedrooms
Fluid depth in absorption field before test 39/40 in. Water added 634 gal. New depth 51/51 in
Elapsed Time: 1,440 min. Final fluid depth 39/40 in. Absorption rate >= 600 g p d
Any rejuvenation treatment (past 12 mo.) (Y/N & type) / y If yes, give date
D. LIFT STATION
Date installed
"Pump on" level at
Datum
Size in gallons Manhole/Access (YIN)
in. "Pump off' level at in. High water alarm level at
Cycles tested Meets alar & circuit requirements?
E. SEPARATION DISTANCES
WELL ON LOT TO:
Septic tankllift station on lot >100' On adjacent lots >100'
Absorption field on lot > 100' On adjacent lots >1 00'
Public sewer main N/A Public sewer manhole/cleanout N/A
Sewer /septic service line >25' Holding tank N/A
Animal containment areas >50' Manure/animal excrete storage areas >100'
SEPTIC/HOLDING TANK ON LOT TO:
Building foundation >5' Property line >5'
Water main >10' Water service line >10'
Wells on adjacent lots >100'
ABSORPTION FIELD ON LOT TO:
Property line >10' Building foundation >10,
Water Service line > 10 Surface water > 100
Curtain drain None Noted Wells on adjacent lots >100'
F. COMMENTS
G. ENGINEER'S CERTIFICATION
I certify that t have determined through field inspections and
review of Municipal records that the above systems are in
conformance with MOA COSA guidelines in effect on this date.
Engineer's Printed Name Michael E. Anderson, P.E.
Date 4/24/14
COSA brown sheet_10-10-12.dw
Absorption field >5'
Surface water >100'
Water main >10'
Driveway, parking/vehiclestorage >10'
c 0`
° L68IP'99ER'S',.
no
0
2006-171
CROSS VIEW ESTATES SUBDIVISION
LOT 15, BLOCK 2
51,159 S.F.
GASTALDI LAND
SURVEYING, LLC
JEFF A. GASTALDI, R.L.S.
4726 WEST 88TH AVENUE
ANCHORAGE, ALASKA 99502
PHONE 248-5454
GRID DATE
2737 8/30/2007
F.B. JOB NO.
07-10 CVE152
I HEREBY CERTIFY THAT I HAVE SURVEYED THE
PROPERTY DEPICTED ABOVE AND THAT NO
ENCROACHMENTS EXIST EXCEPT AS INDICATED.
IT IS THE RESPONSIBILITY OF THE OWNER TO
DETERMINE THE EXISTENCE OF ANY EASEMENTS,
COVENANTS OR RESTRICTIONS WHICH DO NOT
APPEAR ON THE RECORDED SUBDIVISION PLAT.
UNDER NO CIRCUMSTANCES SHOULD ANY DATA
HEREON BE USED FOR CONSTRUCTION OR FOR
ESTABLISHING BOUNDARY OR FENCE LINES.
ANCHORAGE RECORDING DISTRICT, ALASKA
NOTE: NO CORNERS SET THIS DATE
10' STORM DRAIN ESMT.