Loading...
HomeMy WebLinkAboutDENALI VIEW General Information (14)DHI CONSULTING ENGINEERS Civil · Surveying · Planning September 29, 1997 W.O.: 96298 To: All Platting Board Members RE: Denali View Subdivision/Response to Minch's Letters of 8/29/98 On September 3rd, Sharon Minch provide two letters dated August 29th to Staff concerning nitrates in Scimitar. The letter was provided to Staff late on September 3 (the night of the scheduled hearing). Staff had to hustle just to have copies ready for the Board. No copy was provided to the Developer and the Board definitely didn't have time to properly study the i?sues raised. Based on the misleading information and timing of this letter, it can only be inferred that the letters are intended to confuse and delay the whole subdivision process. Ms. Minch is working on the premise that on-site septic systems will eventually cause pollution of our ground water. From that premise she uses a number tactics to create the impression that this a fact. On-site septic systems are not temporary systems to be used until public sewer is available. With todays technology, on-site septic systems are considered to be permanent solutions to waste removal. On-site systems provide up to 30% of the wastewater treatment in the United States. They have made significant contributions to environmental protection. There are many points to consider when comparing large verse small systems. The assumption that large public systems are safer, or less damaging to the environment is not true. Public sewer systems promote greater wastewater discharge per capita. This means that larger bodies of water or land is needed to discharge the waste. Public sewer systems are expensive to build and maintain requiring tax dollars. Can the Municipality afford to provide sewer and water on large remote lots? Can the individual lot owners really afford the true operating and maintenance costs or will these need to be subsidized by the rest of the community? Small individual systems are built and maintained by the property owner. And the property owner is currently responsible for all construction, operating and maintenance costs. Most experts believe that waste water should be treated at or near its source. This causes individuals to economize and use less water. There is little information available on how much ground water pollution occurs from public systems which concentrate waste into Dimond Center Tower, 5th Floor ° 800 E. Dimond Blvd., Suite 3-5,15 · Anchorage, Alaska 99515 (907) 344-1385 · Fax 344-11183 pipes. In Anchorage, we have the sewer pipes that leak due to age, broken joints, corrosion, freezing, and earthquake damage. On-site systems are environmentally sound, Iow cost to local governments, and much safer from catastrophic failures. For example, most on-site septic systems fail gradually. Not only does the home owner have advance warning, but failure will general effect only the one home owner (please note that in some cases several h'ome owners can be effected if the failure is not caught soon enough). However, failure of a centralized systems effects hundreds of people at once. On site septic systems are technologically sound systems. Properly designed and installed, they represent an environmentally safe, economically sound, healthy way to process wastewater. Ms. Minch's continual attack on on-site systems is unfounded and unsubstantiated (particularly with in the Municipality) and is an excellent example where a few facts can be misleading. Her entire letter is punctuated with examples of using partial information to reach a predetermined conclusion. For example: a) There is no evidence to suggest that the presence of Iow levels of nitrates (below 10 ppm) is a health problem. Page 339 of your packet is an editorial on nitrates. It states that only one death has been associated with nitrate (in the United States) in the last 20 years. This was with water containing more than 100 mg/I. There is definitely nothing to indicate that 3 mg/I is "considered elevated" or unhealthy. Mr. Cross is correct when he stated that the EPA standard of 10 mg/I is an economic limit above which mortgage companies will not provide loans, it is generally thought that nitrate leveIs need to be in the range of 40 or more before health concerns need to be addressed. b) I know of no experts that will unequivocally state that on-site septic systems automatically equates to eventual pollution of ground water (in fact, just the opposite has been shown for most areas of the United States). Where properly designed septic systems have been installed, nitrate levels have actually decreased in some areas. c) There is no evidence that nitrates are increasing in Sci:'nitar. Mr. Munter's report on this specific area is currently the most exhaustive report completed to date. There is still more that can be done and the MOA has hired Mr. Munter to do a Study to include the entire Eagle River area. Currently, there is no evidence to support Ms. Minch's claims. d) Mr. Munter's report doesn't indicate that septic systems are the only source of nitrates found on the hillside. He surely doesn't indicate that the only source for high nitrates is from human waste. e) Mr. Munter's report does not state that seasonal fluctuations in the ground water increases nitrate levels in ground water. Yet Ms. Minch's comments suggests that there is a "readily agreed to premise." Therefore, less ground water flow automatically results in increased nitrate levels (the old dilution verse pollution adage). There is absolutely no research to back this up. In fact, just the opposite is more like to be the case. The soils in Denali View are very well suited for on-site septic systems. There is more than adequate separation between the ground water, bedrock and potential absorption fields, There is no reason to suggest that properly designed systems that meet the current codes, will result in elevated nitrates for Denali View or the surrounding neighborhood. f) Highly permeable soils are not automatically a direct link of pollution from septic systems. Actually, this is a misnomer. Soils which are too high in void space can be a problem. This related primarily to very coarse soils such as gravels. High void ratios in soils will prevent the proper formation of a healthy biomat. Without the biomat, treatment is non existent or very limited. This does not relate automatically to permeability. For instance, in the Municipal regulations, native soils with too high f a permeability, require a "sand" layer to be installed. However, the permeability of the "sand" is sometime as great as the native soils. However, the fine grained sand allows for the format[on of the biomat and therefore results in better treatment. g) Ms. Minch states that lot size alone is not a good indicator of the likelihood of elevated nitrates. This is true, but misleading. Lot size a practical indicator. It is used throughout the Municipal Codes. Lots less than 40,000 square feet don't generally have on-site septic. Larger lot size generally allows for more separation distance between systems thereby relating to fewer systems per acre. Septic system design doesn't just use lot size. Design includes computations on wastewater loading, site specific soil conditions, topography, groundwater elevations and bedrock formations. Lot size is a tremendous help to the regulatory agencies and it is well documented in our subdivision standards. In Denali View, the smaller lots are carefully separated by the larger lot impart to provide separation for the septic systems. h) Nitrate reducing systems are being tested by the Municipality. There long term effect will not be known for many years to come. Like most systems, by increasing the efficiency in one area, we may be giving up treatment in another. There is currently no data to support the position that these more expensive systems are warranted except in specific locations. It appears that the new systems will soon be approved for use in the Municipality. They like most system require the owner to have a better understanding of the operation and treatment. They will require better maintenance and proper operation in order to obtain the reduction. Though the new systems show promise, it is yet to be seen if they will be operated in such a way by the everyday household and thereby actually reduce nitrate production. j) k) k) She states again that "it seems obvious that Scimitar has a problem with elevated nitrates". Based on the anecdotal information that has been expound by Ms. Minch, it would appear to be the case. However, when an exhaustive effort was made to collect all the hard data, it showed that Scimitar does not have a problem with elevated nitrates. In fact, just the opposite is true. Mr. Munter (the same person she is quoting who did the nitrate study for the Hillside) has stated that there is no pattern to indicate that nitrates are either increasing or decreasing. This is after an exhaustive review of all the real test data. It didn't include just hearsay, partial or selective review. She states that "experience has shown that hydrofracturing of wells provides a better route through the bedrock for nitrates to contaminate our wells. This just isn't true. Hydrofracturing is the real solution to the Iow flow wells in Scimitar. The test data shows that hydrofracturing increases water flow. Effects of hydrofracturing are relatively close to the well (approximately 30 feet +\-). Hydrofracturingdoesn't cause pollution of the wells by any stretch of the imagination. If you have nitrates within 30 feet of you well, then you have a problem with or without hydrofracturing. If hydrofracturing was instituted as a standard process for developing Iow flow wells, the problem in Scimitar would be virtually non existence. She states that it seem reasonable to assume that continued development at the current density levels will cause nitrate levels to exceed the Federal standards. There is just no basis for this statement and secondly, Denali View is not being developed at the same density levels as Scimitar. Scimitar averages about 1 + acres per lot. Denali View averages about 3.3 Acres per lot. Properly designed system do not automatically result in high nitrates. Once our wells are contaminated, it is nearly impossible to clean them up. This is not a totally true statement. Particularly when discussing nitrates. Nitrates are Iow in solubility. That is why the nitrate ions travel long distances when they get into the ground water. By the same token, they clean up rapidly once the source of the nitrate contamination is identified and corrected. Anchorage needs to implement well head protection and ground water protection before other subdivision become as problematic as Scimitar. She also alludes to the threat that EPA is close to taking over our groundwater regulation process. This is absolutely absurd. EPA has yet to make even the slightest indication that they are going to do any such thing. If you listen to Ms. Minch, without looking at the real data, you will dca great injustice to Scimitar and the residence that live there. If the community wishes to institute a program to address long term nitrate trends, then do it through the public process. However, there is absolutely no data the justify to this Board, the Municipality or the State to put a moratorium on further development or the construction of new homes. Ms. Minch notes two examples where hydrofracturing of the wells caused problems. One was a well dealing with Mr. Hank Warren property and the other with the Hoolihan's property. Neither of these two well has ever been hydrofractured. We tall<ed with Mr. Warren and researched the Hoolihan'swell. Mr. Warren's welI was never hydrofractured and the only record on the Hoolihan's well is a cleaning process that increased the production from 10 gph to 18 gph. We asked Ms. Minch to provide the data to back up her statement. She stated that she didnot have the information readily available and has never produced it. This another example of Ms. Minch making statements that are not true. There is no nitrate problem, no indication of a pending health hazard, no increasing nitrate levels. It just doesn't exist. The individuals making these statements need to be held accountable. Ask them to present the written evidence and data to back up their statements. Properly designed, constructed and maintained septic systems are a safe, economical method of treating wastewater. Please read Mr. Munter's reports carefully. They have been prepared using sound engineering practices. They are objective and accurate. Where data is complete, he has drawn firm conclusions. Where the data is limited he has stated the limitations. The bottom line is that the neighbors will be effected by this development. There will be more homes, there will be more traffic, they will not have the use of private land for sledding, hiking, etc. However, these effects will be well within the reasonable standards for developing property. The developer has responded in a professional, responsible manner to every request that has been made by the Municipality. The developer will continue to make every reasonable effort to provide this Board with enough valid, objective information so that you can make a reasonable assessment as to merits of this subdivision meeting the standards of the Municipality. ~_~¢ry truly yours, Hi Consulting Engin~er~: Dee High,rP(E. Principal cc: Myers O'Brien 298dp 10s.ltr DHI CONSULTING ENGINEERS Civil · Surveying · Planning September 30, 1997 W.O.: 96298 To all Platting Board Members RE: Denali View Additional Comments to Sharon Minch's Letters of 9/29/97 Ms. Minch stated that people were not informed and therefore not prepared to discuss the hydrology and nitrate reports at the Community Council meeting in June. The people who were interested and who had concerns about Denali View Subdivision were at the Platting Board Meeting in June when we were requested to present the reports to the Community Council. The Hydrology and Nitrates reports were presented to the Community Council in June as requested by this Board. Mr. Jim Cross was also present at this meeting. The meeting was well attended and I spent two hours discussing the reports and answering questions. SharonMinch, Chairman of the Community Council, made copies of the reports available to the public by the following Tuesday and we agreed to make another presentation to the Council at its next regularly scheduled meeting in July. In July, Mr. Cross, Mr. Munter and myself spent the entire evening presenting the reports. This meeting was also well attended. The Community Council passed two resolutions. Ms. Minch's comment that no one was notified or had a chance to review the reports is inaccurate. The Community meetings in June and July were well attended, the subject matter discussed at length and two resolutions were passed (one in support of the subdivision with no through road access and one requesting additional water information be provided). ACCESS: Ms. Minch makes claims about the roads which are not accurate. The existing Chugach Park and Sullins Drive roads are in excellent condition. They are safe and have a much flatter grade than the route she proposes through Scimitar. The roads have recently been upgraded and received recycled asphalt pavement as can be seen in the attached pictures. In fact, she neglected to forward to the Platting Board a resolution passed by the Community Council in support of the Subdivision. The community do not want a road through Scimitar Subdivision. Dimond Center Tower, 5th Flaor · 800 E. Dimond Blvd., Suite 3-545 · Anchorage, Alaska 99515 (907) 344-1385 · Fax 344-1383 WATER: Ms. Minch in her letter stated that not all adjoining property owner were contacted when we ran our first pumping tests. Therefore, people who would have participated did not have an opportunity. The single property owner who complained about not being notified is not adjacent to the proposed development. He is across the road and behind another lot. Since the goal of the test was designed to determine effects on adjacent lot owners, this homeowner was not contacted. SHARON MINCH: Sharon Minch lives within 800 feet from this proposed development. She has taken an active adverse stand against this subdivision. In my opinion, she has inappropriately used her position as Chairman of the Community Council to call meetings and write letters of opposition to this project with out the approval or direction of the Council. She has made negative, personal comments about the Developers costing everyone time, money and unnecessary effort with a campaign of anecdotal and misinformation. I encourage the Board to put aside all the anecdotal and misinformation that has been submitted on this project. The Developer has provide this Board with professional reports that clearly demonstrate that the impacts to adjacent properties will be minimal (if any). This Subdivision in almost every aspect exceeds the minimum subdivision standards established by Title 15 and Title 21. Approval of the preliminary plat is reasonable and defensible. Dee High, P.E. Principal CC: Myers, Owners 298dm29s.l~r Chugach Park Drive Chugr 'h Park Drive contir led St llins Driv Wednesday, September 24, 1997 1:23 PM To: ,1" -' 0ro$$ From: Jeff & "' ry Williams Page: 1 of 2 Fax Name: Jeff& Mary Williams Company: J&M Rentals Voice Number: 9076882123 Fax Number: 9076882123 P,O. BOX 774396 EAGLE RIVER, AK 99577 Date: Wednesday, September 24, 1997 Total Pages: 2 Subject: Recommendations to DHI Name: Jim Cross Company: MOA DHHS Voice Number: Fax Number: 343-4786 Note: Jim Here is a copy of sugestions and comments I am sending to DHI I will be out of town until the 29th if you can fax the misleading nitrate documents to Mary ~ 694-2955 I would greatly appreciate it, hopefully we can work to resolve misconseptions. Thank you Jeff Williams I Wednesday, SeCember 24, 1997 1:23 PM To: J~m Cross From: Jeff & ' '~ry WJtliams Page: 2 of 2 To DHI Consulting Engineers Mr. High 9/24/97 After reviewing your letter and forms dated 9/19/97. I submit the following comments and recommendations. The residents in the area want to participate in this study. However they absolutely believe that the pump test should not significantly inconvenience their current ability to procure water for domestic use, and they believe this test should be no additional financial burden. Keeping these parameters in mind I submit the following recommendations. 1 .Send a letter of explanation stating your intentions i.e. how you plan to conduct the pump test. Specific details would be helpful. 2 Ask the residents to help identi~ which wells have had recent wall w~rk. This way you can insure that problems are kept to a minimum. 3~ Write an addendum to alleviate fears that people are not exposing themselves to considerable risk by signing the hold harmless agreement 4. Explain what problems might be encountered dudng the testing and what will be done to correct them ie. Instrument hanging up in pump wiring. Jim Sullivan to pull pump @ developers expense etc. 5 Use data logging equipment so no residents will not have to go without use of their wells for an extended period of time. I believe these changes will significantly increase the likelihood of cooperation by the community. Sincerely Jeffrey D. Williams cc: Jim Cross, Margaret Obrien, Dan Young, Sharon Minsch, Jim Munter Tuesday, September 23, 1997 12:54 PM To: Cross From: Jeff & .pi Williams Page: 2 of 6 DHI CONSULTING ENGINEERS Civil · Surveying · Planning DENALI VIEW SUBDIVISION PUMP TEST QUESTIONNAIRE W.O.: 96298 September 19, 1997 Denali View has drilled two wells that have fouIld excellerlt quentin;les of water,. One well is only 112' deep, which is in a different aquifer that most other wells in Scimitar. When this well was test pumped, two other wells were monitored end they showed COntinuous recovery throughout the ~:est Period. They were not being drawn down by the Denati View We have been re=quested by tho Municipality to run two more pump tests to verify the results of our first purr~.'p tests provided we can obtain some realistic data. If we ca~not ob[ain useable data, then the Municipality will have make a decision using our previous reports. The Myers ere interested in providing the Municipality and the local residents wi~h as much information as ~ossible, so that objective decisioas can be made corlcerning the project, The cooperation of the surrounding property owners is required in order for the results of a testing to he fully interpreted, We would appreciate your participation in tho testin9 program. The first step is to find out how marW people would be willing to participate in e program. Therefore, we are asking you to fiji out the enclosed questionnaire. Once we have the testing schedule, we will provide you with the detail of the program and se~ if you are still willing to participate. We believe that arly concerns relative ~o particlp~ting in the testing program can be resolved. You should contact Paul and Arlene Myers (688-1236) or Mr. Dee High (344.1385) if you have any questions, We w0uld appreciate your immediate response ~o thi8 questionnaire. AWWU water is still available if people vote for it, Obtaining public water has noticing to do with Denall View Subdivision. In fact, the Owner's of Denali View Subdivision ;have voted in support of public water each time it has been on the ballot. A lot of ~egative statements have been made about nitrates in Scimitar, Nitrates I~ed not been studied in Scimitar until Mr. Munter accumulated this information for the Denall View project. With the exception of two Jots with localized problems, nitrates are well within acceptable standards through out the area. A certain amount of nitrates are naturally occurring, These may be in the range of 1 to 3 mg/l. Mr. Kleweno of ADEC commented that Eklutna Lake may have nitrates as high as 1.9 ag/I, Nitrate levels of !0 mg/I are acceptable levels throughout the United States. Di~nond Conter Tower, 5th Floor · 800 E. Dimond Bird,, Suite 3-545 * Anchorage, Alaska 99515 (90'/) 344.1385 · Fax 044-1883 Tuesday, September 23, 1997 12:54 PM To; Jim Cross From: Jeff & ~',ry Williams Page: 3 of G We would alt lika to have higher property values in our neighborhoods. Other subdivision.~, w{th similar water concerns have seen an increase in their property values, Scimitar has not. Property values are effected by the exaggeration and publicizing of misinformation; which I~as happened for Scimitar. We should all strive to restrain from this type of behavior, These tests should help everyone better understand the water issues and we look forward to your cooperation, Very truly yours, ~~,~~ onsulfln Engl eers TOTAL P,02 09-18-1997 10:25AM D HI ONSULTING 90? 344 1383 P.01 FAX MEMORANDUM TO: DHHS FAX NO.: A'FrENT, ION: Jim Cross SUBJECT:iDena[i View/Testing Program FOR yOuR INFORMATION: DATE: September 18, l~q W.O. NO.: 96298 NO. OF PAGES; 1 (Including this cover sheet) Original Diape~iti~m n Maaed n Cal~ for Pickup [] Filed [] For Your use X Fei' Review & Comment [] As Reque~ed I-I Far App,'ova MESSAGE: ' )7 The next i~em on the testing program that needs to be resolved ~s the M~nicipal Criteria for: determining the availability of water, the allowable amount of Iimpact on surrour~ling wells, and how that impact is measured. Page 5 of Munt~r's draft Aqulf. er Test Program covers in detail our recommendation for dealing with these issuers, and your O' To ke~p the momentum g mg~ it would be helpful if Scott, Dan house hydrologist could review the criteria today. How about a work ses,bion some time tomorrow? I think it would be very beneficial and would keep the 3ressure on all the parties to work toward finalizing a plan, Dee SENT BY: Dee High 800 E, DIMOND BLVD. iSUITE 3-S6S DHI CONSULTING ENGINEERS ANCHORAGE. AX 99~15 FH; {907) 344-1385 FAX: (9071 ~,4-1383 TOTAL P.O1 ~9-17-1997 04:4~PM D HI OMSULTI~G 907 E44 i~B~ ~.01 TO: DHHS' FAX NO.: Al I ENTIO SUBJEC'~: FOR Y~ FAX MEMORANDUM Jim Cross ~enali ~/iew/Well Location )UR INFORMATION: Original Dispoai ;ion: [] i Mailed [] Call for Pickup MESSAG Location ol It over laps two holes { problem f°l At this poir in concurre site. Paul the sooner Thanks, Dee DATE: September 17, W.O. NO.: 96298 NO. OF ;PAGES~ (Inol~ding d~is oov~r sh~t 181 Fi~ed [~1 AS Requested well as~ discussed with Jim Munter, the well driller and Paul yers. one of!my test holes for septic area. I'll have to dig anoth6r one or m this Ipt and designate another reserve area. ThisI shouldn't ~3e a this l°I' t, the well location is better dictated by the hydrology test.! S~l'm 3ce ..w. ith the location. We will have to construct a small road ' o the wilhn~ and can start any time· The well driller is s~andinglby so ~ve canitell him we have a permit, the better. SENT, BY:, lee Highi DHI~, CONSULTING ENGINEERS 800 .... E. DJ~VI )ND ~,LVD,{ SUITE 3-545 ANCHORAGE, AK,,,, 99515 PH: (907) 344-1385:: FAX: 09-12-1997 O3:5?PM D HI ONSULTIN~ 90? 54~ 1383 P.O1 C!i vi 1 P1 a n ri veying September 12, 1997 W.O,: 96298 Mr, Jim Cross Department of ~ealth ~ Human Services P,O, Box 196650 Anchorage, AK ] 995 RE: Denali View Sub~livision Dear Mr. Crosst / As you know, I! recomrPe,nded to my Clie;nt that he delay his presentation !to..he platting board for one month. ~hls recommendation was based on two items. Th~ fi 'st was the result of meetings he d !n your office on:the day of the schedule Boa~'d hearin~ g i~ which the Communitie, s :hldrologiJst and the Community representatives agreed to ~me,~t with Mr. Munter' to dev ~lop a. P~ump testing plan". Also with the understanding that ' he meeting would take pla :e by ~riday (September 5). The second reason for recd, mr~ending the postponement ~/as youi agreement~to take immediate action to educate Shar~)n /linch'about nitrates in an e'fort to !control the misleading information that she has been ~;xpounding, Since she is a ~nemberlof the Departments Techn cai Rev ew Board and Pies dent of the Community C°~mci[, sl~e has a responsibility to be objective. There are iselious ethical problems here, The Developer, s in agreement that it his responsibility to work with the Mu develop, a testirtg program that addresses the subdivision standards in ques~iol (if possible) shduld als~ address the concerns of the adjacent property owne. rs. work diligently ~and responsibly to address these issues. We have responded hard data, conducting ~systematic evaluations and trying to put soiree per, pa perceived problems. A ~TeTM homeowners have responded w th ream{ of misihfn delay tactics. I Mr.; Munter has~ provid'~d a testing programs to DNR, Terrasat, and DHHS been review by several!hydrologist and has been deemed to be reasonable. Mr. stated that the~e are s~veral technical issues that need to be addressed. H~h meet with Terr~sat to ~iscuss the issue. Terrasat has now delay meeting and has now p~Jt in wr!ting that they won't meet. We understand the politlcal DHHS insisting ~hat we{try to reach consensus with Terrasat. However, we qan them to sit =d°v~n and c~iscuss the log stic or the cr terla for the test. Ail we g~ good enough'*,! "It's not our responsibility to design a test", "Give us sometl approve". The{e are not statements of cooperation and ~here is absolutely no can get concurrence with this approach. Yet. DHHS has with held~approv~l. Dimond Center Tower, 5th Floor · 800 E. Dimond Blvd., Suite 3-545 · Anchorage A (907) 344-1385 · Fax 344-1383 ~icipality to This plan They have ,y gathering :~ive to the rmatiOn and he plan has Munter has 3d hoped to Jver a week reasons for ~ot even get ~t is "its not ling we can vay that we aska 99515 09-12-1997 OE:5?PM D H! OMSULT~G 90? E44 1~ P.02 Your warning th~at if we cannot get Terrasat's concurrence on a plan, ~hen you ~ itl be forced to put out an RFp to have another hydrologist develop a plan is unreasonable. Ti e developer is being unduly }enalized for the inaction of a group that is opposed to the pr( ect. To date, the only systematic evaluation, the only hard data that the Municip~lit~ has on this project has beel l provid.ed by the Developer. That information has clearly de,or strated that there is enough water ahd that any impacts to adjacent properties are within ~thE acceptable standards. . , We are open tolmeetlng with Terrasat at any time. We are open to: drillinglan >ther well if it helps solve sc~me of the logistic problems. We are open to doing more test~bg r)rovide that the testing trul~ answe~ the question raised by the residents. What we are n~3t '~/illing to do is to continue t~o delayithis project on the pretense that we need ~he Terr.asat's blessing before DHHS ~ill approve this project. I recommend th ~t we have another hydrologist to review the plan. Aihydrolo;gis I that would be acceptable t(, the M~tnicipality. Mr. Munter would provide the third party I~ydl ologist with a pump test pro ;edure And criteria by which the result would be evaluated. ~he Hydrologist would be respm ~sible fo{r reviewing the plan and making recommendation to Mr. Munter that would ensure le goal~ and objectives estabrshed by the Mun cipality wo~Jldibe met It would be Mr. ~unter's responsibility to address concerns raised by' the ne~v I~ydrologist's to his satisfaction. The Developer would be responsible for preparing the pian,l conducting the test and preparing/;~he final report. : establishedThe damage th~tu is b,ei~g done to the subdivision procesS,homeownersthe MuniCipality rffvi' w~ process, en ineerm~ practice, the Myers and the is un~cc,eptable and inexcusable. Further unwar~nted d;elays is not in the best interest of the anybody,, IThe above recommendatioh is ma~le in the spirit of cooperation and an ernest Concern or{ the part of my Client to pr~,vide a r~easonable development that doesn't adverseiy affect hi~ neighbors. I would apprecibte you~ serious consideration and acceptance of this propo~sali C¢: Myers Ov 'ners Very truly yours, Dee Principal TOTAL P.02 Se~-10-~7 11:52A Community Plannin§ & Deve 907-343-4220 P.01 MUNICIP.A. LITY OF ANCHORAGE Community Planning & Development P.O. Box 196650 . Anchorage, AK 99519 6650 Fax Cover Sheet DATE: TO: ~ ~ PHONE: ~ FAX: FAX: CC: Number of pages including cover sheet: Message Sep-10-97 11:52A Community Planning & Deve 907-343-4220 P.02 Y0ur CompanyNsme- (907 8-S590-Created;Honda¥,August 27, 1956 ~PM- Page I of 5 Dr. Sheila Ann Selkregg, Director Commuuity Planning and Development P.O. Box 196650 Anchorage, AK 99519-6650 August 24,1997 Dear Dr. Selkregg; ! am writing Peter's Creek general, and with regard to the proposed Denali View Subdivision in the area. I have concerns about the decision making process in specific concerns about water and road/access issues. Public Process I became involved with this project as an interested citizen; I wish to encourage aud support the M.O.A. and State agencies in making pro-active, rather than re-active, decisions regarding responsible development in our community. I cat] appreciate that you and your staff frequently encouuter citizen groups opposed to one action or another and that you must discount "NIMBY" opinions as a matter of course. However, in this case I believe there are fundamental principles of due process and responsibility involved which need to be addressed. Specifically I wonder: 1. Whose interests does the Municipality most represent, community interests o~ those of individuals (in this case developers desiring to make profit)? a 2. When these interests directly conflict, what role and position will/should the Ivlunicpality take? 3. Where does the burden of proof (as to impacts and mitigating measures) lie9 A corollary here is who bears the financial burden of documenting such impacts- the developer, city and state agencies or affected public/homeowners? the 4. By ,.,,'hat process/procedure is submitted information determined to be adequate, sufficient and/or true? In a letter daled August 19,1997, Mr. Dee High clearly asserts that the burden of proof in the case of Denali View Subdivision rests wilh thc community/homeowners who have questioned the projected impacts and Sep-10-97 11:52A Community Planning & Deve 907-343-4220 P.03 Y,~ur Company Name - (907 8-5590 - Crs~ted:Honday, August 27, t956 ~ Phi - Page 2 of 5 conclusions provided by Mr Myers and his employees. with Mr. High. I strongly disagree Residents of three subdivisions surrounding Denali View (Scimitar, Chugach Park Estates and Petersgate Subdivision) have spent $7000+ trying to ensure that our concerns are addressed. After the Chugiak Community Council Meeting on July 17, eommnnity members hired Terrasat, Inc. to prepare an independent hydrology study because we stongly believed the hydrology and nitrate studies prepared by Mr, Munter for Mr. Myers were biased and inadequate, We were essentially forced into this action because, despite numerous and serious questions raised by the public at the Chugiak Community Council Meeting, Mr, Cross asserted that unless information to the contrary was brought forward he wonld accept the Bristol Environmental report and recommend the project be approved. It was gratifying that two reviewing state agencies: D,E,C. and D.N.R, independently echoed many of the same concerns raised by the "non- professional" public. (l can't help wondering why Mr. Cross didn't identify these areas of concern himself,,.?) To reilerate, the purpose of hiring a consulting hydrologist was to: a) gel a clearer picture of the existing water situation than that provided by Mr. Munter's report', b) to aeertain whether our fears of negative impacts e.'ere warrented; and c) by seeking "professional expertise" to ensure that our concerns were taken seriously by decision-making authorities. The results of our expenditures is a hydrology report that challenges and/or contradicts many of the conclusions put forward by thc developer. It seems to me that we have made our point, that this project deserves more careful seruliny before being approved. It also raises ethical and legal questions about whether a community should have to pay an independent consultant to represent their interests when ,,ye have public (???) agencies presumably mandated to safequard exactly these interests? Mr. (-;ross, in a telephone conversation on August 22, equated our expenditures with those of Mr. Myers, who "has also spent a great deal of money on this process," I contend these expenditures are very different: h,lr. Myers anticipates a profit at the end of this and at the very least can ,.,.,rite it off as a business expense. We cannot, The question of who is responsible and who pays is a very serious policy issue and needs to be addressed directly and with care. I am very concerned about the precedent this case sets for fnture sitnations. 3 0 Sop-10-97 11:53A Comunity Planning & Dove 907-343-4220 P.04 Y~ur Company Name - (9071 3-5590-Created:Monday, August27, 1956 ~PM- Page3of 5 Returning to Mr. High's letter, he wrote: "By working with the appropriate Departments of the Municipality, the Myers (owners) have clearly demonstrated, through "systematic evaluation", that Ihe problem is nol the lack of water, water quality or the effect of one well on another." Yet...at a me~t~ug on ~uly~ 2fl_in. Mr. Jim Cro~s_~Lmff~, ~parti~:_ incl~g ~,_. It~h Environmental were "inadequale" to conclude whether sufficienl waler ~x~. [~.he__~fi~ub~on ~ -~ .tong . run,,, and ...~'he~_sgtr~und~g welt~._~41L_~t ~....~d verscl~p~d~ Mr. High's statement regarding Mr. Cross's request that homeowners provide flow and nitrate tests of their wells is misleading (Paragraph 2, line I and paragraph 2, lines 6-7), I was at both community council meetings in question; Mr, Cross did request any flow and nitrate data available, noting it wonld be very helpful in the assessment of this project. A formal water flow and nitrate test, conducted by a 'professional' hydrologist, costs around $400 per household, I am sure Mr. Cross would be the first to admit he has no authority to insist or require such expenditures. Ironically many homeowners did consider 'conducting these tests and obtaining this information. But because: 1) we were not confident thai our interests would be justly represented within the Municipality; and 2) we were not certain how the data would be used; and 3) many of us have experienced responses ranging from cool to openly dismissive from staff members involved in this projecl, we chose thc alternative of hiring a hydrologist who was capable of interpreting the data and representing us on the "professional" level. Again I assert that this should not have been necessary if city employees had been conscientious about doing their jobs. Other comments regarding Mr. High's letter: Paragraph 2; line 2: I never heard Mr. Young (the homeowner's hydrologist) direct anyone not to provide flow rate and nitrate information flow rate and nitrate; quite the opposite, he solicited any and ail existing available information, With respect to Paragraph 3, line 1, I'm not clear what "position" Mr. High refers to I nnderstand 'the homeowner's' position to be that the developer should be required to provide adequate inforn'lation to assure residents that there is sufficient water for the proposed subdivision and that current residents' waler quality and quantity will not be adversely impacted by the development of Denali View. This position is supported by applicable codes and laws. Furthermore, it is our position that the developer to date has a_ot provided this 'adequate information'- or "real data", to use h:lr. 31 Sep-10-97 11:53A Community Planning & Deve 907-343-4220 P.05 Your Company Name - (907: 3-5590 - Created: Mon~Jay, August 27, 1 g56 ' PM ~ Page 4 of 5 High's own words. Mr. High himself concurred a day after writing this letter that the "hard factual data" provided on behalf of his client was "inadequate" to conclude that a long term supply of clean water exists for the proposed subdivsion and surrounding neighhborhoods. Furthermore, the homeowners' position is supported by an independent hydrology report and by two state agencies, D,E.C. and D.N,R, Therefore Mr, High's assertion that we should be required to conduct flow data and nitrate tests to support our position is ludicrous, It also raises serious questions about public process and burden of proof which should be clarified immediately. I believe the controversy is well documented in other correspondance, My question is: How will the Municipality deal with conflicting opinions from two professional hydrologists? Will the Municipality require definitive data to resolve the conflict, And who is responsible for paying for obtaining this information. Another controversial issue associated DenalJ View is road and trail access up Bear Mountain, Some residents of Scimitar Subdivision have petitioned to exclude righl-of~ways for a Seika-Kullberg road connection, but residents in Chugach Park Estates and Peter's Gate Suhd. strongly desire the right-of-way to be dedicated to leave future options open, We are supported in this by Ted Kinney, our Road Board representative. Another road/trail access issue involves the upper Kullberg-Sullins trail, which is used by pedestrians and school children needing to get to bus stops in Scimitar Subd, (Chugach Park Estates and Peter's Gale Sabd, have no school bus service because of narrow steep roads,) Within the last week or so trees have been felled and "No Trespassing" signs posted along the Seica-Kullberg and Kullberg-Sullins trails. I question the legality of this act- prohibiting access along historical roadbeds and traditional trails when no significant modification to the property has been (or will imminently be) accomplished. But regardless of the legality, this is an example of the kind of behavior xvhich has eroded trust in Mr. Myers' good faith and concern for community welfare. School starts in a week and a half. Given we have no school bus service in Chugach Park Estates and Peter's Gate Subdivisions, how does Mr. Myers propose the children on the mountain get. to their bus stop in Scimitar? By walking an additional two miles along narrow dangerous roads? Judging from his actions Mr. IVlyers does not propose any solution, Therefore, the question reverts to you: How does the Municipality propose to safequard Sep-]O-g7 11:54A Comunity Planning & Deve 907-343-4220 P.06 Your Company Name-(g0T) ~-55g0-Craated:Monday, August 27, 1956; PM- Page Sol 5 our children, beginning September 2 and continuing if Denali View Subdivision is app~'oved? This circumstance supports our contention that the road access issue needs to be formally resolved before approval of plat and not left to the discretion of the developer. In conclusion, given the significance of many of the conflicts in this case, l very strongly oppose any plan to approve the preliminary plat for Denali View, contingent upon completing further pump tests etc. Such an action would end the public process and conscribe the ability for citizens to comment and review decisions that may have serious impacts on their neighborhoods. Given that serious policy issues are at stake, this would set a very dangerous precedent. Water, road access and procedural issues must be resolved before the public process is closed and before thc development is approved. Thank you for )'our serious consideration of these matters. I would be happy to discuss them further at any time. Sincerely yours, Emily M. Davies P.O. Box 671264 Chugiak, AK 99567 907-699.5590 The Platting Board Margaret O'Brien, CP&D (fax) Jerry Weaver, CP&D (fax) Elaine Christian, DHHS (fax) Jim Cross, DHHS (fax) Kevin Klewano, ADEC (fax) Gary Prokosch, DNR (fax) Sharon Minsch, Community Council :33 "HI! CON. SULTING .ENGIN Czvil Surveying P~I an r~i ER8 Mr, Dan You'ng Terrasat, Inc. 9200 Lake Otis Anchorage, AK >arkwa¥ 99507;4228 Denall Vidw/Anecdotal Information RE: Dear Mr. Young, September 8, 1997 W.O.: 96298 __Post-it'" brand f~,x trans, mit[~l merho ? 71 #o~pages · ~;.' I'° ~. ~' ,~= ~ ~ ._ ..."~:_ On August 25t; information Use provid,dll it apPi your opinions. when we read and this well. ~, you iprovided us with a report which was to include al t in pre, paring your report of August 1, 1997. In revie,lwir ars tha~ we stil do not :have all the information that:you used :)r examPle, you show five wells that have been hyd~ofractuied e data,!we can find only one reference to a well that was h~dr positive results. anecdotal the data preparing HoWever, 3fractured, This is again a r{equest l~hat you provide us with all the information used in ~re';)aring your report, Trying t(~ analYSis and understand the extent of the problemsiwithou! all the data is delaying the prolect and causing confus on of the ssues We need al your!inf,)rmation in order for us to s~Ysternaiically evaluate the issues that you raised, ~ Please provide alii the inf~ormation that you have on this project by Wednesday, September 10, 1997. You cooperation would be greatly appreciated, Very truly yours, ~DHI-C.onsulting Engineers Dee High, P.~. / ~ Principal i~ Jim Cross, DHHS ; Myers, Ow@ers M~nter~ BSE ': 29.Sdy085,l~r Dimond Center Tower, 5th Floor · 800 E. Dirnond Blvd., Suite 3-545 · Anchorage, A~aska 995~5 (907) 344~1385 * Fax 344-1883 TOTAL P,O1 DHI CONSULTING ENGINEERS Civil · Surveying · Planning Mr. Jim Cross Department of Health & Human Services P.O. Box 196650 Anchorage, AK 99519-6650 August 27, 1997 W.O.: 96298 RE: Denali View Subdivision Dear Mr. Cross, This "aquifer stress" test that is being proposed by Terrasat will not show the true impact to the aquifer of well pumping over the long term. Such a test will give us very little useful information. This must be considered before plans are made to conduct more testing. There are a number of reasons my concerns. Such a test must be technically sound to produce valid results from which any clear conclusions can be drawn. Controlled pumping is critical. Every well within 1000 feet of the pumped wells must be verifiably shut down for at least 9 to 12 days. This will require absolute compliance by every property owner. This will be difficult if not impossible to accomplish. How is this going to be addressed? The test will not show the true impact on surrounding wells since it does not address seasonal aquifer recharge that will replenish the aquifer. Recharge is a critical part of the equation that would need to be modeled as well. Disparate water levels show that the wells around Scimitar are not closely hydraulically connected to the new well on lot 9. The mathematical basis for determining impact on non- hydraulically connected wells requires many simplified assumption that prohibit clear conclusions. The technical analysis will also need to demonstrate that a 70% stress level will represent long term aquifer pumping levels. This is very unlikely as evidenced by high water level in the well just east of our 500' bedrock well after years of pumping. This fact will invalidate the test results. I tall<ed with Mr. Young about this test on Friday. His plan is to flow the wells at very high rates for a long enough period to show some effect, however little, on surrounding wells. His conclusion would be that an effect on any surrounding well would then be an adverse or undue effect on all Iow flow wells in the area (via less water to dilute nitrates). The obvious problem is that nitrates in the area are not currently elevated any where near State Dimond Center Tower, 5th Floor · 800 E. Dimond Blvd., Suite 3-545 · Anchorage, Alaska 99515 (907) 344-1385 · Fax 344-1383 Dear Mr. Dee High We would like to make o~r well available for monitoring during your aquifer testing of the Denali View Subdivision. ~Lawr~ ~ tha..t..dafflage may occur to Our well or um I . ,~,~wmg conomons wm oe required o~ the (level .... ~ L_ P p.! .ng sy..stem The UlJ~/Il tie use~ trllS Well; " t~f°~ ~s~lem~ u~se~l_,._a_~ual~.ecl pum..p lnstalle? mu? do a pressure ~y~t -. Hletestresul~smus£Derecorded. Costs will be the responsibility of the developer, for this task 2. ~ ~ect~ldavs~ePemr anUnU~ our well, the qualified Installer must evaluate must . i toth;'Lmeow er %m e water ~5..~ ~. ,~_~1~r wiB o~.. re~..pons!o~e .to proviae potabie haule~ the ;-".'L~-u? ,~u u,e house, for me ame that the well is out Of ~'~ice (at a~_U~__ve.-~, s..e~.pen, se). As an alternative, the deve n Hala.Jemell[S Iai: least one week ' ca ma~e ho el ,or e.u .on ,,, be responsible for the~,~"..~ ~ ~w_~?__o~ or .service..lhe qeve~oper will · ~...- ,~- u.¢ .utel aria meals away trom nome. qualrlted pump Installer ~=~ .--.-.~..~'-~-.-"'c ~lu.er t-es~.n~. Ihe same '~'~ ~u~uu~-uc~J i~le pressure allo must do work th ' - .e~--~o~:al tests at ~ done m this .task. The condition of the well wilt be v,,~lfl.ed by the Installer using b~e same techniques during the pre-test (see FZ above). 5. U~l~,,n. w~l _r~storaUon, the d~evel, oper wil be responsible to insure that the ~,c~l~on wnf~lll h~ ~A qual~.ee pump Installer must do the dlslnfecUon. · . iii ue (]one, at a mimm~um, by followi the aescribed in C-rouodwater a. d We~ Z= ediUon, pagesr~gz9-623,procedures ~f any flow tests are conducted from our well, Ifle developer must supply L all pumping equipment. Within 48 hours of collecting data fi-om our well, the developer will provide :~" copies of all data to the homeowner. ! agree to abide by the above conditions. Developer Date Qualified pump installer means a person or company that routinely conducts water well pump installations. The installer must be an active member of the Alaska Water Well Association and the National Ground Water AssOCiation. standards, It assumes that the new septic systems will automatically add nitrates into the ground water at levels above the State standards and this position doesn't address aquifer recharge. It also assumes that any effect would be undue or adverse. This approach is flawed. Any testing must address the issue of undue impact, The testing program as discussed is only going to lead to more disagreement of the issue since the data will not be conclusive and will allow for a wide range of interpretation, Requesting the Owner to conduct additional, questionable tests is not justifiable. The testing being discussed will produce very little information of any value, There is enough technical data available to determine whether this subdivision meets the Municipal subdivision standards. Before I can recommend to my Client that he spend more money on water testing, I need to know exactly what information is missing, what the basis of your decision is, and what portion of Title 21 or Title 15 has not been satisfied. How will further testing be technically valid and how it will provide the missing information. What criteria will the Municipality use to evaluate the data? We strongly believe that the solution to the existing Iow production wells in the area is hydrofracture. We invite you to examine our information on this technology. I think you will become convinced, as we are, of its effectiveness. Additional testing by my client will not solve the existing water problems. (-~" '~r..y,.truly yours, Dee High, I~'.E.~/ Principal cc: Gail High, DHi Gary Prokosch, DNR Munter, BSE Myers, Owner 298dc26t,ltr 0~-26-1997 01:09P~ D HI ONSULT[NQ 907 344 1383 P,01 DiHI:CONSULTING ENGINEERS Civil · Surveying · Plan~i~g Ms. Sheila Ant Selktegg Community Planning &;Development P.O. Box 1966~50 Anchorage, AlAska 99519-6650 RE; Denali ~iew Subdivision August 26, 1997 W,O.: 96298 Post-it' brand fax transmittal memo 7671 (Developer) to Dear Ms. Selkr~egg, EncloSed is ai letter from the Arlene Myers Community ~lanning and Development, Arlene; analyzed all the responses received by the D.epartme~nt as of the printing of the !asr pao,ket, In summarY/, of the 183 property owners, t4 {7~6°~) respor~ded concerning the water issue. From the size of the packet, it would appear that there is a serious water shortage in the area and that there is a large CommunityI out cry for Community water. The public record shows that fewer than 10% of the prol~erty owners are exper~enclr)g water problems and less than that have experienced water s~,ortages that are below the Municipal standards. Their is a small number of very active property owners who are trying to ma ce the water issue much large th~n it really is. When you finally get a copy of Mr. Young's report based on hca say mformabon, this fact wdl once again be substantiated, N~netyltwo percent (92%) of the Commu,ity is not concerned enough with water to even write An opinion· Solutions to the so called water problem is not more testing. Solutions are: Reduce the r~sk:of the new home owners drilling dry wells by using the o well that ere currently drilled to serve two or more lots. If each well serves three Ibts, we have ceduce lJhe risk'of dry or Iow flow wells by 55%. In addition, it will re~luce the risk of adverse impact to adjacent property owners. Current i low flow wells need to be hydrofractured. The data shbw~ that this is reasonable solution both in terms of cost and results. Mr, Mu~ter has ar~ independent study sinews hydrofracture to be a 95% solution for low flow wells in similar geology in Eagle River. The issule of Iow flow wells in this area has CeaSed to exist. Hydrofracture works when done correctlyI Dirnond Center Tower, 5th Floor · 800 E. Dirnond Blvd., Suite 3~545 - Anchorage, A!aska 99515 (907) 344-1385 · Fax 344-1383 08-26-1997 Oi::[OPH D HI ONSULTING 98? 344 138:3 P,02 To the best of my know edge Denah Wew Subd~vm~on meets every standard of itle 21 and Title 15. I'd apprec ate Staff s recommendation of approval for this Subdiv'sion at The upcoming hearing. Very truly yours, (DIHf-C~nsulting Engineers,./ Pnnc~pal ~ cc: Gaff High, Munter, Myers, Ow~ler Cross, DHHs Prokosch, ~)NR P. 01 0B-~'5-1997 01: 29PM L,L.J t 1..,:,L_J_.LJ.:..I .l,,,.t_LJ......l_,.k.._L.[,...I _ . I~-Z~-1997 6881838 P, 04 08-2~-1~97 01:10PM ~ HI ONSULTING 90? ~44 1~8~ P.O~ 8B-26-1997 Oi:llPM D HI ONSULTING 98? 344 1~8~ P.04 To the best of my knowl'edge, Denali View Subdivision meets every sta, ndard of Title 21 and Title 15, I'd aP~preciate Staff's recommendation of approval for th~s Subdivision at the upcoming hearing, Very truly yours, ~Nf 'C;xo, n sultin g Engineers,.-/ De, e ,High, P.E. / .;" / Principal cc: Gall High, DHI Munter, BSE Myers, Owner Cross, DHHS Prokosch, DNR 08-26-1997 81; llPM ~'~'I;~ CI]NT R~lCT ] NO D HI ONSULTING 907 344 1583 P,05 Aog. ~ 1997 03:10PH Pi TO: FROM: DATE: SUBJECT'. Many le,~r~, petition~ and pub|ie no;ices have been sen! in lo your offi=e regardinlt Derm Su~lvist~, S~v~{ ha~ b~n ~nt by the same ~.y o~ and families. The fojh s~dsh~t w~ pm~ ~ citify how many ~y ~ hav~ ~ ~nd to ~ i~ ~hey ~dd~s~: Tho {nfofm~fi~ ~ ~k~ ~om t~ t~ ~&ots p~md'for ~ Bo~d f~ ~e Au~ 6~ Ho~i.n~ by S~ Wc hav~ tfie.~;{ to identify families mslding at one pmp~ty a~ld listed them oWner. O!J~ OF {83 PiIOI~;RT]I~S IlS SCIMITAR SUBDIVISION. CHUGAOt PARX ESTA P~'~S 0{ATE SUBDIVISION ONLY' 14 pROI~,lijT¥ OWNERS HAVE WR1TTEN IN AND ExPR.ESBD CONCERN8 RF.A~ARD[NO WATER QUANITY &QUALITY )_$ pl~_O, l'~T¥ O'WN~ii8 HAYE W~RITTBN m A.ND BXPRF~SF..D CONCBRNS RFX3ARDIN'O SltCONDARY ROAD EASEM~,NT & 13 OF THESE FOR A TRAIL F~I;EMENT qJJ~.RO~!~ ~. NER8 HAvE WRIYri~,N IN AND DO NOT WANT ANY ROAD! ;EASEMENT BUTDO wANT A TRAIL .,EASEMENT FROM 817.]KA TO KULLB~ERG As you c~n f~c there i~ ac~ua{ly vary r~w properties that ha~ ~lor qumli~ ~d q~nttty a~ to $ ~1 ~t ~d haw ~tJsfi~ nil o~r Munlci~J~ of A~t~e ~qui~ We f~ i~M ~i~ ~si~ ~ould re~ive your ~mm~ntion f~ p~iimi~ ~ ~ut ~h~ d~ay. ,wing :'latting res & ~y E~-ZS-1997 E~BBPM 6881238 P,O2 08-~-1997 Oi:i~PM D HI ONSULTING 90? ~44 1385 P.06 06-26-1997 01: 12PM I) HI ONSULTING 90? 344 1363 P.O? ~i8-2~J-1997 01:31~M P. 03 08-25-1997 01:51PM 688125~ P.04 08-26-1997 01: 15PM D HI ONSU/TING 907 344 1ESE P. 10 1~-25-1997 01: ~2.PM 680125~ TOTAL P.10 FAX MEMORANDUM TO: DHHS! DATE:August 22, 997 FAX NO,:: 3~4~'~7~'~, W.O. NO.: 962981 A I ] ENTION: Jim,, Cross NO. OF PAGES~ 2 SUaJECT:IDenah iew . FOR UR INFO MATION: Orlgbtal Disposltlon~ ri ! Mailed n ¢ell for Pickup [] Filed n Fel~Your use ; [] For Review & Comment [] As Requested [~] For App!ove MESSAG E: Jim, I felt the r~eeting On Wednesday was very productive. Everyone came o~lt of it with a will!ngness ~o d.e. velop a.p[an that would provide additional info,ma and hope~.lly end,he 'hearsay' approach that has been driving the Communitiles emolJion on this project. Jim MunteI' met with DNR (Prokosch & Ireland on Wednesday afterno(Jn). They worked 0u: the pr,~§ram as noted in the attached letter, Jim review this program w th ADEC (Klew,ano) today, Kevin also has our soil report a~d yther informatior) that he reviewing. I believ,e that both Departments will previqle you (on Monday,) with }etters supporting this program. Jim Mun~er wouldqike to meet with you first thing Monday to review ~he program a d get apy comments. ' i I'm forwarding this letter to Dan Young and hope to meet with him oniM(nday. j , He has be§n tied dp I assume trying to get the anecdotal information We requested {)n Wedt~esday, I Please call'with a time that is convenient for you. , I Thanks ~ I Dee i SENT BY.' ~ee HighI DHI CONSULTING ENGINEERS 800 E. DI~OND BLVD~ SUITE 3-S4~ ANCHORAGE, AK 99515 PH: (907) 344-1385 FAX: (9d7) 44-1383 RECEIVED AUG 2 5i1997 Mun icipality ot ]Anchorage Dept, Health & Huma~i~l Project Noi 8008LM-00 August 2~,! t997 D HI ONSULTING el, w~er Ma~agem~ artmeat of Nararal Resources Re: P~n~ng water rights appU~e~ou for proposed Dear ML l~rokosch: '~ ! am wri~ proposed D aquifer test vicinit~ of q for ~judic~ additioual homers, 907 344 1383 P.O1 Bristol li;nviro.,~,~tal Services Corporation De.~li View SUbdiviaion, 11 1°'a. ~ to you on behalf of~ the applicant~ fo~ the end' water fi Is ! ' .... : . .~ , p mg , gh appLtc mail ¥1~2 Sub~lv~ioh. We have tlreviously provided ing6~ation fi~m i c~ .p~_~_~d ~: ~e Site a~d ot~er i~urmatio~ regardiag waier availabiltl hc proposal subdivis~ m. Al~ough w~ believe t~at tills f.~f~ma~oa!Js i ~ion of ~ water righ£ applicat~m, Mr, IreJaad at:t~ A~k~ H¥~olo~iC ~ 'ou daze~ July 30, 1~ ~m would be hclpfttl ~tion for 24-hour y in the ufficient urvey in indicate~ that conditions in the area are comp!r.x and r~at ~i.Lng pot~tial effects on ~Unoun~ng iwa&r rights Proposed I,enali V"~.w iqteff~. Test Pro~ aay 8~n~ug w~ ow~s ~ b~ ~y ~d by ~e ~posed ~elo~t, T~ p~nm~g ~d ~. Wc ~ work wi~ ~ CO.,,,,,nuiw ~ ~ wel~ able fnr p~e to h~ at l~t fl~ d~ys, ~g which fi~e R will be i~ to ob~ w~ l~el ~ ~om ~tor~g.wells. ~ P~(907) ~63-00131P~ ~ 0B-~'~-Z997 12:~gPf'l P, 02 TOTRL P.O1 D HI ONSULTING Bristol Enviroumental Sereice do This w~ propo~ that mo~t~ ~lls bt flow ms~ ~o~g ~ s~d MO Au~o:t~ [A~ov~ p~d~ ~ p~ing b~ ~ before test diff~e~e ~in wa~ a~l,b~ w~d b~ evid~ o~ wc~ ~terf~. ' Pump ~ ~ we~ at ~]! ~ m ~ ~ av~bb~ ~wdo~. We p~p bo~ ~is~g~ ~i Vi~ w~s ~ a~ox~m~mly TO s~ul~sly f~ ~rox~te~ 72 hO~s. ~ will s~ fief ~lt ~o~ Io~-~ ~mg at, Iow~ ra~, We ~e ~emb~ o~ test ~ ~du~. AI~, ~ ~e we~ ~p s~ ~i~s, ~o~t of ~cll ~, T~ b ~ ~ro~on ora w~st-~e sc~io Wa ~o p~ pos~g ~at ~c appI~t ~ ~ r~m~ble ~r: de,ih ~f ~e pl~, ~ ~ ~c ~ of ~e mst pl~. · ~ ~st ~. ~t~ p~ ~ ~li~, ~ ~r d~cb~ge ~o we Ils On ~n!i V~ ~r approxi~ly 72 ho~s of ~. · ~lyze ~ da~ ~e a'r~n. ~r ~o~ m~on ,~ ~ a ~gh l~ of res~ ~s~Ylladj~ ~s wa~ ~t ~pli~ou. We w~ld ~pr~i mlo~t~]~ ~ on wh~ you ~1~ ~e ~opo~d ~i~ble for ~j~I~n of~s S' ~ely, [ , ~ li~s a. M~r, 907 344 138~ P.01 ~ CorporaliOn ~s. Any 08-22-1997 12:39PM oposc to ~wdow~ te v~lls Page 2 TOTAL_ P.03 P. 0:$ TOTAL P.O1 0~-11-1997 O~12PM D HI ONSULTING 90? 544 1~85 P.02 DHI iCON. SULTING .ENGINEgERS Civil Surveying Planniil August 11, 1997 W.O.: 96298 Mr. Jim Cross Dept. of Health & Human Services Anchorage, AK 996 RE: Denali Vi.ew Subdivision RECEIVED AUG 1 2 1997 Municipality of Anchorage Dept. Health & Human Services Dear Mr. CrOss, I understand that we are being asked to meet with represen'tatives of DNR, ADEC and the Community in an effort to reach some consensus on what is needed to resolve their concerns with water availability. For the ,record, I want tO state that the Developer has cooperated and complie~l with every request of the Municipality and your Department relative to this matter. Our responses to these iequests have been both timely, accurate and thorough. I am finding it difficult to understand why we need additional meetings to reach corlcurrence When the data and reports show conclusively that there is. adequate water for th~s subd'v's'on. Those who are clouding the issue either didn't understand the data, choose to ignore, the data, or have relied on antidotal information rather than the hard facts. In the case of ADEC, I'm not sure if he understood tee issues. 1) We have installed two wells on the property. Both wells are very good producers. Yet no credit is g!ven to the fact that both wells were drilled in an area where "there is no or little wal~er." 2) Both wells have good, long term quantities of water. This has been adequa,tely demonstrated. 3) The Hydrology report has demonstrated that there is adequate water, quality water, Iow risk of adverse or undue impact to surrounding properties. 4) There is no health issue here. The nitrate report demonstrates that the water quality in the area is excellent. There certainly is no data to suggest that additional on-site septic systems will adversly affect the water quality. Dirnond Center Tower, 5th Floor · 800 E, Dimond Blvd,, Suite 3-545 · Anchorage, Alaska 99515 (907) 344-1385 * Fax 844-1383 We have clearly demonstrated that this is a safe, reasonable development and, that the data is sufficient for this subdivision to be approved, i The real issue is not whether there is adequate quantities of water available, but how expensive it is to find the water. This is inherent with bedrock areas, This issue will is not be affected by this subdivision. The issues of cost will not be resolved w,'hether this subdivision becomes fully developed or not, : I recommend that we meet with ADEC and IDNR concerning their comments. . doubt that they will be able to support their positions if Mr. Munter is provided an opl~ortunity to present his information first hand. I have little inclination to address Mr, Young's report further. He had ample op~ortunityto get hard data, Even alto(you suggested to the Community that they get their yells tested, Mr. Young directed them' not to, Instead, he purposely decided to rely on partial }or antidotal information instead of scientific data. ~ would recommend that Mr. Young be directed to obtain scientific data if his report is given any standing on the issue of adequate water supply. I'm sure the Developer wou!d make the wells available to Mr. Young if he decided to run a pump test, , On Thursday, August 14th, at 1:30 p,m,, we are to meet with the Director a~nd Staff of Community P'lannlng and, Development. I would appreciate your attendance at th, is meeting, If Community Planning continues to be involved in this issue, then we need tO have time alloted to hear their specific concerns and for them to hear first hand exactly how we have addressed the issue, ~ Very truly yours, DHI Consulting Engineers Dee High, P,E, Principal cc; Myers, Owner Munter, 298de05t,~tr CON. SsU L TING .EN;1G Ciivil veying a August 19, 1997 W.O.: 96298 Ms. Sheila Ann Community Plat P.O. Box 1966! Anchorage, AK RE: Denali Vi~ Dear Ms. selkre At the August information" wa., obtained by "he; bring attention a problem or hearsay inform-' the entire subdN the.Myers (own~ is not the lack homeowners re g RS Selkreg~, Director ning anU Development ;0 ; 99519-6650 ;w Subdivision/Hydrology RECEIV AUG 2 1', Munib~pality ot'~An( Dept. Hearth & Hdrna~ gg, 4th Co,.mmunity Planning meeting, a statement was~ made tho relevant in dea ng wth this ssue By definition, anec~lotal mffan.' irsay" r~ther than by "systematic evaluation". Anctedc~tal informal a possible problem, however, it cannot be used to determine it in e exactI nature of a problem. The wilhngness of the Mumcipah tion eyrir the "real data" is not on y damaging to my c!ient bu~is ision precess. By working with the appropriate Departments of the rs) have~ clearly demonstrated, through "systematic evaluation", tho' of water, water quality or the effect of one well en another 3crt shews that the lack of water is not as wide spread as tt horage Services ;"anecdotal information on ca:n help fact there is [y to accept jeopardizing Municipality, the problem Even the e "hearsay" information clair~s. On June 19 an~l July 17, Mr. Cross requested the home owners to piovided flov~ and nitrate tests of their wells conducted by professional engineers. Their hydrolo{]ist directed them not to provide the da~- Instead, he provided evaluations and concluslon!s drawn; p~imarily from hearsay informS, riCh. ~he homeowners have not provided any hard facts !o ~upport their position. Realitest dat~ is needed and the home owner should be required ~[o i~rovided this information if their claims are to be substantiated. Mr. Cross's request~ for the~ho~neowners to conduct these t~sts cannot be ignored or manipulated. I Dimond Center ~ower, 5:th Floor · 800 E, Dimond Blvd,, Suite 3-545 * Anchorage, A ~ (907) 344-1385 * Fax 344-1883 aska 99515 TOTRL P.01 ~997 05:51PM D HI ONSULTING 90? 544 1~8~ P.O1 Unless there sthard factual data provided by the homeowners to support their Municipality ne,~ds stan~l behind their subdivision process, their rational syst~e~ evaluation estal~lished I~y each Department and support this project. cc: Gall High, ,)Hi Myers, Ow ~ers (fax)! Jim Muntel, Jim Cross, DHHS (~x) Sharon Mil i,s, ch, Con~munity Council Margaret~ ~ ~ Brlen, qP & D (fax) Jerry Wea, 'er, CP &!D (fax) Kevin Kle~,ano, ADEC (fax) Gary Prok~sch (fax)l 298ds14,~ (fax) ..~/_~truly yours, Dee High, P.E. Principal )osition, the of problem TOTRL P.O1 D HI ONSULTING DHI CONSULTING Civil * Surveying 907 ~44 i383 P.04 ENGINEERS · Plannihg Ms. Sheila Ann Selkreggl Director Community Planning an~ Development P.O. Box 196,650 Anchorage, AK 99519-6650 RE; Denali View Subdivision (S-10054) Dear Ms. Selkregg, August 11, 1997 W.O.: 96298 AUG 721997 Municipali~y Ot Anct~ · Dept. Health & Hurnnn ~rag. e ...... ~erwces This project has been delayed, again, at the request of the Municipality.. ~he issues surrounding this development are not only important to the Property Owners, ?rlene and Paul Myers, they also have far reaching effects on the further development; within the Municipality. : We are sched!uledto meet at 1:30, August 14th. The issues will be outlined an~l discussed in depth so we can try to reach a consensus on what is needed for the Department to recommend approval of this subdivision. I understand that you ha:Ye scheduled thirty minutes for this meeting. This is not enough time to adequately address the issues, It is important that you be present. We r~eed to hear exactly what the concerns are and why. It is also important that your hear h6w we have addressed the issues to date. We are available any time on August 14th, I recommend at least 2 houcs for the meeting. I would appreciate your help in this matter, CC: Myers, Owners Munzer, BSE Cross, DHHS Ross, DPW Gotten, Traffic 298dsOSt.ltr ,/'~'~r uly yours, Dee High, PiE. Principal Dimond Center Tower, 5th Floor ' 800 E, Dimond Blvd,, Suite 3-545 · Anchorage, Alaska 99515 (907) 344-1385 · Fax 344-1383 TOTRL P.04 MUNICIPALITY OF ANCHORAG~ ENVlI~ONMENT^LSERVlC[$DIVI'SlII::II'EIIJ--J'~ OF TRANSMITTAL , DHI CONSULTING ENGINEERS. ' ' dUll 800 E. Dlmond Blvd. Suite 3-545 Anchorage, AK 99515 (,0,..-,,. ,.-.. RECE!VED TObA~5 WE ARE SENDING YOU _ Shop drawings _ Copy of lelter _ Allached _ Under sepsrale cover via _ Pdnts _ Plans _ Change order _ Repeals lho following items: _ Samples _ Specifications _ Other COPIES CATE NO. DESCRIPTION TNESE ARE TRANSMITTED es checked below: _ For approval _ As reqnesled _ Approved as holed _ FOR BIDS DUE REMARKS _ Approved as submitted _ For review and comment _ Other 19 _ For your use _ Returned for corrections __PRINTS RETURNED AFTER LOAN TO US coPy~o n enclosures ere not aa noted, pleaee notify u~ et once. LOT t 0 0 : LOT 8 °~ .J MAI COIM DRIVE ; ..... I)RAINA(;I'; MAI' I)ENAI,1 VIEW ,/ LOT 1 0 o ol 0 C3 oLOT 8o DHI CONSULTING ENGINEERS CIVIL · 5URVEYINO · PLANNING w.o. 96298 coup r..E 298CTMAP SCALE 1"=300' OA'r£ 5-3-97 PLAT DENAU VIEW 8UBD. CONTOUR MAP DENALI VIEW SUBD. 0E]-27-1997 02:43PM D HI ONSULTING 90? 344 1l]83 P.01 [ alii CO S TING NGIN ERS Civil veying Plann ~g Mr, Jim Cross Department of H~alth & Human Services P.O. BOX 196650 Anchorage, AK 99519-6650 RE: Denali V ew Subd vision August 27, 1997 W.O.: 96298 Post4t~ brand faX transmittal memo 7~ el p.~le. · ~. ~,. Dear Mr. Cross, This "aquifer stress" teS;t that is being proposed by Terrasat will not show the ' 'ue impact to the aquifer ofiWell plumping over the long term, Such a T,est will give .us very.littl.e useful information. Th!s muSt;be considered before plans are maae to conclucT more ~esTmg. There are a number of reasons my concerns, Such a test must be technically/ sound produce valid results from which any clear conclusions can be drawn, Controlled pumping is critical. Every well within 1000 feet of The pumped wells must be verifiablyishut down for at least 9 to'12 days. This will require absolute compliance by every property owner. This will be diffi~:ult if not impossible to accomplish. How is this going to be a~dressed? The Test wil:l not show the True impact on surrounding wells since it does r~ot address seasonal aquifer~recharge That will replenish the aquifer. Recharge is a criticalipart of the equation tha~ weuld need To be modeled as well. Disparate waterjlevels show That the wells around Scimitar are not closely h?draulically connected to th~ new Well on lot 9. The mathematical basis for determining imppct on non- hydraulically connected wells requires many simplified assumption that pr+hibit clear conclusions. 'i The technical adalysis Will also need to demonstrate that a 70% stress lave) w~l represent long ~erm aquife{r pumping levels. This is very unlikely as evidenced by high w~ter level in the well just ea~ of our 500' bedrock well after years of pumping. This fact will invalidate the test results. I talked with Mrl Young about this test on Friday, His plan is to flow, the wells ~t very high rates for a long enough period to show some effect, however little, on surrounding wells. His conclusion would be That an effect on any surrounding well would then beian adverse or undue effect on all Iow flow wells in the area (via less water to dilute nitrates). The obvious problem is that nitrates in the area are not currently elevated any where near STate Dimond Center Tower, 5,tl~ Floor * 800 E. Dimond Blvd., Suite 3-545 ° Anchorage, A}aska 99515 (907) 344-1385 · Fax S44~1383 standards. It asJsumes that the new septic systems will automatically add nitra :es into the ground water atilevels above the State standards and this position doesn't add~ ess aquifer recharge. It also assumes that any effect would be undue or adverse. This ~pproach is flawed, Any res, ting must address the issue of undue impact. The testing }rogram as discussed is only going to lead to more disagreement of the issue since the dar; will not be conclusive and ~vill allow for a wide range of interpretation. Requesting the Owner to conduct additional, questionable tests is not justifiable. The testing being discussedlwill produce very little information of any value. There is enough technical data available to determine whether this subdivisior{ meets the Municipal subdivision standards. Before I can recommend to my ,Clien, t that he spend more money on waterltesting, I need to knoW exactly what information is missing, wh~t the basis of your decisionlis, and what por,tion of Title 21 orTitle 15 has not been satisfie~. How will further testing b~e technica y vahd and how t will provide the missing information. What criteria will the Municipality use to evaluate the data? I We strongly beiieve that the solution to the existing Iow production wells inlthe area Is hydrofracture. We invite you to examine our information on this technology. I tttink you will become convind'ed, as we are, of its effectiveness, Additional testing by my clilent will not solve the existing water problems. (-----~z.~truly yours, . Principal Gail High, DHI Gary Proko~ch. DNR Munter, BSE Myers, Owner TOTRL P.O~ DHI CONSULTING ENGINEERS 800 E. Dimond Blvd. Suite 3-545 Anchorage, AK 99515 (907)344-1385 FAX 344-1383 LETT 2 OF TRANSMITTAL WE ARE SENDING YOU __ Shop drawings _ Copy o1' letter _ Attached _ Under separate cover via __ Pdnts __ Plans _ Change order _ Reports the following items: _ Samples _ Specifications _ Other COPIES DATE NO. DESCRIPTION I% L ~,~ J- I V J'" L~ THESE ARE TRANSMITTED as checked below: __ For approval _ As requesled _ Approved as noted _ FOR BIDS DUE REMARKS _ Approved ns submllted _ For review and comment _ Olher 19 _ For your use _ Returned for corrections _PRINTS RETURNED AFTER LOAN TO US I[ enclosures are not as noted, please notl[y us al ones. DHI CONSULTING ENGINEERS Civil · Surveying · Planning May 5, 1997 W.O.: 96298 Mr. Jim Cross Department of Health and Human Services P.O. Box 196650 Anchorage, AK 99519-6650 RE: Soils Investigation/Denali View Subdivision Dear Mr. Cross, We have submitted a preliminary plat proposing subdivision of Scimitar Subdivision #3, Tract 1, in to 11 lots and rename it to Denali View Subdivision. The following soils report is being submitted for your review and approval in accordance with Title 15.65.180 and the Municipality of Anchorage's platting regulations. We completed the soils investigation on April 10 and 11. We placed one test hole on each of the proposed lots. (See attached sketch). The soils investigation included digging test pits to depths between 13' to 16' (unless water was encountered) using a Hatachi track backhoe. A 4" monitoring tube was placed in each pit. All soils were visually classified. The soils were very consistent throughout the subdivision. Generally, the soils consist of 12" of organic overburden, overlying approximately 2' of organic silts with sand and roots. Below that is slightly silty sandy gravel with rock to 12" and occasional boulders to 3 feet. There were minor variations in soil strata found throughout the subdivision. The only test pit that varied significantly was 7A. The soils found in this test pits consist of clean sands. No gravel was encountered. The soil logs for each test pit are enclosed. At the time of the investigation, water was encountered in test pit 6, 7A, and 7B at 10', 12', and 12' respectively. The water table was monitored through April 30th in an effort to cover Spring runoff and hopefully determine the seasonal high water table. On April 30th, water was logged in test holes 6, 7A, and 7B. Depth to water was 6.7', 8', and 10.4' respectively. None of the other test pits had water. Percolation tests were conducted at all of the test pits. Percolation rates varied from 0.1 minutes per inch to 3.5 minutes per inch. All of the soils have rapid percolation rates. Based on our soils investigation, and in accordance with Section 15.65.180 (B1), each lot has the minimum 10,000 square feet of total reserve area required for on-site waste water disposal systems. Dimond Center Tower, 5th Floor · 800 E. Dimond Blvd., Suite 3-545 · Anchorage, Alaska 99515 (907) 344-1385 ° Fax 344-1383 This subdivision meets the applicable portions of Title 15. We would appreciate your review of the enclosed logs and plan. Please call if you have any questions. sa/dh Gail High, DHI Paul & Arlene Myers Jim Munter, Bristol Environmental 298dc30a.ltr (-~-t.r~ly yours, Dee High, Principal Municipalily of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 82'5 "L" Slreet, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST TH1 PERFORMED EOR:~]?~ul Myers LEGAL DESCRIPTION: Lot 1 Denali View DATE PERFORMED: 4/11/97 Township, Range, Section: SLOPE SITE PLAN 9 10 12 13 14- 15 16 17 18 19- 20- Organic Overburden Frozen to 1' Organic Silt with Sand and Roots to 3' S1. Silty Sandy Gravel Rock to 12" with Occasional Boulders to 3' Bottom COMMENTS Soils presoaked prior to WAS GROUND WATER ENCOUNTERED? NO IF YES, AT WHAT OEP]H? PERCOLA]ION RAJ E 0 . 5 (m,nutes/mch) PERC HOLE DIAMETER 6" TEST RUN BETWEEN 4.5.FTAND 5.0_F]- running percolation test PERFORMED BY: Dee High CERFIFY THA? THIS TESF WAS PERFORMED IN DATE: Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Slreet, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST TM 2 PERFORMED FOR: Paul _Myers DATEPEnEORMED:.. 4/11/97 LEGAL DESCRIP[ION:_.T~t 2 D~na] ~ Vi_RW 1 2. 3 4 5 6 7 8 9 10 il 12 13 16 17 18 19. 20- Organic Overburden Organic Silt with Sand Roots to 3' Si. Silty Sandy Gravel Dry Rock to 12" Prevalent Occasional Boulders to 3' Bottom COMMENTS Soils presoaked_prior Township, Range, Section: SLOPE WAS GROUND WATER ENCOUNTERED? NO Oeplh Io Waler Alter Monilodnfl? 0 ' Dale: ~ 30 / 97 SITE PLAN PERCOLATION RATE 0 . 3 (m,nules/(nch) PERC HOLE DIAMETER TEST RUN BETWEEN 4. 5 FT AND 5. 0 FT to r_u~~/3 test 11 PERFORMED BY: __~e HJ gh I CERTIFYTNAT THIS TEST WAS PERFORMED IN ACCORDANCE WIlD ALI_ STATE AND MUNICIPAL GDIDELINES IN EFFECT ON Tills DATE DATE: 72-008 (Rev 4/85) Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" S[reet, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST PERFORMED FOR: Paul Myers DATE PERFORMED:. 4/10/97 TH3 LEGALDESCRIPTION:__Lot 3 Denali View 6" Organic Overburden Organic Silt with Sand Roots to 3' 4 NFS Sand, Dry 8 Gravelly Sand, Dry Occasional Rock to 8" 11 12 13 14 tS- t6- 17 18 lg 2_0 Township, Range, Section: SI_OPE WAS GROUND WA1 ER ENCOUNTERED? NO DEPTtt? pO Waler A(~er 0 ' 4 / 3 0 / 9_ 7 SITE PI. AN Bottom PERCOLATION RATE 0 , 7 (minutes/tach) PERC HOLE DIAMETER 6" TEST nUN BETWEEN 4 FT AND 4.5 FT COMMENTS Soils presoaked prior to running percolation test Reading Dale Gross Net Depth to Net Time Time Water Drop PERFORMED RY: Dee Hiqh i CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WIn'HALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: 72-008 (Rev, 4/85) Municipality of Anchorage DEPARTMENT OF NEALTFI & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST r'ERFORMEO FOra PaL~i Myc-rs DATE PEREORMED:.4 / 10/97 TH 4 LEGAL DESCRIPTION: T,~t- 4 De,~,a ] i Vi ew Organic Overburden I 2 3 4 6 7 8 g 10 11 12 13 14 15 16. 17- 18 19 20 COMMENTS Organic Silt with Roots SI. Silty Sandy Gravel Rock to 12" Occasional Boulder to 30" Dry Bottom Soils presoaked prior Township, Ran, ge, Seclion: SLOPE WAS GROUND WATER ENCOUN] ERED? NO S L IF YES, AT WUAT O fleplh Io Waler After Mort Iodnfl ? 0 Date: 4/30/97 SITE PLAN PERCOLATION RATE 3,7 (minutes/tach) PERC HOLE DIAMETER __ TEST nUN BETWEEN 4 ,, 5. FT AND 5. 0 FT to runninq percolation test 611 PERFORMED BY: Dee Hiqh_ i CERTIFY TNAT THIS TEST WAS PERFORMED IN ACCORDANCE WI]H ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE DATE: 72-008 (Rev. 4/85} Municipaflly of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L' Slreet, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST PERFORMED FOR: Paul Myers LEGAL DESCRIPTION: Lot 5 Denali View DATE PERFORMED: Township, Range, Section: 4/11/97 TH5 2 4 5 6 ? 8 9 10 13- 14 15 16 17 19- 20- Organic Overburden Organic Silt with Sand Roots to 3' Silty Sandy Gravel Rocks to 12" Prevalent Occasional Boulders to Dry ENCOUNTERED? NO IF YES, AT WItAT DEPTII? SLOPE SITE PLAN riel)Ih In Waler Afler Bottom Monitoring? 0 ~ Date: P E 4/30/97 PERCOLATION RATE TEST RUN BETWEEN COMMENTS ~s-j~e~ [~r_iD/~_kQ_~ u n_n i n q 0. 5 (m,nutes/,nchl PERC HOLE DIAMETER 6" 4 FT AND 4 . 5 FT pe[colatlon tes[ PERFORMED BY: ~[le~_/~iqh ~ ACCORDANCE WIFH ALL STATE AND ~4UNIC{PA[ GUIDEUNES IN EFFECT ON 7HIS DATE. 72-008 (Bev. 4/85) CERTIFY THAT THIS TEST WAS PERFORMED IN DATE: Munlcipallly ol Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L' Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST TH6 PERFORMED FOR: Pall] DATE PEREORMED: 4/11 /97 LEGAL DE$CRIPTION:~i View 1 3 4 5 6- 7 8 9 10 12 13- 16 ~7 18 Organic Overburden Organic Silts with Sand Roots 2½' Silty Sandy Gravel Dense Small Seep Bottom lownship. Range, Section: SLOPE WAS GnOUNO WATER ENCOUN 1 ERED? Yes SITE PLAN YES, AT WIIAT DEP'I I17 '~ 0 ! p E O.plh to Waler After 4 / 3 0 / 9 7 Moniloring? 6. 7 ' Osle: Time Time Water Drop PERCOLATION RATE 3 . 5 (m~nutes/mch~ PERC HOLE DIAMETER 6" TEST RUN BETWEEN 4. 5 FT AND 5. 0 FT COMMENTS _Sl'3i ] .~ prR~oaked prior to runninq percolation test PERFORMED BY: ._D~ [4 i oh ~ CERTIFY THAT THIS TES1 WAS PERFORMED IN ACCORDANCE WITH ALI_ STATE AND MUNICIPAL GUIDELINES IN EFFECT ON Tiffs OATE DATE: 72-008 {Rev. 4/85) Munlcipallly ct Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST PERFORMED FOR: Paul Myers DATE PERFORMED: 4/1 0/97 LEGAL DESCRIPTION:._Lot 7 Denali TH7A 1 2 3- 4 5 6 7 9 lo 11 13--- 14 16 17 18 19- 20- View Organic Overburden 1.5' Organic Silt with Sand Occasional Roots to 3' Frozen ~o 3' SI.. Silty Sand COMMENTS Township, Range, Section: SLOPE WAS GROUND WATER ENCOUNTERED? s IF YES, AT W,,AT O ~7 DEPTH~ 1 2. O ' p Bottom Oeplh ID Waler After Monlloring? 8 ' ~ale: 4/30/37 SITE PLAN Reading Date Gross Net Depth to Net Time Time Water Drop PERCOLATION BATE 1 immures/Ich) PERC HOLE DfAMETER (5" 3EST BUN BETWEEN 5 FT AND 5. 5 FT So±[s presoaked pr±or to runn±nq percolation test PEBFORMEO BY: Dee H± qh i CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: 72-008 (Rev 4/85) Munlcipality ol Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST PERFORMED FOR:_ Pall] MyP_rs_ LEGAL DESCRIPTION: Lot 7 Denali View DATE PERFORMED: 4/11 /97 Township, Range, Section: TH7B 1 2 3 4 5 6 7- 12 13 14 15 16 17 COMMENTS 1 ' Organic Overburden Organic Silt with Sand Roots to 3' NFS Sand Dry Gravelly Sand with Rock to 8" V ~oils presoaked prior SLOPE SITE PLAN WAS GROUND WA]ER ENCOUNTERED? Yes Gross Net Depth to Net Reading D~te Time Time Water Drop PERCOLATION RATE 0 . 8 (minutes/tach) PERC HOLE DIAMETER __ tEST RUN BETWEEN 5 · 5 FT AND 6.6 F3 to runninq percolation test PERFORMED BY: Dee Hiqh __ ~ CERTIFY TNAT THiS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: (Rev 4/85) MURicipallly ol Anchorage DEPARTMENT OF tlE^LTFt & HUMAN SERVICES 825 "L' Street. Am;horage, Alaska 9D502-0650 SOILS LOG --. PERCOLATION TEST (ENGINEER'S SEAL) PSRPORMED F¢11~: Paul M~ers I.EGALDESCRIP]ION: Lot 8 Denal~i View DATE PERFORMED: 4/10/97 Township, Range, Section: TH8 I 2 3 4 6 7 8 g 10 - 'fl 13- 14 15 16 17 18 20- Organic Overburden Organic Silt with Occasional Roots to 3I S].. Silty Sandy Gravel Rock to 12" Occasional Boulders to 30' Dry SLOPE SITE PLAN N Bottom Monitmi.fl? 0 4/30/97 Net Time 1FS1 RIJN BETWEEN 5. 5 FTAND ~ ¢1 COMMENTS _Sg_il~ presoaked prior to runninq percolation test Net Drop PERFORMED BY .._Dee CERIlFY TIIAT 1HIS lES! WAS PERFORMED IN DATE: .......................... Municipality of Anchorage DEPARTMENT OF I IFALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST (ENGINEER'S SEAL) TH9 PERFORMED Porl' Paul __My_~r~s DATE PERFORM/O: 4/10/97 LEGALOESCnIPHONLQ_~_9 Organic Overburden Frozen to 1' 1 3- 4 5 6 7 8 9 10- 13 14 15 16 17. 18- 20 Organic Silt with Sand with Roots to 2' Si. Silty Sandy Gravel Rock to 6" Occasional Boulders Hit 60" Boulder Dry Sl. Silty Gravelly Sand Rock to 3" Bottom COMMENTS ~.Q_~.~ /~resoaked 7ownshlp, Range, Seclion: SLOPE to 24" WA~ ~;f{t)UNDWATER SITE PLAN N No ^lION RATE i rs1 nUN BETWEEN 5 o 5 FT AND 6 F1 prior to runninq percolation test PERFORMED FlY: __~e Hiqh~_ I CERTIFY THAT THIS TEST WAS PERFORMED IN DATE: ................... Municipality of Anchorage DEPARTMENT OF t IEALTH & HUMAN SERVICES 825 "L" Street. Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST (ENGINEER'S SEAL) PERFORMED FOn:__~aul Myers __ LEO^LDPSCmPI~ON Lot 10 Denali Vie~_ DATE ~'Er.-e~M E r~:- ~4../l__q/9 7 Township, Range, Section: TH1 0 t 2 3 5 6 7 8 10 '12 14-- 20- Organic Overburden Organic Silts with Roots NFS Sand Dry Clean Gravelly Sand Dry Occasional Rock to 8" Bottom COMMEN]S _SoilM._pr__esoaked prior SLOPE SITE PLAN No 1FSI nUNI3ETWEEN . 4 FTAND 4.5 F] to running percolation test Net Drop PEnFONMED F~Y: Dee }l_i_q_h_ ............ i CERTIFY ]I-IAT 7Ills ]ESI WAS PERFORMEDIN DATE: Municipality o! Anchorage DEPARTMENT OF flEALTlt & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST {ENGINEER'S SEAL) PEnFonuFo F~)r~: _p@~.l_ Myers DATE PERr-OI~ME[):__.4J_I 0/97 , ,, LEGAl_ DESCRIPTION ..]'~,Q~I 1 TH 1 1 1 2, 3- 4 5 6 7 8 9 10 11 14 16 t7 18 19¸ 20- Denali_~ie~_, Organic Overburden Organic Silt with Sand Roots to 3' Sandy Gravel, Lots of Rock to 12" Dry Bottom Township, Range, Section: SLOPE PLAN Time Time Water COMMENTS _~0il s_pr.asaaked~oz .to Net Drop PERFORMED ~qY ..D.ee H_iqh ~ CERTIFY TilAT Gills 1E,~) WAS PERFORMED IN DATE: ............... · !J,<w :\ ii!l: ,L / ,L t:::'i'" '/ /;',/ Dear Mr. Dee High We would like to make our well available for monitoring during your aquifer testing of the Denali View Subdivision. We are concerned that damage may ocCUr to our well or pumping system. The following conditions will be required of the developer if he uses this well: 1. Before the well is used, a qualified pump installer* must do_a pressure test of the system. The test resultS must be recorded. Costs for this task will be the respensibillty of the developer. 2. Before the developer uses our Well the qualified installer must evaluate the electrical system and record the resultS. This information must be provided to the homeowner the same day of the test. 3. If water service is discontinued to the house for more than 3 hours in any one day, the developer will be responsible to provide potable, hauled water directly to the house for the time that the well is out of service (at the developer's expense). As an alternative, the developer can make arrangementS (at least one week in advance) for our family to stay in a hotel for the duration of time the well is out of service. The developer will be responsible for the cost of the hotel and meals away from home. Immediately after testing, the developer will be responsible for ~restodng the well to the same condition as before the aquifer testing. The same qualified pump Installer that conducted the pressure and electrical tests must do work that is done in this task, The condition of the well will be verified by the installer using the same techniques during the pre-test (see #1 above). upon well restoration, the developer will be responsible to insure that the well is disinfected. A qualified pump installer must do the disinfection. Disinfection will be done, at a minimpm, by following the procedures described in Groundwater and We~Is, 2"° edition, pages 619-623. If any flow tests are conducted from our well, the developer must supply all pumping equipment. Within 48 hours of collecting data from our well, the developer will provide copies of ali data to the homeowner. I agree to abide by the above condiUons. Developer Date installations. The installer must be an active member nf the Alaska Water Well Association and the National Ground Water Association. Adde~s~ L~9ol Dear Mr. Dee Hi~ . We would like to make our well available for monitoring during your aquifer testing of the Denali View Subdivision. We are concerned that damage may oCCUr to our well or pumping system. The following condlUons will be required of the developer if he uses this well: Before the well Is used, a qualified pump installer* must do a pressure test of the system. The test results must be recorded. Costs for this task will be the responsibility of the developer. 2. Before the deVeloper uses our well, the qualified Installer must evaluate the electrical system and record the results. This information must be provided to the homeowner the same day of the test. ~ LLUq ~ 3., If water service is discontinued to the house for more tha~ ~ ~.-day~-, the developer will be responsible to prevlde potable, hauled d }_ o~water directly to the house for ~e time that the well is out of service (at .~Y~.the developer'q expense). ~n alternative, the developer can make~ /~ arn_~ .O~____Qgements_..~at least one week in advance) for our family to stay in notelT0~l:h-~d0ration of time the well is out of service. The developer will' be responsible for the cost ~,.u,u hu,~:~ · Immediately after testing, the developer will be responsible for restoring the .~ell to the .same condition as, before the aquifer testi.'ng. The same qua~.ifl~, pomp installer that conc]ucted the pressure ano .electrical tests must c~ work that is done in this ~task. The condition of the well will be verified by the Installer using the same techniques during the pre-test (see #1 above). 5. Upon well restoration, the developer will be responsible to insure that the well is disinfected. A qualified pump Installer must do the disinfection. Disinfection will be done, at a mimm_~um, by following the procedures described in Groundwater and We/b, 2"0 edition, pages 619-623. / 6.If any flow tests am conducted from our well, the developer must supply all pumping equipment. 7. Within 48 hours of collecUng data from our well, the developer will provide copies of all data to the homeowner. I agree to abide by the above conditions. Developer Date Qualified pump installer means a person or company that routinely conducts water well pump i~lstallat[ons. The installer must be an active member of the Alaska Water Well Association and the ~ot~oa .m concerned that damage may occur to our well or pumping system. The wing condlUons will be requlmd of the developer if he uses this well: Before the well Is used, a qualified pump Installer* must do a pressure test of the system. The test msul~ must be recorded. Costs for this task will be the responsibility of the developer. ~fore the d. eveloper uses our well, the qualified Inmller must evaluate electrical system and record the results. This information must be pmvidecl to the homeowner the same day of the test. If water service is disconUnued to the house for more than 3 hours in any one day, the developer will be responsible to provide potable, hauled .w. ater directly to the house for the Ume that the well is out of se~ce (at me developer's expense). As an altemaUve, the developer can make ,ar~a, n.~m.ents. (at. least one week in advance) for our family to stay in a ~otel rot m.e au. raU..on of Ume the well is out of service. The developer will e responsive for me cost of the hotel and meals away from home. .[.rnmed.i.ately,?fter testing, the developer will be responsible for restodng me well--._ to me same cor~. iUon as before the aquifer testing. The same qua~.m~, pump Installer that conducted the pressure and elecbtcal tests must co work that is done in this task. The condition of the well will be verified by the installer using the same techniques during the pre-test (see #1 above). Upon well restoration, the developer will be responsible to insure that the well is disinfected. A qualified pump Installer must do the disinfection. Disinfection will be done, at a mimmum, by following the procedures described in Groundwater and We/b, 2n~ edition, pages 619-623. If any flow tests are conducted from our well, the developer must supply all pumping equipment. Within 4~_ ..hq~.rs of c~l..lec~d, 'ng data from our well, the developer will provide copies or all data to me homeowner, I agree to abide by the above conditions. Developer Date Qualified pump installer means a person or company that routinely conducts water wall I~urnp installations. The installer must be an active member cf the Alaska Water Well Association and the National Ground Water Association. We are concerned that damage may occur to our well or pumping system. The following condlUons will be required of the developer if he uses this well: Before the well Is used, a qualified pump installer* must do a pressure test of the system. The test results must be recorded. Costs for this task will be the responsibility of the developer. Before the developer uses our well, the qualified Installer must evaluate the electrical system and record the results. This information must be provided to the homeowner the. same day of the test. If water service is discontinued to the house for more than 3 hours in any one day, the developer will be responsible to provide potable, hauled water directly to the house for the time that the well is out of service (at the developer's expense). As an alternative, the developer can make .art?n. ~gem.ents. (at least one week in advance]) for our family to stay in a ,nocel rot m.e ouraUon of time the well is out of service. The developer will De respunsit~e for the cost of the hotel and meals away from home. Immediately after testing, the developer will be responsible for restoring the wel/to the same condiUon as before the aquifer tesUng. The same qualified pump Installer that conducted the pressure and electrical tests must do work that is done in this .13sk. The condition of the well will be verified by the Installer using the same techniques during the pre-test (see 111 above). Upon. well .restoration, the developer will be responsible to insure that the ~we[I Is dlslnfected. A qualified pump installer must do the disinfection. u. is~nf.ecflon will be done, at a mimm.um, by following the procedures aescribed in Groundwater and We/L~ 2"~ edition~ pages 619-623. If any flow tests are conducted from our well, the developer must supply all pumping equipment. Within 48 hours of collecting data from our well, the developer will provide copies of all data to the homeowner. ! agree to abide by the above conditions. Developer Date Qualified pump installer mear~s a person or company that routinely conducts water well pump installations. The installer must be an active member of the Alaska Water Well Association and the National Ground Water Association. Addmess L~9ol description Dear Mr. Dee High , t~V.. c[qs-~.'7 We would like to make our well available for monitoring during your aquifer testing of the Denali View Subdivision. fWoe are concerned that damage may occur to our well or pumping system. The Ilowing conditions will be required of the developer if he uses this well: 1. Before the well is us~ed, a qualified pump installer* must do a pressure test of the system. ~ ne test results must be recorded. Costs for this task will be the responsibility of the developer. 2. Before the developer uses our well, the qualified installer must evaluate the .electrical system and record the results. This information must be provmded to the homeowner the same day of the test 3. If water service is dlsconUnued to the house for mor~ than 3 hours in any one day, the developer will be responsible to provide potable, hauled water directly to the house for the time that the well is out of service at the developer's expense). As an alternative, the developer can ma~e ~rr~2,g~_m2~.(a_tJeast2.ne w..eek in ..advance). for our family to my in a uLc, ,u, ut~ uurauon or ama [ne we i is ou[ or service. The dave oper will be responsible for the cost of the hotel and meals away from home. 4. .I.mmedia~ely.after testing, the developer will be responsib e for restoring the well tO the same condition as before the aquifer testing. The same qualified pump Installer that conducted the pressure and electrical tests must do work that is done in this task. The condition of the well will be verified by the installer using the same techniques during the pre-test (see #! above). 5. Upon well restoration, the developer will be responsible to insure that the ~w.el.I is disinfected. A qualified pump Installer must do the disinfection. ~D~i~ec~b_~.o..n_ ~ll be~ do.ne, at..a...m, in?~,um/ by following the procedures uc;~./ll.~--'U II' (~f'~,~/~/W,l~'~tr ~O0 ~'~/'.~. ~_eoition, pages 6!g-623. 6. If any flow tests are conducted from our well, the developer must supply all pumping equipment. 7. Within 48 hours of collecting data from our well, the developer will provide copies of all data to the homeowner. I agree to abide by the above conditions. Developer Date Oualified pump installer means e person or company that routinely co~ducts water well pump installations. The installer must be an active member of the Alaska ~ater Well Association and the National Ground Water Association. Homeowners name Address te~-ol ~//,~s br. C~,~ Le~l d~cript/on ~ t Dear Mr. Dee High We would like to make our well available for monitoring during your aquifer testing of the Denali View Subdivision. , .We are concerned that damage, may occur to our well or pumping system. The following conditions will be requ red of the developer if he uses this well: 1. Before the well is u.~.he~e, a qualified pump installer* must do a pressure test of the system, e test results must be recorded. Costs for this task will be the responsibility of the developer. 2. Before the developer uses our well, the qualified Installer must evaluate the .electrical system and record the results. This information must be prowded to the homeowner the same day of the test. 3. If water ..~?k:e.is d!scontinued to the house for mor~ than 3 hours in any one oay, me aeve~oper will be responsible to provide potable, hauled ~ter. dlr.ecUy ,_to the house for the time that the well is out of service Cat e Qeveloper s expense). As an alternative, the developer can make ~r_,ra~g~_e_m~n_~ (a_t..least.o..ne w..eek in..a~lvan, ce). for our family to stay in a u[~ ~u[ u,~ aurauon or t~me me we is ou[ or service. The deve oper will be responsible for the cost of the hotel and meals away from home. 4. Immediately after tesUng, the developer will be responsible for restoring the well to the same condition as before the aquifer tesUng. The same qualified pump installer that conducted the pressure and electrical test~ must do work that is done in this task. The condition of the well will be verified by the installer using the same techniques during the pre-test (see #! above). 5. Upon well restoration, the developer w be responsible to insure that the ~w.ell is disinfected. A qualified pump installer must do the dlslnfecUOno ~D?~.f..?~,o..n_ ~11 be. dope, at..a...m, inLm.~um: by following the procedures u~_.u~u ~n orou, Tdwater ant7 we/iS, Z'~ eaiMon, pages 619-623. :if any flow tests are conducted from our well, the developer must supply all pumping equipment. Within 48 hours of collecting data from our well, the developer will provide copies of ali data to the homeowner. I agree to abide by the above condiUons. Developer Date Qualified pump installer means a person or company that routinely conducts water well pump instailatim~s. The installer must be an active member of the Alaska ~titer Well Association and the National Ground Water Association. Addr~s L~9ol d~sciVp~ion Dear Mr. Dee High ~ We would like to make our well available for monitoring during your aquifer testing of the Denall View Subdivision. W~ a.r9 c~ that damage may occur to our well or pumping sys[tem. The ,-'~.cw:n~. CCmlclltions will be required of the developer if he uses this wel~ :1. Before the well is used, a qualified pump installer* must do al pressure test of the system. The test resul~ must be recorded. Costs for this task ~-,i~ be the responsibility of the developer. ectrical system and record the results. This nformation must be provided to the homeowner the same day of the test. 3. l'f water service is discontinued to the house for more than 3 hours in any Own~e' da.y, tile. de~..eloper will ~ responsible bo provide potable, hauled .rater. c~l .mct~y ,t.o me house for me time that the well is out of service (at [ne oevetopers expense). As an alternative, the developer can make ~a~n..gem..ents. (at. least .o. ne w.eek in advance), for our family bo stay in a ,o~e~ mr me euration of time me well is out or service The developer will be responsible for the cost of the hotel and meals away from home. 4. .~.mmedi.a.tel~..after testing, ~ developer will be responsible for resl~odng me ..we. it to me .sa.me.. condition as before the aquifer teslJng. The same qua ~ pump installer that conducted the pressure and electflcal tests must do work that is done in this task. The condition of the well will be verified by the installer using the same techniques during the pre-test (see #! above). 5. UweP~ln' w.~.l .r~_toratlon, the developer will be responsible to insure that the D~sl.I I_S dlslnfec~...e~.. A qualified pump Insta er must do the dlslnfec'don. , s~n~ecti.o.n w_~ll be. do~. e, at a minlm_~um, by following the procedures oeSCTIOeo in erour~waterand I,V~//s, 2~ edition, pages 619-623. 6. ~f any flow tests are conducted from our well, the developer must supply a~ pumping equipment. 7. Within 4~...hob. rs of collecting data from our well, the developer will provide copies or all data to the homeowner. I agree to abide by the above conditions. Developer Date Qualified pump installe~ me. arts a person or company that routinely conducts water well pump installations, The installer must be an active member of the Alaska Water Well Association and the National Ground WateJ Association. L~9ol d~cl~/pffon ,} / Dear Mr. Dee High We would tike to make our well avallabie for monitoring during your aquifer testing of the Denali View Subdivision. ' ~owa~n _r ~x~s__?_ed tha..t..damage, m~y. ~..o~-~.ur.to our well or pumping system. The wing conmaons wm ~e requlrea of me aeveloper if he uses this well: 1. Before ..the wel. I Is used, a qualified pump Installer· must do a pressure test of me system. I ne test results must be recorded. Costs for this task will be the responsibillb/of the developer. 2. ~for?. th.e d. eveloper uses our well, the qualified Installer must evaluate e ~ectrical system and record the results. This information must be provided to the homeowner the same day of the test; 3. Tf water service is discontinued to the house for more than 3 hours in any one day, the developer will be responsible to provide potable~ hauled water dlmcUy to the house for the Ume that the well is out of service at the developer's expense). As an alternative, the developer can ma(~et ,an-.a..n.gem.ents. (at least one wcc~~- in advance) for our family to stay in a hotel for me auration of time the well is out of service. The developer will be responsible for the cost of the hotel and meals away from home. 4. [.mmedla.tely.after testing, bhe developer will be responsible for restoring emueal~el[ to me .same.. condIUon as. before the aquifer testing. The same q ~l.rr .~a pum. p_m.st~.ll~ that conaucl~l the pressure and electrical tests mus[ ~o WOrK that is oone in this .task. The condition of the well will be verified by the Installer using the same techniques during the pre-test (see #! above). 5. Upon well restoration, the developer will be resfx)nsible to insure that the ~w.el.i is .d. islnf ..ec~... A. qualified pu.mp Installer must do the disinfection. at. followi, ~:~.~ iii c~ounowarer ang we//~, 2 eaition~ page~ 619-623. 6. If any flow ~ are condu~ from our well, the developer must supply all pumping equipment. 7. Within 48 hours of collecting data from our well, the developer will provide copies of all data to the homeowner. I agree to abide by the above condlUons. Developer Date Qualified pump installer means a person or company that routinely conducts water well pump installations. The installer must be an active member of the Alaska Water Well Association mid the National Ground Water Association. /.e.9~l de~c~ip~/o~ Dear Hr. Dee High We would like to make our well available for monitoring during your aquifer testing of the Denall View Subdivision. ' fW~ a.m concerned that damage may oCCUr to our wel or pumping system. The ~lowlng conditions will be required of the developer if he uses this well: 1. t~ore the wall Is used, a qualified pump installer* must do a pressure of ..the system. The test results must be recorded. Costs for th s task will be ~ responsibility of the de~eloper. 2. L~o_~ l~..e d. evel.oper use.s our well, the qualified Installer must evaluate u~e ~.ec.m...cai system ann record the results. This information must be provided to the homeowner the same day of the test. If water service Is discontinued to the house for more than 3 hours in any one day, the developer will be respons ble to provide potable, hauled ~et~ di .mctty ,_to the house, for the time that the well is out of service (at oeve,3per s expense). As an alternative, the developer can make ~a_r?_n, ~_g?m.,ents. (at.!east.o..ne w.eek in..adva .r~e). for our family to stay In a .uLe, for me eurauon or ume me Well is OUt or service. The developer wll be respons~e for the cost of the hotel and meals away from home. ~emw~.~,a~_t~ly,~a_fter te~ncj, ,...b~e developer will be responsible for restoring u ,.~w~,. to me .same. con~. lrJon as. before the aquifer testing. The same q al?.ecl, pump .in.st?ne.r. that conoucted the pressure and electrical tests mus[ po work that Is (~one in thls .task. The condition of the well will he verified by the installer using the same techniques during the pre-test (see #1 above). Up~.n. w~l .r .est~ra.tlon, the developer will be responsible to insure that the ~w.eJ.i [s ~L~nrec~...e?. A. qualified pu.mp Installer must do the dlslnfec'don. ~.~,u~J in ~roUr~TWater an~z Wefl~ ~ edition~ pages 619-623. ][f any flow tests are conducted from our well, the developer must supply all pumping equipment. Within 48 hours of collecting data from our well, the developer will provide copies of all data to the homeowner. I agree to abide by the above conditions. Developer Date Oualff[ed pump ir~staller means a person or company that routinely conducts water well pump installations. The installer must be an active member of the Alaska Water Well Association and the National Ground Water Association. · -..~ ¥ 77~.t~-~..- ,,.~,.~ ~ . ~9old~iP~ ~ - . ~ ~.<-~ ~,, .... -/~ '~ D~ar ~r. ~ High J ~/' ' /~' ~; ..... We w~ld IIk~ to m~ke ~r w~ll ~lla~e f~ monit~ng during your aqulf~ tes~ng of ~ ~nali V~w Su~ivis~n. ~a~ con~ ~at damag~ ma~ ~r to our well or pumping ~stem. ~e owing condlgons will ~ r~uir~ o~ ~e ~o~r if h~ u~s ~is w~ll; ~ ~ w~ll Is u~, ~ qu~l~ ~mp ins~ll~· must ~ a p~ ~ o~ ~ ~em. ~e t~ ~sulD must ~ r~. Cos~ f~ this will ~ ~e r~nsibili~ of ~e d~r. 2. ~for~ ~ d~elop~r u~s our w~ll, ~ qual ~ Ins~ll~r mu~ ~ el~l ~m and r~ord ~ r~sul~. ~is inf~ma~on mu~ pmvi~ to th~ hom~wn~r th~ ~m~ da~ of ~e t~. 3. ~f ~ter ~ is di~on~nu~ to ~e ~u~ ~r m~ ~an 3 hou~ in any on~ day, ~ d~e~r will ~ ~nsi~ ~ ~d~ ~ble, hau~ water dl~ ~ ~e ho~e for ~e ~me ~at ~e well is out of ~i~ ~ dev~r's ~p~n~). ~ an alt~ma~w, th~ d~ve~ ~n mak~ ~m~n~. (at.l~st on~ ~ in ~dvance) f~ ~r ~mil~ to ~ in ~o~e~ rot ~e au~on of time ~ w~ll is out of s~c~. ~ d~wlo~r will e ~nsi~ for th~ co~ of ~ ~1 and m~Is ~w~y ~m ho~. ~?m~ia~ ?~r t~, ~ ~o~ will ~ r~ns b e for ~dng ~.~11 ~ ~ ~m~ condl~on ~ ~ ~ ~u~r t~ng. ~ ~ qua~ ~p ~n~ll~ ~t condu~ ~ p~su~ and e~l t~ mu~ ~ w~ that is aone in ~ts.~sk. ~ condl~on of ~ w~l will v~l~ by ~ In~l~ using ~e ~ t~hniqu~ during ~e pr~t~ (~ · ~ a~w). U~ w~ll r~o~t~n, ~e dev~o~ will ~ ~nsible to insu~ ~t ~ ~s ~l~n~. A quall~ ~mp In.lief must do ~ d slnf~n. ~s~n~o~ ~ill ~, don~, at a mini~gm, ~ followi~ ~ ~u~ ~ ~n ~wa~and W~ 2~ ~i~n, ~ ~f any flow ~ a~ ~ndu~ ~m our w~ll, ~ d~o~ mu~ ali pumping ~uipm~t. Wi~in ~8 ~ of ~l~ng da~ ~m our well, ~ develo~r will p~v~e copi~ or all da~ to ~e hom~wn~r. ! agree to abide by the above conditions. Developer Date Ouatified pump il~staller mear~ a person or company that routinely conducts water well pump installations. The installer must be an active member of the Alaska Water Well Association and the National Ground Water Association. /-/om~ow~.c~ ~z~ / I'm ~e ~ld like ~ make ~r ~11 a~lla~e [~ monit~n~ du~n~ ~our tesUng of ~e ~ali View Su~i~n. ~oa~ c~ ~at damage may ~r to our well or pumping ~s~m. wing condigns will ~ r~ulr~ of ~e ~velo~r if he u~s ~is well: 1. ~fo~ ~e w~l Is u~,a qualifi~ pump lns~ll~* must ~ a t~ of ~ ~em. ~e t~ msul~ must ~ r~. Co~ for ~is ~sk will ~ ~e ~nsibili~ of ~e dev~r. 2. ~fo~ ~e d~eloper ~ our well, ~ quallfl~ In,lief mu~ evaluate ~ el~l ~em and ~ord ~e r~ul~. ~is inf~maUon mu~ p~vi~ to ~e hom~wner ~e ~me day of ~e t~. Zf water ~ Is disconUnu~ ~ ~e ~use for m~e ~an 3 hou~ in any one ~, ~e d~e~r will ~ ms~nsi~e ~ ~de po~ble, hau~ water dl~ .~ ~e hou~ f~ ~e Mme ~at ~e well is out of ~ d~rs ~pen~). ~ an altemaMve, the deve~ ~n ~ke ~?~. (at I~ one w~ in a~an~) f~ ~r ~mily to ~y in nom~ mr me au~U~ of Mine ~e well is out of s~ce. ~e develo~ will be ~ns~e for the ~ of ~e ~1 and m~ls a~y ~m ho~. ~m~ia~ a~ t~, ~ ~o~ will be res~sible ~r r~dng w~l ~ ~ ~me c~diUon as ~e ~e ~uif~ t~Mng. qual~ ~mp I~11~ ~t condu~ ~e pr~sum and e~l t~ mu~ ~ w~ that is done in ~ls~sk. ~e condlMon of ~e w~l will v~lfl~ by ~e In~ll~ using ~e ~ t~hniqu~ during ~e pr~t~t ~1 a~ve). U~n well r~o~t~n, ~e dev~o~ will ~ ~nsible ~ in~ ~at ~1 ~s d~ln~. A qual~ ~mp In~ller must do ~ dlsln~on. ~i~n~on will ~ done, at a mim~ym~ ~ followi~ ~ ~u~ oe~i~ in ~w8~and W~ 2~ ~iUon, ~g~ 61~. %f any flow ~ am ~ndu~ ~m our well, ~ d~o~ mu~ ~pp~ all pum~ng ~uipm~L Wi~ln ~ ~ of ~l~ng da~ ~m our well, ~ develo~ will c~i~ of all ~ to ~e hom~wn~. ! agree to abide by the above conditions. Developer Date Qualified pump installer means a person or company that routinely con,ducts water well pump installations, The installer must be an active member ef the Alaska Water Well Association a~d the National Ground Water Association. We w~ld like ~ make ~r ~11 a~lla~e f~ monit~ng durl r aquif~ te~ng of ~ ~all V~ Su~i~s~n. ~a~ ~ ~at damage may ~ur ~ our well ~ pumping ~m. ~e ~owmg ~l~ns will ~ ~ulr~ of ~e ~elo~ if ~ u~ ~is well: 1. ~ ~e w~l b ~, a qualifi~ pump Ins~ll~ mu~ do a p~re ~ of ~ ~em. ~ ne t~ msul~ must ~ ~. Co~ ~ ~is ~sk will ~ ~e ~nsibiliW of ~e dev~r. ~re ~e ~elo~r ~ our well, ~ quallfl~ In, lief mu~ e~luate ~ d~ ~em and ~o~ ~e r~ul~. ~is informa~ mu~ pmvi~ to ~e hom~wn~ the ~me day of ~e t~. 1f water ~ Is dl~onEnu~ ~ ~e ~u~ for m~e ~an 3 hou~ in any one ~y, ~ d~eb~r will ~ r~nsi~e ~ ~de ~ble, hau~ ~te~ dl~ ~o ~e ho~ f~ ~e Ume ~at ~e well is out of ~ (at o~r s ~pen~). ~ an altemaB~, the deve~ ~n ~ke ~~.(at.l~ one w~ in ~vance) ~ ~r ~mily to ~y in a ~ote~ for ~e ou~a~ of Brae me well is out of ~. ~e develo~ will De ~ns~ffe for ~ ~ of ~e ~1 and m~ls a~y ~m ho~. ~-- -.~ m ~ ~me co~i~on as ~e ~e ~uff~ t~ng. qua~ ~mp ~11~ ~t condu~ ~e p~um a~ e~l t~ mu~ ~o w~ ~at is oone in ~ ~sk. ~e condl~on of ~e w~l will v~lfl~ by ~e In~l~ using ~ ~ t~niqu~ during ~e pr~t~ ~1 a~ve). U~n w~l r~o~n, ~e dey~o~ will ~ ~nslb~ ~1 ~s ~n~. A qual~ ~mp n~ er must do ~ dlslnf~n. ~n~ ~dl ~. d~e, at a minimum, ~ ~l~i~ ~ ~u~ oe~ m ~u~wa~a~ W~ 2 ~i~n, ~ 61~. if any flow ~ am ~d~ ~m our well, ~ ~o~ mu~ all pum~ng ~uip~t. Wi~in ~ ~ of ~ng ~ ~m our well, ~ d~elo~ will ~v~ c~i~ or all ~ to me nom~wner. I agree to abide by the above conditions. Developer Date Qualified pump installer means a person or company that routinely conducts water well pump installations. The installer must be an active member of the Alaska Water Well Association and the National Groun~ Wate~ Association. A We w~d like to make ~r ~ll a~llaUe f~ monit~ng duri~ your aquif~ ~ng of ~ ~ali View Su~i~sbn. ~a~ c~ ~at damage may ~r to our well or pumping ~m. ~e wing ~ndlUons will ~ r~ul~ of ~e ~o~r If ~ u~ ~is well: ~f~ .~e w~l Is ~, a qualifi~ pump Ins~ll~* must do ~ or me ~em. ~ ne t~ msul~ mu~ ~ r~. Co~ ~ this ~sk will ~ ~e r~nsibili~ of ~e d~el~. 2. ~ ~ ~elo~r ~ our well, ~ quall~ In,lief mu~ e~luate ~ ~ ~em and ~o~ ~e r~ul~. ~is Inf~ma~ m~ pmw~ to ~e hom~wn~ the ~me day of ~e t~. 3. 1f water ~ Is dl~on~nu~ ~ ~e ~u~ ~r m~e ~an 3 hou~ in any one ~y, ~e d~eb~r will ~ ~nsi~ ~ ~de ~ble, ~u~ ~ate~ dl~ ~o ~e ho~ for ~e Ume ~at ~e well is out of ~ (at ~ oev~rs expend). ~ an altemafl~, the deveb~ ~n ~ke ~n~.(at.~ne w~ in adva~ ~ ~r ~ml~ ~ ~y Ina noce~ rot me eu~ or Eme me well is out or ~. ~e develo~ be ~nsiUe for t~ co~ of ~e ~1 and m~ls away ~m ho~. ~ .~. ~ ~ ~me cono~Uon as ~ ~e ~u~ t~Ung. qua~ ~mp ~1~ ~t condu~ ~ pr~sum a~ e~l mu~ ~ w~ that is oone in ~ ~sk. ~e c~dlUon of ~e w~l will v~lfl~ by ~e In~]~ using ~e ~ t~niqu~ during · 1 a~ve). U~ w~l .r~o~n, ~e dev~o~ will ~ ~nsib~ ~ [s ~]~nt~. A qual~ ~mp In,lief must do ~ dlslnf~. ~[~ ~111 ~ d~e, at a minimum, by ~l~i~ ~ ~u~ u~ ~n b~u~wat~ and ~ 2 ~i~n, ~ 61~. ~f any flow ~ am ~d~ from our well, ~ ~o~ mu~ ~p~ all ~m~ng ~uipm~t. Wi~in ~ ~u~ of ~ng da~ ~m our well, ~e d~elo~ will ~i~ or all ~ to ~e ~m~wn~. I agree to abide by the above conditions. Developer Date Oualified pump installer means a person or company that routinely conducts water well pump installations. The installer must be an active member ef the Alaska Water Well Association and the National Ground Water Association. Addeess Legal de~ceip~on Dear Mr. Dee High We would like to make our well available for monitoring during your aquifer tab-ting of the Denali View Subdivision. .We. a.m concerned that damage may oCCUr to our well or pumping system. The ro~owmg condlUons will be required of the developer if he uses this well: I. .Before the wel. I is used, a qualified pump Installer* must do a pressure mst of the system, i ne test resul~ must be recorded. Costs for this task will be the responsibility of the developer. . 2. ~fo~ the developer uses our well, the qua fled Insl~lier must evaluate ectrtcal system and record the results. This information must be provided to the homeowner the same day of the test. 3. If water service is discontinued to the house for more than 3 hours in any ~a~ day_, tt~e. developer will ~ responsible to provide potable, hauled ~_~er~r dl .mctty ,_to the house rot me ume that the well is out of se~ice (at dev_c%q3p? s expense). As an alternative, the developer can make .arrangem~,~ (at !e~ one week in advance) for our family, to stay in a ,hotel for the duration of time the well is out of service. The developer will De responsible for the cost of the hotel and meals away from home. ur~ ...,.,~.. to me .same condition as before the aquifer testing. The same qmUua~tl~ pum. p., .nC~.lle? tha.t conducted the pressure and ,e]ectrlcal tests s[ aa won( mat ~ aone m this .task. The condition of the well will be verified by the Installer using the same techniques during the pre-test (see #1 above). 5. Ul~..n. w~l restoration, the developer will be responsible to insure that the _w.~j Is clistnfected. A qualified pump Insta let must do the dlslnfecUon. ~u?_n~mcu?? w_ill be d .o~e, at a minim_pm, by following the procedures ue~n~e~ in bmur~water and We/~s, 2~ edition, pages 619-623. ]:f any flow tests are conducted from our well, the developer must supply all pumping equipment. Within 48 hours of collecting data from our well, the developer will provide copies of all data to the homeowner. · [ agree to abide by the above conditions. Developer Date Qualified pump installer means a person or company that routinely conducts water well pump iflstallat~ans. The installer must be an active member of the Alaska Water We, Association and the National Ground Water Association. Add/~s$ tmgol demoVpHon Dear Mr. Dee High We would like to make our well available for monitoring during your aquifer testing of the Denali View Subdivision. ~ f~?oa~ corw. e~...ed that damage may occur to our well or pumping system. The wing conoltlons will be required of the developer If he uses this well: 1. Before ~ wel. I is u__sed, a qualified pump Insl211er* must do a pressure test of system. I ne test results must be recorded. Costs for this task will be the responsibility of the developer. 2. ~Be~for,e_~e d, evel.oper us~s. our well, the qualified Installer must evaluate u ~ ?.~..~l system ano record the resu ts. This information must be pray ~ to the homeowner the same day of the test. 3. If wa?r .se~-v. Ice.is d!sconUnued to the house for more than 3 hours in any 4. ~em~'lYtf~el~mt e~cc~llutl~on _~_~o_ _1~ .wi,'ll be r.e. sponsible for restoring ,~uallfled .-,.~- , .......... ~. uerore me aquifer tesUng. The Same · ~ _ -- i~u?p u~.dl~r ITlal; COrlOu~ the nressure a ,-1,---h4,--~ ~ u=~ u~ wur~ mac Is oone in this 12sk. The condition of the well will be verified by the Installer using the same techniques during the pre-test (see #1 above). Dlslnfec'd-- ---'" ~- ~ q ~m. eo pu.mp Installer must do the dlslnfecUon. 6. If any flow tests are conducted from our well, the developer must supply '"~ ' all pumping equipment. 7. Within 48 hours of collecting data from our well, the developer will prOvide copies of all data to the homeowner, I agree to abide by the above conditions. Developer Date Qualified pump installer means a person or company that routinely COndUCtS water well pump installatian~, The installer must be an active member of the Alaska Water Well Association and the National Ground Wate~ Association. Dear Mr. Dee High We would like to make our well available for monitoring during your aquifer · testing of the Denali View Subdivision. We are concerned that damage may occur to our well or pumping system. The following conditions will be required of the developer if he uses this well: 1. Before the well is used, a qualified pump installer* must do a pressure test.of the system. The test results must be recorded. Costs for this task will be the responsibility of the developer. 2. Before the developer uses our well, the qualified installer must evaluate the electrical system and record the results. This information must be provlded to the homeowner the same day of the test. 3. ff water service is discontinued to the house for more than 3 hours in any one day, the developer will be responsible to provide potable, hauled water directly to the house for the Ume that the well is out of service (at the developer's expense). As an alternative, the developer can make .ar.ran. g~em..ents. (at least one week in advance) for our family to stay in a hotel for me OuraUon of time the well is out of service. The developer will be responsible for the cost of the hotel and meals away from home. 4. immediately after testing, the developer will be responsible for restoring the well to the s~me condition as before the aqu far testing The same qual?e.d pump Installer that conducted ~e pressure and electrical tests must ap work that is done in this task. The condition of the well will be verified by the installer using the same techniques during the pre-test (see #1 above). 5. Upon well restoration, the developer will be responsible to insure that the ~w.e!l I_s disinfected. A qualified pump installer must do the disinfection. U, lSlnt.?cti,on ~ll be done, at a minimum, by following the procedures aescrioeo in Groundwater and We/Is, 2 edition, pages 619-6Z3. :If any' flow tests are conducted from our well, the developer must supply all pumping equipment. Within 48 hours of collecting data from our well, the developer will provide copies of all data to the homeowner. [ agree to abide by the above conditions. Developer Date Qua[flied pump installer means a person or company that routinely conducts water well pump installations. The installer must be an active member ~f the Alaska Water Well Association and the National Ground Water Association. Dear Mr. Dee High We would like to make our well available for monitoring during your aquifer testing of the Dena, View Subdivision. We are concerned that damage ma,/occur to our well or pumping system. The following condlUons will be required of the developer if he uses this well: 1. Before the well is used, a qualified pump installer* must do a pressure test of the system. The test resultS must be recorded. Costs for this task will be the responsibility of the developer. 2. Before the developer uses our well, the qualified Installer must evaluate the electrical system and record the results. This informaMon must be provided to the homeowner the same day of the test, 3. If water service is discontinued to the house for more than 3 hours in any one day, the developer will be responsible to provide potable, hauled water direclJy to the house for the Mme that the well is out of service (at the developer's expense). As an alternative, the developer can make ,arran, g, ementS (at least one week in advance~ for our family to stay in a hotel rot the duraUon of time the well is out of service. The developer will be responsible for the cost of the hotel and meals away from home. 4. Immediately after testing, the developer will be responsible for restoring the well to the same condition as before the aquifer testing. The same qualified pump installer that conducted the pressure and electrical tests must do work that is done in this task. The condition of the well will be verified by the Installer using the same techniques during the pre-test (see #1 above). Upon well restoration, the developer will be responsible to insure that the ~well I_s disinfected. A qua,fled pump Installer must do the disinfection. L~isintection will be done, at a minimum I~ following the procedures described in Groundwater and Hie/Is, 2"~ edition, pages 619-6Z3. If any flow tests are conducted from OL~We~ the developer must supply all pumping equipment. Within 48 hours of collec'dng data~from our w~,, the developer will provide copies of all data to the homeown~ ! agree to abide by the above condiUons. Developer Date Oualified pump installer means a person or t~mpany that routinely conducts water well pump installations. The installer must be an active member of the Alaska Water Well Association and the National Ground Water Association. Address ,~ '7C0 ~:' ~ : ~.~ Dear Mr. D~ High We w~ld like to make our well ava,able for monitoring during your aquifer tes~ng of ~e D~ali View 5u~ivision. We are con~m~ ~at damage may ~r to our well or pumping ~stem. following condlUons will be requir~ of ~e developer if he u~s this well: 1. Befo~ ~e well is used, a qualifi~ pump ins~iler· must do a p~ssure t~ or me ~stem. The test msul~ must be r~. Cos~ for this ~sk will ~ ~e r~ponsibiliW of ~e develo~r. 2. Before the developer u~s our well, ~e qualified ins~ller must evaluate the el~l ~em and ~cord ~e result. ~is informa~on must be provi~ to the homeowner the same day of the te~. 3. If water ~e ts discontinu~ to the house for more ~an 3 hou~ in any one day, ~e developer will be res~nsible to pro, de potable, haul~ water dir~ ~ the h~se for ~e Ume ~at the well is out of ~i~ (at the develo~r's expense). ~ an alternative, the develo~r can make ar~ngemen~ (at lea~ one w~k in ~vance) for ~r rarely to hotel for the du~Uon of Ume ~e well is out of s~ice. ~e d~eloper will be responsible for the co~ of U]e hotel and meals away from ho~. ~m~ia~ly.a~er testing, ~e dev~o~r will be respons b e for re~odng t e well m me ~me condition as be~re the aqu far t~Ung. ~e same quailed pump Ins~ll~ that conduced ~e pressure a~ ~1 mu~ do wo~ that is done in ~is ~sk. ~e condl~on of ~e well will be verlfl~ by ~e ln~ller using ~e same t~hniqu~ during ~e pre-test (see ~1 a~ve). 5. U~n well resto~tlon, the develo~r will ~ ms~nsible to in~m that the ~1) Is ~islnf~. A quatlfl~ pump in~ller must do the d s nfe~ on ~s~n~on ~11 ~. done, at a minimum, by following the p~ums ee~ri~ in oroun~ter and ~/~ 2"~ ediUon, ~ges 619-6~. 6. Zf any flow t~ are condu~ from our well, ~e develo~r mu~ ~pply all pumping ~uipm~t. 7. Wi~in ~ hours of coiling data from our well, the d~ve o~r w ~ov de copi~ of all data to the hom~wner~ I agr~ to abide by ~e above condiUon~':' Developer Date Qua[died pump installer means a person or company that routinely conducts water well pump installalions. The installer must be an active member of the Alaska Water Well Association and the National Ground Wate~ Association, We would like to make our well available for monitoring during your aquifer testing of the Denali View Subdivision. .We. a.m concerned that damage may occur to our well or pumping system. The following corldJ/~ons will be required of the developer if he uses this well: ~. Before the wel. I Is used, a qualified pomp Installer* must do a pressure test of the system. The test msul~ must be recorded. Costs for this task will be the responsibility of the developer. 2. t~oelm~ ~e ,devel.oper uses our ,,,Yell, the qualified Installer must evaluate · ectrical system and record the results. This information must be provided to the homeowner the same day of the test. .~f water service is discontinued to the house for more than 3 hours in any one day, the developer will be responsible to provide potable, hauled water, dt .mctly to the house for the time that the well is out of service (at the oeveloper's expense). As an alternative, the developer can make ,art?., .r~,,ents. (at.!east.o. ne w,eek in advance) for our family to stay in a no[el mr me ouraaon m Ume me well is out of service, The developer will be respons~e for the cost of the hotal and meals away from home. I~.m_m_edj,a~_l~dy.,_after testing, the developer will be responsible for restoring u.~ ,..wo~. m me .same condition as before the aquife~ tesUn~. The same qual?.e? pump i .n.sl.:a. lie,r, that conducted the pressure and.electrical tests mus~ oo work thai is oone in thIs .~sk. The condition of the well will be verified by the Installer using the same techniques during the pre-test (see #1 above). lon~ _l_isw.e[,I.restoration., the developer will be responsible to insure that the oJsmfacted. A qualified pomp nstaller must do the dislnfecUon. · ~ sanf,,,ectl,op w_lll be.d .ope, at a minim_pm, by following the procedures oescnoeo m c~ur~water and We/b, 2"" edition, pages 619-623. Jif any flow ~ are conducted from our well, the developer must supply all pumping equipment. Within 4~...ho~.m of colle~d, 'rig data from our well, the developer will provide copies or all data to the nomeowner. ! agree to abide by the above conditions. Developer Date Qualified pump l~stalle~ means a person or company that routinely conducts water well pump installations, The installer must be an active member of the Alaska Water Well Association and the National Ground Water Association. 7 :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::x:::: ;:.::z::;:;i :::: ::: :: ~ =========================================== 'f :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~ ::::::::::::::::::::::::::::::::::::::::: ~ ~ / / / ============================================ : , ' ; . ~i...oc ..~. ,..,. w...,...~w:.v.w~.. ~ ~.~ ~ ~ ~....w.,..~=...=..~....~...~,w...w? N A L CDL N' :::::::::::2:::::::::: . x.a.:¥.,.~¥..,.:..=,. =. ........... ... .=,:.x.:~<~:.:.:.:(.,:.:.:. m.:.:.:.:+:.:.:~:e:.:.:e:.:.:.:.:4 7 3 ::~:~:i:~:~(:~:i:~:::~ ~!~.:i.:4.:.:.>:.::¢:~:x.:.:.:.:.:~i~i!: :, ::,: 13 ~]: .:.x+:.: .:e:.:.:.:..:.*i.:.: z::~:>x~.~;,.:.>x{e:.xex. / ~ E :.:.:.x.x.x.:.:.:.:.:< · ,... :5:: ::::::::?, ::::~:::;::::::: ...... :::::::::::::::::::::::::::::::::: .......................... ~ 1 ::::::~5:::~ ~plve--/ x~:~41.:.~ % BLOCK 8 ~:~:~ 8~:~:~ :~: ¢ ========================== ======================================== ~ ~ ::::::::::::::::::::::: W g::::::9~:i:::::> ...... · ',. .... 3 I-------- WHALEY ~ Ave ¥:,~,[.:¥:::,:~ . ~ =============================== LEGEND DT1002645 ~"::~:~:~:'-~~ ~~ ~ ~ - ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::: :::.~:~..:~ :::~:::::::, .... .~...:. ¥:~:~:~:~:~:: ~ ~:~:~:~:~:~:~:::~:~:~::~:~: :~:~:~::~:~:~:~::.~.:~:~:~:~:~:~:~: ':::~:~:~ ~:~:~:~:~ ~ ~ :::::::::::::::::::::::::::::::::::: ~ .:.:.:.:~:.:.:.::.:~:':+::'::~: ~::~ ~' '" .:.::~ ' ======================= ================================================== ~ :::::::::::::::::::::::::: i::::::::~:~:~: :~:~:~:~:~:~:~:~:~:~:~:~:~: :~:~:~:~:~:~:~:~:~:~: ::: :~:~:~:~:~:~:~?::~:~:~:~:~:~:~:~:~:~? ~:?~:~ 7~ ~ ~n~ nnx 9 ::: :::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::