Loading...
HomeMy WebLinkAboutMIDWAY Lots 1 & 2 Plat# 84-453 S-7888 CASE NUMBER: S-7888 L"~'MuNICIPALITY OF ANCHORAGE ~-~ DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION Environmental Health Division CASE REVIEW WORKSHEET DATE RECEWED: S DUE BY: ------- October 9, 1984 suBo'v's,oN oR PBOJECT T, TLE: 1 Lots :.1, 2 ~ Subdivision ;OMMUNITY WATER AVAILABLE 7 ER AVAILABLE COMMENTS: 71-014 (Rev. DEPT. OF I~]~¥1RONMENTAL CONSI~;flVATION / SOUTHCENTRAL REGIONAL OFFICE 43? "E" STREET, SUITE 200 ANCHORAGE, ALASKA 9950l BILL SFI£FFI£LD, GOVERNOR 274-2533 July 13, 1984 S&S Engineers 7125 Old Seward Highway Anchorage, Alaska 9950] Dear Sir: Subject: Water & Sewer System - Fer§uson Subdivision ~ (852]-FA-005) and (852l_DA_005)' We have reviewed the plans and specifications for the subject project. The project is hereby approved for construction :for :the items with which this Department is concerned. This ]etter cOns%itut.es._the by A.S. 46.03.720(a) for apprOval o ' · Permit required sewage application rate is l lmi+-~ ~f.s_ewerag.e.sy rems provided that the - ~ ~u one gal/ftL~/daY :Or less. Enc]osed with this letter is a .*Certificate ' . to' Construct* fOr the drinking water system. The *A~PrOVa] to OPerate'".section of the certificate ~st be completed by a representative, of this Department prior to placing the system in operation. ~].,,.,: Zt should be remembe~ that fine] approval' will necessitate the submission of Engineer As-built Plans.. This will 'conseQuently mandate that a pro- fessional engineer Conduct basic inspection of this project sO' as to be able to sign off on aS-built p]ans. Arrangement for this insPection work is the responsibility of:the developer. B£E/msm Enclosure Zely, Environmental Engineer STATE OF ALASKA ~....~ DEPARTMENT OF ENVIRONMENTAL CONSERVATION CONSTRUCTION AND OPERATION CERTIFICATE for PUBLIC WATER SYSTEMS A. APPROVAL TO CONSTRUCT Plans for the'construction or modification of__F - : ~ approved. ':' '?~:'~ .... ~ ~ appr0v~ (s~ched conditions). ~' -~':~; .lf.c0ns~mc~jbn has not sta~ within ~o years of:the ~pr0val date, this ce~ificate Is void and new plans and '.' · -. -:.Sp~lf cat ohs must ~ submitted for review and approval before construction. B-::'~APPROVED CHANGE ORDERS Change'{c~ ~ ~. ~ ~pt~ ~ : ' :' Approved by. · Date · public water system located , Alaska, submitted In accordance with 18 AAC 80.100 ~-~ . __.have been reviewed and are C. APPROVAL TO OPERATE The "APPROVAL TO OPERATE" section must be completed and signed by the Department before any water is made available to the public. _public (date). The system is hereby The construction of the water system was completed on granted interim approval to operate for 90 days following the completion date. TITLE -- DATE As-built plans submitted during the interim approval period, or an Inspection by the Department, has confirmed the system was constructed according to the approYed plans. The system is hereby ~;rante,~ final approval to operate. TITLE DATE OWNER OF LAND LEGAL DESCRIPTION-- DATE - Started PERMIT NUMBER DOC Co. dba P.O. Box 272, CHUGiAK, ALASKA 99567 · TELEPHONE 688-2759 Ended ra n oF FORM ,tiO -- From (~" Ft. to t:'d Ft.__ From Ft. to~; L:'~ Ft.~. From ."' Ft. to "t/.:, _Ft. From Ft, tO Ft.~ From .... Ft. t~ Ft. From_~ ~Ft. to _ Ft.~ From Ft, to Fmm~ ~Ft. From__. Ft. to Ft._. From_ Ft. to__ _Ft._ From _Ft. to -- Ft.. From_ _ Ft. to _ _Ft._ From_ _Ft. to____ _Ft. From__ _Ft. to~ Ft. From _Ft. to__. --Ft. MISCL. INFORMATION~ ' 6 0 ' - DEPTH OF WELL STATIC LEVEL OF WATER FT. DRAW DOWN FT. GA LS. PER HR KIND OF CASING From Ft. to ' ' Ft._ From Ft. to Ft. ' "' ' .... From Ft. to Ft. From Ft. to Ft From Ft. to Ft_ From Ft. to--Ft. ' From Ft. t0Ft' From Ft. to , Ft. From Ft. to Ft._ From Ft. to Ft From--Ft. to Ft. From Ft. to Ft._ Fr°m--Ft. to Ft. Fr°m--Ft. to__Ft. From Ft. to FL DRILLER'S NAME __A.;::,.~.~./ ,~..,...,,... .... Jim Sullivan 688-25~0 ~ &~CT~c · [ ~'v~, ~ w~za.) ~ww, c~?~v .uM~ WELL RECOVERy TEST Alaska Distribu! P.O. 8ox Eagle River, ADDRESS: LEGAL CHECKED()- VERBAL(] WELLLOG¢i DRAW DOWN -- CHECKED() VERRALi) WELLLOG() DATE: CASING DIAMETER CHECKEDf) VERBAL{~ TANK CAPACITy CHECKEDI) WELLLOG(} WELLLOG() VERBAL() WELL LOG(} CHECKEB() PUMp HP VERBALf) CHECKED(-j- WELLLOG() VERBAL{) WELL LOG ( ) / C~ SCREENED() ;,~%~, I oPEN(, ELLLOG() I PERFORATED4"~ ~~ ,""' '., ~ .- _'- I LINED() COMMENTS: - ~ /,'c~/ C~ ENGINEERS, INC. PER~Or~MEDFO~ (~ICL ~/ M~I~TI~ SOIL LOG PERCOLATION TEST V SO~L LOG )(' PEPCO~ A FiON DATE PERFORMED ~''~ SLOPE . SITE PLAN ~"=-':<2 ~_,0-I~.0' .s~,ab, I e;A~,,~_w._ ~Jn~ 11-- W 13 ~ IF YES P - . AT WHAT ' DEPTH [FEET) PERCOLATION RATE (rain utes/inch) COMMENTS TEST RUN BETWEEN . FT AND ..... FT