Loading...
HomeMy WebLinkAboutDOWLING LT 12 E2 S70'D L. I (907) 243-2282 KEN JOHNSON KEN'S COMPANY WATER WELL DRILLING PUMP SALES & SERVICE 30 YEARS ALASKA DR/LLING 3163 LINDEN DRIVE ANCHORAGE, ALASKA 99502 APRIL 16, 1984 TONEY L. & WILLOW CALICIN~ DBA T L C BODY SHOP 6601 Holly Anchorage, Alaska 99502 ( 243-7149 ) RE~ El' of South 70 fto of Lot 12 Dowling Subd. WATER WELL LOG 0 ft to 18 ft 18 ft to 25 ft 25 ft to 34 ft 34 ft to 64 ft 64 ft to 78 ft 78 ft -to 80 ft 80 ft to 82 ft 82 f't to 84 ft 84 ft to 104 ft 104 ft to 109 ft 109 ft to111 ft 111 ft to 112 ft 1!2 ft to 115 £t 115 ft to121 ft 121. ft to 122 ft 122 ft to 134 ft 134 ft to 138 ft 138 ft to 140 ft Soft Black organic peat Water 'bearing fine sand and gravel Med. gravel and clay Course gravel & gray silt Clay & med. gray Course gray & gray silt ( tight ) fine sand a gray. Weeps in six fto bails dry Fine grav& sand H20 ..heaves 3 ft.. 15 ft h~° Bails down 100% at 5 GP~ Course gray & gray silt..Weeps 3 GPN.. Me~. gray & clay ..dry .o Same..weeps H20..20 ft head..Bails dry.. Same with 40 ft. head ( overnight ) Bails dry at 3 GP~ Ned. gravel & gray silt Same..Weeps.. Course grav& gray silt Clay & med. g~avel Heaves fine gravel & sand 5 ft. Clean med. gravel & sand..Water bearing.. Overnight STATIC $49 ft. 9 in. TOO ( 91 ft. Hdo Test bailed one hour 30 min. at 11.25 GP~ Drawdown to 115 ft. Good Recovery ( very clean ) Total casing 140-10½ MUNIGPalW O1: A$OE DE~, OF HEAL~ & ENVI~NMENTAL PEOTECI1ON RECEIVED STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION CONSTRUCTION AND OPERATION CERTIFICATE for PUBLIC WATER SYSTEMS A. APPROVAL TO CONSTRUCT Plans for the construction or modification of public water system located ., Alaska, submitted in accordance with 18 AAC 80.100 by ~ have been reviewed and are approved. [] conditionally approved (see attached conditions). BY TITLE DATE If construction has not started within two years of the approval date, this certificate is void and new plans and specifications must be submitted for review and approval before construction. B. APPROVED CHANGE ORDERS Change (contract order no. or descriptive reference) Approved by Date C. APPROVAL TO OPERATE The "APPROVAL TO OPERATE" section must be completed and signed by the Department before any water is made available to the public. The construction of the water system was completed on granted interim approval to operate for 90 days following the completion date. public (date). The system is hereby BY TITLE DATE As-built plans submitted during the interim approval period, or an inspection by the Department, has confirmed the system was constructed according to the approved plans. The system is hereby granted final approval to operate. BY TITLE DATE 18-0407 (Rev, 11/83) DISTRIBUTION: 1. WHITE - ENGINEER (Complete Section C) 2, YELLOW - WATER SYSTEM FILE (Complete Section C) 3, PINK - ENGINEERIMUNI-BOROUGH (Complete Section C) 4, GOLDENROD - MUNI-BOROUGH (Complete Section A)