LOT lA, CLOUD NINE SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Four Bedroom Home 5' Wide Trench System
Perc. Rate: 39 Min./Inch 4 Bedroom Advantex Treatment System
Application Rate: 2 GPD/SF 2' DrainfJeld Rock
4 Bedrooms X 150 GPD/2 GPD/SF (Application Rate) = 300 SF Absorption Area
300 SF/5 SF/LF*.7 (Red. Factor) = 42 LF Trench Length
THEREFORE: Construct a Trench 42' Long x 5' Wide x 2' Effective Depth.
Flow Line Elevation in Trench to be 2' Below Original Ground Surface. Total Depth to be
4' Below Existing Ground. Provide 4' Cover Over Septic Tank and 3' Cover Over
Absorption Trench,
Backfill
Geotaxtile
Fabdc
I" Perforated
PVC (Holes Down)
3/16"Holes @ 2' Spacing
-- Drainfield Rock
TYPICAL DEEP TRENCH SECTION
(NO SCALE)
NOTE: Grade Area Over Trench to Drain Away. .~.~
Minimum 6' Separat on From Bedrock ~
Mm,mum 4 S~paratlon From Groundwater. ~. ~'~ ~"~
Mini .........
mum 200 Sepa~tlon From Wells in the Area. ~At MICHAEL
Minimum 100' Separation From Su~ace Water or Streams. ~:~% No.
4700
DEPTH
(f=~0
1
2
3
4
5
6
7
8--
9--
11
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
BRAGAW STREET ANCHORAGE, AK 99519-0650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION: LOT IA, CLOUD NINE SUBDIVISION
PERFORMED FOR: CHARLES LEKITES
DATE: 6/27/2002 PROJECT No.:
PARCEL ID#: TECHNICIAN:
OB/OG
A. HARALA
SLOPE
SILTY GRAVEL
WITH SAND
GP/GM
WAS GROUND WATER ENCOLEqTERED? YEs
BOH @ 15.5'
BEDROCK
READING
SiTE PLAN
SEE SITE PLAN
GROSS TIME NET TIME DwE,~-I~RTO INET DROF
(MINUTES) (MINUTES) (INCHES) (INCHES)
TES- HOLE PRESOAKED PRIOR TO TESTING:
1 16:26 0.00
2 16:41 15 0.50 0.50"
3
4
5
6
20 7/8
16:43
16~5R
17:03
17:18
17:24/17:39
lq
15
0.00
0.44
0.00
0.38
0.00/0.38
0.44"
0.38"
0.38"
PERCOLATION RATE: 39 ,(MrN/rNCH) PERC. HOLE DIA. 6" (n~ci-ms)
TEST RUN BETWEEN: 5 FT. and 6 FT.
COMMENTS: TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFORMED BY ANDERSON ENGINEERING. I, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED 1N ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE: 7/16/2002
LOT lB, CLOUD NINE SUBDIVISION
DESIGN FACTORS: SYSTEM REQUIREMENTS:
Four Bedroom Home 5' Wide Trench System
Parc. Rate: 3.2 Min./Inch 4 Bedroom Advantex Treatment System
Application Rate: 4 GPD/SF 3' Drainfield Rock
4 Bedrooms X 150 GPD/4 GPD/SF (Application Rate) = 150 SF Absorption Area
150 SFI5 SF/LF*.58 (Red. Factor) = 17.4 LF Trench Length
THEREFORE: Construct an Oversized Trench 20' Long x 5' Wide x 3' Effective Depth.
Flow Line Elevation in Trench to be 2' Below Original Ground Surface. Total Depth to be
5' Below Existing Ground. Provide 4' Cover Over Septic Tank and 3' Cover Over
Absorption Trenches.
Natural
Backfill
0
Geotextile
Fabric
1" Perforated
PVC (Holes Down)
3/16" Holes @ 2' Spacing
Drainfield Rock
TYPICAL DEEP TRENCH SECTION
--
NOTE: Grade Area Over Trench to Dra~n Away.
Minimum 6' Separation From Bedrock. F.....J.....2~::....~..~.~....~
Minimum 4' Separation From G~undwater.
M n mum 200' Sepa~tion From Wells in the Area ~'~;;~;~"'~:'~
M'n'mum 100' Separation From Su~ Water or'Streams-~,~t
4700
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
BRAGAW STREET ANCHORAGE, AK 99519-6650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION: LOT lB, CLOUD NINE SUBDIVISION
PERFORMED FOR: CHARLES LEKITES
DATE: 6/27/2002 PROIECT No.:
PARCEL ID#:
DEPTH
1
2
3--
4--
5
6
7
8
9
TECHNICIAN:
0B/0G
SILTY GRAVEL
WITH SAND
GM
SILT/GRAY
SILTY GRAVEL
WITH SAND
GM
>20% SILT
11 BOH @ 11.5'
BEOROCK
A, HARALA
SLOPE
WAS GROUND WATER ENCOLFI'YFERED? NO
20
SITE PLAN
SEE SITE PLAN
DEPTH TO
GROSS TIME NET TIME WATER NET DROP
READING (MINUTES) (MINUTES) (INCHES) (INCHES)
TEST HOLE PRESOAKED PRIOR TO TESTING:
1 17:10 0.00
2 17:20 15 3.56 3.56"
3
4
5
6
17:21
17:36
17:38
17:53
15
15
0.00
4.69
0.00
4.75
4.69"
4.75"
PERCOLATION RATE: 3.2 (MrNnNCH) PERC. HOLE DIA. 6" aNCH~S
TEST RUN BETWEEN: 4.5 .FT. and 5.5 FT.
COMMENTS: TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST.PERFORMED BY ANDERSON ENGINEERING. I, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED 1N ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE: 7/16/2002
4700
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
BRAGAW STREET ANCHORAGE, AK 99519-6650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTiON: LOT IA, CLOUD NINE SUBDIVISION
PERFORMED FOR: CHARLES LEKIT5$
DATE: 6/27/2002 PROIECT No.:
PARCEL ID#:
DEPTIq
(feet)
1
2
6
7
11
TECHNICIAN:
I r s .oL lO I
OB/OG
GP
A. HARALA
SLOPE
SILTY GRAVEL
WITH SAND
GH
WAS GROLrND WATER ENCOUNTBKBD? Y~S
IF YES @ WRAT DEFTH% 9'__.
DEPTH OF WATER APT]~ MONITORRqG: 7'
DATB OF MONITORING: 5/~1/06
BOH @ 15'
SITE PLAN
SEE SIT~ PLAN
DATE,
7/11/02
DEPTH
TO
READ NG GR. 0SS TIUE .NET TIH.EIWATER NET DROF
(INCHES)
(,MINUTES) J (.MINUTES) J (INCHES)
TEST HOLE PRESOAKED PRIOR TO TESTING:
1 13:36 0.00
2 13:46 15 2.00 2.00"
3 13:48
4
0.00
2.56 2.56"
14:03 15
5 14:12 0.00
6 14:27 15 2.50 2.50"
PERCOLATION RATE: 6 ,(M~N/n~CH) PERC. HOLEDIA. 6" 0NCHES
TEST RUN BETWEEN: 5 FT. and 6 FT.
COMMENTS: TEST HOLE PRE SOAKED PRIOR TO TEST.
TEST PERFORMED BY ANDERSON ENGINEERING. I, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MLTNICIPLE GUIDELINES IN EFFECT ON THIS
DATE: 7/16/02
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773
September 1, 2010
Municipality of Anchorage
Building Safety Division
On Site Water and Wastewater Program
4700 Elmore Street
Anchorage, AK 99507
Attention: Debbie Wockenfuss
Subject:
Cloud Nine Subdivision, S-11723
Water Availability Study
Dear Debbie:
We have collected information on several wells in the area of the proposed Seclusion
Subdivision to estimate the possible depths and production rates of wells to be
constructed in the future on Lots lA and lB of Cloud Nine Subdivision. Field
investigations indicate a combination of wells constructed without the presence of
bedrock and others indicating bedrock at depths exceeding 40'. In all cases the well are
shallow in comparison to most wells in the Anchorage area with the deepest at 183' and
the shallowest at 55'.
No information is available on Lot 2, Paine Subdivision which falls close to Cloud Nine
Subdivision. It is thought to be fairly shallow with sufficient production to support the
house. The well on Lot 1, Gallagher Subdivision directly east of Cloud Nine is cased to
a depth of 111'. No exact depth of the well is known, but a recent production test
indicated a yield of 5.6 gallons per minute. The well on Lot 3, Gallagher Subdivision
approximately 1,400' east of Cloud Nine has a well 135' deep with a production rate of
1.5 gallons per minute. The ground elevation at the well head is similar to the elevation
where wells would probably be constructed in Cloud Nine Subdivision.
Little information could be found on the wells located immediately south of Paine Road.
It is known the wells have been in use for many years and no shortage of water has
been reported. Lot 10, Block 10 Rabbit Creek Heights Subdivision is directly across
Paine Road from Lots 2 and 3, Seclusion Subdivision and adjacent to Cloud Nine. The
well on this lot is 183' deep and produces 3.5 gallons per minute according to the well
log. Lot 9 immediately west of this lot and directly across from Lot 2, Seclusion is 130'
l:::loud Nine Subdivision
September 1, 2010
Page 2
deep with a production rate of 4.0 gallons per minute noted on the well log. Two
production tests have been performed in the past on the well, which indicate 3.8 and 3.0
gallons per minute.
A breakdown of the wells in the area with their respective production rates follows:
LOTS IA AND lB, CLOUD NINE SUBDIVISION
WATER AVAILABILITY STUDY
WELL
LEGAL DESCRIPTION DEPTH PRODUCTION - LOG PRODUCTION - TEST
Galla~lher, Lot 1 >111' 5.8 GPM
Gallagher, Lot 3 135' 1.5 GPM
King Heights, Lot 3 127' 8.0 GPM 5.25 GPM
Hunter Heights, Tract 1 90' 5.0 GPM
Cinerama, Lot 17 212' 40 GPM
Mountain Vale, Lot 2A 83' 20 GPM
Mountain Vale, Lot lA 83' 10 GPM
Mountain Vale, Lot 4 >49' 3.5 GPM
Mountain Vale, Lot 5 11.0 GPM 5.25 GPM
Rabbit Creek Hfs, Lot 8A 160' Unknown
Rabbit Creek Hts, Lot 10 183' 3.5 GPM
Rabbit Creek Hts., Lot 9 130' 4.0 GPM 3.8/3.0 GPM
No development has yet occurred to the immediate east of Cloud Nine Subdivision nor
is there any development to the south or southwest. Grandeur Subdivision will soon be
developed to the southwest which will provide further indications of the well depths and
productions to be expected on Cloud Nine Subdivision.
Surface water in the form of Rabbit Creek runs through the area and to the northeast of
Cloud Nine Subdivision. The presence of Rabbit Creek and the watershed area
surrounding the Bear Valley area contributes to the shallow aquifer apparently serving
the area. Runoff from the mountains surrounding the area is noted year 'round
constantly replenishing the aquifer.
Cloud Nine Subdivision
September 1, 2010
Page 2
It is obvious from our study that any wells to be constructed in Cloud Nine Subdivision in
the future will be placed to depths of less than 200' and will probably be founded in
bedrock. The depth of the bedrock is unknown, but may exceed 50'. It is also possible
bedrock may not be found as noted on Lot 3, Gallagher Subdivision which indicated no
bedrock to 135'. The production rates will be sufficient to support a four bedroom home
and can be expected to be between 2 and 5 gallons per minute.
Sincerely,
Michael E. Anderson, P.E.
Attachments
4A
16
Lof lB
Lof
lA
Lof
EABBIT
CEEEK
HEIGHT:
BLOCK
LOT 2
Lof 2 Lof 3
LOT 5A
:REEK
CINERAMA
BLOCK 2
TR D
Lof 4
LOT 7
MO /NTAIN
LOT 6 LOT 5
PAINE ROAD
LOT 1
GALl
LOT2
VACANT
LOT 4
VACANT
LOT 4
LOT 3
VACANT
LOT 2
LOT 1
LOT 5 .~ 0
TR 1
49'~
No, CE-4381
WATER AVAILABILITY
SCALE 1" = 200'
PLAN