HomeMy WebLinkAboutHYLEN CREST #1 Water Improvements - Wells abandoned - Connected AWWU Nov. 1991
CONSTRUCTION AND OPERATION CERTIFICATE
ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION
PUBLIC WATER SYSTEM
APPROVAL TO CONSTRUCT
Plans forthe construction of t'~ '(' ~.~-~1~
public water system located
, Alaska, submitted in accordance with 18 AAC 80.100
have been reviewed and are
in ~' )'~-Li~ rz,'T~o(.~, ~
by ~ ~,' l(' H-
If construction has not started within two years of the approval date, this certificate is void and new
plans and specifications must be submitted for review and approval before construction.
APPROVED CHANGE ORDERS
Change (contract order no. Approved by Date
or descriptive reference)
The "APPROVAL TO OPERATE" section must be completed before any water is made available to
the public.
APPROVAL TO OPERATE
The construction of the H ?' L'~)~/ (~_~-~"F ~-~'.,//) /'Z~'~;/L':/i~.Z'~:f'~P /¢~. public
water system was completed on /0 -/? ~ .c-'~ (date). The system is hereby
granted interim approval to operate for 90 days following the c.ompletion date.
BY TITLE DATE
As-built plans submitted during the interim appr6val period, or an inspection by the Department has
confirmed the system was constructed according to the approved plans. The system is hereby granted
final/2~proval to operate.
CONSTRUCTION AND OPERATION CERTIFICATE
ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION
PUBLIC WATER SYSTEM
APPROVAL TO CONSTRUCT
p, ans for the construct,on of
in
· . public water system located
Alaska, submitted in accordance with 18 AAC 80.].00
have been reviewed and are
approved.
:/~/[3 conditionally approved (s~,~attached conditions).
'B'y~ '- - ~' - · TITLE
DATE
If construction has not started within two years of the approval date, this certificate is void and new
plans and specifications must be submitted for review and approval before construction.
APPROVED CHANGE ORDERS
Change (contract order no. Approved by Date
or descriptive reference)
The "APPROVAL TO OPERATE" section must be completed before any water is made available to
the public.
APPROVAL TO OPERATE
The construction of the /'Jl/f~vt~?l~C*J~ 3'//5 .//~14~"l' .~ /,(J,//rT~-I~ :~]'~, JZJ public
water system was completed on /0 ¢ J ~-- ~4' (date). The system is hereby
granted interim approval to operate for 90 days following the cpmpletion date.
BY TITLE DATE
As-built plans submitted during the interim appr~)val period, or an inspection by the Department has
confirmed the system was constructed according to the approved plans. The system is hereby granted
fin,,Ti~approval to operate.
TITLE DATE