Loading...
HomeMy WebLinkAboutKOBUK TR BMark Begich Mayor Development Sewices Department Building Sefety Division On-Site Water & Wastewater Program 4700 Elmo~e P.O, ~ox 196650 Anchorage, AK 99507 www.muni.orq/o~ite (~7) 343-79~ Pump Installation Log () Well Drilling Permit Number: SW Date of Issue: Parcel Identification Number: Legal Description Pump Instillation Date: Property Owner Name & Address: JJ ~.~.t Hv[D~,,O ~..0 . Pump' Intak~e Depth Below Top of Well Casing: 0'O feet Pump~Manu, facturer's Name: ~V~.~O~ Pump'Model: PumpSize /O hp Pitless Adapter Burial Depth: /t9 feet Pitless Adapter Manufacturer's Name: Pitless Adapter Installer: Well Disinfected Upon Completion? ~Yes [--] No Method of Dislnfection: Comments: Pump Installer Name: ~Je}¢ ~ 0~ ~, t~,~'l ~; & .~ll~erage Well-& Pump Serv!ce, 330 East 76th Avenue ~chorage, AK 99518 Phone: 907-243-0740 Attention: The pump installer shall provide a pump installation log to the DSD within 30 days of pump installation. MUNICIPALITY OF ANCHORAGE Development Services Department Phone: 907-343-7904 On-Site Water & Wastewater Section Fax: 907-343-7997 Pump Installation Log Well Drilling Permit Number: _______________ Date of Issue: ____-____-____ Parcel Identification Number: ____-____-____ Legal Description Block Lot Property Owner Name & Address: Pump Installation Date: _____-_____-_____ Pump Intake Depth Below Top of Well Casing: __________ feet Pump Manufacturer’s Name: ___________________________ Pump Model: _____________________________________ Pump Size: ____________hp Pitless Adapter Burial Depth: _________ feet Pitless Adapter Manufacturer’s Name: _________________________ Pitless Adapter Installer: ____________________________ Well Disinfected Upon Completion? XX Yes No Method of Disinfection: _____________________________ Comments: Pump Installer Name: __________________________________ Company: ___________________________________________ Mailing Address: ______________________________________ City: ___________________ State: __________Zip: _________ Attention: The pump installer shall provide a pump installation log to On-site within 30 days of pump installation.