Loading...
HomeMy WebLinkAboutROBIN HILL #1 BLK 2 LT 1Robin Hills #1 Block 2 Lot 1 #017-442-05 Conditional Approval Expired. When house built need Swing ties and pump log and H2O samples Municipality of Anchorage Development Services Department Building Safety Division On-Site Water and Wastewater Program, 4700 Elmore St. P.O. Box 196650 Anchorage, AK 99519-6650 Page I of www.ci.anchorage.ak.us (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT Permit Number: Sw G90 (e 2 PID Number: 017 - Yy 2 - LIS- Name: Pt4-t r /1 a!G If Wastewater System: ® New ❑ Upgrade Atltlress' 62GG Nenetna Place ABSORPTION FIELD Phone: Number of Bedroom$: 5-i5_Z- LZ 'LZ I$Deep Trench p Shallow Trench O Bed ❑ Mound ❑ Other: LEGAL DESCRIPTION Soil Rating: I.&/S- GPD/FF Total Depth from original grade: Iu.S- Ft. Block: Lot. Subdivision: Depth to pipe bottom from original grade: Gravel depth beneath pips: �j �y 2 1 I`3061.1 17r I1 T / 0•9 Ft. FL Township: Range: Section: Fill added above original grade: Gravel Length'. 02.s, Fl. S / Fl. Well: ® New El Upgrade Gravel width: 2. S Number ofhriev I Distance between lines: Ft. Fl. Classification (Private, A, B. C): Total Depth: Cased to. Total absorption area: Pipe Material: D .3 It✓G� 2d6 Fl. I 137- FL 1020 Flt Duller A( Date Dnlled: Slabc Water Level: Installer: Eu 1e Glc4tytr ax. Date Installed'. /U/7S/G9 1ne (6/01/0,91IZ1 FL Yield: Pump Set al: Casing Height Above Ground: TANK 6 GPM F I.s + FL SEPARATION DISTANCES IS Septic ❑ Holding ❑ S.T.E.P. ❑ Other: To Septic Absorption Lift Holding ublic?Pdvate Manufacturer Capacity: From Tank Field Station Tank Sewer Line #+,%e ra %Qq Ic 160d Gal. wall x 13V' 176' 2S' Materiel'. Number of Compartments: surfacewater > 1e,6 f ) Ivo' _ _ LIFT STATION Size : a acturec Lot Line .�.. Iai • ^ • _ _ Gal. /'vi 'Pump on' level at: 'Pump OW level at: High water alarm at Foundation 76 • r 9G' — _ in, in. in. Pump Make & Model Electrical Inspections performed by: Curtain Drain - - �- Remarks: F keds cva not .. aF /-arq� of sr fz' BENCH MARK Location and Description: t�rkr(f..fro., Nuil 1n ht�c% 1-+-�e a.� lut�,ho•, Assumed Elevation: .S/1 CALW^ c, Z /(�.� FI. Engineer's Stamp Inspections performed by: F (uf6,,P %tcl, S-e- Dates: 151 1. / IY /09 2nd 16 / IS /a9 w`ee�e%�* r'� fir A @ . Developm nt Services De artment Approval AV l' '""�' � ;. Conditional Approval U. Date: J :2.3-/2- 01 `fix%;/`'1 9I •. THEC' Reviewed and approved by: 1 �X Date I z/37/0,9 (Rev. 04/06) h ` t►l,6{� Municipality of Anchorage f a i4 Development Services Department Building Safety Division - On -Site Water and Wastewater Program, 4700 Elmore St. P.O. Box 196650 Anchorage, AK 99519-6650 Page I of - www.ci.anchorage.ak.us (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT Permit Number: TW 09018 2 PID Number: 01 T - YY 2 - as Name: Ref-er Aalelf Wastewater System: ®New E] Upgrade Address: 6200 Nenetna P(ac� ABSORPTION FIELD Phone: SG L-' 2-77 2Z Number of Bedrooms: 19 Deep Trench 0 Shallow Trench 0 Bed 0 Mound 0 Other: LEGAL DESCRIPTION Soil Rating: G•yS Total Depth from original grade: GPD/Ft` IV.r Ft. Block: Lot: yp� '2 I /Subdivision: .y� Depth to pipe bottom from original grade: Gravel depth beneath pipe: (IOgM 0,11 �r / 0•9 Ft. Ja•G Ft. Township: Range: Section: Fill added above original grade: Gravel Length: 2. r Ft. S Ft. Well: New ® ❑Upgrade Gravel width: r� 2• Number of lines: Distance between lines: J Ft. I Ft. Classification (Private, A, B. C): TotalIDdIled: Cased to: Total absorption area: Pipe Material: �— 3G 3 Y r(✓ef-E 6 Ft. /3Z Ft. 1020 Fe Driller. t me Date 13/09 Static Water Level: I Z I Ft. Installer: Ear rP �rlutltr Ex, Date Installed: (U / IS -169 Yield: / Pump Set at: Casing Height Above Ground: TANK 61 GPM FL 1-;' + Ft. SEPARATION DISTANCES to septic ❑ Holding ❑ S.T.E.P. ❑ Other: To Septic Absorption Lift Holding ublic/Private Manufacturer: Capacrty: From Tank Field Station Tank Sewer Line A-^GRGrQ Tun Ac I& 06 Gal. Well ^.- I$7l' 170' — — 12.,f ( Material: S� Q� / Number of Compartments: 'L p Surface Water > 1&6 r ISI _ _ LIFT STATION W. /, Size: Manufacturer. Lot Line J64 Gal. rti. Foundation I -7e, , x 90' ,,,, "Pump on' level at: 'Pump ofr level at High water alarm at in. in. in. Curtain Drain — — Pump Make 8 Model Electrical Inspections performed by: Remarks: i -(nal /7o� nei ,.. aF tr.r4s of x4gA BENCH MARK Location and Description: I �x fu(Iair l7,& 'Noir to b,rclti f-r''ee 01 10Cc,/76n Assumed Elevation: •� SAC.tW , 1 o/f ` 1,0& it Ft. F (uffs�iJ %ick. ..Engineer's Inspections performed by:Dates: tat 10111Y1,09 S � Stamp 2nd 10 / Is lag 0""`"®e'°€ Develo m P nt Services De artment Approval PP r! l'1 ,. Conditional Approval PP / LU •�;'1Ti� Date: �1J j -/ r .,} ®> . , • ..... THEODORE F. MOORE n ` CE - 35£39 °4 Reviewed and approved by: Date: , v'•1 Z/3e( (Rev 04/06) i, Y PAG. LH 0*0000*7000000060 THEODORE F. MOORE i CE - 3589 .0* A A ��.00000 20F3 i � I HF�yq�q p 44cF SWING TIES: FROM: Pt. X T.H. #3 TO: S.T. C.O. "A" 36' 39' S.T. C.O. "B" 39.5' 33' DBL. C.O. "C" 42' 30' TR. M.T. "D" 71' 17' TR. C.O. "E" 98' 35' T.H. #2 ..X" 1000 -GALLON SEPTIC TANK 51' 51' -LONG SOIL ABS. TRENCH W. 10.0' EFFECTIVE GRAVEL Alpine Drilling & Enterprises Well Lag Permit Number: #SW090182 Date of Issue: 9-24-09 Parcel Identification Number: 017-442-05 Date Started: 10-2-08 Date Completed: 10-3-09 Is well located at approved permit location? x Yes ❑ No Legal Description: Robin Hills #1 Blk 2 Lot 1 Property Owner Name & Address: Peter Adolf 4900 Old Seward Highway Anchorage. Alaska 99503 Borehole Data: Soil Type, Thickness & Water Strata Depth (ft) From To Method of Drilling x air rotary ❑ cable tool Casing type: steel Stick-up 0 2 Wall Thickness:.25 inches Gravelly silt 2 38 Diameter: 6 inches Depth: 132 feet silt silty gravel 38 41 41 56 Liner Type: Diameter: inches Depth: feet Casing stickup above ground: _2 feet sandy silt 56 77 Static water level (from ground level): 121 feet silty gravel 77 114 Pumping level: 200 feet after gravelly silty sand bedrock 114 128 128 206 2 hours pumping 6 gpm Recovery Rate: 6 gpm Method of Testing: air !i —� Well Intake Opening Type: ❑ Open End x Open Bole H2O 138 146 ❑ Screened Start feet Stopped feet ❑ Perforations Start feet Stopped feet Grout Type: bentonite ranules Volume: 1 bg Depth: Start 0 feet Sto ? feet Pump: intake Depth feet Pump size hp Brand Name Well Disinfected Upon Completion? x Yes ❑ No Method of Disinfection: chlorine tablets Comments: Well Driller: Alpine Drilling & Enterprises PO Box 110496 Anchorage AK Alaska MUNICIPALITY OF ANCHORAGE Development Services Department On -Site Water& Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM I WATER SUPPLY PERMIT Renewal Permit Number: SWO90182 Date Issued: Sep 24, 2009 Expiration Date: Sep 24, 2010 Parcel ID: 017-442-05 Legal Description: ROBIN HILLS #1 BLOCK 2 LOT 1 Design Engineer: 0019 FLATTOP TECHNICAL SERVICES Site Address: 6200 NENANA PLACE Owner Name: PETER ADOLF Lot Size: 0 SO. FT. Owner Address: 4900 OLD SEWARD HIGHWAY Total Bedrooms: 0 Permit Bedrooms: 3 ANCHORAGE. AK 99503 - This permit Is for the construction of: 0 Disposal Field E Septic Tank ❑ Holding Tank ❑ Privy Private Well ❑ Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specked In Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations (18AAC80 ). 3, The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. Received Issued - / -3217. Date: 9 / 1-2 /69 Date: 2b4 \� Municipality of Anchorage 0 toe -Ce a<- L&V7_1 Development Services Department Site address Building Safety Division /✓Cn4na P <<.e -C On -Site Water and Wastewater Program 4700 Elmore Road P.O. Box 196650 Anchorage, Alaska 99507 www.muni.org/onsite (907)343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Parcel I.D. O r 7— Y V 2 - 0's Property owner(s) P -e b&— /}-G% !F Day phone S! 2-- 2.> 7- t Mailing address 4V900 0 toe -Ce a<- L&V7_1 Zip Code 9 9s -do s Site address 6'2-00 /✓Cn4na P <<.e -C Zip Code 9 9S 1 if, Legal description (Sub'd., Block & Lot) — J_y l� 13 Ile Z. R44on /f+// B6 / Legal description (Township, Range & Section) Lot Size Sq. Ft. THIS APPLICATION IS FOR (® all that apply): Absorption Field 12 Septic Tank ER Holding Tank ❑ Privy ❑ Private Well Number of Bedrooms THIS APPLICATION IS AN: Initial ❑ Upgrade ❑ Renewal P I ewe c« a T,C 1-r Water Storage ❑ wh[n 4+t �Y �vfa� rpnM. f 11 R'Opev &,v w(. 1 certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. (Signature of property owner or authorized agent) Permit/Rush Fees: 130 =` Waiver Fees: _ Date of Payment: ZZ -1 Date of Payment: Receipt Number: to I.5' sH (. Receipt Number: (Rev. IVOS) .S W 06 O 2.36 Aenawa+/ ,•r C� .,FLATTOP TECHNICAL SERVICES CML & ENVIRONMENTAL ENGINEERING • ENERGY CONSERVATION & ANALYSIS TED MOORE, P.E. 14530 ECHO CANYON ROAD PHIFAX: (907)345-1355 ANCHORAGE, AK 99516 E -Mail: tgmoore@gcl.net September 21, 2009 M.O.A. DSD P.O. Box 19-6650 Anchorage, AK 99519 Dear Sirs: The purpose of this letter is to request renewal of permit # S W080238 with a modified design for on-site water and wastewater facilities on Lot 1, Block 2, Robin Hill S/D # 1. The originally permitted design called for construction of a 15' by 58' soil absorption bed in the vicinity of test hole #1, however during the 2009 spring breakup both test holes #I and #2 were observed to be filled with snowmelt water nearly up to ground surface. Accordingly, we dug an additional test hole #3 at a better drained location on July 30, 2009, and now are submitting a revised design calling for a 3 -bedroom soil absorption trench in the vicinity of test hole 0. A new soils log and perc test results, as well as a revised site plan, design drawings and specifications are enclosed for your review. The proposed soil absorption system will be constructed in the vicinity of test hole # 3. As can be seen from the soil log, the highly permeable native loam is underlain between 2 and 16.5 feet below ground level with a dense gravelly silt with a measured perc rate of 30 minutes per inch. No groundwater was encountered at the time of test hole excavation, nor in subsequent monitoring as recently as 9/17/09. Using a slightly conservative soil application rate of 0.45 gpd/sq. ft. the required effective soil absorption area for a 3 -bedroom residence is (3 x 150)/0.45 = 1000 square feet. The calculated effective soil absorption area for the proposed 50 -foot long soil absorption trench with 10 feet of effective gravel between 0.5 and 10.5 feet below ground level is 1000 square feet. As is illustrated on the site plan, the topography in the area of proposed construction slopes is near the base of a 25% slope, beyond which the slope flattens to approximately 5% The long axis of the proposed trench will be oriented parallel to a natural contour of the land. A revised well location is also shown on the site plan The proposed project will have no significant impact on present or future water supply and wastewater disposal systems serving adjacent properties, nor will it have any significant impact on reserved space - surface and subsurface, or on drainage. A site for a similar replacement trench is also shown on the site plan. Please give me a call at 345-1355 if you have any questions on this submittal. Sincerely, Z. "Uo ' Ted Moore, P.E. i i i , I I I � • I � , I ` �WaL �••—L R - 100' , I LOT IA, BLOL'I(12 '}-, --'MTN. PARK EST:.. I , LOT 2A, BLOCK 1� MTN. PARK EST. (VACANT) I , , DRAIN FIELD , I SEPTIC ' TANK � c , , LOT 3, BLOCK 12 MTN. PARK EST. - b1C TANK ' T.H. ` I #3 I • , LOT 1B, BLOCK 1 ROBIN HILL #1 SEPTIC AREA /\\- �PI-1CF I , I , I , 1 ` I ' CONSTRUCT SO -LONG SOIL•ABS0`RPTION TR. Nv.10'tiff. GVL betty. V.5&10VB.G.L---- ------ 1% ----- SITE FOR �I % SIMILAR REPL TR. f5%' , I , I I END , -` •R=100•-- LOT 2, BLOCK 2 T4 ----PROPOSE ' WELL BITE; ?BO i` S`c0 --- '-- ----- ROBIN HILL /2, I --- _INSTALL ` ' 1000=GALt.QN - b1C TANK ' T.H. ` I #3 I • , LOT 1B, BLOCK 1 ROBIN HILL #1 SEPTIC AREA /\\- �PI-1CF I , I , I , 1 ` I ' CONSTRUCT SO -LONG SOIL•ABS0`RPTION TR. Nv.10'tiff. GVL betty. V.5&10VB.G.L---- ------ 1% ----- SITE FOR �I % SIMILAR REPL TR. f5%' , I , I I END LOT 2, BLOCK 2 ROBIN HILL #1 LOT 1, BLOC ROBIN HILL /2, SEPTIC AREA ;NODEVELOPMENT.,- I_ TTHIS OF LOT , , _LDT 3, BLOCK 2 - - .►���• ,••:Q •• ��R � 49 OBIN HILL SID #1 - * n'*�1 .p • THEODORE F. OOORE i CE -3569 :•Aw �c'j ,1� 1}ofeaal0ZOO, NOTE: CONTOUR INTERVALV LOT 1, BLOCK 2, ROBIN HILL SID #1 PROPOSED WELL AND SEPTIC SYSTEM SITE PLAN FLATTOP TECI INICAL SERVICES IINCH =60 FEET 14330 ECIIO CANYON ROAD DRAWN BY TFM ANCI IORAGE, ALASKA 99516 REV. SEPT, 2009 NOTE: THIS IS NOTA SURVEYED PLAT. ALL LOCATIONS SHOWN ARE APPROXIN FROM HOUSE INSTALL 1000 -GALLON SEPTIC TANK 4' DIA D-3034 C.O. MONITOR TUBE T SOIL COVER 2' RIGID INS. - 10.5110 CONSTRUCT 50' LONG SOIL ABS. TRENCH w.10.0' EFF. GVL. BETW. 0.5 310.5' b.g.l. --d*�..A,. PLAN VIEW SCALE: 1" = 10' 0. CROSS-SECTION "A -All SCALE: 1" = 5' !Z 4' DIA. F-810 PERF. PIPE „A„ C.O. . «...................... THEOOORE F. MOORE ._ CE -3589 ORIGINAL GROUND FILTER FABRIC 4" DIA. F-810 PERF. PIPE 1/2' - 21R' SEWER GRAVEL OF EXCAVATION LOT 1, BLOCK 2, ROBIN TALL SID #I SEPTIC SYSTEM INSTALLATION PLAN AND CROSS-SECTION FLATTOP TECIINICALSERVICES SCALE: AS SIIOWN 14510 ECI10 CANYON ROAD DRAWN BY: TFM ANCHORAGE,AK. 99516 REVISED SEPT, 2009 FLATTOP TECHNICAL SERVICES 14530 ECHO ST. ANCHORAGE, ALASKA 99516 TEST HOLE # 3 LEGAL DESCRIPTION:—Lot1,01ock 2,Robin.HilI. SID Unit#1 DATE PERFORMED: _July 30, 2009, PERFORMED FOR: Peter Adolf DEPTH Reading --- - ._12"Presoak _12"_Re-soak _- Add water $ Start_ — lot 1 _ --Add-water— #2 _ _Add Water #3 Cknck Tine Net Tine (minutes) (feet) Net Drop (Inches) Depth to Groundwater Date PL 1 SM Reddish sandy loam 2- --- _ _30 _—_ 30 __. -___2312— 23 3/8._ 22 318 _ _23 7/16 _271!16 — Soft. dry 1. 1 3- L4-:58:15---30,----221/2 4- ML/GM Gray gravelly sift 6- Dense. hard digging. damp .. Slightly sandier below 4' 7- Some cobbles 8- O lile ��E RF * 49 m 1 ...............q........ • of THEODORE F. YOORE i CE -3589 : x A �+f� '•,'f/2i/ty SITE PLAN l� .7.7 T.H. N #1 T.H. 106 82 /--em -T IH ! _ 92 /#2 106 163LOT 1, BLOCK 2 103 ROBIN HILL #11 10 - 11- 12-. 13- Reading --- - ._12"Presoak _12"_Re-soak _- Add water $ Start_ — lot 1 _ --Add-water— #2 _ _Add Water #3 Cknck Tine Net Tine (minutes) LOP6.-- Net Drop (Inches) Depth to Groundwater Date L _ — _No Groundwater Monitor tube dry._ 8/10!09 _ _Monitortube dry,—_9/17/09_ 114- 15- 16.51 16- 4- 15-16.5'16- B.H. i 17' 18- 19- Date 819 Date -- - - ._7/30_._ — Reading --- - ._12"Presoak _12"_Re-soak _- Add water $ Start_ — lot 1 _ --Add-water— #2 _ _Add Water #3 Cknck Tine Net Tine (minutes) Peroometer Reading Net Drop (Inches) ---`---'-- -------- 27 518 3:27:30 _ 3:57:30.— _3:58 4:28 --- _ _30 _—_ 30 __. -___2312— 23 3/8._ 22 318 _ _23 7/16 _271!16 — 1. 1 1 L4-:58:15---30,----221/2 �- PERCOLATION RATE -30— (minrdesfmch) PERC HOLE DIAMETER _5•_ TESTRUNBETWEEN 4.25 FTAND 4.75 FT COMMENTS: _Test hole #3 was dug in a better drained area after the monfto tubes for test holes #1 and #2 filled with water during spring _ --breakup — ---- PERFORMED BY FLATTOP TECHNICAL SERVICES. I Zwe CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: 9_4( 2 Flattop 7ecknicalSeMices 14530 Echo Canyon Rv91lncinorage, fl?C99516 "am (907) 34S -135S Lot 1, Block 2, Robin Hill S/D, Unit #1 Nenana Place Wastewater disposal system installation Specifications 1.0 General: 1.1 The scope of the project consists of installing a 1000 -gallon septic tank that discharges by gravity into a 50 -foot long soil absorption trench with 10.0 feet of sewer gravel below the horizontal distribution pipe network. 1.2 Construction shall be as depicted on the approved site plan and design drawings. Minor deviations from these drawings may be allowed or required by the engineer conducting the inspections. All construction procedures and material specifications shall conform to Municipal and State requirements. All separation distances shall be in conformance with Municipal requirements, unless specifically waived. 1.3 The contractor shall be responsible to obtain any necessary utility locates, and to work around any buried utilities. 1.4 Unless agreed otherwise, the contractor shall be responsible for any tree clearing and grubbing necessary to complete the project. 1.5 The contractor shall provide adequate cover material and rough grading over all system components to ensure that proper drainage is achieved after settlement and that there are no residual depressions. Insofar as possible the contractor shall minimize damage to trees and existing lawn areas. 1.6 Unless specifically agreed otherwise, the homeowner shall be responsible for finish grading after the soil is compacted, as well as placement of topsoil and reseeding all areas disturbed by the construction. 2.0 Septic Tank: 2.1 The new 1000 -gallon, 2 compartment septic tank shall be Municipally approved and shall be set level on undisturbed soil. Each compartment shall be equipped with a watertight manhole cover and a 4" cleanout. If the tank is buried less than 4 feet, it shall be insulated with 2 inches of approved burial type, rigid insulation. 2.2 All pipe connections to the tank shall be equipped with waterproof mechanical couplings. The waste line from the residence to the septic tank shall have a minimum slope of 1/4'" per foot, and the waste line between the tank and the soil absorption system shall have a minimum slope of 1/8" per foot. A cleanout shall be installed I - 4 feet from the building foundation and a double cleanout within 5 feet downstream of the septic tank. 3.0 Soil absorption system: 3.1 The soil absorption system shall be constructed by excavating a 50 -foot long trench to a depth of 10.5 feet below ground level at the location of test hole #3. The long axis of the excavation shall parallel an existing contour. 3.2 The bottom of the excavation should be level. Any compacted or smeared surfaces shall be raked to allow proper infiltration. 3.3 A total of 10.5 feet of approved sewer gravel shall be placed in the excavation with the perforated distribution pipes laid level such that the pipe inverts are no less than 10.0 feet above the bottom of the sewer gravel. 3.4 A monitor tube and cleanout pipes shall be of 4" diameter and installed in the locations shown on the design drawings. The portion of the monitor tube extending through the sewer gravel shall be perforated. 3.5 Two inches of rigid, burial type insulation and approved filter fabric shall be placed over the entire top surface of the sewer gravel. A minimum of 2 feet of soil cover is to be placed over the filter fabric. 3.6 The top surface of the cover material shall be raised a minimum of 6 inches higher than the surrounding terrain to allow for subsequent settlement, and shall be graded to smooth contours. Fill slopes shall be no steeper than 3:1. 3.7 Unless specifically agreed otherwise the homeowner shall be responsible for arranging to have the site finish graded after the backfill material has stabilized, and for placement of adequate topsoil and seed to promote rapid revegctation of all areas disturbed by the construction. 4.0 Inspections: 4.1 A total of 4 engineering inspections will be required during the course of the project: (1) initial stakeout with the contractor to establish the location of the system and to discuss the plans, specifications and construction procedures, (2) after the native material has been excavated to expose the infiltrative surface to ensure that it conforms with the soil test information, (3) after the sewer gravel is in place and the distribution pipes have been laid and connected up to the septic tank, but prior to placement of insulation or filter fabric, and (4) after rough backfill and grading is complete. The septic tank requires one inspection after it is set level and the piping connected, but prior to backfill. This inspection may be incorporated with any of the above inspections. 4.2 The installer shall coordinate the timing of the inspections with the engineer sufficiently far in advance to ensure the availability of the engineer. MUNICIPALITY OF ANCHORAGE Development Services Department On -Site Water 6 Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM / WATER SUPPLY PERMIT Initial Permit Number: SW080238 Legal Description: ROBIN HILLS #1 BLOCK 2 LOT 1 Design Engineer: 0019 FLATTOP TECHNICAL SERVICES Owner Name: PETER ADOLF Owner Address: 4900 OLD SEWARD HIGHWAY ANCHORAGE. AK 99503 - Date Issued: Oct 29, 2008 Expiration Date: Oct 29, 2009 Parcel ID: 017-442-05 Site Address: 6200 NENANA PLACE Lot Size: 87991 SQ. FT. Total Bedrooms: 4 Permit Bedrooms: 4 This permit is for the construction of: 0 Disposal Field ❑✓ Septic Tank ❑ Holding Tank ❑ Privy ❑✓ Private Well ❑ Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72 ) and Drinking Water Regulations ( 18AAC80 ). 3, The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours). ( Not required for a Water Supply Permit only). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, seated, and heated to prevent freezing. Received By: ��+ ( Date: Issued By- 16,1711045 y- is/7i1045 Date: Municipality of Anchorage \`• -• Development Services Department Building Safety Division On -Site Water and Wastewater Program ` 4700 Elmore Road ..... P.O. Box 196650 Anchorage, Alaska 99507 www.muni.org/onsite (907)343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Parcel I.D. 0 I -7 — Y Y Z. - C>&- Property S Property owner(s) fle l-e� AaGf Day phone S6 2 - 2-7 ZZ Privy El Mailing address k9coc> o (e( ccr a.,.0 1}w X Zip Code 99S-03 Site address G Zo G Al c r) cmet p lac r Zip Code Legal description (Sub'd., Block & Lot) �o f (j B la c L 2 R o S on N, // fit' / Legal description (Township, Range & Section) Lot Size R T i I9 Sq. Ft. THIS APPLICATION IS FOR (® all that apply): Absorption Field Septic Tank IR Holding Tank 0 Privy El Private Well Water Storage Number of Bedrooms °/ THIS APPLICATION IS AN: Initial IR Upgrade 0 Renewal ❑ I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. A*..04, _- i hr 'r (Signature of property owner or authorized agent) Permit/Rush Fees: N6o rr-rS =X635 Waiver Fees: Date of Payment: r 4, /1 7 / 2oc,B Date of Payment: Receipt Number. �Jl��r Receipt Number, (Rev. 11/05) FLATTOP TEGHNIGAL_ SERVICES CIVIL & ENVIRONMENTAL ENGINEERING • ENERGY CONSERVATION 8 ANALYSIS TED MOORE, P.E. PH.IFAX: (907)345-1355 E -Mail: tgmoore@gcl.net M.O.A. DSD P.O. Box 19-6650 Anchorage, AK 99519 Dear Sirs: October 15, 2008 14530 ECHO CANYON ROAD ANCHORAGE, AK 99516 The purpose of this letter is to provide the required design narrative in support of our application for a permit to construct water supply and wastewater disposal facilities on Lot 1, Block 2, Robin Hill S/D #1, located on Nenana Place. Soils logs, perc test results, a site plan, design drawings and specifications are enclosed for your review. The proposed soil absorption system will be constructed in the vicinity of test hole # 1. As can be seen from the soil log, the native material between 3 and 12.5 feet below ground level is a damp sandy silt with a measured perc rate of 3 minutes per inch. Groundwater was monitored as shallow as 6.0 feet below ground level shortly after the test hole was excavated and at 6.3 feet below ground level during the rainy autumn season. Because of the relatively shallow groundwater we propose to construct a soil absorption bed underlain by 1.5+ feet of imported filter sand and 6 inches of sewer gravel below the distribution pipe network. The bottom of the filter sand will be at a depth of 3.2 feet below ground level, causing the bottom of the sewer gravel to be no deeper than 1.7 feet b.g.l. Using the bed soil application rate of 0.7gallons per day per square foot specified in the wastewater ordinance for filter sand, this 4 -bedroom residence requires a total absorption area of (4 x 150)/0.7 = 858 square feet. The proposed 15 -foot wide by 58 -foot long absorption bed has a total absorption area of 870 square feet. As is illustrated by the contours on the site plan, the topography in the area of proposed construction slopes is low-lying and slopes gently down towards the southwest at approximately 7%. The long axis of the proposed bed will be oriented parallel to a natural contour of the land, and variations in the elevation of the designated receiving stratum will be compensated for by the placement of additional filter sand. The proposed project will have no significant impact on present or future water supply and wastewater disposal systems serving adjacent properties, nor will it have any significant impact on reserved space - surface and subsurface, or on drainage. A site for equivalent replacement trenches is also shown on the site plan. Please give me a call at 345-1355 if you have any questions on this submittal. Sincerely, Z,X _)� Ted Moore, P.E. T7attop 7echnicafSer i ices 14530 Echo Canyon POa4Anchorage,,19 99516 Thone (907) 345-1355 Lot 1, Block 2, Robin hill S/D, Unit #1 Nenana Place Wastewater disposal system installation Specifications 1.0 General: 1.1 The scope of the project consists of installing a 1250 -gallon septic tank that discharges by gravity into a 15 -foot wide by 58 -foot long soil absorption bed with 0.5 feet of sewer gravel and 1.8+ feet of filter sand below the horizontal distribution pipe network. 1.2 Construction shall be as depicted on the approved site plan and design drawings. Minor deviations from these drawings may be allowed or required by the engineer conducting the inspections. All construction procedures and material specifications shall conform to Municipal and State requirements. All separation distances shall be in conformance with Municipal requirements, unless specifically waived. 1.3 The contractor shall be responsible to obtain any necessary utility locates, and to work around any buried utilities. 1.4 Unless agreed otherwise, the contractor shall be responsible for any tree clearing and grubbing necessary to complete the project. 1.5 The contractor shall provide adequate cover material and rough grading over all system components to ensure that proper drainage is achieved after settlement and that there are no residual depressions. Insofar as possible the contractor shall minimize damage to trees and existing lawn areas. 1.6 Unless specifically agreed otherwise, the homeowner shall be responsible for finish grading after the soil is compacted, as well as placement of topsoil and reseeding all areas disturbed by the construction. 2.0 Septic Tank: 2.1 The new 1250 -gallon, 2 compartment septic tank shall be Municipally approved and shall be set level on undisturbed soil. Each compartment shall be equipped with a watertight manhole cover and a 4" cleanout. If the tank is buried less than 4 feet, it shall be insulated with 2 inches of approved burial type, rigid insulation. 2.2 All pipe connections to the tank shall be equipped with waterproof mechanical couplings. The waste line from the residence to the septic tank shall have a minimum slope of 1/4... per foot, and the waste line between the tank and the soil absorption system shall have a minimum slope of 1/8" per foot. A cleanout shall be installed 1 - 4 feet from the building foundation and a double cleanout within 5 feet downstream of the septic tank. 3.0 Soil absorption system: 3.1 The soil absorption system shall be constructed by excavating a 15 -foot wide by 58 -foot long bed to expose the top of a gray, sandy silt stratum at a depth of approximately 3.2 feet below ground level, at the location shown on the site plan. The long axis of the excavation shall parallel an existing contour. 3.2 The bottom of the excavation will not be level. Any compacted or smeared surfaces shall be raked to allow proper infiltration. 3.3 A minimum of 18 inches of M.O.A. approved filter sand (less than 4% passing the 4100 sieve) shall be placed in the bottom of the excavation to create a level top surface no deeper than 1.7 feet below ground level. Due to topographic variations it is estimated that the average sand thickness will be at least 2 feet. 3.3 A total of 1.0 feet of washed sewer gravel shall be placed on top of the filter sand with the perforated distribution pipes laid level such that the pipe inverts are no less than 0.5 feet above the bottom of the sewer gravel. Sewer gravel shall be 0.5" - 2.5" washed gravel. 3.4 Monitor tubes and cleanout pipes shall be of 4" diameter and installed in the locations shown on the design drawings. The portion of the monitor tube extending through the sewer gravel down to the top of the filter sand shall be perforated. 3.5 Two inches of rigid, burial type insulation and approved filter fabric shall be placed over the entire top surface of the sewer gravel. A minimum of 2 feet of soil cover is to be placed over the filter fabric. 3.6 The top surface of the cover material shall be raised a minimum of 6 inches higher than the surrounding terrain to allow for subsequent settlement, and shall be graded to smooth contours. Fill slopes shall be no steeper than 3:1. 3.7 Unless specifically agreed otherwise the homeowner shall be responsible for arranging to have the site finish graded after the backfill material has stabilized, and for placement of adequate topsoil and seed to promote rapid revegetation of all areas disturbed by the construction. 4.0 Inspections: 4.1 A total of 5 engineering inspections will be required during the course of the project: (1) initial stakeout with the contractor to establish the location of the system and to discuss the plans, specifications and construction procedures, (2) after the native material has been excavated to expose the infiltrative surface to ensure that it conforms with the soil test information, (3) after the sand filter material has been placed, but prior to the placement of the washed sewer gravel, (4) after the sewer gravel is in place and the distribution pipes have been laid and connected up to the septic tank, but prior to placement of insulation or filter fabric, and (4) after rough backfill and grading is complete. The septic tank requires one inspection after it is set level and the piping connected, but prior to backfill. This inspection may be incorporated with any of the above inspections. 4.2 The installer shall coordinate the timing of the inspections with the engineer sufficiently far in advance to ensure the availability of the engineer. i \ LOT 113, BLOCK 1 _-_ROBINHILL#1 SEPTIC WELL , \ AREA ` R=100' ' i `,, �r -- �\ • i -�- 4 � \ Uq ' aQp PROPOSED - \ \� D<qC a. DO , e S 'WELLSITE- pRLi Fp R=100 �.� LOT 1A, BLOCK 12 S ; MTN. PARK EST. INSTALL ------%-------- 1250 -GALLON" %- SEPTIC TANK ' -= --`--------- T - ; ; CONSTRUCT 15'x 58' SOIL ABS. BED - i.H `w. 0.5' EFF. GVL. & 1.5+' FILTER SAND --- -#1 r UNDER DIS __-, T. PIPES LOT 2A, BLOCK 12 ------�`•` _ MTN.PARK EST. ; 7% _ ---- (VACANT) 1% SITE FOR SIMILAR " REPLACEMENT BED, 'DRAIN ; T;H `. . FIELD #2 SEPTIC----_-_-- �TANK ; ; % LOT 2, BLOCK 2 ROBIN HILL #1 LOT 1, BLOCK 2 ; ROBIN HILL #1 Cop, U; Rjp1NORp1N i I LOT 3, BLOCK 12 ; MTN. PARK EST. ' SEPTIC _ --- - AREA ;NO DEVELOPMENT ; "',THIS END OF LOT NOTE: CONTOUR INTERVAL 4' ��♦ _��\, LOT 3,BLOCK 2 PF 4 ROBIN HILL SID #1 LOT 1, BLOCK 2, ROBIN HILL SID #1 Ar ��'• �.. �, PROPOSED WELL AND SEPTIC SYSTEM 1 *G: 49 m` t t SITE PLAN ........................ _ • � .......... .l FFLATTOP TECINICAL SERVICES 1 INCH = 60 FEET.. -p �. THEODORE F. MOORE0' !.i 14530 ECHO CANYON ROAD DRAWN BY TFM ••��C- 3589 'o c.14Ar ANCI IORAGE, ALASKA 99516 REV. OCT., 2008 ,,P' Po re sslo =moi NOTE: THIS IS NOT A SURVEYED PLAT. `��"I ALL LOCATIONS SHOWN ARE APPROXIMATE. SOIL ABSORPTION BED CROSS-SECTION "A -All SCALE: 1" = 5' MONITOR TUBE 2.0' SOIL COVER 2' RIGID INSULATION ORIGINAL GROUND LOT 1, BLOCK 2, ROBIN BILL S/D til SEPTIC SYSTEM INSTALLATION PLAN AND CROSS-SECTION FLATTOP TECI INICAL SERVICES SCALE: AS SI IOW4N 14530 ECIIO CANYON ROAD DRARN BY: TPM ANCI IORAGE, AK, 99516 OCTOBER, 2008 FILTER FABRIC 4" DIA. F-810 PERF. DIST. PIPES 1.5 ` 1/2" - 2 1/2" SEWER GRAVEL 2.5 18" MINIMUM (AVG. 24") FILTER SAND BOTTOM OF EXCAVATION LOT 1, BLOCK 2, ROBIN BILL S/D til SEPTIC SYSTEM INSTALLATION PLAN AND CROSS-SECTION FLATTOP TECI INICAL SERVICES SCALE: AS SI IOW4N 14530 ECIIO CANYON ROAD DRARN BY: TPM ANCI IORAGE, AK, 99516 OCTOBER, 2008 FLATTOP TECHNICAL SERVICES 14530 ECHO ST. ANCHORAGE, ALASKA 99516 TEST HOLE # 1 LEGAL DESCRIPTION: Lot 1, Block 2, Robin Hill SID, Unit #1 DATE PERFORMED:. August 19, 2008 PERFORMED FOR: Peter Adolf DEPTH . .,. Date Reading Clock SLOPE (feet) ' Pt. Time _ Reading . •.v 15 -6/19 12" Pre-soak 2 j ML Brown gravelly silt - i 271/2 Dry 8/20: 12" Re -soak 25% 3' Add water & start .�.,„ ,12:40:15-233/8- 4 . #1 .. 10 .. 193/8 5 17 _12:50:15.,. Add water 12:51 233/8 .4 6 #2 1:01 10 191/2 __. t6 Add water 1:01:20 233/8 .-37/8 0% 7 199/16 ,. - MUSM Gray sandy silt 19 ... Damp, sticky .. _ .. 8 PERCOLATION RATE .. 3 (minutes/nch) PERC HOLE DIAMETER 6" 9 FT 1 10 .. _ ... I. %1?�.i� CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: Depth W Groundwater Date 11 /Yri Seeps a 10.5' 8/19/06 Water 6.0' 8120/08 SLOE 12 B H Water 6.3' 8/26/08 Water( 6.3' _ 9/30/08 I✓,aFr�LBIiA' lalz+/oE . 13 tf] - 'Tofesslo"�*w- rYL, SITE PLAN 77 i T.H. #1 T.H. #2 163 LOT 1, BLOCK 2 ROBIN HILL #1 5% 14 - Date Reading Clock Net Time Percometer Net Drop Time (minutes) Reading (inches) 15 -6/19 12" Pre-soak 27318 12" Re -soak i 271/2 16 8/20: 12" Re -soak 271/2 Add water & start .�.,„ ,12:40:15-233/8- . #1 .. 10 .. 193/8 17 _12:50:15.,. Add water 12:51 233/8 .4 #2 1:01 10 191/2 __. t6 Add water 1:01:20 233/8 .-37/8 .. #3„ _.__1:11:20 _ 10 199/16 ,. - _ 313/16. 19 ... 20 .. _ .. PERCOLATION RATE .. 3 (minutes/nch) PERC HOLE DIAMETER 6" TEST RUN BETWEEN 3.5 FT AND 4.0 FT COMMENTS: PERFORMED BY FLATTOP TECHNICAL SERVICES. I. %1?�.i� CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: &V /Yri 14 / 27 / cE FLATTOP TECHNICAL SERVICES♦♦��_ —A%>t, 14530 ECHO ST. & pp�,�.T•••A ANCHORAGE, ALASKA 99516 / �`.• �• •;.�. �' TEST HOLE # 2 y *.'490 ........................ / LEGAL DESCRIPTION:Lot 1,_ Block 2, . Robin Hill S/D, Unit #1 •, A �• THEODORE F. MOORE : �.Of DATE PERFORMED: August 19, 2008 % CE - 3589t Nc j Ar PERFORMED FOR: Peter AdolftY4� ',�....% _ ... .. .. _... -. o fe sslo ��W DEPTH ., SLOPE SITE PLAN (feet) .. . _ ... F Pt. R Y4 y 2NJ if I j /251% N 3 77 T.H. 4 106 #1 5 T.H. ML Gray gravelly silt#2 6NJ Dense, drier than in T.H.#1 192 . 0% 7 103 163 LOT 1, BLOCK 2 6 ROBIN HILL #1 10 / / Depth b Groundwater Date 11 No Groundwater 6/19/08.. ; 3% SM Silty gravelly sand Monitor tube dry ,_ 826108 12 Monitor tube dry 913 , .. - 0/08 SLOP 13 B.H. ... .. ... .- 14 Clock Net Time Percometer Net Drop 15 Time (minutes) Reading (inches) ) - 8119 ; _.12" Presoak - _ .... _ . 31 12 . 620 ! 12" Re -soak . 31 12 _ 16 ' Start ... .. , ,_12:27:30 27 12 i #1 12:57:30 30 2615/16 -, .. 9/16 - #2 '"1:27:30 30 26118 13/16 17 - --._' _ Add water ,,,1:28 , __ 271/16. ... #3 _ 1:58 . _ _ 30 . ... 26 7/16.. 5/8 ., 18 .... ... _. .... 19 20 ... ........ ..._.._.. ...._.... _ .. .. .. ..._.._. .. PERCOLATION RATE ,53 _ _ (minuteslnch) PERC HOLE DIAMETER 6" TEST RLN BETWEEN 3.5 FT AND 4.0 FT COMMENTS: PERFORMED BY FLATTOP TECHNICAL SERVICES. I �� ivcµCERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: