Loading...
HomeMy WebLinkAboutCROSS VIEW ESTATES BLK 1 LT 13C oss View lock I Lot I 015-301 -61 Permit Number: Tax Code Number: Work Type: On-Site Water & Wastewater System Permit OSPl11257 01530161000 WellSeptic MUNICIPALITY OF ANCHORAGE Development Services Department On-Site Water & Wastewater Program 4700 Elmore Road, PO Box 196650 Anchorage, AK 99519-6650 Telephone: (907) 343-7904 Initial Permit Effective Dates: September 28, 2011 to September 27, 2012 Design Engineer: ANDERSON ENGINEERING Subdivision: CROSS VIEW ESTATES Site Legal Address: CROSS VIEW ESTATES BLK 1 LT 13 G:2737 Owner/Address: H2L INVESTMENTS LLC 633 E 81ST AVE ANCHORAGE AK 995180000 Site Mailing Address: 5317 HERITAGE HEIGHTS DR, Anchorage Lot Size in Sq Ft: 50276 Total Bedrooms: 4 This permit is for the construction of: Y Disposal Field Y SepticTank N Holding Tank N Privy Y Private Well N Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80). 3. The wastewater code requires inspections during the installation. The engineer must notify the Development Services Department at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 (24 hours). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must either: A. Open and Close on the same day. B. Covered, sealed, and heated to prevent freezing. Received BY:f~~ i~:~i~ Date: MUNICIPALITY OF ANCHORAGE Community Development Department Development Services Division On-Site Water & Wastewater Program Mayor Dan Sullivan ~ Phone:907-343-7904 Fax:907-343-7997 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Parcel I.D. ~::)/~"--~O/~-' ~' I Property owner(s) ~_.j:Z.OiJ~,j 'Po~¢'t'~ i '~'~"~". Day phone Mailing address 'PO 'l'~O,/, IIZ~i Site address ~e="1¢44 ,r'A Legal description (Sub'd., Block & Lot) Legal description (Township, Range & Section) Lot Size CC): Z-~ Sq. Ft. Number of Bedrooms ~1~.. ~) THIS APPLICATION ([] all that apply) Absorption Field [~' Septic Tank [~ Holding Tank [] Privy [] Private Well ~ Water Storage [] IS FOR: THIS APPLICATION IS AN: Initial '~ ~"~, Upgrade ~ Renewal [] THIS APPLICATION INCLUDES A VARIANCE / WAIVER REQUEST FOR: I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. (Signature of property owner or authorized agent) Permit/Rush Fees: Date of Payment: Receipt Number: Permit No. Waiver Fees: Date of Payment: Receipt Number: Waiver No. G:\Building\On Site\Forms\Client Forms\Permit App_010411 .doc (Rev. 1111 ) ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 677-7766 (FAX) September 20, 2011 Municipality of Anchorage Development Services Department On-Site Water and Wastewater Program 4700 South Bragaw Street Anchorage, AK 99519-6650 Subject: Lot 13, Block 1, Cross View Estates Subdivision Septic System Design and Permit Application Impacts to Adjacent Properties Dear Onsite Services Engineer: The owner of Lot 13, Block 1, Cross View Estates Subdivision intends to construct a new four-bedroom home on the lot. We are therefore requesting a permit be issued for '~ of a new well and septic system to accommodate the home. The attached Site Plan and backup documentation identify the location and configuration of the proposed well and septic system along with the alternate site. Also identified on the plans are the existing wells and septic systems on surrounding lots. No conflicts exist between the proposed septic system and well or septic systems and wells on adjacent lots. Drainage arrows are shown on the site plan showing the grade and direction of flow on the lot. The drainage pattern will not be changed as a result of this project. Two test holes were placed on the lot in the area of the absorption trench and alternate site. The logs indicate silty sand (SM) in the zone specified for the absorption trench. The percolation rate of the soil was determined to be 5 minutes per inch. No groundwater was found during the placement of the test holes and none was noted during the monitoring period. An application rate of 1.2 gallons per day per square foot was used in the design of the absorption system. We are proposing to place a new 1,250-gallon septic tank and a 50' long by 5' wide by 4' effective depth absorption trench to treat and dispose of the effluent generated in the house. The elevation of the distribution line in the absorption trench will be 6' below the surface and the total depth will be 10'. A minimum of 3' of fill or 2" of insulation and 2' of fill will be placed over the absorption trench and 4' over the septic tank. The ground surface on the lot in the area of the septic system slopes to the northwest. The new trench will be constructed parallel with the contours of the slope as much as possible in conformance with Municipal requirements. The new septic system will be Lot 13, Block 1, Cross Point Estates Subdivision September 20, 2011 Page Two constructed a minimum of 100' from all wells and any surface water and 10' the proposed and existing water services in the area. If the system is constructed in accordance with our design the following statements apply: o The system, if constructed as designed, will have no adverse impact on the wells in the area or those to be constructed in the future. The system, if constructed as designed, will have no adverse impact on existing septic systems in the area or those to be constructed in the future. The system, if constructed as designed, will have no adverse impact on reserve space, either surface or subsurface, on any lots located in the area. The system, if constructed as designed, will have no adverse impact on drainage patterns in the area. The current drainage pattern will be maintained. Sincerely, Michael E. Anderson, P.E. Attachments [ \ COMMUNITY WATER SYSTEM ..........................................................................LOT 12, BLOCK I LOT 13, BLOCK 1 .-- LOT 14. BLOCK 1 VACANT AREA MAP SCALE 1~ = 100' CROSS 20' X 40' GAS ESMT. ' ' 20' STORM DRAIN ESMT. - · 2006-171 VIEW ESTATES SUBDIVISION LOT 15, BLOCK 1 50,276 S.F. N 89°47'24"E I84.77' 10' T. & E. ESMT. GTH2 50' Long x 5' Wide CO~....J~-----"~(DTH1CO~ x 4' Effective Depth "-~T \ ~ ,,_ Absorption Trench ~ ~ ~ ~ ~CO(2) SVI 1,250 Gallon ~ ~ Septic Tank ~ sv / I Four Bedroom 1 II G. SLAB I ilE'' = 62°' ___r--~-=~ -. J Proposed II ~ A*C' DRIVE / .... S 8g'54'lS"E 91.32' L=45.2; HERITAGE HEIGHTS DRIVE SITE PLAN SCALE 1" = 50' LEGEND MT - Monitor Tube FCa -Foundotlon Cleon Out TH -- Test Hole CO - Cleon Out NOTE: No Areas of Excessive Slope or Surface Water ore Within 100' of Any Part of the New Septic System. LOT 13, BLOCK 1, CROSS VIEW ESTATES SUBDIVISION DESIGN FACTORS: SYSTEM REQUIREMENTS: Four Bedroom Home 5' Wide Trench System Perc. Rate: 1-5 Min./Inch 1,250 Gallon Septic Tank Application Rate: 1.2 GPD/SF 4' Drainfield Rock 4 Bedrooms * 150 GPD/Bedroom = 600 SF Absorption Area 600 SF/1.2 GPD/SF/5 SF (Width) *.5 (Red. Factor)= 50 LF Trench Length THEREFORE: Construct a 50' Long x 5' Wide x 4' Effective Depth Absorption Trench. Flow Line Elevation in Trench to be 6' Below Original Ground Surface. Total Depth to be 10' Below Existing Ground. Provide 3' Cover Over Absorption Trench and 4' Cover Over Septic Tank. ~Geotextile Fabric 4" Perforated PVC (Holes Down) Drainfield Rock ! TYPICAL 5 WIDE TRENCH SECTION Performed For: Legal 6~ 7~ 8- 9- 10- 11- 12- 13~ 14- 15- 16- 17~ 18 19- 20- COMMENTS TEST HOLE #1: Municipality of Anchorage Development Services Department Building Safety Division On-Site Water and Wastewater Program 4700 Elmore Road P.O. Box 196650 Anchorage, AK 99507 www. ci.anchorage.ak.us (907) 343-7904 Soils Log - Percolation Test Harding Homes of Alaska, Inc. Cross View Estates Subd., Lot 13, BIk 1 Slope WAS GROUND WATER ENCOUNTERED? .NO S IF YES, AT WHAT DEPTH? XXX L Depth to Water After i~'~ ~,~"' Op Monitoring? E Date: 9/16/11 Date Pedormed: Fd, Sept 9, 2010 Township, Range, SeCtion: Reading Date Gross Time Net Time Depth to Water Net Drop 9/9/11 IS:, ~ a~ ~I~ (';.~',~" ~,~" ,, ~{~ ~ ~,~ II.~" ~.~" PERCOLATION RATE 5 (minutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN -6.5 FT AND -7.0 FT perc test cavity was presoaked- PERFORMED BY: A. Harala I-~I~,- ~¢~ CERTIFYTHATTHISTESTWAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: Performed For: Legal D, scdption: 9- 10- 11- 12- 13- 14- 1 16~ 17- 18- 19- 20~ COMMENTS TEST HOLE #3: Municipality of Anchorage Development Services Department Building Safety Division On-Site Water and Wastewater Program 4700 Elmore Road P.O. Box 196650 Anchorage, AK 99507 www. ci.anchorage.ak, us (907) 343-7904 Soils Log - Percolation Test Harding Homes of Alaska, Inc. Cross View Estates Subd., Lot 13, BIk 1 Slope WAS GROUND WATER ENCOUNTERED? NO ' S IF YES, AT WHAT DEPTH? XXX L Depth to Water After P Monitoring? No Water E Date: 9/16/11 Date Performed: Fd., Sept. 9, 2010 Township, Range, Section: Reading Date Gross Time Net Time Depth to Water Net Drop 9/9/11 I¢2; ~'¢'. .--'- ~/, ~'~" ~ PERCOLATION RATE 5 (minutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN -7 FT AND -7.5 FT perc test cavity was presoaked- PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION AND MATERIAL SPECIFICATIONS SUBJECT: LOT 13, BLOCK 1, CROSS VIEW ESTATES SUBDIVISION GENERAL: The scope of this project includes the procurement and placement of a new 1,250-gallon Septic tank at the location shown on the Site Plan. Work also includes the construction of a new 50' long X 5' wide X 4' effective depth absorption trench at the location also shown on the Site Plan. The distribution line in the trench will be placed at 6' below the existing ground surface. Total depth of the trench will be 10' below the existing ground surface. The new absorption trench and septic tank must be placed a minimum of 100' from all private wells and any surface water in the area and 10' from the water service line proposed for the lot. A minimum of 3' of cover is required over the absorption trench and 4' of cover over the septic tank. Construction shall be in accordance with the approved site plan, design drawings, Municipal Permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. The Contractor shall be responsible for obtaining all underground utility locates and for the layout of the septic system and verification of the location of all lot lines. The Contractor must also verify the location of wells in the area and assure that the separation distances are met. Unless specifically agreed otherwise, the contractor shall be responsible for final grading areas subsequently depressed from soil settling. Property owner shall be responsible for revegetation of affected areas unless specifically agreed otherwise. Contractors installing wastewater disposal systems must be certified by the Municipal Building Safety Division On-Site Water and Wastewater Program for system installations. Owners installing their own systems must receive prior approval from the On-Site Water and Wastewater Program. before beginning system installation. SEPTIC TANK INSTALLATION 1. A new 1,250-gallon septic tank must be procured from an approved source and installed at the location shown. 2. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. Lot 13, Block 1, Cross View Estates September 20, 2011 Page 2 of 3 3. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank. 4. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 5. Tanks installed without 4' of cover shall have a minimum of 2" of direct burial insulation. 6. A foundation cleanout shall be installed one to four feet from the building foundation. Two cleanouts are required between the tank and the drainfield. 7. Final grading over the tank shall be such that a positive slope exists away from the septic tank. DRAINFIELD CONSTRUCTION: 1. The drainfield shall be constructed to the dimensions shown on the design. The bottom of the trench shall be within 2" of level. Distribution piping must be placed level with perforations down atop a level bed of drainfield rock. Rock should then be placed over the pipe to provide a minimum of 2" of cover. 3. A silt barrier or geotextile fabric must be placed between the drainfield rock and the natural soil backfill. 4. Monitor tubes must be 4" in diameter and installed at the locations shown on the design. The portion below the distribution line must be perforated. Contractor shall verify the septic tank and drainfield are a minimum 100' away from any private water wells in the area, 150' from a Class "C" Well or 200' from any community well. Direct bury insulation must be placed over the distribution system if less than 3' of backfill depth is available. Finish grade over the trench must be mounded to prevent settlement or depressions. 7. Grade area surrounding the absorption trench to drain away. A minimum 2' of accepting soil is required below the drainfield rock for a 5' wide trench. All pockets of unacceptable materials must be removed and replaced. Lot 13, Block 1, Cross View Estates September 20, 2011 Page 3 of 3 MATERIAL SPECIFICATIONS: 1. Septic tanks must be constructed by a municipally approved septic tank manufacturer. 2. The following pipe materials are approved for use in septic system installations in the Municipality of Anchorage: Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and ASTM D2662 or A. BS. (perforated and solid). 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Co. Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Fernco, or equal). 5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed between the final drain rock layer and the native soil layer. 6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the #200 sieve. INSPECTIONS: Municipal Ordinance requires a minimum of two inspections. These inspections must be conducted under the supervision of a professional engineer registered in the State of Alaska. The first inspection must be conducted after the excavation of trenches, beds or pits and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled. The second inspection must be conducted after the placement of the geotextile fabric, gravel, distribution piping, standpipes, cleanouts and insulation. No backfill should be in place at the time of inspection. Contractor shall provide a copy of all field survey layout and construction notes for use in preparing the certified as-built of the completed system.