ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT
Permit Number: -SW O%O iq-}
Name
Address:
MtpTT fRRtSENt
Q. o , 6.ok 154- - [araw:5-1109la+
Phone: CA0� 3 (4. •, G Lag - Number or Batlrooms:
LEGAL DESCRIPTION
Block: Lol:
Subdivision:
7
Township:
2 KAUErS M'i. C-SzP-'€5
Range: Basilan:
Well:
Classification (Private,
?R.IUAT
Driver
Yield:
1
From
5
New 0 Upgrade
GA,
B. CU TeIM gaPlh: yh Cued to FI.
jG I,2.FI.
bawl paOle leC: /D� Slagc Weber Le. Fl.
GPMIPump Sal al: �iJy(//��(r(�/, Casing Height Abovoovv_eGrGround:
-(iA. — Ft,I a//,rf
G rt.
SEPARATION DISTANCES
To Septic
Tank
Absorption) Lift
Field Station
PID Number: C' lo- 63t- 6 Z
Wastewater System: i9 New ❑ Upgrade
ABSORPTION FIELD
0 Deep trench Shallow Trench 0 Bed ❑ Mound 0 011ier
Sot Rating:
0 k O GPD/FI°
Depth to pipe bolbom from original armies
0.2 Ft.
Fill added above original grade:
4, 'to -4.%
Total Depth from original grade:
Gravel depth beneath pipe.
J FI.
FI.
Gravel Length:
Gravel width:
Total abaernnan area:
fasten[
�W NEPA
FI.
563 Fe
Number of lines:
4-
tpD rt.
Distance between lines:
FI.
Plrya Malarlak
ASlIn 1)3(334i F214.0
Dale lnslalled:
TANK
Septic 0 Holding D S.T.E.P.
Holding Tublic/Privale
Tank Sewer Line
Well
Surface Water
lol line
Foundallon
Curlain Drain
loo's io0'+J —
1061+
loo+
W
Remarks:
ASC3ultr1 SUR\]E,Lr
/I NEE.D`D %c, VEPvty.
(JL jf1SAsuRWvICWIS (SRA {14{'pai py
Manuladuros
RF.E IZ
Material:
lib PE
LIFT STATION
Size: factures
Gal
CZ
D Other:
,C(apacity.
loon Gal
Number of Compartments
2
'Pump on' level at: 'Pump off level al:
Mali weber alarm al:
Pump Make & Model Elealdcal Inspections performed by:
Lucallon and Description:
BENCH MARK
In
ToP of WEue
Assumed Elevation
SOO FI
Inspections performed by: E Dates: 1s1 9- 34- o$
Chugiak, Alaska 99567 2nd -L8-a
Development Services
�/Department
�Approval
Reviewed and approved by/ "
"( Date: V-73/11/
-1�
(Rev. Iinr
Engineer's Stamp
siggisittli
i 4 44
'4" •e«..... 04s 4
/.
a
PERMIT ND SW080177
PAGE 2 OF 3
Municipality of Anchorage
DEPARTMENT OF HEALTH AND HUMAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P.O. Box 196650 • Anchorage, Alaska 99519-6650 • Telephone: 343-4744
On—Site Wastewater Disposal System and/or Well Inspection Report
LEGAL LOT 2,BLOCK 2, RAVEN MOUNTAIN ESTATES S/D g1 P.I.D. ND. 076-031-02
LOT 3�
UNDEVELOPED
i
LOT 1
cUNDEVELOPED-
SCALE 1 = 50'
eTH1 & 2
Cy
\ 38'
22'
0'
NEW
1000 GAL.
HOPE TANK ,.
8' Z
PROPOSED `
<
3 BEDROOM \
'� ` HOUSE
A
i
tt
(AP
Lo
CA
PERMIT No. SW080177
PAGE 3
OF 3
Municipality of Anchorage
DEPARTMENT OF HEALTH AND HUMAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P.O. Box 196650 s Anchorage, Alaska 99519-6650 • Telephone: 343-4744
On—Site Wastewater Disposal System and/or Well Inspection Report
LEGAL LOT 2, BLOCK 2, RAVEN MOUNTAIN ESTATES S/D #1 P.I.D. N0. 076-031-02
/ FINAL GRADE
ST2=109.0'
INSULATION
TOP OF TANK = 105.0'
C01
MT2 CO2 MT1 co1 = 104.1'
1CO2 = 104.1'
FINAL GRADE
2" INSULATION
. ! C01 = 108.6'3
CO2 = 108.7'
OUTLET -104.0'
MT2 = 10
SCALE NTS
1
MT1 = 100.9'
s
WATER FOUND AT 93.4'
88.9'= B.O.H.
Ga.v$ F4.eec-
ftvnbtrs eLYe
ee✓SLoL.
8'-23-0- T,P,
Municipality of Anchorage
Development Services Department
Building Safety Division
On -Site Water and Wastewater Section
4700 South Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650
www.muni.org/onsite
(907) 343-7904
Attention: Propd'rty owner shall provide a well log to the
DSD within 60 days of well completion.
Permit Number:SW080177
Date of Issue: Aug / 20 / 2008
Parcel Identification Number: 076 -031 -02
Is well located at approved permit location? ( x) Yes or ( ) No
Ile Drilling, Inc.
Well Log
Water Weir Drafty anfPunf Service
Anchorage, A(us&ta (907) 345- )593
Drilling Started:10/ 22 2008contpleted: 107_23:2008
City'Borongh.
Subdivision:
BLOCK
LOT
Prupenv Owner Natne & Address: Matt Parisen
Girwood
Raven Mnt. Esti
2
2
P.O. Box 157 Site:126 Muddy Dog Circle
Girdwood, AK 99587
Meridian Township Range Section tVa of IA of _ _ 74 of _ _'A
BOREHOLE DATA(from top of casing)Bepth
Drilling method: (X ) Air rotary. ( ) Cable tool, Other
Material: Type, Color & wetness From To
Well use: ( )Public supply, (x i Domestic. Other
stickup
0
2
Depth of hole: 82 f1, Casing stickup: 2 ft
Casing type:steel Thickness: .250 inches
2
8
_ _
Casing diameter: 6 inches Casing depth: 82 ft
gravel pad
Liner type: - Diameter: - inches Depth: - fl
Static water (from top of casing): 63 ft on 10 _23 :2008
silt & gravel
8
40
Pumping level Sc. yield: fret atter hours at gpm
_
Recovery rate: 5 gpm, Method of testing: airlift
moist clay
40
52
Development method: airlift Duration: 1 hour
clay w/ rock
52
76
Well intake opening type: (X) Open end. ( ) Open hole, Other
Screened: Start: - ft, Stopped ____ _ _ ft
wet clay & rock
76
78
_
Screen type: - Slot/mesh size: -
Perforated: Stan: - ft. Stopped: - ft
gravel w/ H2O
78
82
Start: - ti. Stopped: - ft
Note:
Grout type: bentonite Volume -
Depth; from ground surface . to 20____,._
_
Pump intake depth: ft
Pump size: hp. Brand name:
Was well disinfected upon completion? (x) Yes, ( ) No
Method ofdisinfectiomCalcium.Hypochlorite.(Chlorine)._.
Driller comments/ disclaimers-
Welt driller name: Johnny
Company name: Hefty Drilling, Inc.
Mailing address- 3540 Akula Dr.
City: Anchorage State: AK Zip 99516
Phone number : ( 907 345 - 0593 fax:345-4700
Drillers signature:
Municipality of Anchorage
Development Services Department
Building Safety Division
On -Site Water and Wastewater Section
4700 South Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650
www.muni.org/onsite
(907) 343-7904
Attention: Propd'rty owner shall provide a well log to the
DSD within 60 days of well completion.
Permit Number:SW080177
Date of Issue: Aug / 20 / 2008
Parcel Identification Number: 076 -031 -02
Is well located at approved permit location? ( x) Yes or ( ) No
RUG -31-201E 08:21P FROM:
TO:3437997
P.1/1
Pump Installation Log G'rdiu4
WrMil A 114UV %IQ
�°���'".C5�,1
lA
IA,(,, = T*? Orr C.ab.%n5
Afio14 GROUND
„„0
NAME:
OATS:
Pitkas Adapter Manufacturer's Name: Ce14' 04 // tb r
Pitless Adapter installer: 1,40447 /4/5
PUMP TYPE )1,14701445'64.
MACE i
14000.
' C, � �Jo
SERIALt- New —
Motor
DROP MID Tips PY - i/`
DmtCn �p
POKER CARE: Tme ) A.�✓�'., l Sia � 2 /� Ml at(
raiditini /je.✓'
ELECTRICAL: Vas ,.st ciU
— 43,U
WATER TAW rip ✓y O i
til, 4v 64
a CASIO Sao Col 1 lis. T)pe s `
eei
USED MU: from v To ea '
INTAKE SRUCIURE; Tip.
Fran To
OP D1 NOTE: From
COSENTS:
well was disinfected upon completion.
method: calcium hypochlorite,
q-(efty Drilling, am
Water welianct Pumy Service
Anchorage, Alaska
(907) 345-0593
.4
LOT 2 HAS 56,131 SQ.FT. OF AREA
2.11% OF THE LOT IS COVERED.
hr
30.0' FIUND IRON Pipe
o
I/o'
0i
s5/' 11
Utility Esmt
/ Septic pipe
" ) /"..,--
.
FOUND IRON PIPE
.00
eptic pipes
Septic pipes
co
S 0002330" W
HOUSE DETAIL
1"=30'
°WELL
FOUND IRON PIPE
FOUND MONUMENT
S 89°2115"W 105.90'
GRAPHIC SCALE: 1 Inch = 60 Feet
3o 1S 6 lb 30 60
VERTICAL DATUM ASSUMED
120
FOR:
Little Bear Services
2941 Carriage Drive
Anchorage, Alaska 99507
(907) 950-5541
Date
7/26/12
Scale
1"=60'
Grid
SE4018
AS—BUILT
Legal Description
Lot 2
Block 2
Drawn by
BFB
Field Book
RAVEN MTN. ESTATES #1
SUBDIVISION
I hereby certify that the property described hereon has been surveyed
by me, or at my direction, and that the improvements situated thereon
are within the property lines and do not overlap or encroach on the
property lying adjacent thereto unless otherwise shown. That no
improvements on the property lying adjacent thereto encroach on the
premises in question and that there are no roadways, transmission
lines or other easements on said property except as shown.
It is the responsibility of the owner or builder, prior to construction,
to verify proposed building grade relative to finish grade and utility
connections and to determine the existence of any easements, covenants,
or restrictions which do not appear on the recorded subdivision plat.
Listed distances prevail over scaling.
Reproduction may cause distortion.
SGS Ref.#
Client Name
Project Name/#
Client Sample ID
Matrix
1123065001
Residential Testing -Cash Account
126 Muddy Dog Circle
126 Muddy Dog Circle
Drinking Water
Printed Date/Time
Collected Date/Time
Received Date/Time
Technical Director
07/24/2012 13:28
07/17/2012 13:20
07/17/2012 17:00
Stephen C. Ede
Sample Remarks:
Parameter
Results
LOQ
Units Method
Allowable Prep Analysis
Container ID Limits Date Date Init
Metals by ICP/M3
Hardness as CaCO3
Waters Department
Total Nitrate/Nitrite-N
Microbiology Laboratory
E. Coli
Total Coliform
Private Individual Analysis
Alkalinity
Aluminum
Antimony
Barium
Cadmium
Calcium
Chloride
Chromium
CO3 Alkalinity
Conductivity
Copper
Fluoride
HCO3 Alkalinity
Iron
Lead
73.8 5.00. mg/L SM21 23408 C
1.03 0.100 mg/L SM214500NO3-F B
Negative
Negative
1
1
100mL SM21 9223B A
100mL 8M21 9223B A
07/18/12 07/19/12 NRB
07/19/12 CMA
07/17/12 DLC
07/17/12 DLC
64.4 10.0 mg/L SM21 23208 D 07/18/12 SDP
6.637 20.0 ug/L EP200.8 C 07/18/12 07/19/12 NRB
ND 1.00 ug/L EP200.8 C (<6) 07/18/12 07/19/12 NRB
4.74 3.00 ug/L EP200.8 C (<2000) 07/18/12 07/19/12 NRB
ND 0.500 ug/L EP200.8 C (<5) 07/18/12 07/19/12 NRB
26400 500 ug/L EP200.8 C 07/18/12 07/19/12 NRB
0.365 0.100 mg/L EPA300.0 D (<250) 07/18/12 07/18/12 SDP
0.9223 2.00 ug/L EP200.8 C (<100) 07/18/12 07/19/12 NRB
ND 10.0 mg/L SM21 23208 D 07/18/12 SDP
156 1.00 umhos/cm SM21 2510B D 07/18/12 SDP
7.85 1.00 ug/L EP200.8 C (<1300) 07/18/12 07/19/12 NRB
0.05503 0.100 mg/L EPA 300.0 D (<2) 07/18/12 07/18/12 SDP
64.4 10.0 mg/L SM2I 2320B D - 07/18/12 SDP
ND 250 ug/L EP200.8 C (<300) 07/18/12 07/19/12 NRB
0.311 0.200 ug/L EP200.8 C (<15) 07/18/12 07/19/12 NRB
SGS Refit
Client Name
Project Name!#
Client Sample ID
Matrix
1123065001
Residential Testing -Cash Account
126 Muddy Dog Circle
126 Muddy Dog Circle
Drinking Water
Printed Date/Time
Collected Date/Time
Received Date/Time
Technical Director
07/24/2012 13:28
07/17/2012 13:20
07/17/2012 17:00
Stephen C. Ede
Parameter
Results
LOQ
Units Method
Allowable Prep Analysis
Container ID Limits Date Date Init
Private Individual Analysis
Magnesium
Manganese
Nickel
011 Alkalinity
PH
Selenium
Silver
Sodium
Sulfate
Total Dissolved Solids
Zinc
Arsenic
Thallium
1900
3.72
1.137
ND
7.50
ND
ND
1860
5.93
78.0
3.021
ND
ND
50.0 ug/L
1.00 ug/L
2.00 ug/L
10.0 mg/L
0.100 pH units
5.00 ug/L
1.00 ug/L
500 ug/L
0.100 mg/L
10.0 mg/L
5.00 ug/L
5.00
1.00
EP200.8
EP200.8
EP200.8
SM21 2320B
SM21 4500-11B
EP200.8
EP200.8
EP200.8
EPA 300.0
SM21 2540C
EP200.8
ug/L EP200.8
ug/L EP200.8
C 07/18/12 07/19/12 NRB
C (<50) 07/18/12 07/19/12 NRB
C (<100) 07/18/12 07/19/12 NRB
D 07/18/12 SDP
D (6.5-8.5) 07/18/12 SDP
C (<50) 07/18/12 07/19/12 NRB
C (<100) 07/18/12 07/19/12 NRB
C (<250000) .07/18/12 07/19/12 NRB
D (<250) 07/18/12 07/18/12 SDP
D (<500) 07/20/12 JSK
C (<5000) 07/18/12 07/19/12 NRB
C (<10) 07/18/12 07/19/12 NRB
C (<2) 07/18/12 07/19/12 NRB
MUNICIPALITY OF ANCHORAGE
Development Services Department
On -Site Water 8 Wastewater Program
4700 South Bragaw Street
P.O. Box 196650, Anchorage, AK 99519-6650
(907) 343-7904
ON-SITE WASTEWATER DISPOSAL SYSTEM 1 WATER SUPPLY PERMIT
Initial
Date Issued: Aug 20, 2008
Expiration Date: Aug 20, 2009
Permit Number: SW080177
Parcel ID: 076-031-02
Legal Description: RAVEN MOUNTAIN ESTATES #1 BLOCK 2 LOT 2
S t Address: 126 MUDDY DOG CIRCLE
Design Engineer: 0003 S & S ENGINEERING
Lot Size: 56131 SQ. FT.
Owner Name: MATT PARISEN Permit Bedrooms: 3
Owner Address: PO BOX 157 Total Bedrooms: 3
GIRDWOOD , AK 99587 -
This permit is for the construction of:
Q Disposal Field ❑✓ Septic Tank ❑Holding Tank 0 Privy ❑
Private Well 0 Water Storage
All construction must be In accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ).
3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling
(907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and closed on the same day.
B. Covered, sealed, and heated to prevent freezing.
Glad (os : Yosk►; Ca tit 'IAA A Clutnvt of •frQf irws
• kW -JR P1/41
• '.tIJ vwved
MI , I
'Id dI%t3wider 4tvtd J 7led. ate
Received By.
Issued By
c14410 gdejazn
Date:
4e
Date: O 4t7/On
Parcel I.D.
Municipality of Anchorage
Development Services Department
Building Safety Division
On -Site Water and Wastewater Program
4700 Elmore Road
P.O. Box 196650
Anchorage, Alaska 99507
www.muni.org/onsite
(907) 343-7904
ON-SITE SEWER/WELL PERMIT APPLICATION
FORA SINGLE FAMILY DWELLING
ham -(W-0
Property owner(s) MATT PARiSI;PJ 11
Mailing address PO BOx 157 (trd> lel, AC Zip Code 99587
Site address lap m u n 03 DOS, t JR. Zip Code
Legal description (Sub'd., Block & Lot) LOT 2. BLOCK 2. RAVEN MOUNTAIN ESTATES S/D #1
Legal description (Township, Range & Section)
Lot Size 510 , jai Sq. Ft. Number of Bedrooms 3
Day phone 907-317-2239
THIS APPLICATION IS FOR (® all that apply):
Absorption Field
Septic Tank
Holding Tank
Privy
Private Well
Water Storage
0
THIS APPLICATION IS AN:
Initial
Upgrade
Renewal
0
0
I certify that the above information is correct. I further certify that this application is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes.
2i,e2
(Signature of property owner or authorized agent)
Permit/Rush Fees
Date of Payment:
Receipt Number.
(Rev. 11/05)
$/73-2-9, / G O. `° Waiver Fees:
1,1rr/O 8
I 16433 Pmv1/4/
Date of Payment:
Receipt Number:
•
T'A,S&S
EngIneeMing
NEAIm AUTHORITY
APPRCP/ALS
SEWER & WATER
LAIN UTENSIONS
SEWER & WATER
INSPECTION
ENGINEERING STUDIES
Ano REPORTS
WEU INSPECTION
&
FLOW TEST
SITE PLANS
ROAD DESIGN
SOIL TEST
PERCOLATION
TEST
STRUCTURAL&
MECNWNICAL
ISPECR016
ON SITE
WASTEWATER
DISPOSALSYSTEM
DESIGN
ROBERT C.COWAN .
CIVIL ENGINEERING
PH: 907.694.2979
FAX: 907.694-1211
August 13, 2008
MUNICIPALITY OF ANCHORAGE
Development Services Department
P.O. Box 196650
Anchorage, AK 99519
REFERENCE: Lot 2, Block 2, RAVEN MTN ESTATES S/D 141
It is requested that you issue a permit to install a new septic system and well to serve
the proposed three bedroom house on the referenced property.
A test hole was excavated and a percolation test performed. The approximate location of
the test hole is located on the attached site plan. At the time of excavation (10/16/2007)
water was found at 10.5 feet. After seven days of monitoring, ground water was found at
10.5 feet.
We do not anticipate any adverse effects on neighboring wells, septic systems, reserve
areas or drainage patterns by the installation of the proposed septic system. The
construction of this system will not prevent any future development on any of the adjacent
properties.
If you require additional information, please contact us.
Sincerely,
Robert c. cesdithi P.E.
RAS/elle
Enclosure
15861 S. Birchwood Loop Road - Chugiak, Alaska 99567
L
0
ro
0
00CO
0
J
J
0
NOIS3O
NVld-311S
L-
0
M
00
O
CO03
U
J
J
0
<
W
-J
L<
0
a
a
4.1
O
03/
M
3113021d
NDIS30
4 C i,
01 = 1
Performed For:
Legal Desaiplion:
1-
2-
N:. •
5-
6-
7-
8-
9-
10-
11-
12
13-
14-
15
16-
17-
18 -
19-
20 -
Depth
(Feel]
O a
6:1 ,C.
e:
Lid o:
QS
'20:6
•e1:
•rf
oP-:
COMMENTS
•
Municipality of Anchorage
Development Services Department
Building Safely Division
On -Site Water and Wastewater Program
4700 South Dragnw SI.
P.O. Cox 196650 Anchorage. AK 995196650
www.munl orglonsiln
(907) 343-7904
s Log - Percolation Test
r
(EIJGII Fop y
ROBERT C. COWAN W
mac\ CE -8801 • f
•Ci' sr
�,,`O fit
t` Dale Porto red:
l.oT2',15Leal'1 RIi1,'E11) t'iTownship, Range. Section:
Slope
—Cm
WAS GROUND WATER • .
ENCOIJIIIERED7
4th Sr r l IF YES. AT WWIAT DEPTH? Io, s OL
Depth
Monitoring?
11or IDI Si E
— S7'/Fiy
Site Plan
Reading
Dale
Groes Time
Nnl Time
Dopet to Water
NM Drop
cMefK
10/16/09
,,watts
iWcif
all
30
30
51/1"
3%
7'
30
60
5%¢"
S%
a"
30
40
5"
S'I
2-"
3 0
/7,0
gag,"
2-14"
zr'
30
/GO
'J%"
q'S/b"
2'Va."
g'`/rb'
2-"
-;7O
/ a U
PERCOLATION RATE /Or .1 ar++nrrendq 4 PERC IIOLE D AMC IER
TEST RIRJ BETWEEN '5 FT AND ' FT
oo �
PERFORMED BY: S A- 5 tric-i itUtrtic. 1 II �/,n.A-- CERTITYTIIATTIIIS TESTJyrAS
PERFORMED IN ACCORDANCE W1TII ALL STATE AND MUNICIPAL GU U -LINES IN ErFECT 0141)115 DATE. DATE: /0 J' 6/0 7
�
4
t S&S
EnglneeRinq
TEMPI AUTHORITY
APPROVALS
SEWER E. WATER
MAIN EXTENSIONS
SEWER a WATER
NSPECTICN
ENGINEERING STUDIES
AND REPORTS
WEU INSPECTION
l FLOW TEST
SITE PLANS
ROAD DESIGN
SOIL TEST
PERCOLATION
TEST
STRUCTURAL &
MECIAMCAL
INSPECTIONS
ONSITE
WASTEWATER
DEPC6ALSYSTEM
MEN
ROBERT C. COWAN
CIVIL ENGINEERING
PN: 907-694-2979
FAX: 907-694-1211
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION PRACTICES
and
MATERIAL SPECIFICATIONS
REFERENCE: Lot 2; Block 2; Raven MTN Estates Subdivision #1
August 13, 2008
GENERAL:
1. The scope of this project includes the installation of a new 1000 gallon IIDPE
septic tank and a septic trench to serve the proposed three bedroom residence
located on the referenced property.
2. Construction shall be in accordance with the approved site plan and design
drawings, Municipal permit with any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal Regulations.
3. The contractor shall be responsible for obtaining any necessary underground
utility locates.
4. Unless specifically agreed otherwise, the property owner shall be responsible
for final grading areas subsequently depressed from soil settling.
5. Contractors installing wastewater disposal systems must be certified by the
Municipal Development Services Department or ADEC if required, for
system installations. Owners installing their own systems must also receive
prior approval from the respective agency.
SEPTIC TANK INSTALLATION:
1. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shall include two 4" cleanouts for pumping access. All EIDPE
septic tanks are required to have a 4" monitoring pipe installed next to the
tank extending to the bottom of the tank.
15861 S. Birchwood Loop Road - Chugiak, Alaska 99567
Page 2
Lot 2; Block 2; Raven MTN Estates Subdivision #1
August 13,2008
2. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank.
3. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade.
4. Septic tanks installed with less than 4 ft. of cover shall be insulated. All HDPE septic
tanks are required to be covered with a minimum of 2" direct burial insulation, and a
maximum of 4 feet of cover.
5. A foundation cleanout shall be installed one to four feet from the building foundation. In
the line between the tank and the leachfield there shall be two adjacent cleanouts (unless
an effluent pumping system exists within the septic tank). These cleanouts shall be
located on undisturbed soil not more than 10 ft. from the tank. The first cleanout, in line,
shall be to clean toward the leachfield. The second cleanout shall be to clean toward the
septic tank.
6. Final grading over the septic tank shall be such that a positive slope exists away from the
septic tank.
ABSORPTION TRENCII/DRAINFIELD INSTALLATION:
1. Excavate the proposed trench to the dimensions shown on the design. The bottom of the
excavation shall be within 2 inches of level. If the sidewalls of the excavation become
smeared, they must be raked or scratched (ruffed -up) before gravel (sewer rock)
placement.
2. Once the gravel is installed, the distribution pipe is to be installed level with the
perforations faced downward. Gravel is then to be placed over the distribution pipe to
provide a minimum of 2 inches of cover over the pipe.
3. A silt barrier must be installed between the final gravel layer and the native soil backfill.
Ensure the silt barrier covers the entire gravel surface before placing backfill.
4. Monitor tubes shall be of four (4) inch diameter, installed approximately in the locations
shown on the design, and extend a minimum of 12 inches above final grade. The portion
of the monitoring tube extending through the gravel shall be perforated from the bottom of
the trench to the invert of the distribution pipe. This is equivalent to the effective depth of
the gravel as noted on the design.
5. Backfill over the final gravel layer must not be less than twenty-four (24) inches.
Insulation must be installed when the backfill depth is less than thirty-six (36) inches. The
finish grade over the trench must be mounded to prevent the formation of a depression
after settling.
Page 3
Lot 2; Block 2; Raven MTN Estates Subdivision #1
August 13, 2008
MINIMUM MATERIAL SPECIFICATIONS:
1. Any septic tank proposed for installation must be constructed by a Municipal approved
septic tank manufacturer.
2. The following pipe materials are approved for use in septic system installations in the
Municipality of Anchorage:
Type of Pipe Perforated Solid
Cast Iron Yes Yes
ASTM D3034 (PVC) Yes Yes
ASTM F810 (HDPE) Yes No
ASTM D2662 (ABS) Yes Yes
Use of a type of pipe other than listed above must be approved by the inspecting engineer.
3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical
Company Styrofoam III or equal).
4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Femco, or
equal).
5. A permeable nontoxic silt barrier (Typar 3401, Miran 140N, or equal) must be installed
between the final Ieachfeld gravel layer and the native soil backfill.
6. All Ieachfield gravel (sewer rock) shall be 0.5"-2.5" screened gravel with less than 3%
passing the #200 sieve.
7. When sand is being used as a filter material, its gradation specifications must conform to
current M.O.A. or D.E.C. requirements, which ever requirement applies.
Page 4
Lot 2; Block 2; Raven MTN Estates Subdivision #1
August 13, 2008
INSPECTIONS:
Typically there will be a minimum of three (3) inspections required during the installation of the
wastewater disposal system. These inspections will occur as follows:
1. The first inspection must be conducted after the excavation of ditches, pits,
trenches, or beds and before the installation of any gravel. A septic tank may be
set in place, but may not be backfilled before this inspection.
2. The second inspection must be conducted after the placement of the silt barrier,
gravel, distribution lines, standpipes, cleanouts, and insulation, but before the
placement of any other backfill.
3. The final inspection is to occur upon final grading of the property.
Often there will be more than these 3 inspections required. Especially with the installation of
multiple trenches, sand filters, pressurized distribution systems, etc. Thus, the inspecting engineer
is to be contacted at least 24 hours prior to the start of construction. If necessary, a pre -
construction meeting will take place on-site. The inspecting engineer will not coordinate, direct or
control in any way the contractors activities.
The owner shall contract with the contractor to perform the work outlined in these specifications
and plans and in accordance with the attached M.O.A. permit. There will be no contractual
arrangement existing between the contractor and S & S Engineering. S & S Engineering shall be
the owner's representative and will inspect the work as stated above to document the contractors
activities. Final acceptance of the contractors work rests with the owner and the M.O.A.
S & S Engineering shall have no liability to the owner or to others for acts or omissions of the
contractor or any other persons performing work on this project or the failure of the contractor to
carry out the work in accordance with these construction documents. S & S Engineering's
inspecting engineer will not be responsible for the construction means, methods, techniques,
sequence, procedures or the safety precautions incident to this project.
CONTRACTOR / INSTALLER
SEP -26-2008 10:20 FROM:RLYESKR RESORT FRCIL 907 754 2291
Matthew C. Parisen
Y.O. Box 157
Girdwood, AK 99587
907-317-3329
September 25, 2008
Municipality of Anchorage
Development Services Division
On -Site Water and Wastewater Program
4700 South Bragaw Street
P.O. Box 196650
Anchorage, AK 99519-6650
TO:907 343 7997 P.2'2
Re: My Permit H SW080177 for Parcel ID 076.031-02, issued Aug. 20, 2008
Dear Sir or Madam:
This is to inform you that, in reference to thc above -referenced wastewater system
installation permit for my lot in Girdwood, 1 wish to avail myself of the "owner
installation" option.
I will be present for the entire installation of the septic system. The excavator will be
rented from Airport Rentals on Old Seward Highway, and the operator will be Dan Sill of
Girdwood. His career is operating excavation equipment, and Hs most recent operator
experience was the installation of the septic system at Greg Anderson's at mile 100 on
Seward IIighway. Also, I was thc supervisor at a project at the Alyeska Resort in the
summer of 2007 at which he was the excavator operator on the installation of 38,000 feet
of 8" high pressure steel pipe and 6" HDPE sewer pipe.
As stated in the permit, the project will be periodically inspected by an engineer from
S&S Engineering, the system designer.
Sincerely,
Matthew C. Purism
Owner
?/2 a/9