HomeMy WebLinkAboutNORTH SLOPE BLK 4 LT 10ANorth Slope
Block 4
Lot 1OA
#050 - 581 - 22
Permit Number:
Tax Code Number:
Work Type:
On-Site Water & Wastewater System Permit
0SP121228
05058122000
WellSeptic
MUNICIPALITY OF ANCHORAGE
Development Services Department
On-Site Water & Wastewater Program
4700 Elmore Road, PO Box 196650
Anchorage, AK 99519-6650
Telephone: (907) 343-7904
Initial
Permit Effective Dates: August 10, 2012 to August 10, 2013
Design Engineer: ANDERSON ENGINEERING
Subdivision: NORTH SLOPE
Site Legal Address: NORTH SLOPE BLK 4 LT 10A G:0703
Owner/Address: KUESTNER DON & ANITA R
30534 KUPARUK AVE EAGLE RIVER AK 9957797'16
Site Mailing Address: 30650 SAGWON AVE, Eagle River
Lot Size in Sq Ft: 75609
Total Bedrooms: 4
This permit is for the construction of:
Y Disposal Field Y Septic Tank N Holding Tank N Privy Y Private Well N Water Storage
All construction must be in accordance with: 1. The attached approved design.
2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater
Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80).
3. The wastewater code requires inspections during the installation. The engineer must notify the Development Services
Department at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 (24 hours).
4. From October 15 to April 15, a subsurface soil absorption system under construction dudng freezing weather must either:
A. Open and Close on the same day.
B. Covered, sealed, and heated to prevent freezing.
Special Provisions: PRIOR TO CONSTRUCTION: Additional percolation tests shall be completed
such that the entire drainfield is within 30 feet of a percolation test. Results shall be submitted
with the inspection report.
Issued By: ,
Date:
Date:
MUNICIPALITY OF ANCHORAGE
Community Development Department ~.~,?~.~.~
Development Services Division
On-Site Water & Wastewater Program
Mayor Dan Sullivan
ON-SITE SEWER/WELL PERMIT APPLICATION
FOR A SINGLE FAMILY DWELLING
Parcel I.D. 050-58t-22
Property owner(s): Troy Davis Homes, Inc. Day phone:
Mailing address: 165 E. Parks Highway, Wasilla, AK 99654
Site address: 30650 Sagwon Avenue Eagle River, AK 99577
Legal description (Sub'd., Block & Lot): North Slope, Block 4, Lot t0A
Legal description (Township, Range & Section)
Lot Size: 75,609 S.F. Number of Bedrooms: Three (3)
Phone: 907-343-7904
Fax: 907-343-7997
357-9394
THIS APPLICATION IS FOR:
([] all that apply)
Absorption Field X
Septic Tank X
Holding Tank []
Privy []
Private Well X
Water Storage []
THIS APPLICATION IS AN:
Initial X
Upgrade []
Renewal []
THIS APPLICATION INCLUDES A VARIANCE / WAIVER REQUEST FOR:
I certify that the above information is correct. I further certify that this application is being made
for a Single Family Dwelling and is in accordance with applicable Municipal Codes.
(Signature of property owner or authorized agent)
Permit/Rush Fees:
Date of Payment:
Receipt Number:
Permit No. ~'~-~
Waiver Fees:
Date of Payment:
Receipt Number:
Waiver No.
C:\Users~AndEng\Desktop\Mike\North Slope\Permit Application Lot 10A.docC:\Users~AndEng\Desktop\Mike\Nor/h Slope\Permit
Application Lot 10A.doc
July 31,2012
Municipality of Anchorage
Development Services Department
On-Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject:
Lot 10A, Block 4, North Slope Subdivision
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 10A, Block 4, North Slope Subdivision intends to construct a new
three-bedroom home on the lot. We are therefore requesting a permit be issued for the
construction of a new well and septic system to accommodate the home. The attached
Site Plan and backup documentation identify the location and configuration of the
proposed septic system along with the alternate site. No existing wells or septic
systems are closer than 100' from the proposed well or septic system. Drainage arrows
are shown on the site plan showing the grade and direction of flow on the lot. The
drainage pattern will not be changed as a result of this project.
The test holes placed on the lot in the area of the absorption trench and alternate site
indicated silty gravel with sand (GM). The percolation rate of the soil was determined to
be between 6 and 15 minutes per inch. No groundwater was found during the
placement of the test holes and none was noted during the monitoring period. Bedrock
was encountered however at 10' below the surface. An application rate of .8 gallons
per day per square foot was used in the design of the absorption system. We are
proposing to place a new 1,000-gallon septic tank and 2 - 50' long by 5' wide by 1'
effective depth absorption trenches to treat and dispose of the effluent generated in the
house. The elevation of the distribution line in the absorption trench will be 1' below the
surface and the total depth will be 2'. A minimum of 3' of fill or 2" of insulation and 2' of
fill will be placed over the absorption trench and 4' over the septic tank.
The ground surface on the lot in the area of the absorption trench slopes to the
southwest at a grade approximating 20%. The new trench will be constructed parallel
with the slope as much as possible in conformance with Municipal requirements. The
new septic system will be constructed a minimum of 100' from all wells and any surface
Lot 10A, Block 4, North Slope Subdivision
July 31, 2012
Page Two
water and 10' from the proposed and existing water services in the area.
If the system is constructed in accordance with our design the following statements
apply:
1. The system, if constructed as designed, will have no adverse impact on the wells
in the area or those to be constructed in the future.
2. The system, if constructed as designed, will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
3. The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
4. The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely,
Michael E. Anderson, P.E.
Attachments
LEBEND
bff - Monitor Tube
FCO - Foundation Clean Out
TH - Test Hole
CO - Clean Out
2C0 - Double Clean Out
NOTE:
No Areas of Excessive Slope or Surface
Water are Within 100' of Any Par~ of the
New Septic System.
NOTE:
No SeparoBon Distance Conflicts Between
the Well and Septic System on This Lot
and Adjacent Lots.
SITE PLAN
SCALE 1' = 50'
~.4C~.o.,v ~'---....~O~TH SLOPELoT IoASUBDIVISION
/
ALTERNATE SITE:
Advantex Treatment
System wi~h 25' Long x
5' Wide x 1' EiTect~ve
Depth Absorption Trench.
4 DPD/SF Application
/
/
/
&
/ /
/ /
/ /
/ /
/
/
/
/ /
/ / 49t:h
/ /
/
MICHAEL £. ANDERSON
NO, CE-4381
LOT 10A, BLOCK 4, NORTH SLOPE SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Three Bedroom Home 5' Wide Trench System
Perc. Rate: 6-15 MinJInch 1,000 Gallon Septic Tank
Application Rate: .8 GPD/SF 1' Drainfield Rock
3 Bedrooms * 150 GPD/Bedroo,m. = 450 SF Absorption Area
450 SF/.8 GPD/SF/5 SF (Width) .87 (Red. Factor)= 97.9 LF Trench Length
THEREFORE: Construct 2-50' Long x 5' Wide x 1' Effective Depth Absorption Trenches.
Flow Line Elevation in Trench to be 1' Below Original Ground Surface. Total Depth to be
2' Below Existing Ground. Provide 3' Cover Over Absorption Trench and 4' Cover Over
Septic Tank. Place Flow Splitter Valve to Insure Even Flow to Each Trench.
~- -- Geotextile Fabric
4" Perforated
PVC (Holes Down)
Drainfield Rock
TYPICAL 5' WIDE TRENCH SECTION
--
NOTE: Grade Area Over Trench to Drain Away.
Minimum 6' Separation From Bedrock. ¢.,,,~....~....~..~...~..,~
Minimum 4' Separation From Groundwater
Minimum 100 Separation From Private Wells In the Area.
Minimum 100' Separation From SuCace Water or Streams:~.~%
&700
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
BRAGAW STREET ANCHORAGE, AK 99519-6650
DEPTH
(feet)
1
2
3
4--
5
6--
7--
8
9--
20-
1
SOILS LOG - PERCOLATION TEST J
LEGAL DESCRIPTION: LOT 10A, BLOCK /4, NORTH SLOPE SUB. NO. I
PERFORMED FOR: TROY DAVIS HOMES
DATE: 7 / 9 / 2 012 PROJECT No.:
PARCEL ID#: TECHNICIAN: JKB
Silty Gravel
w/Sand
Bedrock
@8'
WAS GROUND WATER ENCOUNTERED9 ___
IF x/ES ~ WHAT DEPTH?___
DEPTH OF WATER AFTER MONITORING:
DATE OF MONITORING:
SLOPE
No
None
7/28/12
SITE PLAN
2_% __
DEPTH TO
DATE READING GROSS TINE NET TINE WATER NET DROP
(MINUTES) (MINUTES) (INCHES) (INCHES)
TEST HOLE PRESOAKED PRIOR TO TESTING:
7/18 1 1:27 4.75"
2 1:57 30 7.75" 3.00"
3 1:58 4.00"
4 2:28 30 6.75" 2.75"
5 2:29 3.50"
6 2:59 30 6.25" 2.75"
PERCOLATION RATE: 11 (MIN/INCH) PERC. HOLE DIA. (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
COMMENTS: TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFORMED BY ANDERSON ENGINEERING. 1, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED 1N ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES 1N EFFECT ON THIS
DATE:. 7/28/12
4700
DEPTH
(feet)
1
2--
3
4--
5
6
7--
8
9
20
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
BRAGAW STREET ANCHORAGE, AK c)9519-0650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION: LOT 10A, BLOCK 6, NORTH SLOPE SUB. NO.
PERFORMED FOR: TR0¥ DAVIS HOMES
DATE: 7/9/2012 PROJECT No.:
PARCEL ID#: TECHNICIAN:
[ TEST HOLE 2
SLOPE
Silty Gravel
w/Sand
Bedrock
SITE PLAN
WAS GROUND WATER ENCOUNTERED? No
IF YES @ XYHAT DEPTH?.__
DEPTH OF WATER AFTER MONITORING: 7'
DATE OF MONITORING 8/9/l 2
DEPTH TO
DATE READING GROSS TIME NET TIME WATER NET DROP
(MINUTES) (MINUTES) (INCHES) (INCHES)
TEST HOLE PRESOAKED PRIOR TO TESTING:
7/18 1 1:37 5.00"
2 2:07 30 10.25" 5.25"
3 2:08 5.00"
4 2:38 30 9.50" 4.50"
5 2:39 4.00"
6 3:09 30 8.50" 4.50"
PERCOLATION RATE: 6.7 .(MIN/INCH) PERC. HOLE DIA. 8 (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
COMMENTS: TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFORMED BY ANDERSON ENGINEERING. I, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE:. 7/28/12
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 10A, BLOCK 4, NORTH SLOPE SUBDIVISION
GENERAL:
The scope of this project includes the procurement and placement of a new
1,000-gallon septic tank at the location shown on the Site Plan. Work also
includes the construction of 2 new 50' long X 5' wide X 1' effective depth
absorption trenches at the location also shown on the Site Plan. The
distribution line in the trench will be placed at 1' below the existing ground
surface. Total depth of the trench will be 2' below the existing ground
surface. The new absorption trench and septic tank must be placed a
minimum of 100' from all private wells and any surface water in the area and
10' from the water service line on the lot. A minimum of 3' of cover is
required over the absorption trench and 4' of cover over the septic tank. A
cleanout must be placed every 50' minimum between the septic tank and the
absorption trench.
Construction shall be in accordance with the approved site plan, design
drawings, Municipal Permit with any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal Regulations.
The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the location
of all lot lines. The Contractor must also verify the location of wells in the
area and assure that the separation distances are met.
Unless specifically agreed otherwise, the contractor shall be responsible for
final grading areas subsequently depressed from soil settling. Property
owner shall be responsible for revegetation of affected areas unless
specifically agreed otherwise.
Contractors installing wastewater disposal systems must be certified by the
Municipal Development Services Department Building Safety Division On Site
Water and Wastewater Program for system installations. Owners installing
their own systems must receive prior approval from the On Site Water and
Wastewater Program before beginning system installation.
SEPTIC TANK INSTALLATION
1. A new 1,000-gallon septic tank must be procured from an approved source
and installed at the location shown. The cover over the tank shall not exceed
4' unless approved by the tank manufacturer.
Lot 10A, Block 4, North Slope Subdivision
July 31, 2012
Page 2 of 3 -
2. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shall include two 4" cleanouts for pumping access.
3. The septic tank shall be sufficiently bedded to prevent settling or shifting of
the tank.
4. All standpipes on the septic tank shall extend a minimum of 12 inches above
final grade.
5. Tanks installed without 4' of cover shall have a minimum of 2" of direct burial
insulation.
6. A foundation cleanout shall be installed one to four feet from the building
foundation. Two cleanouts are required between the tank and the drainfield.
7. Final grading over the tank shall be such that a positive slope exists away
from the septic tank.
DRAINFIELD CONSTRUCTION:
1. The drainfield shall be constructed to the dimensions shown on the design.
The bottom of the trench shall be within 2" of level.
Distribution piping must be placed level with perforations down atop a level
bed of drainfield rock. Rock should then be placed over the pipe to provide a
minimum of 2" of cover.
3. A silt barder or geotextile fabric must be placed between the drainfield rock
and the natural soil backfill.
4. Monitor tubes must be 4" in diameter and installed at the locations shown on
the design. The portion below the distribution line must be perforated.
Contractor shall verify the septic tank and drainfield are a minimum 100' away
from any private water wells in the area, 150' from a Class "C" Well or 200'
from any community well.
Direct bury insulation must be placed over the distribution system if less than
3' of backfill depth is available. Finish grade over the trench must be
mounded to prevent settlement or depressions.
7. Grade area surrounding the absorption trench to drain away.
A minimum 2' of accepting soil is required below the drainfield rock for a 5'
wide trench. Contractor shall verify this condition prior to placement of the
rock. All pockets of unacceptable materials must be removed and replaced.
Lot 10A, Block 4, North Slope Subdivision
July 31, 20t2
Page 3 of 3
MATERIAL SPECIFICATIONS:
1. Septic tanks must be constructed by a municipally approved septic tank
manufacturer.
2. The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated and
solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and ASTM D2662
or A.B.S. (perforated and solid).
3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow
Chemical Co. Styrofoam HI or equal).
4. Septic tank inlets and outlets shall be fitted with watertight couplings
(Caulder, Fernco, or equal).
5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed
between the final drain rock layer and the native soil layer.
6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the
#200 sieve.
INSPECTIONS:
Municipal Ordinance requires a minimum of two inspections. These inspections
must be conducted under the supervision of a professional engineer registered
in the State of Alaska. The first inspection must be conducted after the
excavation of trenches, beds or pits and before the installation of any gravel. A
septic tank may be set in place, but may not be backfilled.
The second inspection must be conducted after the placement of the geotextile
fabric, gravel, distribution piping, standpipes, cleanouts and insulation. No
backfill should be in place at the time of inspection.
Contractor shall provide a copy of all field survey layout and construction notes
for use in preparing the certified as-built of the completed system.