HomeMy WebLinkAboutSCHROEDER EAST BLK 6 LT 10Schroeder
East
Block 6
Lot 10
#050-071-21
Permit Number:
Tax Code Number:
Work Type:
On-Site Wastewater Disposal System Permit
OSP151114
05007121000
Septic
MUNICIPALITY OF ANCHORAGE
Development Services Department
On-Site Water & Wastewater Program
4700 EImore Road, PO Box 196650
Anchorage, AK 99519-6650
Telephone: (907) 343-7904
Initial
Permit Effective Dates: May 11, 2015 to May 10, 2016
Design Engineer: ANDERSON ENGINEERING
Subdivision: SCHROEDER EAST
Site Legal Address: SCHROEDER EAST BLK 6 LT 10 G:0353
Owner/Address: TROY DAVIS HOMES INC
165 EAST PARKS HIGHWAY STE 200 WASILLA AK 996547059
Site Mailing Address: 17548 SANTA MARIA DR, Eagle River
Department
Lot Size in Sq Ft: 20708
Total Bedrooms: 3
This permit is for the construction of:
Y Disposal Field Y Septic Tank N Holding Tank N Privy N Private Well N Water Storage
All construction must be in accordance with: 1. The attached approved design.
2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater
Disposal Regulations (18AAC72) and Drinking Water Regulations (ISAACS0).
3. The wastewater code requires inspections during the installation. The engineer must notify the Development Services
Department at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 (24 hours).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must either:
A. Open and Close on the same day.
B. Covered, sealed, and heated to prevent freezing.
Date:
MUNICIPALITY OF ANCHORAGE
Phone: 907-343 ,927_~.~
Community Development Department
Development Services Division Fax~' ~.,,_~
On-Site Water & Wastewater Program
ON-SITE SEWER/WELL PERMIT APPLICATION
Parcel I.D. 050-071-21
Properly owner(s) Troy Davis Homes Day phone
Mailing address 165 E. Parks Highway #200 Wasilla, AK 99654
Site address 17546 Santa Maria Drive Eagle River, AK 99577
Legal description (Sub'd., Block & Lot) Schroeder East, Block 6, Lot 10
Legal description (Township, Range & Section)
Lot Size 20,708 . Sq. Ft. Number of Bedrooms .Three
APPLICATION IS FOR: APPLICATION IS AN: TYPE OF DWELLING:
(~] all that apply)
Absorption Field [] Initial [] Single Family (SF) []
(w/wo ADU)
Septic Tank [] Upgrade []
Duplex (D) []
Holding Tank [] Renewal []
Multiple Dwellings []
Privy [] (SF and/or D)
Private Well []
Water Storage []
THIS APPLICATION INCLUDES A VARIANCE / WAIVER REQUEST FOR:
Dis tance:
I certify that the above information is correct. I further certify that this is in accordance with
applicable Municipal Codes.
(Signature of property owner or authorized agent)
permit/Rush Fees: ~ .¢"~[,~f0 ~' ~/'0,~/~Waiver Fees:
Date of Payment: '~/¢//~"' ~ Date of Payment:
Receipt Number: 0~':~~'' Receipt Number:
Permit No. O~ i¢[~ lll~ waiver No.
ANCHORAGE, AK99524 '
522-7773 677-7766 (FAX)
May 9, 2015
Municipality of Anchorage
Development Services Department
On-Site Water and Wastewater Program
4700 South Bragaw Street
Anchorage, AK 99519-6650
Subject:
Lot 10, Block 6, Schroeder Subdivision East Addition
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of the subject lot intends to construct a three bedroom home. We are
therefore requesting a permit be issued for the construction of a new septic system to
accommodate the home. The attached Site Plan and backup'documentation identify
the location and configuration of the proposed septic system. The subdivision is served
by the AWWU water system and a service will be extended to this lot. No existing wells
or septic systems are closer than 100' from the proposed septic system Drainage
arrows are shown on the site plan showing the grade and direction of flow on the lot.
The drainage pattern will not be changed as a result of this project.
The test hole placed on the lot in the area of the proposed absorption trench indicated
silty sand and gravel (GM/SM) material. The percolation rate of the soil was
determined to be 4.6 minutes per inch. Groundwater was found at 8' during the
placement of the test hole and stabilized at 6' below the surface during the monitoring
period which included a recent inspection. An application rate of 1.2 gallons per day
per square foot was used in the design of the absorption system. We are proposing to
place a new 1,250-gallon STEP tank and 2-33" long by 5' wide by 1' effective depth
absorption trenches to treat and dispose of the effluent generated in the house. The
elevation of the distribution line in the absorption trench will be 1' below the surface and
the total depth will be 2'. A minimum of 3' of fill or 2" of insulation and 2' of fill will be
placed over the absorption trench and 4' over the septic tank.
The ground surface on the lot in the area of the absorption trench slopes to the
southeast at approximately 2%. The new trenches will be constructed parallel with the
contours of the slope as much as possible in conformance with Municipal requirements.
The new septic system will be constructed a minimum of 100' from all wells and any
Lot 10, Block 6, Schroeder Subdivision East Addn.
May 9, 2015
Page Two
wells and any surface water and 10' from the proposed and existing water services in
the area.
If the system is constructed in accordance with our design the following statements
apply:
to The system, if constructed as designed, will have no adverse impact on the wells
in the area or those to be constructed in the future.
2. The system, if constructed as designed, will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
3. The system, if constructed as designed, will have no adverse impact On reserve
space, either surface or subsurface, on any lots located in the area.
The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area. The current drainage pattern will be maintained.
Sincerely,
Michael E. Anderson, P.E.
Attachments
, /
9
/
/
8
11
VACANT
/
I
/
AREA
MAP
NOTE:
Subdivision is Served by
AWWU Woter System. No
Conflicts with Adjocent
Wells or Septic Systems.
SCALE 1' : 60'
SCHROEDER
LOT
SUBDIVISION EAST
10, BLOCK 6
20,708 S.F.
ADDN.
30. O0
66' Long x 5' Wide x 1'
Effective Depth Absorption
Trench.
9
30.00
MT
1,250 Gallon '
Step Tank
Three Bedroom House
10
11
NOTE:
No Areas of Excessive
Slope or Surface Water
ore Within 100' of Any
Port of the New Septic
;9.61
SITE PLAN
SCALE 1' = 30'
ALTERNATE SITE:
Advontex Treatment Sytem w/14'
Long x ,5' Wide x 1' Effective
Depth Absorption Trench.
Appl Rate 6 GPO/SF
/
/
/
/
/ /
/ /
/
//s
/ ,
/
/
/
6
LEGEND
SV - Septic Vent
CO - Clean Out
MT - Monitor Tube
TH - Test Hole
MH - Man Hole
LOT 10, BLOCK 6, SCHROEDER EAST SUBDIVISION
DESIGN FACTORS:
Three Bedroom Home
Perc. Rate: 1-5 Min./Inch
Application Rate: 1.2 GPD/SF
SYSTEM REQUIREMENTS:
5' Wide Trench System
1,250 Gallon STEP Ta[~k
1' Drainfield Rock
Pressure Distribution System
3 Bedrooms * 150 GPD/Bedroom = 375 SF Absorption Area
375 SF/1.2 GPDISF/5 SF (Width) *.87 (Red. Factor)= 65.25 LF Trench Length
THEREFORE: Construct 2 - 33" Long x 5' Wide x 1' Effective Depth Absorption Trenches at the
Location Shown. Flowline Elevation to be 1' Below the Existing Ground Elevation. Total Depth to be
2' Below Existing Ground. Provide 4' of Cover Over Septic Tank and 3' of Cover Over Absorption
Trench. Maintain 200' Separation From Class A Well in the Neighborhood.
ell
110"
~ Geotextile Fabric
1" Perforated
PVC (Holes Down)
15 - 3/16" Holes @ 2.2'
Each Lateral
Drainfield Rock
TYPICAL 5' WIDE TRENCH SECTION
SCA,E) ..........
NOTE: Grade Area .Over Trench to Drain Away. ~'.~ ~
· . , . ,"' 49th
M~mmum 6 Separabon From Bedrock. · ,,........~.....~......¢, .......... ./..]z....~
Minimum 4' Separation From Groundwater. t
Minimum 200' Separation From Class A Well in the Area. ~'~ ,~0,^~,.^,'""""'"'"'""~¢-'~;'~'"?"~
Minimum 100' Separation From Surface Water or Streams· ~,.~'.,.. No. c~4~, ./.~..~
4700
DEPTH
(feet)
1
2
3
4
5
6
7
8
9
11
20'
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
BRAGAW STREET ANCHORAGE, AK 99519-6650
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION:
PERFORMED FOR:
DATE: 2/27/15
PARCEL ID#:
0L/0G
SILTY GRAVEL
WITH SAND
GM/SM
BOH @ IL,'
LOT 10, BLOCK 6, SCHROEDER EAST SUBDIVISION
TROY DAVIS HOMES
PROJECT No.:
TECHNICIAN: LARRY BETTS
SLOPE
E
SITE PLAN
SEE SITE PLAN
2% ~
DEPTH TO
DATE READING GROSS TIME NET TIME WATER NET DROF
(MINUTES) (MINUTES) (INCHES) (INCHES)
TEST HOLE PRESOAKED PRIOR TO TEST[NO:
2/27 1 2:09 1.63"
2 2:39 30 8.13" 6.50"
3 2:40 1.50"
4 3:10 30 8.00" 6.50"
5 3:11 1.50"
6 3:41 '30 8.00" 6.50"
!
PERCOLATION RATE: 4.6 (MIN/INCH) PERC. HOLE DIA.10'' (INCHES)
TEST RUN BETWEEN: 3.5 FT. and 4.5 FT.
COMMENTS: TEST HOLE PRE SOAKED PRIOR TO TEST,
TEST PERFORMED BY ANDERSON ENGINEERING. I, MICHAEL E. ANDERSON CERTIFY THAT
THIS WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPLE GUIDELINES IN EFFECT ON THIS
DATE: 5/10115
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 10, BLOCK 6, SCHROEDER SUBDIVISION EAST ADDN.
GENERAL:
The scope of this project includes furnishing and installing a new 1,250
gallon STEP Tank at the location shown on the Site Plan. Work also
includes the construction of 2 new 33' long by 5' wide by 1' effective
depth absorption trench also shown on the Site Plan. A 1.25" PVC line
must be placed between the lift station and the new absorption trench.
The distribution pipe for the trench will be placed at 1.0' below the
ground surface. The total depth of the trench will be 2.0'. A minimum
of 3' of cover must be placed atop the trench. A minimum of 4' of cover
is required over the Septic Tank and Lift Station. All disturbed areas
must be revegetated after construction is complete.
Construction shall be in accordance with the approved site plan,
design drawings, Municipal Permit with any special provisions or
conditions, and all applicable State and Municipal Wastewater
Disposal Regulations.
The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the
location of all lot lines. Contractor is also responsible to verify the
separation distance from the well on this and adjacent lots and from
surface water and streams in the area.
Unless specifically agreed otherwise, the contractor shall be
responsible for final grading areas subsequently depressed from soil
settling. Property owner shall be responsible for revegetation of
affected areas unless specifically agreed otherwise.
Contractors installing wastewater disposal systems must be certified
by the Development Services Department Building Safety Division On-
Site Water and Wastewater Program for system installations. Owners
installing their own systems must receive prior approval from the On-
Site Water and Wastewater Program before beginning system
installation.
SEPTIC TANK/LIFT STATION INSTALLATION
1. The-1,250-gallon STEP Tank must be obtained from a Municipally
approved septic tank manufacturer.
2. The septic tank shall be sufficiently bedded to prevent settling or
shifting of the tank.
Lot 10, Block 6, Schroeder Subdivision East Addn.
May 9, 2015
Page 2 of 4
3. All standpipes on the septic tank shall extend a minimum of 12 inches
above final grade.
4. Tanks installed without 4' of cover shall have a minimum of 2" of direct
burial insulation.
A foundation cleanout shall be installed one to four feet from the
building foundation. Two cleanouts are required between the tank and
the drain field.
6. Final grading over the tank shall be such that a positive slope exists
away from the septic tank.
DRAIN FIELD CONSTRUCTION:
1. The drain field shall be constructed to the dimensions shown on the
design. The bottom of the bed shall be within 2" of level.
Distribution piping must be placed level with perforations down atop a
level bed of drain field rock. Rock should then be placed over the pipe
to provide a minimum of 2" of cover.
3. A silt barrier or geotextile fabric must be placed between the drain field'
rock and the natural soil backfill.
Monitor tubes must be 4" in diameter and installed at the locations
shown on the design. The portion below the distribution line must be
perforated.
Contractor shall verify the septic tank and drain field are a minimum
100' away from any private water wells in the area, 150' from a Class
"C" Well or 200' from any community well.
Direct bury insulation must be placed over the distribution system if
less than 3' of backfill depth is available. Finish grade over the trench
must be mounded to prevent settlement or depressions.
7. Grade area surrounding the absorption trenches to drain away.
A minimum 2' of accepting soil is required below the drain field rock for
a 5' wide trench. All pockets of unacceptable materials must be
removed and replaced.
Lot 10, Block 6, Schroeder Subdivision East Addn.
May 9, 2015
Page 3 of 4
MATERIAL SPECIFICATIONS:
The lift station must be constructed by a municipally approved septic
tank manufacturer. An Orenco 20 OSI 05 HHF-5 pump is
recommended.
2. The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated
and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and
ASTM D2662 or A.B.S. (perforated and solid).
3. insulation shall be at least 2" thick extruded direct burial polystyrene
(Dow Chemical Co. Styrofoam HI or equal).
4. Septic tank inlets and outlets shall be fitted with watertight couplings
(Caulder, Fernco, or equal).
5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed
between the final drain rock layer and the native soil layer.
6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing
the #200 sieve.
FILTER SAND SPECIFICATION:
1. Material for Filter Sand must be classified as a masonry sand and
meet the following gradation:
50% or More Passing the No. 4 Sieve
2% or Less Passing the No. 100 Sieve
1% or Less Passing the No. 200 Sieve
INSPECTIONS:
Municipal Ordinance requires a minimum of two inspections. These
inspections must be conducted under the supervision of a professional
engineer registered in the State of Alaska. The first inspection must be
conducted after the excavation of trenches, beds or pits and before the
installation of any gravel. A septic tank may be set in place, but may not
be backfilled.
The second inspection must be conducted after the placement of the
geotextile fabric, gravel, distribution piping, standpipes, cleanouts and
insulation. No backfill should be in place at the time of inspection.
Lot 10, Block 6, Schroeder Subdivision East Addn.
May 9, 2015
Page 4 of 4
Contractor shall provide a copy of all field survey layout and construction
notes for use in preparing the cedified as-built of the completed system.