Loading...
HomeMy WebLinkAboutMOUNTAIN AIR ESTATES #1 BLK 5 LT 1Mountain Air Estates #1 Block 5 Lot 1 #017�21 1 � 12 MOA has confirmed that the 2010 upgrade has not been installed. On -Site Wastewater Disposal System Permit MUNICIPALITY OF ANCHORAGE Development Services Department On -Site Water & Wastewater Program 4700 Elmore Road, PO Box 196650 Anchorage, AK 99519-6650 Telephone: (907) 343-7904 Permit Number: OSP101142 Tax Code Number: 01721112000 Work Type: Septic Upgrade Permit Effective Dates: August 27, 2010 to August 27, 2011 Design Engineer: ANDERSON ENGINEERING Subdivision: MOUNTAIN AIR ESTATES #1 Site Legal Address: MOUNTAIN AIR ESTATES #1 BLK 5 LT 1 G:3139 Owner/Address: THROOP THOMAS I & LORETTA 6621 CLOUDCROFT LANE ANCHORAGE AK 995160000 Site Mailing Address: 6621 CLOUDCROFT LN, Anchorage Lot Size in Sq Ft: Total Bedrooms: This permit is for the construction of: 25270 3 Y Disposal Field Y Septic Tank N Holding Tank N Privy N Private Well N Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80). 3. The wastewater code requires inspections during the installation. The engineer must notify the Development Services Department at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 (24 hours). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must either: A. Open and Close on the same day. B. Covered, sealed, and heated to prevent freezing. Received By: ///1�� Ej"_� Issued By: Date: �� ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING 0"P'/c% 11 U: Parcel I.D. 017-211-12 Property Owner(S) Thomas and Loretta Throop Day phone Mailing address 6621 Cloudcroft Lane Anchorage, AK Zip Code 99516 Site address 6621 Cloudcroft Lane Anchorage, AK Code 99516 Legal description (Sub'd., Block & Lot) Mountain Air Estates Subdivision No. 1, Block 5, Lot 1 Legal description (Township, Range & Section) Lot Size 25,270 Sq. Ft. THIS APPLICATION IS FOR (® all that apply): Absorption Field Municipality of Anchorage Septic Tank Development Services Department **or Building Safety Division Privy On -Site Water and Wastewater Program Private Well 4700 Bragaw Street Water Storage P.O. Box 196650 Anchorage, Alaska 99519-6650 www.muni.org/onsite (907) 343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING 0"P'/c% 11 U: Parcel I.D. 017-211-12 Property Owner(S) Thomas and Loretta Throop Day phone Mailing address 6621 Cloudcroft Lane Anchorage, AK Zip Code 99516 Site address 6621 Cloudcroft Lane Anchorage, AK Code 99516 Legal description (Sub'd., Block & Lot) Mountain Air Estates Subdivision No. 1, Block 5, Lot 1 Legal description (Township, Range & Section) Lot Size 25,270 Sq. Ft. THIS APPLICATION IS FOR (® all that apply): Absorption Field F� Septic Tank El Holding Tank ❑ Privy ❑ Private Well ❑ Water Storage ❑ Number of Bedrooms Three (3) THIS APPLICATION IS AN: IMP Initial ❑ Upgrade F-� Renewal ❑ I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. (Signature of property owner or authorized agent) Permit/Rush Fees: C=' Waiver Fees: Date of Payment: 2�C Date of Payment: Receipt Number: �q Receipt Number: (Rev. 11/05) ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 677-7766_(FAX) August 3, 2010 Municipality of Anchorage Development Services Department On -Site Water and Wastewater Program 4700 Elmore Road Anchorage, AK 99519-6650 Subject: Lot 1, Block 5, Mountain Air Estates Subdivision, Addn. No. 1 Septic System Design and Permit Application Impacts to Adjacent Properties Dear Onsite Services Engineer: The existing absorption system on the subject lot has failed and must be upgraded. We are therefore requesting a permit be issued for the upgrade of the septic system to accommodate the three-bedroom home on the lot. The attached Site Plan and backup documentation identify the location and configuration of the existing and proposed septic system. The existing septic tank will be pumped, crushed and backfilled in place. A new 1,250 Gallon STEP Tank will be placed at the location shown. The existing absorption pit will be completely removed along with all contamination and buried on site. The excavated area will be backfilled with clean gravel to within 2' of the existing surface. A new 12' wide x 30' long sand filter will then be installed along with an air line connected to a compressor in the garage. Also identified on the plans are the locations of the existing well on this and adjacent lots and adjacent septic systems. The new system will be installed outside the well radii and will eliminate all conflicts between the proposed septic system and the wells on this or adjacent lots. Protective radii are shown to the adjacent wells. Drainage arrows are shown indicating the current drainage patterns. The drainage patterns will be maintained after construction. Several test holes were recently placed on the lot with varying results. Test Hole Nos. 1 and 5 nearest the old pit indicated silty gravel with some sand (GM). The percolation rate was determined to be 30 to 40 minutes per inch. An application rate of 2 gallons per day per square foot was utilized to design the intermittent dosing sand filter system. The total depth of the system will be 2' below the existing surface. The filter will be covered with insulation and 2' of cover or a minimum of 3' of cover. The new STEP tank will have a minimum of 4' of cover. Lot 1, Block 5, Mtn. Air Estates No. 1 August 3, 2010 Page Two The ground surface on the lot slopes slightly to the northeast in the area of the absorption trench. The trench will be placed parallel to the contours of the ground as much as possible and in conformance with design criteria. A minimum of 100' will be maintained between all components of the septic system and the proposed well and from any surface water in the area. If the system is constructed in accordance with our design the following statements apply: The system, if constructed as designed, will have no adverse impact on the wells in the area or those to be constructed in the future. 2. The system, if constructed as designed, will have no adverse impact on existing septic systems in the area or those to be constructed in the future. 3. The system, if constructed as designed, will have no adverse impact on reserve space, either surface or subsurface, on any lots located in the area. 4. The system, if constructed as designed, will have no adverse impact on drainage patterns in the area. The current drainage pattern will be maintained. Sincerely,,T— C4—z--, Michael E. E. Anderson, P.E. Attachments ��O*- v� PAE, �....��qs.i �.„ 49th .....: MICHAEL E. ANDERSON 4 •�.�f�S• NO. CE -4381 ��� i w � U I' ui 41� 3 49th ':�: ............... MICHAEL E. ANDERSON • W / �•° NO. CE -4381 'raj • 0419 �FESS14NPi••• C FEE,- Rppp \ 4 v I i' 5 \�\ /3 VACANT 1 M UNTAA IR --------------------- ------ -------------- --------------------- 6 10 9 8 7 / SNOW FLAKE AREA MAP SCALE 1' = 100' MOUNTAIN AIR ESTATES NO. 1 LOT 1, BLOCK 5 25,270 S.F. / go N9 RPBB\I_ REEK t Exisellting Eosetnei W 149 5a 10, Sc�ee� � � i i i i i i \ / Z Contamination FCO N Disposal Three Bedroom o, D Area T113® Home Air Compressor Shall be � Located in the Garage. Contractor Shall Provide o 0-10 PSI Pressure Gauge. o () Gauge Located in Garage. p M TH2® 1,250 Gallon SV / \ Air Compressor Shall be a STEP Tank Thomas Industries Model m M .Sy 5070 as Supplied by 0 1.25' PVC Line Sloped to \ Anchorage Tank. Air Drain to Lift Station. All / Compressor Alarm must be Connections to be Stainless 10% Installed in the Garage. Steel with Stainless Steel 0- \ Bands. c LU TH4 ® N of I a 10% o 5% _ ~– > Remove o MT h ( Absorption Pit.Well Existing I See Section 5� A. 5% ~—A I I I A ® !- TH1 I—IIII i MJI 1«_ ' !�0 uta Y Eosecne�t -t--1--1- t-I–J 9 TH5 t5% i i 1 i i NOTE: V,� �oE Remove Existing Absorption UD\iRo Pit in its Entirety. Replace CLQ with Clean Gravel. Construct. New 12' x 30' Sand Filter. SITE PLAN Intermittent Dosing Sand Filter System (IDSF) must be as manufactured by Anchorage Tank and Orenco Systems unless previously approved. SCALE 1' = 30' LOT 1, BLOCK 5, MOUNTAIN AIR ESTATES SUBDIVISION DESIGN FACTORS: SYSTEM REQUIREMENTS: Three Bedroom House Bottomless Intermittent Sand Filter Perc. Rate: 31-60 Min./Inch 1,250 Gallon STEP Tank Application Rate: 2 GPD/SF 2' Coarse Sand (See Spec.) Air Supply Line (Anch. Tank) 6" of 3/8" Pea Gravel 3 Bedrooms X 150 GPD/2 GPD/SF (Application Rate) = 225 SF Absorption Area 225 SF/12 LF (Width) = 18.75 LF Bed Length THEREFORE: Construct a 30' Long x 12' Wide Bottomless Sand Filter Bed as Shown Below. Place Distribution Piping at Original Ground Surface. Provide 2" of Insulation and 2' of Cover or T of Cover Over Bed. Maintain 100' Separation From All Wells in the Area and 10' From Water Services. 6" Topsoil and Seed Monitor Tube 4 1� 2" Insulation & 2' Cover (Min.) Geotextile Fabric Pea Gravel .5' O O O 3/4" PVC Laterals (4 ing Ground Existing Ground 2 2' Fift�c`5arid=. 3/8" Pea Gravel Air Line 18" Below Top of Sand 12' NOTE: Remove Old Absorption Pit and All Contamination. Replace with Clean Gravel (GW) to 2' Below Original Ground. TYPICAL BED SECTION .�� of IT3 (NO SCALE) ; • •,.... NOTE. Grade Area Surrounding Bed to Drain Away. Ar 49th Minimum 6' Separation From Bedrock. : ,,,,;,',,,,, ,,,,,,,,,,,,,,,, %,,, Minimum 4' Separation From Groundwater. s��*-� f..................................... Minimum 100' Separation From Wells in the Area. % MICHAELE- ANDERSON'• �'b Minimum 100' Separation From Surface Water or Streams. . 0� No. CE 4381 Minimum 10' Separation From Water Service Line. ♦ 3§A �FESS��Pi��• • �� ea w e�j/ JA FTZ uj IL: /v W/ 00- ui 'g 1 C _ z Z c� Q O UX Z �+ W O Q m Q 0 Z C o O o I Q U O I— IL -J CL E? _ c o 0) o Q M w m00;� W (D 0) 0) E v J a) o r w a) c> co c a) C� o W — c cl_ H O O L.Lo c a O N a).. ' O c N = O CL fn od J ul O O .. O N O O y m� �� m ° .0 C.0 5 Q Q C7 o m c m cu a) a NW N C) Co N X �p @ O fn > W c a).+ E > U U m 2 a) o CD o. w E Z' E c m = m o o CRMFUU r N co, cr In N `d (O .O C _ O y X W Performed For: Legal De criptiof 10- 11- 12- 13- 14- 15- 16- 17- 18- 19- 20 - COMMENTS MR Municipality of Anchorage Development Services Department . Building Safety Division On -Site Water and Wastewater Program 4700 Elmore Road P.O. Box 196650 Anchorage, AK 99507 www. ci. an chorage. ak. u s (907) 343-7904 NVA % *;0 pN�rN�rrr�:rrr•riL irrrdi+rr r% rrrrrrirrri•r�.-•:: �:• rr•rr•/ MICHAEL E. ANDERSON :•� Jf.•• CE 4381••: .W � �� . .tom ^L4 . • �.r V 40W Soils Log - Percolation Test ��o P • • • • • • •A Thomas Thropp Date Performed: Mountain Air Ests. Add # 1, 1-1, B5 Township, Range, Section: t7� �ivl L. -- CM WAS GROUND WATER , ENCOUNTERED? Net Time Depth to Water S IF YES, AT WHAT DEPTH? y- L Depth to Water After P Monitoring? E E Date: 51t'? 1 Reading Date Gross Time Net Time Depth to Water Net Drop 7.6 4 I �; ,79"d 140r05- MIA* PERCOLATION RATE AW (minutesfinch) PERC HOLE DIAMETER TEST RUNBETWEEN -FT AND FT FT I r • PERFORMED BY: �'� I CERTIFY THAT THIS TEST WAS PERFORMED IN ACCOR ANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: Municipality of Anchorage ••�L �� + Development Services Department �'`�'�• "•,�,II f'r Building Safety Division On -Site Water and Wastewater Program 4700 Elmore Road * : 49M •, * t9 • d "" '•' P.O. Box 196650 Anchorage, AK 99507 •••••.... .. ...... ....Of www.ci.anchoraoe.ak.us 1-1-M EL p, ANDERSON ; `�' •• �--. - (907) 343=7904 ♦ CE - 4381 •�4;' r •���9Fo' Soils Log:: - Percolation. Test Q;��� «AW Performed For Thomas Thropp Date Performed: Legal QeAsonpti., Mountain Air Ests. Add # 1, L1, B5 Township, Range, Section: Slope (Feet)' 5- 6- 7- 8- 7- 8- 10- 11- 12- 13- 14- 15- 16- 17- 18- 19- 20- 10- 11- 12- 13- 14- 15- 16- 1718- 19- 20- n 11 WAS GROUND WATER ENCOUNTERED? IF YES, AT WHAT DEPTH? Depth to. Water After Monitoring., Date 1u • ffm� em■E■E®NEEN■ Date Gross Time, N■■.N•WNRN■ Depth to Water Net Drop r . N j(p: C s I 0 • ffm� em■E■E®NEEN■ Date Gross Time, N■■.N•WNRN■ Depth to Water Net Drop Reading Date Gross Time, Net Time Depth to Water Net Drop j(p: v wlAn� s I r PERCOLATION RATE �- (minutWinch) PERC HOLE DIAMETER TEST RUN BETWEEN FT AND FT COMMENTS fi�r1h.i� rem"«� PERFORMED BY: I CERTIFY THAT THIS TEST WAS PERFORMED IN ACCOR ANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: Mountain Air Estates, Addn., # 1, Lot 1, Blk 5 Testhole Summar Testhole No. Date Perc Tested Perc Depth Perc Date Excavated By: Comments: 1 Oct / 2009 yes -6 to -6' 10/28/ 2009 Friend of Thomas Thropp 40 min / in 2 July 10, 10 Pre soak Monitored only -4 to -4.6' JL 10-11 Pomraning Excavation, LCC Vern Pomraning, opr. Perc slightly under 200 Win 3 July 14, 110 No Did not attempt PCN LLC Eric Philips, opr. the lense that appears percable was too damp 4 July 14, 110 No Did not attempt PCN LLC, Eric Philips, opr. 140 5 July 14, 110 yes -4 to - 4.6' PCN LLC Eric Philips, opr 36 min / in jTest hole 2�: loaded the perc cavity on Sat, July 10. to find a very slow absorption level. Returned on Mon, July 12 to find this cavity absorbs water at a rate exceeding 200 min / in. est hole 3: Silt content is too high and damp to consider attempting a perc test here est hole : Fill material of approx 3' in thickness appears perc able, however this lies above a 12 -14" lense of original ground organic mat that lies above a moderately dense to more dense with depth soils that vary in silt content with the classifications of GM / ML to ML. Alan Harala, Soils Technician aZ ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION AND MATERIAL SPECIFICATIONS SUBJECT: LOT 1, BLOCK 5, MOUNTAIN AIR ESTATESSUBDIVISION NO. 1 GENERAL: 1. The scope of this project includes total removal of the existing absorption pit including all contamination. Removed material to be buried on site at the location shown. The existing septic tank must be pumped, crushed and backfilled. Work also includes the furnishing and installing of a new 1,250 gallon STEP Tank at the location shown on the Site Plan. Work also includes the construction of a new 12' wide by 30' long intermittent dosing sand filter (IDSF) also shown on the Site Plan. A 1.25" PVC line must be placed between the lift station and the new sand filter. In addition an HDPE air hose must be placed in the sand filter and run to the garage and connected to an air compressor. The specifications for the compressor and hose are found on the Site Plan. The distribution pipe for the sand filter will be placed at the ground surface. The total depth of the sand filter will be 2'. The specification for the sand to be used in the filter is found in these documents. A minimum of 3' of cover must be placed atop the sand filter. A minimum of 4' of cover is required over the Septic Tank and Lift Station. All disturbed areas including the bed atop the new filter must be revegetated after construction is complete. The manufacturer's installation and material specifications are attached. Work and materials must comply with these specifications. 2. Construction shall be in accordance with the approved site plan, design drawings, Municipal Permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 3. The Contractor shall be responsible for obtaining all underground utility locates and for the layout of the septic system and verification of the location of all lot lines. Contractor is also responsible to verify the separation distance from the well on this and adjacent lots and from surface water and streams in the area. 4. Unless specifically agreed otherwise, the contractor shall be responsible for final grading areas subsequently depressed from soil settling. Property owner shall be responsible for revegetation of affected areas unless specifically agreed otherwise. 5. Contractors installing wastewater disposal systems must be certified by the Development Services Department Building Safety Division On - Site Water and Wastewater Program for system installations. Owners installing their own systems must receive prior approval from the On- Lot 1, Block 5, Mtn. Air Estates No. 1 August 3, 2010 Page 2 of 4 Site Water and Wastewater Program before beginning system installation. SEPTIC TANK/LIFT STATION INSTALLATION 1. The 1,250 -gallon STEP Tank must be obtained from a Municipally approved septic tank manufacturer. The settings for the lift station must be as specified by the supplier of the lift station in accordance with requirements, for the sand filter. See the manufacturer's specifications attached. 2. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank. 3. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 4. Tanks installed without 4' of cover shall have a minimum of 2" of direct burial insulation. 5. A foundation cleanout shall be installed one to four feet from the building foundation. Two cleanouts are required between the tank and the drain field. 6. Final grading over the tank shall be such that a positive slope exists away from the septic tank. DRAIN FIELD CONSTRUCTION: 1. The drain field shall be constructed to the dimensions shown on the design. The bottom of the bed shall be within 2" of level. 2. Distribution piping must be placed level with perforations down atop a level bed of drain field rock. Rock should then be placed over the pipe to provide a minimum of 2" of cover. 3. A silt barrier or geotextile fabric must be placed between the drain field rock and the natural soil backfill. 4. Monitor tubes must be 4" in diameter and installed at the locations shown on the design. The portion below the distribution line must be perforated. 5. Contractor shall verify the septic tank and drain field are a minimum 100' away from any private water wells in the area, 150' from a Class "C" Well or 200' from any community well. Lot 1, Block 5, Mtn. Air Estates No. 1 August 3, 2010 Page 3 of 4 6. Direct bury insulation must be placed over the distribution system if less than 3' of backfill depth is available. Finish grade over the trench must be mounded to prevent settlement or depressions. 7. Grade area surrounding the absorption trenches to drain away. 8. A minimum 2' of accepting soil is required below the drain field rock for a 5' wide trench. All pockets of unacceptable materials must be removed and replaced. MATERIAL SPECIFICATIONS: 1. The lift station must be constructed by a municipally approved septic tank manufacturer. An Orenco 20 OSI 05 HHF-5 pump is recommended. 2. The following pipe materials are approved for use in septic system installations in the Municipality of Anchorage: Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and ASTM D2662 or A.B.S. (perforated and solid). 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Co. Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Fernco, or equal). 5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed between the final drain rock layer and the native soil layer. 6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the #200 sieve. FILTER SAND SPECIFICATION: 1. Material for Filter Sand must be classified as a masonry sand and meet the following gradation: 50% or More Passing the No. 4 Sieve 2% or Less Passing the No. 100 Sieve 1 % or Less Passing the No. 200 Sieve INSPECTIONS: Lot 1, Block 5, Mtn. Air Estates No. 1 August 3, 2010 Page 4 of 4 Municipal Ordinance requires a minimum of two inspections. These inspections must be conducted under the supervision of a professional engineer registered in the State of Alaska. The first inspection must be conducted after the excavation of trenches, beds or pits and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled. The second inspection must be conducted after the placement of the geotextile fabric, gravel, distribution piping, standpipes, cleanouts and insulation. No backfill should be in place at the time of inspection. Contractor shall provide a copy of all field survey layout and construction notes for use in preparing the certified as -built of the completed system. ADVANCED WASTEWATER TREATMENT SYSTEM MAINTENANCE AND REPAIR AGREEMENT MEMORANDUM OF UNDERSTANDING BETWEEN MUNICIPALITY OF ANCHORAGE AND THIS MEMORANDUM OF UNDERSTANDING made and entered into as of this Day of of 20, by and between herein the "OWNER," and the Municipality of Anchorage, herein the "MUNICIPALITY." In consideration of the mutual covenants contained herein, the parties to this Memorandum of Understanding agree as follows: 1. ADVANCED WASTEWATER TREATMENT SYSTEMS. Municipality grants permission to Owner to utilize and operate an Advanced Wastew4er'.. , Treatment System (AWWTS), described as r: c - tVj Sr. -00 located at G•LI f_ 1 , Anchorage, Alaska. 2. Definitions. A. Alteration. Any change to the design or function of an AWWTS that Includes the installation or removal of any parts, components or pieces not included in the original construction permit and design. Prior to performing any alterations to an AWWTS the owner must obtain a Wastewater Disposal System Construction Permit from the Municipality pursuant to Anchorage Municipal Code (hereinafter, "AMC") 15.65. B. Certificate of On -Site Systems Approval. An approval by the Municipality of existing water and wastewater disposal systems given at the time of property sale and title transfer in accordance with AMC 15.65. These approvals certify that the systems are adequate for the homes that they support and meet the codes that were in place at the time of system construction. C. Damage. Any man-made or natural change in a system that would inhibit the system from performing as designed. D. Maintenance and Repair. The scheduled and as needed replacement of existing parts, components and pieces of an AWWTS that were included in the original design which would allow the AWWTS to continue to perform as designed. E. Permit (Construction) An On -Site Wastewater Disposal System Construction Permit as defined by AMC 15.65. F. Permit (Operating) An Advanced Wastewater Treatment System Operating Permit. An annual permit, issued by the Municipality, that allows the Owner to operate an AWWTS, upon meeting all the requirements of this agreement, the conditions of Operating Permit, the requirements of the On -Site Wastewater System Construction Permit and all relevant provisions of AMC 15.65 3. Fee. Owner shall pay to Municipality an annual fee of ($ (C= .00), payable on or before the issuance of the operating permit and annually thereafter. The annual fee is due on or before the anniversary date of the approval by the Municipality of installed system. 4. Term. The term of this Memorandum of Understanding shall be for the life of the AWWTS. The term begins on the date of approval by the Municipality of the installed system and shall continue while the AWWTS system is in use or operational or until the property is sold or title is transferred by owner and a new certificate of On -Site approval is issued to the new owner or transferee of the property. 5. Alterations, Installation and Removal of Additional Equipment. Owner agrees not to make any alterations, removal of parts or additions to the AWWTS without a Construction Permit from the Municipality. 6. Maintenance and Repairs. A. Throughout the term of this Memorandum of Understanding, the Owner shall maintain AWWTS in good repair. In addition, it shall be the responsibility of the Owner during the term of this Memorandum of Understanding, and any extensions or renewals thereof, at the owner's sole expense, to pay for any and all: (1) repair(s), (2) maintenance, (3) adjustment(s), (4) replacement costs, and (5) inspection costs. Further, Owner agrees to comply will all applicable ordinance, laws, regulations, rules and orders for the AWWTS. B. Owner agrees to provide the Municipality a written schedule of routine maintenance and repairs which have been performed on the system pursuant to the terms and conditions contained in the Owner's AWWTS Operating Permit. This schedule shall be submitted to the Municipality annually upon the renewal of the permit. The schedule of maintenance and repair contained in the Owner's AWWTS Operating Permit is: 14,jo c C. Owner acknowledges that the fine schedule for failing to maintain and repair an AWWTS are codified in AMC 14.60. D. Owner agrees that only maintenance, repair personnel certified by the Municipality will inspect and make any necessary maintenance, repairs or permitted alterations to the system. E. Owner agrees to grant the Municipality reasonable access to test and inspect the AWWTS upon 24 hours written notice. F. Owner agrees that any sale or transfer of title of the property will not occur without a new Certificate of On -Site Systems Approval. G. Owner agrees that the relevant provisions of the standard specification guidebook for AWWTS is the governing professional guidelines for the construction, maintenance and repair of the Owner's AWWTS. 7. Nonwaiver. The failure of either party at any time to enforce a provision of this Memorandum of Understanding shall in no way constitute a waiver of the provisions, nor in any way effect the validity of the Memorandum of Understanding or any part hereof, or the right of such party thereafter to enforce each and every provision hereof. 8. Amendment. A. This Memorandum of Understanding shall only be amended, modified or changed by a writing, executed by authorized representatives of the parties, with the same formality of this Memorandum of Understanding was executed and such writing shall be attached to this Memorandum of Understanding as an amendment. B. For the purposes of any amendment modification or change to the terms and conditions of this contract, the only authorized representatives of the parties are: Owner: Anchorage: Purchasing Officer C. Any attempt to amend, modify, or change this contract by either an unauthorized representative or unauthorized means shall be void. 9. Jurisdiction: Choice of Law. Any civil action arising from this Memorandum of Understanding shall be brought in the Superior Court for the Third Judicial District of the State of Alaska at Anchorage. The laws of the State of Alaska shall govern the rights and obligations of the parties under this Memorandum of Understanding. 10. Severability. Any provisions of this Memorandum of Understanding decreed invalid by a court of competent jurisdiction shall not invalidate the remaining provisions of the Memorandum of Understanding. By: -1110'04-11�"i X�a-" Date:r STATE OF ALASKA THIRD JUDICIAL DISTRICT MUNICIPALITY: By: Title: Date: ss. The foregoing instrument was acknowledged before me this day of , 20/6), by 7-,-2&-) �g G NOTARYUBL C FO ALA A �Y PUBLIC My Commission expires: o y M. MKA*U E pM FCOMW- TATE OF ALASKA LOMN oa rss wmrY 14.:ots GREG R ANCHORAGE AREA BOR 'GH US) Department of Environmental Quality 3500 Tudor Road Anchorage, Alaska 99507 SEEPAGE PIT: i NUMBER OF PITS I DIAMETER —AOR WIDTH, LENGTH Ly 1, DEPTH 5►-ri��l �l�i�a LINING MATERIACRIB SIZE: DIAMETER_DEPTH DISTANCE FROM: WELL �R�.) D i TOTAL EFFECTIVE j BUILDING FOUNDATION_, ��1 ABSORPTION AREA WALL AREA _U_� �L_SQ. FT. NEAREST LOT LINE ( ) ADDITIONAL ABSORPTION WELL TYPE 'Y- CONSTRUCTION 111 EPTH BUILDING NEAREST NEAREST SEPTIC FOUNDATION—,LOT LINE SEWER LINE TANK _ CESSPOOL OTHER SOURCES APPROVED DISAPPROVED REMA DISTANCESA Vel', ``v INSTALLED BY: 50y PIPE MATERIAL: C -1 - LOT SLOPE: REMARKS:C�Y�E c 3c,h'\J V' 1 1 n PW -026 DIAGRAM OF SYSTEM DISTANCE FROM: SEEPAGE SYSTEM _ INSPECTION REPORT ON-SITE SEWAGE DISPOSAL SYSTEM NAMEEk k YYWA\—,,—`VV kN-0.0? MAILING ADDRESS J (1 J"I - PHONE 4J1 �� Qj LOCATION 1i 1, f: LEGAL DESCRIPTION SEPTIC TANK: DISTANCE CmI \\ N J0j 1 t C I NUMBER OF FROM WELLP� `>%e•I�MANUFACTURER �'�< MATERIAL��-� COMPARTMENTS INSIDE LENGTH INSIDE WIDTH LIQUID DEPTH "` LIQUID CAPACITYIDO GALLONS. SEEPAGE PIT: i NUMBER OF PITS I DIAMETER —AOR WIDTH, LENGTH Ly 1, DEPTH 5►-ri��l �l�i�a LINING MATERIACRIB SIZE: DIAMETER_DEPTH DISTANCE FROM: WELL �R�.) D i TOTAL EFFECTIVE j BUILDING FOUNDATION_, ��1 ABSORPTION AREA WALL AREA _U_� �L_SQ. FT. NEAREST LOT LINE ( ) ADDITIONAL ABSORPTION WELL TYPE 'Y- CONSTRUCTION 111 EPTH BUILDING NEAREST NEAREST SEPTIC FOUNDATION—,LOT LINE SEWER LINE TANK _ CESSPOOL OTHER SOURCES APPROVED DISAPPROVED REMA DISTANCESA Vel', ``v INSTALLED BY: 50y PIPE MATERIAL: C -1 - LOT SLOPE: REMARKS:C�Y�E c 3c,h'\J V' 1 1 n PW -026 DIAGRAM OF SYSTEM DISTANCE FROM: SEEPAGE SYSTEM _ F. N r (j F- j- I,JV 1 4 r A L. Q 13 A L, I I PERMIT NO APPIACAMON AND PERMIT S i,I j ,-14: A-, //o Al MUM DI�AIN I IE Lu 1 LAT"dq W '51 1 1 11 'A I', PIT %fill A-- 10 13E IN STAI LEI) UY 4P: PEW,! T Y 61 T 0 0 1 H 0F AH -V I'vi-I Ivan Q;11.-ivrn"RU Q It Hy IL) AM Ili VYI I A PC Y 'I T y p r DNAIN l­IELO--"QA2- I PAG L PIT A DI I A I N FIELD -Jo— f P ; c JI' LINE. So 1 1 P! It SELPA(31, PIT AIAO CONSIDER AREA WELLS U? VAIN 10 r NK SEEPAGE PI -1 I -j 1, 1 r to fln I, I I r� �AN K, SE(L'A(,;E I']'. -J90 -OwA_ DRIAIN FILED . 50 jLo, ;;J RIVt U, I AKE 51 REAM. '.WI)N R:YQ AND QUI OF SUAIC TANK AND INTO CHILI CHO-;_INKG 14 1 OF A-A"ON 5 PEET INTI) UNDIbTURDED SOIL. iNKII4 DEtJ.IF)rR CAST IRON ,IPI -ION l ON Sill TKA AN" GRIAPAGE Mi rt D Nt IIt AIRTIGHT RVl`.IoVADLr CAPS. -14FORP.1 TO HQPOt)GL1 Hk i!U!.A­1R-)NS REGARDING INWfA1-FA-1 10N. /60 HFALIH AUTHOnify 011 f1F31c;Nf:H jPjHYTHA1 I ANI FAMILIA" Vol" Iml: ,,y SI L Et 1 It? /,CCOPPA?U I WITH !iAll) � DDI 4�9 I r 10 VIT. RIO' illk 10 HQHC. to I vx. ry 700 In PII? G 0 , � i 1: r C I cl? II1" A 14 11 r 11 1 2 A 7 9 10 1'2- Oenth Feet Soil Characteristics 7opsoli) a-1-01vall", S614d ;4c 0... r;.f 5.4. Sol re cK&Q on 0; S 4" r 50 V44 "i t (as 1-- 4 ---- --- - -- -- s Ground Water Encountered? - If Yes, At what Depth? I Reading ! Date Gross Time 0 P4,/ T Het DY -)n: Ori PA P. "I f1L N f �-`W 35001 T I I D 0 R P i; A'ICHORAGF ALASKA 99502 Performed For n r00p Date 11ec m0d -29-7 24s-- Leaal- Oescrintion: Lot I Block -5 Suhdivision --- This Form Renorts Soils 1,c)q,-_.y Percolation Test 1 2 A 7 9 10 1'2- Oenth Feet Soil Characteristics 7opsoli) a-1-01vall", S614d ;4c 0... r;.f 5.4. Sol re cK&Q on 0; S 4" r 50 V44 "i t (as 1-- 4 ---- --- - -- -- s Ground Water Encountered? - If Yes, At what Depth? I Reading ! Date Gross Time 0 P4,/ T Het DY -)n: A. Percolation Rate Proposed 1 n s t 4 1 Depth of 1 n I e T(, - !ren - f�n'"`FNTS Test Performed -7—A v r -T- 3 % ... ... .� I 1 `. ... h i i't' .. � � i �: S I .. .. _� A