MEMO
Steve Eng, PE, PH
17237 Bear Paw Circle, Eagle River AK 99577
(907) 694-7028 tel
(907) 694-7026 fax
NorthRimEng@aol.com
Date: 11/4105
Number of Pages: 5
To: Dan Roth, Manager On-Site Services
Subject: Mount Baldy Estates S/D, Potential Aquifer Yield & Monitor Well Measure
CMM General Contractors is in the process of a subdividing 4 lots near the upper end of Skyline
Drive in Eagle River. Soil tests for the subdivision revealed bedrock at about a 10 foot depth.
Bedrock at this depth in this portion of the mountain is not unexpected. At this elevation a thin
lateral moraine is present. A large unconsolidated strata does exist at the Wallace Homestead
site; this is generally along an alluvial flow where sediments have built up over time.
Due to the thin unconsolidated strata, the expected aquifer will be bedrock. Bedrock aquifers in
this area generally do not produce large amounts of water, but many times will yield sufficient
flow for a residential household. Success has been achieved by hydro-fracture of bedrock water
wells to increase well yield. Other methods of increasing flow also are available.
Well information for four bedrock water wells along Timberline Drive is included. Flow rates
are typical for bedrock water wells. Two neighboring well logs, drilled by M-W Drilling are also
included. These also are typical bedrock wells. These wells tend to be deep wells, which has an
added benefit of providing underground storage.
Mount Baldy Estates can be expected to have similar success with bedrock water wells. The
wells can be expected to be deep, and hydro-fracture may increase yield. The lots are large
enough to attempt secondary wells if insufficient water is discovered.
We do not expect any impact to neighboring water wells due to the nature of the large lots.
Draw-down from each residential water well could be expected to be localized to a radius that is
located on the individual property. The relatively small flow requirements for a single family
residential property can be expected to not adversely impact the local aquifer.
Mount Baldy Estates
MEMO
October 25~ 2005 Monitor Well Measurements
Measurements were made to Monitor Tubes which were originally logged by Allan W. Murfitt
in March, 2005. The Monitor Tube identification is listed fi'om the Legal Description of the soils
log.
1. Lot 1, a Subdivision of Lot 2: No water present in monitor tube.
2. Lot 2, a Subdivision of Lot 2: No water present in monitor tube.
3. Lot 3, a Subdivision of Lot 2: No water present in monitor tube.
4. Lot 4, a Subdivision of Lot 2: 8" water present in monitor tube.
5. Lot 5, a Subdivision of Lot 2: No water present in monitor tube.
6. Lot 6, a Subdivision of Lot 2: No water present in monitor tube.
Mount Baldy Estates
(Q
~ X
°*
.J~A!~:~ elbe3 :uo!~oo9
t
A.W. Murfitt Company_
CONSULTING ENGINEERS & TESTING
13810 Venus Way · Anchorage, Alaska 99515 · Telephone (907) 345-2737 · FAX (907) 345-3264
June 27, 2005
CMM General Contractors
P.O. Box 774042
Eagle River, AK 99577-4042
ATTENTION: Mr. Robert Caywood
Mount Baldy Estates
Lots 1 through 6, A Subdivision of Lot 2
NWl/4, NE1/4, T14N, R1W, See. 6, S.M.
Eagle River, Alaska
AWM Co. Job 05-294.11
Dear Mr. Caywood:
Water levels were rechecked in the standpipes at the referenced sites and cross slopes measured within 50 feet
of each test pit location on June 10, 2005 by Mr. Russell Hepner, E.I.T. of our firm. Standpipes in Test Pits 1,
2, 3 and 6 were dry, with no water. Water was observed at depths of 6 feet below the ground surface at Lots 4
and 5. This subdivision is located at or above the tree line on north western facing slopes on Skylme Drive
above Eagle River. Spring break up is later than in the lower areas of Anchorage and Eagle River due to the
higher elevation. Surface melt water had run into the excavations at Lots 4 and 5 accounting for water in the
pipes. New test pits were dug and new standpipes installed within 15 feet of the original holes at these
locations on June 17, 2005. The soil profiles were essentially the same as in the original Test Pits. Holes were
dry on June 17, and June 25, 2005.
Cross slopes were measured both up and down slope within 50 feet at each test pit location using conventional
survey techniques. These are summarized as follows:
LOT # SLOPE DIRECTION UPSLOPE, %
DOWN SLOPE, %
1 E-W 24 18
2 E-W 23 23
3 E-W 20 20
4 NW-SE 5 22
5 E-W 20 20
6 SE-NW 12 12
Page 2
June 27, 2005
CMM General Contractors, Inc.
Mount Baldy Estates, 05-294.11
Please do not hesitate to call if you need any additional information.
Sincerely,
A.W. Murfitt Company
Registered Civil Engineer 4977-E
Attachments: Soil Particle Size Distribution Reports, Soils at Lots 2, 3, 4, 5, and 6.
FAST
FAST 1320' 60'~O ~,PRIVAT[
S~L.~ E.~,",400g ~,LL. T-..S
LOT ~A
J~ I LO'T '~
EA~L~S~EST SUB.
NORTH 1298'
4-
5-
6-
7-
8-
9-
20-
COMMENTS
Performed For:
Municipality of Anchorage
Development Services Department
Building Safety Division
On--Site Water and Wastewater Program
4700 South Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650
vAvw. mu hi. orq/onsite
(907) 343-7904
Soils Log - Percolation Test
CMM General Contractors
Lot 1, a Su~b~¥ision of Lot 2
~tr c~C_i~ ~:~ S,ope
gand with Silt and Gravel
Date Performed:
, root mat.,
frozen to 0.5', moist.
t, brown, moist.
GP-GM) brown moist. '~ o
WAS GROUND WATER
ENCOUNTERED? NO
S
IF YES, AT WHAT DEPTH? L
Depth to Water After
Monitoring? lX~O Water
Date: 3/29/05
120 backhoe.
~ee gite Plan
Reading Date Gross Time Net Time Depth to Water Net Drop
6" 3/18/05 ~:45 pm
3-15/16 .... 3:55 pm 10 min 2-1/16"
5" 3/18/05 5:56 pm
~-13/16" 6:06 pm 10 min 2-3/16"
5" 3/18/05 6:07 pm
~-13/16" 6:17 pm 10 min 2-3/16"
PERCOLATION RATE 4,57 minutes/inch) PERC HOLE DIAMETER 6"
TEST RUH BETWEEN 4.25 FTAND 4.75 FT
PERFORMED BY: Russell Hepner, E.I.T. ] Allan W. Murfitt CERTIFY THAT THIS TEST WAS
PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: March 18, 2005
Municipality of Anchorage
Development Services Department
Building Safety Division
On-Bite Water and Wastewater Program
4700 Boulh Bragaw Bt.
P.O. Box 196650 Anchorage, AK 995196650
(907) 343-7904
Legal DoscripUo~io~of Lot 2
Soils Log - Percolation Test
CMM Geaeral Contractors Date Performed: 3/! ~/2005
, root mat.,
1,
2- frozen to 0.5', moist.
Slope
Silt and Sand
brown, moist.
/
/
5-
6-
7-
8-
Komatsu PC 120 backhoe_
WAS GROUND WATER
ENCOUNTERED? NO
'IF YES, AT WHAT DEPTH? o
rote: 3/29/05
12-
Site Plan
Sec Site iPlat
13-
14-
15-
16-
17-
18-
19-
20-
COMMENTS
Reading Date Gross Time Net Time Depth to Water Net Drop
5" 3/18/05 5:06 pm
;4/16" 5:16pm 10min 2-8/16"
6" 3/18/05 5:17 pm
3-10/16" 5:27 pm 10 rain 2-6/16"
5" 3/18/05 5:28 pm
3-9/16" " 5:38 pm 10 rain 2-7/16"
PERCIDLATIONRATE 4.10 minutest'inch pERCHOLEDIAMETIER 6"
TEST RUN EiETWEEN 2.75 FTAND 3.25 FT
PERFORMED BY: Russell Hepner, E.I.T. { Allan W. Murfitt CERTIFY THAT THIS TEST WAS
PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: March 18, 2005
Particle Size Distribution Report
?o
2O
GI~IN SIZE - mm
%COBBLES t %GRAVELI */.SAND 39.1 %SILT
SIE~ PERCENT SPEC.* PASS? Material D~criotion
S~E FINER PERCENT (X=NO) Well-~aded ~avel wi~ Silt and Sand (OW-GM).
1.5 in. 85.8
1 in. 75.8
.75 in. 74.7
.5 in. 66.0 &~a~*m Limita
.375 ~. 60.0
~ 48.6 PL= NP LL=
gl0 35.8
~20 27.0
~0 21.4 D8fi= 37.2 D60= 9.52 DS0= 5.20
860 17.0 D30= 1.19 D~5= 0.191 D~0= 0.0824
gl~ 13.4 Gu= 115.58 Ge= 1.79
8200 9.5
Glaaaifi~ation
HSGS= OW-GM ~SHTO=
R~mar~
Lot 2 P~c. Test.
* (m ~ificafion ~hd~)
8ampla ~o.: l 8ou~ of 8ampla: ~at,: 3/18/05
~o*ation: Lot 2 El*v./Oapth: 2.75-3.25'
~roj~: Skyline ~ve P~c. Tests
Company Eagle River, AK
Proj~t No: 05-294.11 Figure 1
Municipality of Anchorage
Development Services Department
Building Safety Division
On-Sits Water and Wastswater Program
4700 Seulh Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6050
Soils Log - Percolation Test
Pedormed For: CiYLM General Contractors
Legal Descdptron.~~division of Lot 2
Slope
frozen to 0.5', moist.
Gravel and
WAS GROUND WATER
ENCOUNTERED?
Komatsu PC 120 backhoe.
Reading
6" 3/18/05
4-12/16"
2-14/16"
6" ~/18/05
3-2/16"
6-1/16" 3/18/05
3-2/16"
No Water
3/29/05
lO-
12-
13-
14-
15-
16-
18-
19-
20-
COMMENTS
See Site Plat
Date
PE~COLA~ON RA'r~ 10.2
TEST RUN BETWEEN 2
Gross Time
3:12 pm
3:22 pm
3:42 pm
3:44 pm
4:14 pm
4:16 pm
~-:46 pm
FT AND 2.5
Net Time Depth to Water
10mia
30 rain
30 rain
30 rain
F:T
Net Drop
14/16"
3-2/16"
2-14t16"
2-15/16"
PERFORMED BY: Russell Hepner, E.LT. I Allan W. Murfitt CERTIFY THAT THIS TEST WAS
PERFORMED tN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE, DATE: March 18, 2005
Particle Size Distribution Report
500 100 10 I 0.1 0.01 0.001
GRAIN SIZE - mm
% COBBLES % GI~J~VEL %SAND I %SILT 1%CLAYI
0.0 32.0 58.8 9.2
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
1.5 in. 100.0
1 in. 90,8
.75 m. 86.8
.5 in. 81.8
.375 in. 78.6
//4 68.0
#10 52.7
#20 39.2
g40 29.6
fl60 21.3
#100 15.1
#200 9.2
(no specification provided)
Sample No.: 1
Location: Lot 3
Source of Sample:
Material Description
Poorly waded Sand with Silt and Gravel (SP-SM).
Atterberfl Limits
PL= NP LL= NV
Coefficients
D85= 16.5 D60= 3.02
D30= 0.436 D'is= 0.149
CU= 36.36 CC= 0.76
Classffication
USCS= SP-SM AASHTO=
Remarks
Lot 3 Perc. Test.
PI=
DS0= 1.71
D10= 0.0832
Date: 3/18/05
ElevJDepth: 2-2.5'
A · m · m aa ~'"tt [[ Client: CMM General Contractors
.W. MUF~II! Project: Skyline Drive Perc. Tests
"m n It Eagle River, AK
pa y It.,oj t.o:05-294.11 Figure 2
Performed For:
Municipality of Anchorage
Development Services Department
Building Sal'ety Division
Or. Site Water and Wastewater Program
4700 South Bragew SI.
P.O. Box 196650 Anchorage, AK 99519-6650
(907) 343-7904
Soils Log ~ Percolation Test
CIVIM General Contractors
,
Date Performed: 3/18/2005
6-
7-
8-
11-
13-
15-
~7-
20-
COMMENTS
~ root mat.,
frozen to 0.5', moist.
It and Gravel
moist.
Slope
/
/
/
No Water
3/29/05
Site Plan
See i Site lPlan
13I.
Kormtau PC 120 bacldme.
Reading Date Gross Time Net Drop
PERCOLATIO~fl RATE
!2:27 pm
2:37 pm
12:38 pm
12:48 pm
t2:49 pm
[2:59 pm
Net Time Depth to Water
lOmin
IOmin
lOmin
FT AND 6 FT
5-12/16"
%8/16"
5-9/16"
PERFORMED BY: Russell Hepner, E.I.T. I Allan W. Mtlrfitt CERTIFY THAT THIS TEST WAS
PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: March 18, 2005
Particle Size Distribution Report
500 100 10 I 0.1 0.01 0.001
GRAIN SIZE - mm
%COBBLESI %GRAVEL %SAND56.3 %SILT 7.9 I '/°CLAYI
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
1.5 in. 86.5
1 in. 86.5
.75 in. 82.3
.5 in. 79.6
.375 in. 75.8
g4 64.2
#10 50.6
#20 37.4
~?40 27.6
#60 19.5
#100 13.2
//200 7.9
(no specification provided)
Sample No.: 1
Location: Lot4
Source of Sample:
Material Description
Poorly graded Sand with Silt and Gravel (SP-SM).
Atterber.q Limits
PL= NP LL= NV pi=
Coefficients
D85= 23.2 D60= 3.66 D50= 1.92
D30= 0.501 D15= 0.177 D10= 0.103
CU= 35.71 CC= 0.67
Classification
USCS= SP-SM AASHTO=
Remarks
Lot 4 Perc. Test.
Date: 3/18/05
Elev.IDepth: 5.5-6'
A.W. Murfitt
Client: CMM General Contractors
Project: Skyline Drive Perc. Tests
Eagle River, AK
Project No: 05-294.11
Company 3
8-
g-
2O-
COMMENTS
Municipality of Anchorage
Development Serv;,ces Department
Bui~ing Safe['/Division
On-Sit~ Water and Wastewater Program
4700 Sou{h Bragew St.
P.O. Box 196650 Anchorage, AK 995196650
Soils Log - Percolation Test
CMM General Contractors Date Pefforme,
1- (OL), mot mat.,
2- fi~ozen to 0.5', moist.
;and
moist.
Smvel
brown, moist.
Komatsu PC 120 backhoe.
Site Plan
See Site Plan
Monifodng? 'NO Water ~ ~ .~- .---. -----" J °
Date: 3/29/05 [
Reading Date
5" 3/21/05
3-6/16"
5" 3/21/05
~-! 1/16"
5" 3F21/05
3-10/16" "
PEIRGOL-a,TION F~e~TE 4.21
TEST RUN BETVV~EN 2
Gross Time Net Time
1:56 pm
2:06 pm
-~:07 pm
!:17pm
2:19 pm
2:29 pm
10 mtn
10 rain l-5/16"
10 rain ~.-6/16"
Depth to Water/ Net Drop
40/16"
FT AND 2,5 FT
PERFORMED BY: Rassell H~ner, EJLT. I Allan W. Murfitt CERTIFY THAT THIS TEST WAS
PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: Mamh 2t, 2005
2~
3-
5-
6-
7-
8-
9-
10-
11-
15-
17-
18-
2O~
COMMENTS
Municipality of Anchorage
Development Services Department
Building Safety Division
On-Site Water and Wastewater program
4700 Soulh Bragaw SI.
(907) 343-7904
Soils Log - Percolation Test
Performed For: CMM General Contractors
Legat Description: L~n of Lot 2
frozen to 1', moist.
It and Gravel
moist.
Slope
~ 120 backhoe.
No Water
3/29/05
fi" 3/21/05
- 6" 3i21/05
Date Performed: 3/21/2005
Township, Raoge. Section: NW 1/4of NE 1/4, Sec. 6, TI4N, RIW, SM
Site Plan
See j Site Plax
1:22 pm
1:30 pm
31 pm
[:40 pm
1:4I pm
1:50 pm
Net Time Depth lo Water
8 mm
)min
TEST RUNSET'//ffEfl 3 FT AND 3.5 FT
Net Drop
jPr
PERFORMED BY: Russell Hepner, E.LT. r Allan W, Murfitt CERTIFY THAT THIS TEST WAS
PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: March 21, 2005