Loading...
HomeMy WebLinkAboutRAVEN MOUNTAIN ESTATES #1 BLK 2 LT 2Raven Mountain Estates #1 Block 2 Lot 2 #076 - 031 - 02 Municipality of Anchorage Development Services Department Building Safely Division On-Sife Water and Wastewater Program, 4700 S. Bragaw SI. P.O. Box 196650 Anchorage, AK 99519-6650 www.cl.anchor ge.al .us (907) 343-7904 Page ± of 3 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT Permit Number: -SW O%O iq-} Name Address: MtpTT fRRtSENt Q. o , 6.ok 154- - [araw:5-1109la+ Phone: CA0� 3 (4. •, G Lag - Number or Batlrooms: LEGAL DESCRIPTION Block: Lol: Subdivision: 7 Township: 2 KAUErS M'i. C-SzP-'€5 Range: Basilan: Well: Classification (Private, ?R.IUAT Driver Yield: 1 From 5 New 0 Upgrade GA, B. CU TeIM gaPlh: yh Cued to FI. jG I,2.FI. bawl paOle leC: /D� Slagc Weber Le. Fl. GPMIPump Sal al: �iJy(//��(r(�/, Casing Height Abovoovv_eGrGround: -(iA. — Ft,I a//,rf G rt. SEPARATION DISTANCES To Septic Tank Absorption) Lift Field Station PID Number: C' lo- 63t- 6 Z Wastewater System: i9 New ❑ Upgrade ABSORPTION FIELD 0 Deep trench Shallow Trench 0 Bed ❑ Mound 0 011ier Sot Rating: 0 k O GPD/FI° Depth to pipe bolbom from original armies 0.2 Ft. Fill added above original grade: 4, 'to -4.% Total Depth from original grade: Gravel depth beneath pipe. J FI. FI. Gravel Length: Gravel width: Total abaernnan area: fasten[ �W NEPA FI. 563 Fe Number of lines: 4- tpD rt. Distance between lines: FI. Plrya Malarlak ASlIn 1)3(334i F214.0 Dale lnslalled: TANK Septic 0 Holding D S.T.E.P. Holding Tublic/Privale Tank Sewer Line Well Surface Water lol line Foundallon Curlain Drain loo's io0'+J — 1061+ loo+ W Remarks: ASC3ultr1 SUR\]E,Lr /I NEE.D`D %c, VEPvty. (JL jf1SAsuRWvICWIS (SRA {14{'pai py Manuladuros RF.E IZ Material: lib PE LIFT STATION Size: factures Gal CZ D Other: ,C(apacity. loon Gal Number of Compartments 2 'Pump on' level at: 'Pump off level al: Mali weber alarm al: Pump Make & Model Elealdcal Inspections performed by: Lucallon and Description: BENCH MARK In ToP of WEue Assumed Elevation SOO FI Inspections performed by: E Dates: 1s1 9- 34- o$ Chugiak, Alaska 99567 2nd -L8-a Development Services �/Department �Approval Reviewed and approved by/ " "( Date: V-73/11/ -1� (Rev. Iinr Engineer's Stamp siggisittli i 4 44 '4" •e«..... 04s 4 /. a PERMIT ND SW080177 PAGE 2 OF 3 Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 • Anchorage, Alaska 99519-6650 • Telephone: 343-4744 On—Site Wastewater Disposal System and/or Well Inspection Report LEGAL LOT 2,BLOCK 2, RAVEN MOUNTAIN ESTATES S/D g1 P.I.D. ND. 076-031-02 LOT 3� UNDEVELOPED i LOT 1 cUNDEVELOPED- SCALE 1 = 50' eTH1 & 2 Cy \ 38' 22' 0' NEW 1000 GAL. HOPE TANK ,. 8' Z PROPOSED ` < 3 BEDROOM \ '� ` HOUSE A i tt (AP Lo CA PERMIT No. SW080177 PAGE 3 OF 3 Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 s Anchorage, Alaska 99519-6650 • Telephone: 343-4744 On—Site Wastewater Disposal System and/or Well Inspection Report LEGAL LOT 2, BLOCK 2, RAVEN MOUNTAIN ESTATES S/D #1 P.I.D. N0. 076-031-02 / FINAL GRADE ST2=109.0' INSULATION TOP OF TANK = 105.0' C01 MT2 CO2 MT1 co1 = 104.1' 1CO2 = 104.1' FINAL GRADE 2" INSULATION . ! C01 = 108.6'3 CO2 = 108.7' OUTLET -104.0' MT2 = 10 SCALE NTS 1 MT1 = 100.9' s WATER FOUND AT 93.4' 88.9'= B.O.H. Ga.v$ F4.eec- ftvnbtrs eLYe ee✓SLoL. 8'-23-0- T,P, Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Section 4700 South Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 www.muni.org/onsite (907) 343-7904 Attention: Propd'rty owner shall provide a well log to the DSD within 60 days of well completion. Permit Number:SW080177 Date of Issue: Aug / 20 / 2008 Parcel Identification Number: 076 -031 -02 Is well located at approved permit location? ( x) Yes or ( ) No Ile Drilling, Inc. Well Log Water Weir Drafty anfPunf Service Anchorage, A(us&ta (907) 345- )593 Drilling Started:10/ 22 2008contpleted: 107_23:2008 City'Borongh. Subdivision: BLOCK LOT Prupenv Owner Natne & Address: Matt Parisen Girwood Raven Mnt. Esti 2 2 P.O. Box 157 Site:126 Muddy Dog Circle Girdwood, AK 99587 Meridian Township Range Section tVa of IA of _ _ 74 of _ _'A BOREHOLE DATA(from top of casing)Bepth Drilling method: (X ) Air rotary. ( ) Cable tool, Other Material: Type, Color & wetness From To Well use: ( )Public supply, (x i Domestic. Other stickup 0 2 Depth of hole: 82 f1, Casing stickup: 2 ft Casing type:steel Thickness: .250 inches 2 8 _ _ Casing diameter: 6 inches Casing depth: 82 ft gravel pad Liner type: - Diameter: - inches Depth: - fl Static water (from top of casing): 63 ft on 10 _23 :2008 silt & gravel 8 40 Pumping level Sc. yield: fret atter hours at gpm _ Recovery rate: 5 gpm, Method of testing: airlift moist clay 40 52 Development method: airlift Duration: 1 hour clay w/ rock 52 76 Well intake opening type: (X) Open end. ( ) Open hole, Other Screened: Start: - ft, Stopped ____ _ _ ft wet clay & rock 76 78 _ Screen type: - Slot/mesh size: - Perforated: Stan: - ft. Stopped: - ft gravel w/ H2O 78 82 Start: - ti. Stopped: - ft Note: Grout type: bentonite Volume - Depth; from ground surface . to 20____,._ _ Pump intake depth: ft Pump size: hp. Brand name: Was well disinfected upon completion? (x) Yes, ( ) No Method ofdisinfectiomCalcium.Hypochlorite.(Chlorine)._. Driller comments/ disclaimers- Welt driller name: Johnny Company name: Hefty Drilling, Inc. Mailing address- 3540 Akula Dr. City: Anchorage State: AK Zip 99516 Phone number : ( 907 345 - 0593 fax:345-4700 Drillers signature: Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Section 4700 South Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 www.muni.org/onsite (907) 343-7904 Attention: Propd'rty owner shall provide a well log to the DSD within 60 days of well completion. Permit Number:SW080177 Date of Issue: Aug / 20 / 2008 Parcel Identification Number: 076 -031 -02 Is well located at approved permit location? ( x) Yes or ( ) No RUG -31-201E 08:21P FROM: TO:3437997 P.1/1 Pump Installation Log G'rdiu4 WrMil A 114UV %IQ �°���'".C5�,1 lA IA,(,, = T*? Orr C.ab.%n5 Afio14 GROUND „„0 NAME: OATS: Pitkas Adapter Manufacturer's Name: Ce14' 04 // tb r Pitless Adapter installer: 1,40447 /4/5 PUMP TYPE )1,14701445'64. MACE i 14000. ' C, � �Jo SERIALt- New — Motor DROP MID Tips PY - i/` DmtCn �p POKER CARE: Tme ) A.�✓�'., l Sia � 2 /� Ml at( raiditini /je.✓' ELECTRICAL: Vas ,.st ciU — 43,U WATER TAW rip ✓y O i til, 4v 64 a CASIO Sao Col 1 lis. T)pe s ` eei USED MU: from v To ea ' INTAKE SRUCIURE; Tip. Fran To OP D1 NOTE: From COSENTS: well was disinfected upon completion. method: calcium hypochlorite, q-(efty Drilling, am Water welianct Pumy Service Anchorage, Alaska (907) 345-0593 .4 LOT 2 HAS 56,131 SQ.FT. OF AREA 2.11% OF THE LOT IS COVERED. hr 30.0' FIUND IRON Pipe o I/o' 0i s5/' 11 Utility Esmt / Septic pipe " ) /"..,-- . FOUND IRON PIPE .00 eptic pipes Septic pipes co S 0002330" W HOUSE DETAIL 1"=30' °WELL FOUND IRON PIPE FOUND MONUMENT S 89°2115"W 105.90' GRAPHIC SCALE: 1 Inch = 60 Feet 3o 1S 6 lb 30 60 VERTICAL DATUM ASSUMED 120 FOR: Little Bear Services 2941 Carriage Drive Anchorage, Alaska 99507 (907) 950-5541 Date 7/26/12 Scale 1"=60' Grid SE4018 AS—BUILT Legal Description Lot 2 Block 2 Drawn by BFB Field Book RAVEN MTN. ESTATES #1 SUBDIVISION I hereby certify that the property described hereon has been surveyed by me, or at my direction, and that the improvements situated thereon are within the property lines and do not overlap or encroach on the property lying adjacent thereto unless otherwise shown. That no improvements on the property lying adjacent thereto encroach on the premises in question and that there are no roadways, transmission lines or other easements on said property except as shown. It is the responsibility of the owner or builder, prior to construction, to verify proposed building grade relative to finish grade and utility connections and to determine the existence of any easements, covenants, or restrictions which do not appear on the recorded subdivision plat. Listed distances prevail over scaling. Reproduction may cause distortion. SGS Ref.# Client Name Project Name/# Client Sample ID Matrix 1123065001 Residential Testing -Cash Account 126 Muddy Dog Circle 126 Muddy Dog Circle Drinking Water Printed Date/Time Collected Date/Time Received Date/Time Technical Director 07/24/2012 13:28 07/17/2012 13:20 07/17/2012 17:00 Stephen C. Ede Sample Remarks: Parameter Results LOQ Units Method Allowable Prep Analysis Container ID Limits Date Date Init Metals by ICP/M3 Hardness as CaCO3 Waters Department Total Nitrate/Nitrite-N Microbiology Laboratory E. Coli Total Coliform Private Individual Analysis Alkalinity Aluminum Antimony Barium Cadmium Calcium Chloride Chromium CO3 Alkalinity Conductivity Copper Fluoride HCO3 Alkalinity Iron Lead 73.8 5.00. mg/L SM21 23408 C 1.03 0.100 mg/L SM214500NO3-F B Negative Negative 1 1 100mL SM21 9223B A 100mL 8M21 9223B A 07/18/12 07/19/12 NRB 07/19/12 CMA 07/17/12 DLC 07/17/12 DLC 64.4 10.0 mg/L SM21 23208 D 07/18/12 SDP 6.637 20.0 ug/L EP200.8 C 07/18/12 07/19/12 NRB ND 1.00 ug/L EP200.8 C (<6) 07/18/12 07/19/12 NRB 4.74 3.00 ug/L EP200.8 C (<2000) 07/18/12 07/19/12 NRB ND 0.500 ug/L EP200.8 C (<5) 07/18/12 07/19/12 NRB 26400 500 ug/L EP200.8 C 07/18/12 07/19/12 NRB 0.365 0.100 mg/L EPA300.0 D (<250) 07/18/12 07/18/12 SDP 0.9223 2.00 ug/L EP200.8 C (<100) 07/18/12 07/19/12 NRB ND 10.0 mg/L SM21 23208 D 07/18/12 SDP 156 1.00 umhos/cm SM21 2510B D 07/18/12 SDP 7.85 1.00 ug/L EP200.8 C (<1300) 07/18/12 07/19/12 NRB 0.05503 0.100 mg/L EPA 300.0 D (<2) 07/18/12 07/18/12 SDP 64.4 10.0 mg/L SM2I 2320B D - 07/18/12 SDP ND 250 ug/L EP200.8 C (<300) 07/18/12 07/19/12 NRB 0.311 0.200 ug/L EP200.8 C (<15) 07/18/12 07/19/12 NRB SGS Refit Client Name Project Name!# Client Sample ID Matrix 1123065001 Residential Testing -Cash Account 126 Muddy Dog Circle 126 Muddy Dog Circle Drinking Water Printed Date/Time Collected Date/Time Received Date/Time Technical Director 07/24/2012 13:28 07/17/2012 13:20 07/17/2012 17:00 Stephen C. Ede Parameter Results LOQ Units Method Allowable Prep Analysis Container ID Limits Date Date Init Private Individual Analysis Magnesium Manganese Nickel 011 Alkalinity PH Selenium Silver Sodium Sulfate Total Dissolved Solids Zinc Arsenic Thallium 1900 3.72 1.137 ND 7.50 ND ND 1860 5.93 78.0 3.021 ND ND 50.0 ug/L 1.00 ug/L 2.00 ug/L 10.0 mg/L 0.100 pH units 5.00 ug/L 1.00 ug/L 500 ug/L 0.100 mg/L 10.0 mg/L 5.00 ug/L 5.00 1.00 EP200.8 EP200.8 EP200.8 SM21 2320B SM21 4500-11B EP200.8 EP200.8 EP200.8 EPA 300.0 SM21 2540C EP200.8 ug/L EP200.8 ug/L EP200.8 C 07/18/12 07/19/12 NRB C (<50) 07/18/12 07/19/12 NRB C (<100) 07/18/12 07/19/12 NRB D 07/18/12 SDP D (6.5-8.5) 07/18/12 SDP C (<50) 07/18/12 07/19/12 NRB C (<100) 07/18/12 07/19/12 NRB C (<250000) .07/18/12 07/19/12 NRB D (<250) 07/18/12 07/18/12 SDP D (<500) 07/20/12 JSK C (<5000) 07/18/12 07/19/12 NRB C (<10) 07/18/12 07/19/12 NRB C (<2) 07/18/12 07/19/12 NRB MUNICIPALITY OF ANCHORAGE Development Services Department On -Site Water 8 Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM 1 WATER SUPPLY PERMIT Initial Date Issued: Aug 20, 2008 Expiration Date: Aug 20, 2009 Permit Number: SW080177 Parcel ID: 076-031-02 Legal Description: RAVEN MOUNTAIN ESTATES #1 BLOCK 2 LOT 2 S t Address: 126 MUDDY DOG CIRCLE Design Engineer: 0003 S & S ENGINEERING Lot Size: 56131 SQ. FT. Owner Name: MATT PARISEN Permit Bedrooms: 3 Owner Address: PO BOX 157 Total Bedrooms: 3 GIRDWOOD , AK 99587 - This permit is for the construction of: Q Disposal Field ❑✓ Septic Tank ❑Holding Tank 0 Privy ❑ Private Well 0 Water Storage All construction must be In accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ). 3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. Glad (os : Yosk►; Ca tit 'IAA A Clutnvt of •frQf irws • kW -JR P1/41 • '.tIJ vwved MI , I 'Id dI%t3wider 4tvtd J 7led. ate Received By. Issued By c14410 gdejazn Date: 4e Date: O 4t7/On Parcel I.D. Municipality of Anchorage Development Services Department Building Safety Division On -Site Water and Wastewater Program 4700 Elmore Road P.O. Box 196650 Anchorage, Alaska 99507 www.muni.org/onsite (907) 343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FORA SINGLE FAMILY DWELLING ham -(W-0 Property owner(s) MATT PARiSI;PJ 11 Mailing address PO BOx 157 (trd> lel, AC Zip Code 99587 Site address lap m u n 03 DOS, t JR. Zip Code Legal description (Sub'd., Block & Lot) LOT 2. BLOCK 2. RAVEN MOUNTAIN ESTATES S/D #1 Legal description (Township, Range & Section) Lot Size 510 , jai Sq. Ft. Number of Bedrooms 3 Day phone 907-317-2239 THIS APPLICATION IS FOR (® all that apply): Absorption Field Septic Tank Holding Tank Privy Private Well Water Storage 0 THIS APPLICATION IS AN: Initial Upgrade Renewal 0 0 I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. 2i,e2 (Signature of property owner or authorized agent) Permit/Rush Fees Date of Payment: Receipt Number. (Rev. 11/05) $/73-2-9, / G O. `° Waiver Fees: 1,1rr/O 8 I 16433 Pmv1/4/ Date of Payment: Receipt Number: • T'A,S&S EngIneeMing NEAIm AUTHORITY APPRCP/ALS SEWER & WATER LAIN UTENSIONS SEWER & WATER INSPECTION ENGINEERING STUDIES Ano REPORTS WEU INSPECTION & FLOW TEST SITE PLANS ROAD DESIGN SOIL TEST PERCOLATION TEST STRUCTURAL& MECNWNICAL ISPECR016 ON SITE WASTEWATER DISPOSALSYSTEM DESIGN ROBERT C.COWAN . CIVIL ENGINEERING PH: 907.694.2979 FAX: 907.694-1211 August 13, 2008 MUNICIPALITY OF ANCHORAGE Development Services Department P.O. Box 196650 Anchorage, AK 99519 REFERENCE: Lot 2, Block 2, RAVEN MTN ESTATES S/D 141 It is requested that you issue a permit to install a new septic system and well to serve the proposed three bedroom house on the referenced property. A test hole was excavated and a percolation test performed. The approximate location of the test hole is located on the attached site plan. At the time of excavation (10/16/2007) water was found at 10.5 feet. After seven days of monitoring, ground water was found at 10.5 feet. We do not anticipate any adverse effects on neighboring wells, septic systems, reserve areas or drainage patterns by the installation of the proposed septic system. The construction of this system will not prevent any future development on any of the adjacent properties. If you require additional information, please contact us. Sincerely, Robert c. cesdithi P.E. RAS/elle Enclosure 15861 S. Birchwood Loop Road - Chugiak, Alaska 99567 L 0 ro 0 00CO 0 J J 0 NOIS3O NVld-311S L- 0 M 00 O CO03 U J J 0 < W -J L< 0 a a 4.1 O 03/ M 3113021d NDIS30 4 C i, 01 = 1 Performed For: Legal Desaiplion: 1- 2- N:. • 5- 6- 7- 8- 9- 10- 11- 12 13- 14- 15 16- 17- 18 - 19- 20 - Depth (Feel] O a 6:1 ,C. e: Lid o: QS '20:6 •e1: •rf oP-: COMMENTS • Municipality of Anchorage Development Services Department Building Safely Division On -Site Water and Wastewater Program 4700 South Dragnw SI. P.O. Cox 196650 Anchorage. AK 995196650 www.munl orglonsiln (907) 343-7904 s Log - Percolation Test r (EIJGII Fop y ROBERT C. COWAN W mac\ CE -8801 • f •Ci' sr �,,`O fit t` Dale Porto red: l.oT2',15Leal'1 RIi1,'E11) t'iTownship, Range. Section: Slope —Cm WAS GROUND WATER • . ENCOIJIIIERED7 4th Sr r l IF YES. AT WWIAT DEPTH? Io, s OL Depth Monitoring? 11or IDI Si E — S7'/Fiy Site Plan Reading Dale Groes Time Nnl Time Dopet to Water NM Drop cMefK 10/16/09 ,,watts iWcif all 30 30 51/1" 3% 7' 30 60 5%¢" S% a" 30 40 5" S'I 2-" 3 0 /7,0 gag," 2-14" zr' 30 /GO 'J%" q'S/b" 2'Va." g'`/rb' 2-" -;7O / a U PERCOLATION RATE /Or .1 ar++nrrendq 4 PERC IIOLE D AMC IER TEST RIRJ BETWEEN '5 FT AND ' FT oo � PERFORMED BY: S A- 5 tric-i itUtrtic. 1 II �/,n.A-- CERTITYTIIATTIIIS TESTJyrAS PERFORMED IN ACCORDANCE W1TII ALL STATE AND MUNICIPAL GU U -LINES IN ErFECT 0141)115 DATE. DATE: /0 J' 6/0 7 � 4 t S&S EnglneeRinq TEMPI AUTHORITY APPROVALS SEWER E. WATER MAIN EXTENSIONS SEWER a WATER NSPECTICN ENGINEERING STUDIES AND REPORTS WEU INSPECTION l FLOW TEST SITE PLANS ROAD DESIGN SOIL TEST PERCOLATION TEST STRUCTURAL & MECIAMCAL INSPECTIONS ONSITE WASTEWATER DEPC6ALSYSTEM MEN ROBERT C. COWAN CIVIL ENGINEERING PN: 907-694-2979 FAX: 907-694-1211 ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION PRACTICES and MATERIAL SPECIFICATIONS REFERENCE: Lot 2; Block 2; Raven MTN Estates Subdivision #1 August 13, 2008 GENERAL: 1. The scope of this project includes the installation of a new 1000 gallon IIDPE septic tank and a septic trench to serve the proposed three bedroom residence located on the referenced property. 2. Construction shall be in accordance with the approved site plan and design drawings, Municipal permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 3. The contractor shall be responsible for obtaining any necessary underground utility locates. 4. Unless specifically agreed otherwise, the property owner shall be responsible for final grading areas subsequently depressed from soil settling. 5. Contractors installing wastewater disposal systems must be certified by the Municipal Development Services Department or ADEC if required, for system installations. Owners installing their own systems must also receive prior approval from the respective agency. SEPTIC TANK INSTALLATION: 1. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. All EIDPE septic tanks are required to have a 4" monitoring pipe installed next to the tank extending to the bottom of the tank. 15861 S. Birchwood Loop Road - Chugiak, Alaska 99567 Page 2 Lot 2; Block 2; Raven MTN Estates Subdivision #1 August 13,2008 2. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank. 3. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 4. Septic tanks installed with less than 4 ft. of cover shall be insulated. All HDPE septic tanks are required to be covered with a minimum of 2" direct burial insulation, and a maximum of 4 feet of cover. 5. A foundation cleanout shall be installed one to four feet from the building foundation. In the line between the tank and the leachfield there shall be two adjacent cleanouts (unless an effluent pumping system exists within the septic tank). These cleanouts shall be located on undisturbed soil not more than 10 ft. from the tank. The first cleanout, in line, shall be to clean toward the leachfield. The second cleanout shall be to clean toward the septic tank. 6. Final grading over the septic tank shall be such that a positive slope exists away from the septic tank. ABSORPTION TRENCII/DRAINFIELD INSTALLATION: 1. Excavate the proposed trench to the dimensions shown on the design. The bottom of the excavation shall be within 2 inches of level. If the sidewalls of the excavation become smeared, they must be raked or scratched (ruffed -up) before gravel (sewer rock) placement. 2. Once the gravel is installed, the distribution pipe is to be installed level with the perforations faced downward. Gravel is then to be placed over the distribution pipe to provide a minimum of 2 inches of cover over the pipe. 3. A silt barrier must be installed between the final gravel layer and the native soil backfill. Ensure the silt barrier covers the entire gravel surface before placing backfill. 4. Monitor tubes shall be of four (4) inch diameter, installed approximately in the locations shown on the design, and extend a minimum of 12 inches above final grade. The portion of the monitoring tube extending through the gravel shall be perforated from the bottom of the trench to the invert of the distribution pipe. This is equivalent to the effective depth of the gravel as noted on the design. 5. Backfill over the final gravel layer must not be less than twenty-four (24) inches. Insulation must be installed when the backfill depth is less than thirty-six (36) inches. The finish grade over the trench must be mounded to prevent the formation of a depression after settling. Page 3 Lot 2; Block 2; Raven MTN Estates Subdivision #1 August 13, 2008 MINIMUM MATERIAL SPECIFICATIONS: 1. Any septic tank proposed for installation must be constructed by a Municipal approved septic tank manufacturer. 2. The following pipe materials are approved for use in septic system installations in the Municipality of Anchorage: Type of Pipe Perforated Solid Cast Iron Yes Yes ASTM D3034 (PVC) Yes Yes ASTM F810 (HDPE) Yes No ASTM D2662 (ABS) Yes Yes Use of a type of pipe other than listed above must be approved by the inspecting engineer. 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Company Styrofoam III or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Femco, or equal). 5. A permeable nontoxic silt barrier (Typar 3401, Miran 140N, or equal) must be installed between the final Ieachfeld gravel layer and the native soil backfill. 6. All Ieachfield gravel (sewer rock) shall be 0.5"-2.5" screened gravel with less than 3% passing the #200 sieve. 7. When sand is being used as a filter material, its gradation specifications must conform to current M.O.A. or D.E.C. requirements, which ever requirement applies. Page 4 Lot 2; Block 2; Raven MTN Estates Subdivision #1 August 13, 2008 INSPECTIONS: Typically there will be a minimum of three (3) inspections required during the installation of the wastewater disposal system. These inspections will occur as follows: 1. The first inspection must be conducted after the excavation of ditches, pits, trenches, or beds and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled before this inspection. 2. The second inspection must be conducted after the placement of the silt barrier, gravel, distribution lines, standpipes, cleanouts, and insulation, but before the placement of any other backfill. 3. The final inspection is to occur upon final grading of the property. Often there will be more than these 3 inspections required. Especially with the installation of multiple trenches, sand filters, pressurized distribution systems, etc. Thus, the inspecting engineer is to be contacted at least 24 hours prior to the start of construction. If necessary, a pre - construction meeting will take place on-site. The inspecting engineer will not coordinate, direct or control in any way the contractors activities. The owner shall contract with the contractor to perform the work outlined in these specifications and plans and in accordance with the attached M.O.A. permit. There will be no contractual arrangement existing between the contractor and S & S Engineering. S & S Engineering shall be the owner's representative and will inspect the work as stated above to document the contractors activities. Final acceptance of the contractors work rests with the owner and the M.O.A. S & S Engineering shall have no liability to the owner or to others for acts or omissions of the contractor or any other persons performing work on this project or the failure of the contractor to carry out the work in accordance with these construction documents. S & S Engineering's inspecting engineer will not be responsible for the construction means, methods, techniques, sequence, procedures or the safety precautions incident to this project. CONTRACTOR / INSTALLER SEP -26-2008 10:20 FROM:RLYESKR RESORT FRCIL 907 754 2291 Matthew C. Parisen Y.O. Box 157 Girdwood, AK 99587 907-317-3329 September 25, 2008 Municipality of Anchorage Development Services Division On -Site Water and Wastewater Program 4700 South Bragaw Street P.O. Box 196650 Anchorage, AK 99519-6650 TO:907 343 7997 P.2'2 Re: My Permit H SW080177 for Parcel ID 076.031-02, issued Aug. 20, 2008 Dear Sir or Madam: This is to inform you that, in reference to thc above -referenced wastewater system installation permit for my lot in Girdwood, 1 wish to avail myself of the "owner installation" option. I will be present for the entire installation of the septic system. The excavator will be rented from Airport Rentals on Old Seward Highway, and the operator will be Dan Sill of Girdwood. His career is operating excavation equipment, and Hs most recent operator experience was the installation of the septic system at Greg Anderson's at mile 100 on Seward IIighway. Also, I was thc supervisor at a project at the Alyeska Resort in the summer of 2007 at which he was the excavator operator on the installation of 38,000 feet of 8" high pressure steel pipe and 6" HDPE sewer pipe. As stated in the permit, the project will be periodically inspected by an engineer from S&S Engineering, the system designer. Sincerely, Matthew C. Purism Owner ?/2 a/9