HomeMy WebLinkAboutDOWLING LT 12 E2 S70'D
L. I
(907) 243-2282
KEN JOHNSON
KEN'S COMPANY
WATER WELL DRILLING
PUMP SALES & SERVICE
30 YEARS ALASKA DR/LLING
3163 LINDEN DRIVE
ANCHORAGE, ALASKA 99502
APRIL 16, 1984
TONEY L. & WILLOW CALICIN~
DBA T L C BODY SHOP
6601 Holly
Anchorage, Alaska 99502
( 243-7149 )
RE~ El' of South 70 fto of Lot 12 Dowling Subd.
WATER WELL LOG
0 ft to 18 ft
18 ft to 25 ft
25 ft to 34 ft
34 ft to 64 ft
64 ft to 78 ft
78 ft -to 80 ft
80 ft to 82 ft
82 f't to 84 ft
84 ft to 104 ft
104 ft to 109 ft
109 ft to111 ft
111 ft to 112 ft
1!2 ft to 115 £t
115 ft to121 ft
121. ft to 122 ft
122 ft to 134 ft
134 ft to 138 ft
138 ft to 140 ft
Soft Black organic peat
Water 'bearing fine sand and gravel
Med. gravel and clay
Course gravel & gray silt
Clay & med. gray
Course gray & gray silt
( tight ) fine sand a gray. Weeps in six fto
bails dry
Fine grav& sand H20 ..heaves 3 ft.. 15 ft h~°
Bails down 100% at 5 GP~
Course gray & gray silt..Weeps 3 GPN..
Me~. gray & clay ..dry .o
Same..weeps H20..20 ft head..Bails dry..
Same with 40 ft. head ( overnight ) Bails
dry at 3 GP~
Ned. gravel & gray silt
Same..Weeps..
Course grav& gray silt
Clay & med. g~avel
Heaves fine gravel & sand 5 ft.
Clean med. gravel & sand..Water bearing..
Overnight STATIC $49 ft. 9 in. TOO ( 91 ft. Hdo
Test bailed one hour 30 min. at 11.25 GP~
Drawdown to 115 ft.
Good Recovery ( very clean )
Total casing 140-10½ MUNIGPalW O1: A$OE
DE~, OF HEAL~ &
ENVI~NMENTAL PEOTECI1ON
RECEIVED
STATE OF ALASKA
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CONSTRUCTION AND OPERATION CERTIFICATE
for
PUBLIC WATER SYSTEMS
A. APPROVAL TO CONSTRUCT
Plans for the construction or modification of
public water system located
., Alaska, submitted in accordance with 18 AAC 80.100
by ~
have been reviewed and are
approved.
[] conditionally approved (see attached conditions).
BY TITLE DATE
If construction has not started within two years of the approval date, this certificate is void and new plans and
specifications must be submitted for review and approval before construction.
B. APPROVED CHANGE ORDERS
Change (contract order no. or descriptive reference)
Approved by Date
C. APPROVAL TO OPERATE
The "APPROVAL TO OPERATE" section must be completed and signed by the Department before any water
is made available to the public.
The construction of the
water system was completed on
granted interim approval to operate for 90 days following the completion date.
public
(date). The system is hereby
BY TITLE DATE
As-built plans submitted during the interim approval period, or an inspection by the Department, has confirmed
the system was constructed according to the approved plans. The system is hereby granted final approval to
operate.
BY TITLE DATE
18-0407 (Rev, 11/83)
DISTRIBUTION: 1. WHITE - ENGINEER (Complete Section C) 2, YELLOW - WATER SYSTEM FILE (Complete Section C)
3, PINK - ENGINEERIMUNI-BOROUGH (Complete Section C)
4, GOLDENROD - MUNI-BOROUGH (Complete Section A)