MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION
Environmental Health Division
CASE REVIEW WORKSHEET
CASE NUMBER: DATE RECEIVED: COMMENTS DUE BY:
S-7787 August 2, 1984 August 17, 1984
SUBDIVISION OR PROJECT TITLE: .,.....~
,,~2 Block 2 Denali Industrial Park S ubdi:is~.~o~
lID . ,,
( u- ) PUBLIC WATER AVAILABLE (/~/ '~ PUBLIC SEWER AVAILABLE
( ) COMMUNITY WATER AVAILABLE
COMMENTS: /~: /// F // /,, . /~ / ~
/: ,:,/ /
.. ,,,- -1 / ~/~ -(.-
~ · ~. ,'~~-
71-014 (Rev. 5/83)
N
R.4W.
M.
AUG 2 ~ 1984
39.0
MA FIG-19
38.
39.~
57
KEY
MA = MECHANICAL ANALYSIS
~L : LIOUID LIMIT
Pi = PLASTIC INDEX
[] = GRAB SAMPLE
[] = SPT SAMPLE
[] = SHELBY TUBE-PUSHED
[] = 2.5" i .0. SPOON SAMPLE
340# WE[CHT. J0" CALL
TEST BORI NG
LOCATION-88 N. 380 E
ELEVAT I ON-
DEPTH
F4. DARK BROWN ORGANIC SILT. SOME COARSE ORGANIC
IERS. DAHP. SOFT
IY LITTLE SEASONAL FROST
;HED AUGER TO 2 i/2 FEET
__TANDPIPE WATER LEVEL AT 4.0 FEET ON ~/13/84
;REY SANDY SILT. TRACE GRAVEL. KINE SAND.
ASTIC. DAMP. VERY STIFF
GROUND WATER LEVEL WHILE DRILLING
2. GREY CRUELLY SILT
ING LAR TO SU~ANGULAR
MEDIUM DENS~
5.0
~ DI IO.O
Y FINE T EDIUM SAN
GRAVEL T~ 3/4'-. WET)/
6 FEET OF 'HEAVING" SAND AFTER PULLING SAMPLE 3
14-5
NFS. GREY FINE SAND. SATURATED. DENSE
SAMPLER FULL BY 18 FEET
SMOOTH DRILLING
iO FEET OF "HEAVING" SAND. dNABLE TO SAMPLE
SMOOTH FAST DR]LLING
25.0
NFS. GREY GRAVELLY MEDIUM SAND. TRA/[;~mr SILT.
ANGULAR GRAVEL TO 3/4'*. SATURATED/ MEDIUM DENSE
SPOON FULL BY 28 I/2 FEET ~ ~
_ 29.0
TEST BORING COMPLETED 2/23/84
PUC STANDPIPE PLACED
TEST BORING PLACED IN AN AREA DF LOW RESiSTIViTY.
*BLOWCOUNT OUESTIONABLE DUE TO 'HEAVING' SANDS
ALASKA TESTLAB
LOG OF BORING
"~ LOGGED BY:C.c.
'"---. K i CURE ~
39.0
40.0
40.31
4010
TEST BORING
LOCATION--30 N. ,.10 E
ELEVAT ] ON--
9
DEPTH
BROWN PEAT. DAMP, SOFT
F4. GREY SANDY SILT. ROOT SYSTEMS. ¢INE TO MEDIUM
SAND. NONPLASTiC. DAMP. CERY STIFF
THIN SEAMS Of MEDIUM SAND
~Z OROUND WATE
WHILE DRILL;NG
NFS. GREY MEDIUM SAND. WET. DENSE
2/3 FOOT OF "HEAVING" SAND
F2. GREY SILTY FINE SAND. SATURA'ED. /ERY DENSE
i FOOF OF "HEA'¢iNG" SAND
KINE TO MEDIUM SAND
2 FEET DF "HEA¢iNG" SAND
c2. CREY SL;GHTLY S;Lty FiNE TO MED;UM SAND.
qATURATED. IERV DENSE
2 ~/2 CEET OF "HEAliNG" KAND
rESt BOR]NG COMPLETED 3/5/84
*BLOWCOUN! OUEST;ONADLE DUE r~ "HEAVING" SANDS
21g
;; .9
16.0
KEY
MA ~ MECMANiCAL ANAL¥S~S
LL = LIQUID LiMI!
PI = PLASTIC iNDEX
[] = CRAB SAMPLE
[] : SPT SAMPLE
[] : SHELBY TUBE-PUSMED
[] ' 2.5" ~.9. SPOON SAMPLE
340# WEIGHT. JO" CALL
ALASKA TESTLAB
LOG OF BORING
~C"~FD
:-'; cuRF /2.
39.9
/
42.0
38
38.
39.
4
KEY
MA = MECHANICAL ANALYSIS
~L : LiOdig LiMiT
Pi : °LASTiC iNDEX
[] = GRAB SAMPLE
[] = SPT SAMPLE
[] = SHELBY TUBE-PUSHED
[] = 2.5" i-D. SPOON SAMPLE
340# WEIGHT. 30" rAgL
TEST BORING
LOCATION=SS5 N. 380 E
ELEVATION-
12
DEPTH
FI. SILTY SANDY GRAVEL. FROZEN (FILL)
3.0
F4. GREY SANDY SILT. TRACE ORGANICS. ~INE SAND.
NONPLASTIC. DAMP, HARD
~Z CROUND WATER L EL WHILE DRiLLiNG
~3. Cr LTV FiNE SAND. SATURATED. DENSE
9.3
F4. GREY SiLtY FiNE SAND. SATURATED. MEDIUM DENSE
;3.,9
F4. GREY SANDY S[LT. tiNE SAND. NONPLASTiC.
SATURATED. HARD
22 5
¢2. GREY SILTY FiNE SAND. SATURATED. MEDIUM tO
VERY DENSE
1 FOOT OF "HEA~ING" SAND. SAMPLER KULL
28 3
K4. GREY SANDY SiLT· ~ERY FiNE SAND. NONPLASTiC.
SATURATED. MEDIUM DENSE TO IERY DENSE
I ¢00? OF "HEAVING" SAND
tEST BORING CgMPLFTED 3/2./84
TEST BORING PLACED iN AN AREA O¢ LOW RES;St;I;
· BLOWCOUNT OUESTiONABLE DUE Y0 "HEA¢iNG" SAND
ALASKA TESTLAB
LOG OF BOR I NG
LOGGED Bv . B. D. B m
r; CdRE IE
BROWN SILTY SAND (FILL)
IPE WATER LEVEL AT 2.4 FEET ON 3/13/84
36.0
D.C.'=5.g
/
/
38.0
38.0
r4, BROWN ORGANIC SILTY GRAVELLY SAND (FILL)
LAYERED GREY SILTY FiNE TO MEDIUM SAND AND
~Z. K4, ORE' SANDY SILT, 2" 70 3" LAYERS, NONPLAS'iC
LTS ED, ~ERY DENSE SAND, HARD SiLT
GROUND WATER LEVEL WHILE DRILLING
K2. CREY SILTY FiNE SAND, SATURATED, DENSE TO
~ERY DENSE
i cOOT OK "HEAVING" SAND
9.3
8.3
4
MA K;G 22
40.0
41
COOT OK "HEA~;NG" SAND
K3. MORE SiLT
i ~00~ OF 'HEA~iNG" SAND
r4 GREY SANDY SILT. KINE SAND, NONPLASTiC.
ED, HARD
K4, GREY SILT, DAMP. CERY SfiFF
i cOOT O~ "HEA¢iNG" SAND
~ES' BOR;NG COMPLETED 3/2184
PVC SrANDP;~E ~LACED
*SLSWCOUNT OOESTiONABLE DUE TO "HEAliNG" S~NDS
KEY
MA = MECHANICAL .ANALYSIS
,-L = LiOU;D LIMIT
Pi : PLASTIC ~NDEX
~ = CRAB SAMPLE
~7) = SPT SAMPLE
[] = SHELB¥ TUBE-PUSHED
~ : 2.5" i.D. SPOON SAMPLE
340# dEiGHT, JO" ¢'A,_.L
DEPTH
4.5
8.5
i2.5
25.0
27.S
3; .5
ALASKA TESTLAB
LOG OF BORI NG
~OCCED
~.O- NO. .'~'
Municipality of Anchorage
MEMORANDUM
DATE:
TO:
FROM:
SUBJECT:
August 20, 1984
Robbie Robinson, Environmental Health Manager
Donald E. Bennett, AWWU Engineering Planning Supervisor
78" West Interceptor
The 78" West Interceptor is under construction at this
time. Completion of the construction is anticipated
to be summer of 1985.
DONALD E. BENNETT
Engineering Planning Supervisor
Anchorage Water & Wastewater Utility
DEB/slr
cc: Bob Ward
DEPT. OF ENVIRONMENTAL CONSERVATION
ANCHORAGE/WESTERN DISTRICT OFFICE
437 "E" STREET, SUITE 303
ANCHORAGE, ALASKA 99501
RECEIVEDDEC ? 1984 December 4, 1984
BILL SHEFFIELD, GOVERNOR
Telephone: (~07)
Address:
274-2533
Northway Development
ATTN: Bob Ward
2819 Dawson Street
Anchorage, Alaska 99503
SUBJECT: Holding Tank, Lot 2, Denali Industrial Subdivision
(8521-DA-179)
Dear Si r:
We have reviewed the plans and spectt:-tcations for the subject project.
The subject holding tank, formerly aPProved by the Municipality of Anchorage,
is hereby approved until the Phase 2 West Interceptor is complete. Upon
completion of the interceptor, sewer connection will be made to Denali
Industrial Subdivision.
SWE/msm
Si ncerely,
~[~Egi neer
TO
F-
I__
SHIP TO
i. N£ 00689~
I='ASTWI N O INC,
6400 ROV£NNA ISTRE~L:'r · ANCH°RAGE, AI_~BK~ gg502 · (go?) 274-3676
FOR RESALE
AUTHORIZED S~GNATURE
OUR pURCHASE ORDER NUMSER MUST APF~AJ~ ON AL.L INVOtCF'S, SHIPPING; PAPERS. AND PACKAG~'c;
kd03 ]11.1
20 3uly, 1984
Northway Development
2819 Dawson St.
Anchorage, Alaska 99503
ATTN: Roger
RE: Development of Lot 2 Denali Industrial Subdivision
Wastewater Disposal
Gentlemen:
Per your request, we have reviewd the requirements for wastewater
disposal for the proposed warehouse office development on Lot
2 of Denali Industrial Subdivision. There are currently no
sewage facilities available in the ifm~ediate area. This condition
will remain until the completion of the Raspberry Road Interceptor
scheduled for 1985 - 86 completion.
In the interm an on site disposal system or a holding tank
will be required. The site is poorly suited for on-site disposal
because of high ground water ( 3-5 feet below the surface)
and poor soil conditions (peat and stiff grey silt). Therefore
the only solution is a holding tank. Based on 2,500 square
feet of office space and 28,000 square feet of warehouse, we
assume a total work force of 25 people. At a flow rate of
15 gallons/person/day, the total daily sewage flow is estimated
at 375 gallons per day. The Municipality of Anchorage Department
of Environmental Health requires a minimum of 7 days storage
or a minimum capacity of 2,625 gallons.
This letter, along with the soils report by Alaska Test]ab
and a plot plan should be submitted to 3ohn Linn @ MOA Department
of Environmental Health (825 L street) to obtain a permit for
a holding tank. They may also require a signed agreement between
the developer and a septage pumping company that the tank will
be maintained on a regular basis.
Should you have any questions or require further assistance
from us do not hesitate to call myself or Brian Looney.
Truly,
CRW ENG I NEER I NG GROUP
Wi I lem Van Hemert
3900 Arctic Blvd. * Suite 203. Anchorage, Alaska 99503 · (907) 562-3252
Municipality of Anchorage
MEMORANDUM
DATE:
TO:
FROM:
SUBJECT:
August 20, 1984
Robbie Robinson, Environmental Health Manager
Donald E. Bennett, AWWU Engineering Planning Supervisor
78" West Interceptor
The 78" West Interceptor is under construction at' this
time. Completion of the construction is anticipated
to be summer of 1985.
DONALD E. BENNETT
Engineering Planning Supervisor
Anchorage Water & Wastewater Utility
DEB/slr
cc: Bob Ward
....... '['1' I'11' [[~1Ir I il II ~,~ -
ML,icipality of Ancho age
MEMORANDUM
DATE:
TO:
FROM:
SUBJECT:
August 20, 1984
Community Planning Department
Health and Environmental Protection
Case Due for Review - August 17, 1984
The Environmental Health Division of the Department of Health
and Environmental Protection has reviewed the following case
and has these comments:
S-7787:
Lots 1, 2 Block 2 Denali Industrial Park Subdivision
The developer has proposed a holding tank until
public sewer(Phase 2 West Interceptor) is complete.
Upon the completion of the public sewer line, the
proposed subdivision must connect to the public
sewer line.
Holding tank requirements: minimum size; 2,000 gallons
with monthly pumping and a maintenance contract.
John W. Lynn
Environmental Specialist
91-010 (5/78)
IECE VED JUL 1984
Ineerlng
20 3uly, 198~
Northway Development
2819 Dawson St.
Anchorage, Alaska 99503
ATTN:
RE:
Roger
Development of Lot 2 Denali Industrial Subdivision
Wastewater Disposal
Gentlemen:
Per your request, we have reviewd the requirements for wastewater
disposal for the proposed warehouse office development on Lot
2 of Denali Industrial Subdivision. There are currently no
sewage facilities available in the immediate area. This condition
will remain until the completion of the Raspberry Road Interceptor
scheduled for 1985 - 86 completion.
In the interm an on site disposal system or a holding tank
will be required. The site is poorly suited for on-site disposal
because of high ground water ( 3-5 feet below the surface)
and poor soil conditions (peat and stiff grey silt). Therefore
the only solution is a holding tank. Based on 2,500 square
feet of office space and 28,000 square feet of warehouse, we
assume a total work force of 25 people. At a flow rate of
15 gallons/person/day, the total daily sewage flow is estimated
at 375 gallons per day. The Municipality of Anchorage Department
of Environmental Health requires a minimum of 7 'days storage
or a minimum capacity of 2,625 gallons.
This letter, along with the soils report by Alaska Testlab
and a plot plan should be submitted to 3ohn Linn ~ ~A Department
of Environmental Health (825 L street) to obtain a permit for
a holding tank. They may also require a signed agreement between
the developer and a septage pumping company that the tank will
be maintained on a regular basis.
Should you have any questions or require further assistance
from us do not hesitate to call myself or Brian Looney.
TruLy,
CRW ENG I NEER I NG GROUP
Willem Van Hemert
3900 Arctic Blvd..Suite 203-Anchorage, Alaska 99503.(907) 562-3252
L
~ PURCHASE ORDER
No 00689~
EASTWIN O INC.
6400 RAVENNA STREET · ANCHORABEt ALASKA gg502 · (90'7) 274-36'76
O NOT FOR RESALE
TAX NUMBER
I'1 FOR RESALE
AUTHORIZED SIGNATURE
OUR PURCHASE ORDER NUMBER MUST APPEAR ON ALL INVOICES, SHIPPING PAPERS, AND PACKAGES
DATE:
TO:
FROM:
SUBJECT:
m..¢ipality of Anchor,ge
MEMORANDUM
August 20, 1984
Community Planning Department
Health and Environmental Protec,tion
Case Due for Review - August 17, 1984
The Environmental Health Division of the Department of Health
and Environmental Protection has reviewed the following case
and has these comments:
S-7787:
Lots 1, 2 Block 2 Denali Industrial Park Subdivision
The developer has proposed a holding tank until
public sewer(Phase 2 West Interceptor) is complete.
Upon the completion of the 13ublic sewer line, tho
proposed subdivision must connect to the public
sewer line.
Holding tank requirements: m~nimum size; 2,000 gallons
with monthly pumping and a mai'ntenance contract.
John W. Lynn
Environmental Specialist
91-0~0 (5/78)
Municipality of Anchorage
MEMORANDUM
DATE:
TO:
FROM:
SUBJECT:
August 20, 1984
Robbie Robinson, Environmental Health Manager
Donald E. Bennett, AWWU Engineering Planning Supervisor
78" West Interceptor
The 78" West Interceptor is under construction at this
time. Completion of the construction is anticipated
to be summer of 1985.
DONALD E. BENNETT
Engineering Planning Supervisor
Anchorage Water & Wastewater Utility
DEB/slr
cc: Bob Ward
274-2533
637 g Street
Suite 200
/mchorage /~
95501
CEKTIF LSD MAIL
October 21, 1983
~r. Damiel Greea
Triad Engl~eerin~
6937 Old Seward HAghway
Anchorage, Alaska 99502
Dear GreeD:
Subo=ct: D~nalX i~du~:r£al Park Water & Sewer Improvemeots (S421-FA-199) and (6421-DA-179)
~e project ~ hereb~ approvee for construction for the items with
this ~part~at is concernS. ~i8 le[ter con~:i~tes the ~it require.
oy A.S, 46. O3.720(a) for approval of se~raMe syst~s (~ter-the-Fact),
Enclosed with :ais letter is a "C~rtiiicate to O~ra:e" ~or t~ dr~og
~a:er
£aclu~ure
CONSTRUCTION AND OPERATION CERTIFICATE
ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION
PUBLIC WATER SYSTEM
APPROVAL TO CONSTRUCT
Plans for the construction of ]~
¢..
in
by
~ ~ C~ ~ public w~er system Ioc~tefl
~( ~0 ¢ ,~ , Alaska, submitted in accordance with 18 AAC 80.100
~~ ~ ~ ~ ~I~N~~~ have been reviewed and are
approved. ~ ~t~ T~ ~c~
[] conditionally approved (see attached conditions).
If construction has nc~t,started within two years of the approval date, this certificate is void and new
plans and specifications must be submitted for review and approval before construction.
APPROVED CHANGE ORDERS
~nange (contract order no.
or descriptive reference)
Approved by Date
The "APPROVAL TO OPERATE" section must be completed before any water is made available to
the public.
APPROVAL TO OPERATE
The construction of the D~--~) .~ ~. ~-' _~/'~/~ ~"~/~'" ~ ~ ~::~/~-, l~-.,_' public
water system was completed on ! (~) - ! ,~"- ~ '~ (date). The system is hereby
granted interim approval to operate for 90 days following the completion date.
BY TITLE DATE
As-built plans submitted during the interim approval period, or an inspection by the Department has
confirmed the system was constructed according to the approved plans. The system is hereby granted
fina~ approval to operate.
BY TITLE E~ATE