HomeMy WebLinkAboutEQUESTRIAN HEIGHTS S-6875 SUBDIVISION CASE REVIEW
STAFF ANALYSIS AND RECOMMENDATION
DATE:
SITE:
April 20, ].983
50.1 acres
CASE: S-6875 BAVARIAN HEIGNT SUBD.
(Cluster Subdivision)
Unsubdivided land into 40 lots
and 3 tracts and vacation of
rights-of-way.
LAND USE:
TOFO:
Undeveloped
Varies
ZONING: R-6
COMPREHENSIVE
P ]hA N
DENSITY BEFORE:
CLASSIFICATION:
SURROUNDING AREAS:
LAND USE:
ZONING:
SOILS: Attached
VEGETATION: Scrub Spruce and
Undergrowth
40 DUA AFTER: 40 DUA
Residential INTENSITY: Less than
1 DUA
NORTH EAST SOUTH WEST
.............. Developing Residential ..............
FI NDIt~GS:
Utilities have been requested.
Public Works request the following:
a. A subdivision agreement to construct all interior
roads to suburban interior standards.
b. Resolving the need to construct ~Jorthfield Drive to
suburban access standards from the subdivision to
Rabbit Creek Road.
c. A subdivision agreement to construct 142nd Avenue to
suburban peripheral access standards from Go].denview
Drive to the end of the cul-de-sac.
d. A subdivision agreement to construct Pickett Street
to suburban peripheral access st:andards from the
south end of Lot 9, Block 3 to 142nd Avenue.
e. Resolving drainage and drainage easements with
Public Works Engineering.
Planning Staff Analysis
Case No. S-6875
Page 2
4.
5.
6.
f. Resolving need for a wetlands permit.
g. Resolving the need for footing drains, footing drain
stub-outs.
h. Resolve the need for engineered foundations·
i. Resolve the need for erosion and sedimentation
control plan.
j. Removing the well from the right-of-way, or moving
the right-of-way outside of the well location·
k. Resolving the need for temporary turnarounds.
1. Prior to the filing of the plat 24-month monitoring
program to review the functioning and the proposed
curtain draining system·
Public Works recommends denial of vacations·
Traffic Engineering has no objection to the plat,
requests a subdivision agreement for street name signs,
traffic control devices·
Traffic Engineering has no objection to the requested
vacations with the exception of Fernwood Street along
the south boundary of tract A.
DHEP requests a monitoring program for the curtain drain
system after installed for a period of 12 months on a
montly basis. After that review, the Department of
Health would review percolation tests to determine that
each lot can function with an on-site septic system·
Physical Planning points out that the area is in the
Hillside Wastewater Management Plan as non-suitable for
on-site septic systems, points out that special require-
ments for unsuitable sites be adhered to in the develop-
ment of the property· Physical Planning points out that
natural vegetation should be maintained wherever
possible and that oil, grease separators should be pro-
vided at the outfalls of any drainage systems·
RECOMMENDATIONS:
APPROVAL of the vacation on the east boundary, the west boun-
dary, the south and north boundaries with the exception
of Fernwood Street along the southeast boundary.
Subject to Assembly concurrence and filing a suitable
replat within 18 months.
Recommendation of the plat. APPROVAL of the plat subject to:
1. Resolving utility easements.
Planning
Case ~o.
Page 3
Staff Analysis
S-6875
5
6
7
8
9
10
11.
Installing the curtain drain system and monitoring that
curtain drain system for a period of 12 months with
final resolution from the Department of Health and
Public Works to determine the effectiveness of the cur-
tain drain system and 'the ability of each lot to func-
tion with an on-site septic system.
Obtaining a wetlands permit from the Corps of Engineers,
if required.
Providing a soils report from a registered soils
engineer indicating which lots may require engineered
foundations, and placing an appropriate note on the
plat.
Resolving drainage and drainage easements with Public
Works Engineering.
Resolving the need for footing drains, and footing drain
stubouts with Public Workd Engineering.
Providing a soils sedimentation and erosion control plan
prior to plat recording.
Removing the well from the right-of-way or moving the
right-of-way outside the well location.
Resolving the need for any temporary turnarounds with
Public Works Engineering.
Entering into a subdivision agreement for:
a. community water system;
b. subdivision agreement to construct all interior
roads to suburban interior standards;
c. Northfield Drive to suburban access standards from
the subdivision to Rabbit Creek Road.
d. 142nd Avenue to suburban peripheral access standards
from Goldenview Drive to the end of the cul-de-sac
along the north boundary of the subdivision, and
e. Subdivision agreement to construct Pickett Road to
suburban peripheral standards from Northfield Drive
to 142nd Avenue.
Doing no additional construction on the DropertV with
the e×ceDtion of the installation of the curtain drain
system until it has been determined by the Department of
Health and Public Works that the curtain drain system
works efficiently enough for each lot to function with
an on-site septic system.
COMMENTS:
There has been considerable past case history on this pro-
perty. The area is obviously extremelv wet with surface and
subsurface drainage. Staff has conditioned the property with
an extensive requirement to monitor the installation of the
curtain draining system before any final approval is given.
There also is considerable objection from adjacent property
owners.
jw6/mpsa22
S-6875
Proposed Vacations
14
I3
12
3
2
0 500 1000
I I I
FEET
BAVARIAN HEIGHTS SUBOIVI~IOI¢
S~S EN6TNEERS, ].nc.
~03
//I'~
Platting Officer
March 25, 1983
Page 19
S-6871
1.
S-6872
1.
S-6874
1.
2.
S-6873
1.
2.
Aurora Subdivision, Block 10, [Jot 13A2
Public Works has no adverse comment.
AOT East Addition, Tract A, Block 33A
Resolve drainage
Works Engineering.
Note: Easements
drain system.
Public Works recommends
and 2nd Avenue.
Borough
and drainage easements with Public
must be provided for existing storm
approval of vacation of Karluk
Tudor Road Subdivision
Public Works has no adverse comment.
Public Works recommends approval
Wintergreen Street.
Borough Tudor Road Subdivision
Public Works has no adverse comment.
Public Works recommends approval of
Avenue.
Bavarian Heights Subdivision
of vacation of
vacation of 48th
A subdivision agreement is required to construct
interior roads to suburban interior standards.
Resolve the need to construct Northfield Drive to
ban access standards from the subdivision to
Creek Road with Public Works Engineering.
A subdivision agreement is required to construct
Avenue to suburban peripheral access standards
Golden View Drive to end or cul-de-sac.
all
subur-
Rabbit
142nd
from
A subdivision agreement is required to construct Pickett
Road to suburban periphral access standards from the
south end of Lot 9, Block 3, to 142nd Avenue.
Platting Officer
March 25, 1983
Page 20
007
6.
7.
8.
9.
10.
11.
12.
14.
15.
S-6876
1.
S-6704A
1.
Resolve drainage and drainage easements with Public
Works Engineering.
A wetlands permit may be required on this subdivision.
Resolve the need for footing drains and footing drain
stub-outs with Public Works Engineering.
Resolve the need for engineered foundations with Public
Works Engineering.
Resolve erosion and sediment control with Public Works
Engineering.
Remove well from right-of-way or move right-of-way out-
side the well location.
Resolve the need for temporary turnarounds with Public
Works Engineering.
Prior to filing pla~, Public Works requests a 24 month
monitoring program to review the functionability of the
proposed curtain drainage system.
Public Works recommends denial of vacation of 30 feet ot
right-of-way along the southern most boundry of the sub-
division between Northfield Drive and Lupine Street.
Public Works recommends approval 6f vacation of the
other right-of-way as indicated.
Spring Forest Subdivision
Public Works has no adverse comment.
Fernwood Revised
The proposed subdivision layout is not adequate and re-
design is recommended. The ~ollowing deficiencies must
be resolved: access and drainage. If approval is given,
the comments which follow should be addressed.
A subdivision agreement is required to construct West
47th to urban interior/access standards from Arctic to
end ok cul-de-sac.
S-6868
S-6869
C-G WAREHOUSE
The Traffic Engineering Division has no objection to the
requested easement vacation.
GOLDEN VIEW HEIGHTS SUBDIVISION
S-6871
S-6872
The Traffic Engineering Division recommends denial of
this requested vacation.
On this, as well as previous occasions, the right-of-way
to the petitioned area was barricaded. On-site
inspection of the right-of-way in question could not be
made.
AURORA SUBDIVISION
The Traffic Engineering Division has no objection to the
requested variance, Section 21.80.115.
ANCHORAGE ORIGINAL TOWNSITE, ]EAST ADDITION, BLOCK 33A
The Traffic Engineering Division has no objection to the
requested right-of-way vacations.
S-6873
S-6876
and S-6874 BOROUGH TUDOR ROAD SUBDIVISION
The Traffic Engineering has no objection to the partial
vacation requests of right-of-way along Wintergreen
Street and East 48th Avenue
BAVARIAN HEIGHTS SUBDIVISION
Ail of the roadways peripheral as well as interior are
local streets.
The Traffic Engineering Division has no objection to the
requested vacations with retention of Fernwood Street
along the south boundary of tract A.
Traffic Engineering Division concurs with this plat
subject to providing a subdivision agreement for street
name signs, and traffic control devices.
SPRING FOREST SUBDIVISION
West Tree Drive is a local Street.
The Traffic Engineering Division has no objection to
this subdivision.
DATE:
TO:
FROM:
SUBJECT:
u dcip it , Anchorage
MEMORANDUM
March 23, 1983
Planning Department
Department of Health and Environmental Protection
'~~ - Bavarian Heights Subdivision
OOg
The Department has reviewed the soils data and the
proposed engineering design of drainage network and
finds the department can grant concept approval°
The design of the drainage network may reduce the water
table to a significant depth so lots will support septic
system. However, to assure that all lots will support
onsite septic systems a monitoring program will be adopted
for twelve months. A monthly monitoring report must be
submitted to the department by the engineering firm and
substantiated by a HEP person reviewing the project°
The Department prefers using perforated PVC standpipe
1" in diameter placed at.five monitoring stations in
percable and nonpercable locations with two stations in
the tract areas. Also, Gold Creek flow change monitoring
chart be submitted before and after construction of
drainage network. If monitoring proves to be successful
percolation tests can then be renewed in all questionable
and nonpercable tests to establish leach field end
trench size.
Environmental Specialist
91-010 (4/76)
99501
.?: ~ f Jo'.in:
~: CF 2ra',~Is to santy gravels. ':~a <.i !s ., } '~ '~in
.: ,p,_ ~,_ syst ~::':s. NdSitJonal p.2 r,lo!e t t.Da [. ~.s ,rill
7:$ : 1}
Job 1119
if you have any
aubdivision, the monitor in~
.£
Jerry Weaver
March 23, 1983
Page 15
("!2
constructed transit facility. The proposed vacation appears
to be located in a wetlands designated developable by the
the Anchorage Wetlands Management Plan. Physical Planning
does not object to the vacation for landscaping purposes,
however, it is essential that wetland functions be retained
to the maximum possible extent, and that pedestrian access
to the Campbell Tract be maintained· Landscaping should be
designed to minimize effects on the adjacent preservation
wetlands. Preferably species which are visually ecologi-
cally compatible with local vegetation and should be used.
The site should be disturbed as little as possible, and
groundcover and trees or shrubs should be established as
quickly as possible.
The project, if determined to be within the Wetland boundary
by the Corps of Engineers, will require an individual
wetland permit.
BAVARIAN HEIGHTS
Physical Planning has the following comments concerning the
subject plat.
The Hillside Wastewater Management Plan shows most of
the area is unsuitable for on-site septic systems.
Therefore, in addition to %he requirements for on-site
systems listed on pp 29-31 of the Hillside Wastewater
Management Plan (February 1982), the special require-
ments for unsuitable areas listed on p 32 of that plan
will apply·
Portions of the property are within areas of mixed deve-
lopment wetlands. These wetlands should remain as open
space as illustrated on the site plans. Natural vegeta-
tion should be maintained wherever possible. (Anchorage
Wetlands Management Plan, and 21.85.085)
To protect water quality an oil and grease separator and
sediment trap should be placed at the outfall of the
drainage system for this subdivision into the receiving
waters. (Anchorage Wetlands Management Plan, 208 Water
Quality Plan)
S-6876 - SPRING FOREST
The water easement through the center o]~ Lot 7-A may not
leave a suitable building sits.
Bill Sheffield, Governor
DEPARTMENT OF TRANSPORTATION
and PUBLIC FACILITIES
March 8, 1983
Municipality of Anchorage
Pouch 6-650
Anchorage, AK 99502
ATTENTION: Jerry Weaver ~'
Platting Officer
Dear Mr. Weaver:
RE: MOA Plats
The Department of Transportation and Public Facilities (DOT/PF)
has
reviewed the following plats submitted to DOT/PF for comment. We have no
comment on the following plats:
S6704A S6825 S6842 S6858 S6869
S6814 S6826 S6843 S6860 S6870
S6816 S6828 S6847 S6861 S6871
S6818 S6830 S6848 S6862 S6872
$6819 S6833 S6849 S6863 S6873
S6820 S6834 S6853 S6866 S6874
S6822 S6839 S6854 S6867
S6823
Thank you.
S6841 S6857 S6868 S6876
Sincerely,
A. Reed Gibby
Regional Plan~f~g~nager
Transportation Planner
ARG:KS:MDM/lbk
DATE:
TO:
FROM:
SUBJECT:
&iun Anchorz je
MEMORANDUM
March 8, 1983
PLANNING DEPARTMENT
ANCHORAGE TELEPHONE UTILITY
Bavarian Heights Subdivision -
DEPARTMENT
!.!",.R 9 i~83
COM~iUI'ilTY PLANNI~'Iq
The Anchorage Telephone Ut[l|ty has checked the above described plat
and recommends the Following:
Ten and twenty ft. telecommunications and electrical easements required,
as shown on the attached plat.
ATU has no objection to the proposed vacation.
RLM:LVM:m
Attachment
R. L. Metcalfe {// .".22'~-~
Manager-
Outside P~ant Englneer~ng
ANCHORAGE TELFPHONE UTILITY
9%010 (4~76)
C INTI;!AL ALASKA UTILITll $ ,NC.
1301 EAST 80TH AVENUE
ANCHORAGE, ALASKA 99502
TELEPHONE (907) 349-6444
March 4, 1983
Planning Department
Municipality of Anchora~g~
Pouch 6-650
Anchorage, Alaska 99502
Gentlemen:
The following is provided per your request concerning the March 1,
1982, letter reqarding "Request for Comments on Subdivision."
S-68S0 thru S-6864 No Comments
S-6704 & S-6968 & S-5354A No Comments
S-6~6~h~pu~-6869,~..,. No Comments
S-6871 thru S~-6876 No Comments
Central Alaska Utilities, Inc. requests no easements at'this time.
. Sincerely,
CENTRAL ALASKA UTILITIES,
Assistant Engineer
hm
INC.
SERVING SUBURBAN ALASKA
Page 2 . ~,'
S-6798A SHACKLETON SUBD., Tract A,
S-5354A BLM lots 105 & 106A
C-G WAREHOUSE, (VACATIg~ ONLY)
GOLDEN VIEW HEIGH-~--iVACATiO~_ONLY)
AURORA SUBD., Block lb, Lot 13A-2, variance
AOT EAST ADDITION, Tract A, Block 3'~, '9~ation Only
BOROUGH TUDOR RD. SUBD., (~TiQ~NLY~~-
BOROUGH TUDOR RD. SUBD., (~ACA-TXON_~NLY)
BAVARIAN HEIGHTS SUBD., Blocks 1 - 3, with Vacation ~
SPRING FOREST SUBD., Block 2, Lots 7A & llA ~t/--
Variance only
Sincerely,
Planning Department
Enclosures
CMB/gb
u t V,s ons
March 23, 1983
Municipality of Anchorage
Planning Department
Pouch 6-650
Anchorage, AK 99502-0650
Dear Sir:
The following PLATS were reviewed by our office and the additions
and/or changes were made as indicated:
S-6824
S-6825
S-6826
S-6827
S-6829
S-6830
S-6831
S-6833
S-6834
S-6835
S-6836
S-6837
S-6840
S-6842
S-6844
S-6846
S-6847
S-6848
S-6849
S-6850
S-6851
S-6852
$-6858
S-6859
S-6862
S-6863
S-6864
S-6704A
S-6866
S-6867
S-6761
S-6798A
S-5354A
RUTH SUBD., Lots 1-10
WOODLAND PARK SUBD., Block 5, Lot llA
ATHENIAN VILLAGE, Block 4, Lots lA
DEBORA SUBD., Block D, Lots lA & 3A, Eagle River*
GREY SUBD., Lot 3, Eagle River*
SKY HARBOR ESTATES, With Vacation
PARK DOWNS ESTATES SUBD., Block 1 ~ 4
HARHOR SUBD., Block 3
MCKENZIE VIEW SUBD., with Variance
PINES SUBD., Lots 2A, 2B & 3A
INDEPENDENCE PARK SUBD., with Vacation
SPORTSMEN'S POINT SUBD., ADDN #1, Blocks 1-5
EFF - EFF. SUBD., Lots 1 - 22
FOSTER SUBD., Lot 3, Eagle River **
HILLCREST PARK SUBD., ADDN #1, Blocks 1 -3
SNEAD HEIGHTS SUBD., with Vacation, Tracts A & B, Lots 1 - 17
VAIL VILLAGE SUBD., Blocks 1 - 3
IGLOO ESTATES SUBD., ADDITION #1, Block 1 - 4
WOODLAND PARK ADDITION, Block L, Lots 7L - 9L
NORTON PARK SUBD., lots 18A - 18G
NORTH BIRCHWOOD SUBD., with Vacation, Birchwood*
LABATE SUBD., ADDITION #1, Blocks 1 & 2
DISCOVERY POINT SUBD., Lots 1-10, Tract A
WESTCENTER SUBD., Block 1, Lots 1-5
ALPINE WOODS SUBD., Blocks 2 & 6
BRUMBELOW SUBD., w~th Vacation, Block 1, Lots 2A-2F
JACTON SUBD., Block 1, lots 1-14
FER~OOD SUBD., lots 1-6 (REVISED)
MELINDA VIEW ESTATES SUBD., Block 1, Lots 1-8
SNOWBIRD HILL, Blocks 1-4, Eagle River**
DIAMOND-WILLOW ESTATES, (REVISED)
BAVARIAN HEIGHTS SUBD., Blocks 1 3, with Vacation
SHACKLETON SUBD., Tract A, Variance only
BLM lots 105 & 106A
4~2 Business Park Blvd.
Anchorage, Alaska 99503
~un~cipality of Anchorafle 0~ ~
DATE:
TO:
FROM:
SUBJECT:
MEMORANDUM
March 21, 1983
Planning Department
Anchorage Water & Wastewater Utility
~ '~¢~E a v a r i a n Heights
DEPARTMENT
: ;:,.R 2 5 i983
COM~IUNI~ PLANNI~'!6
The Anchorage Water & Wastewater Utility
the subject plat and have no objections.
PEGGY CORRY
Engineering Tech
Anchorage Water & Wastewater
Utilil:y
has reviewed
91-010 (5/78)
unicipality of nchora e
MEMORANDUM
DATE: March 23, 1983
TO: Jerry Weaver, Platting Officer, Zoning and Platting Division
FROMT'~on Crenshaw, Manager, Design and De?e~pme~.~ .~i~v~,sion
SUBJECT: P1 at Review
The Parks and Recreation Staff has review~-~Yth'eafollowing cases and offers
no comment:
S-6824 S-6835 S-6847 S-6858 S~6867
S-6825 S-6836 S-6848 S-6859 S-6868
S-6826 S-6837 S-6849 S-6860 S-6869
S-6828 S-6840 S-6850 S-6861 S-6870
S-6829 S-6841 S-6851 S~6862 S-6872
S-6830 S-6842 S-6852 S-6863 S-6873
S-6831 S-6843 S-6853 S-6864 S-6874
S-6832 Johns Pk. S-6844 S-6854 S-6865
S-6833 S-6845 S-6856 S-6704A
S-6834 S-6846 S-6857 S-6866
We offer con~ents on the following cases:
S-6827 Debora Subdivision located in Eagle River.
The Parks and Recreation Staff recommends no direct driveway
access to the Old Glenn Highway to avoid existing State Bike
Trail conflicts.
S-6838
Abbott Park Subdivision located at the northeast corner of
Lake Otis Parkway and Abbott Road.
The Parks and Recreation Staff notes:
- The existing Municipal Lake Otis and Abbott Road Bike Trail
are adjacent to this plat and constructed within road R.O.W.
The Parks and Recreation Staff recommends:
- Resolution of Bike Trail access to Lake Otis and Abbott with
Parks and Recreation Staff.
S-6839
Mariah Subdivision located on the east boundary of Nadine Street
Park.
The Parks and Recreation Staff notes:
- Nadine Street Park is located on the'boundary of this subdivision.
- Pleasure View Subdivision, located north, was approved on
February lC, 1983 to provide a lO~ walkway to Nadine Street Park
at an alignment adjacent to Lot 88, Block 1 of this subdivision.
91-010 (5/781
Ntunicipality o~ Anclxorage
MEMORANDUM
Page 3
DATE: March 23, 1983 D~'PA~I~ff~'f OS
rD: Jerry Weaver, PlanninS"~¢~t ~oninq ,;~.'~,~ 2 q .1~83
' ,Engineer,, blL&P _
~OM: ~c~ ~a~, Sen~[ ~;~' ~'~ ~1 Il 3~
SUBJECT: Preliminary Plats
S-6704A Fernwood Subdivision No Comment
S-6866 Melinda View Estates Subdivzsion No Comment
S-6867 Snow Bird Hill No Comment
S-6868 C-G Warehouse Nc) Comment
S-6869 Golden View Heights No Comment
S-6871 A~rora Subdivision :. No Comment
S-6872 AOT East Addition, Tract A, Block 33A,
Vacation On~
. S-6873 Borough Tudor Rd. Subdivision
S-6874 Borough Tudor Rd. Subdivision
Due to electrical
g£ow Lh ~u Le~Lial --
requirements base{{ on
l'~i~t~ ~1 e~:~al
demand data, ML&P fore-
vacation areas as future
~-~-o.,,~o.~on ,~nsmis-
sion and distribution areas
ffequired ~ha "h' ' ~
~ ~lty;
therefore, ML&P requires
...... ~P~ vaca%~on area
NO C6~ent
No Comment
_ .~.'-'~..~ Bavarian Heights Subdivision No Con~ent
S-6876 Spring Forest Subdivision No Comment
S-6798A Shacleton Subdivision No Comment
S-5354A BLM Lots 105 and 106A No Comment
JB/csn
~Brady ~
senior ROW/Cadastral Engineer
Municipal Light & Power
' 3icsko !~f~e
(2~
March 8, 1982
CERTIFICATE TO PLAT
S & S Engineers
· 7125 Old Seward Highway
Anchorage, Alaska 99502
Attention: Bill Hag~aier
Sir:
ORDER NO. A-70998
This is a Certificate to Plat as of March 2, 1982 at 8:00 A.'M. for a
plat of the following described property:
~ARCEL NO. 1:
The Southeast 1/4 of the Northeast 1/4 of the Northwest 1/4; the
North 1/2 of the Southeast 1/4 of the Northwest 1/4; and the South-
east 1/4 of the Southeast 1/4 of the Northwest 1/4 of Section 35,
Township 12 North, Range 3 West, Seward Meridian, filed in the Anchorage
Recording District, Third Judicial District, State of Alaska.
The Southwest 1/4 of the Northeast 1/4 of the Northwest 1/4, Section
35, Township 12 North, Range 3 West, Seward Meridian, filed in the
Anchorage Recording District, Third Judicial District, State of Alaska.
This Agency certifies that record title is vested in
REXFORD L. TUP~ER, individually and as executive trus~tee of
Bridget Enterprises, an estate i~ fee simple.
Free from all liens, encumbrances and objections, EXCEPT as follows:
1. Taxes and assessments, if any, due the taxing authority indicated~
Taxing Authority: Municipality of Anchorage.
2. Easement for electric transmission or distribution line or system
and/or telephone lines across said premises, together with the right
· to enter said premises to make repairs and the right to cut shrubbery
and trees which constitute a menace to said lines and/or systems
located on said premises.
Recorded : January 20, 1952.
Volume/Page : 84/294.
Granted to : Chugach Electric Association, Inc.
Affects : General easement - no definite location disclosed.
3. Reservation of a 20 foot strip around the perimeter for road and
other public uses, as contained in deed recorded June 1, 1957 in Book
147 at Page 117. (Affects Parcel NO. 2)
Southerly boundaries and a 20 f~ot rightSof-way around the balance of
the perimeter Of said tract of land for highway and other public purposes,
as contained in deed recorded May 17, 1961 in Book 222 at Page 120~
(Affects Parcel No..1).
5. Deed of trust to. secure an indebtedness of the amount herein stated
and any other amounts payable under the terms thereof.
Dated
Recorded
Volume/Page
Trustor
5eneficiary
A~d re-recorded
February 17, 1981.
February 19, 1981.
570/146.
Rexford L. Turner, individuallv and as Executive
Trustee of Bridget EnterDr£ses~
Alaska Title Guaranty Company.
Wayne Schwabrow and ~renda Schwabrow.
$ 6 i' ?' --
Page 2
A-70998
EXCEPTION NO. 5 - CONTINUED:
On : May 20, 1981.
volume/Page : 763.
,This report is restricted to the use of the addressee and is not to be
used as a basis for closing any transaction affecting title to said
property. 5lability of the Agency is limited %0 the compensation
received therefor.
ALASKA TITLE GU~,.;NTY AGENCY, INC.
JAG:bt
continued.. ·
BAVARIAN
HE!IGHTS
SUBDIVi.$10N
S
& ENGINEERS, INC.
S
· 7125 OLD SEWARD HIGHWAY * ANCHORAGE ALASKA 99502
February 23, 1983
0 P-
Municipality of Anchorage
632 Wo 6th Avenue
Anchoprage, Alaska 99501
Attn: Chairman~ Platting Board
RE: Application for approval
Bavarian Heights Subdivision
Dear Mr. Chairman:
On behalf of our client, Bridger Enterprises, S & S
Engineers, Inc. is pleased to submit our request for ap-
proval of a res~dentla cluster development Our project
encompasses a 50 acre site located on Nor thwood Drive
approximately 1,200 feet north of Mile 3 on Rabbit Creek
Road o
We feel that the cluster development and our proposal
in particular is appropriate for the site. The existing
soils on this site preclude development on this land under
existing R-6 zoning. This cluster development incorporates a
comprehensive distribution system for all utility services
except sewage. An overall land use plan also has delineated
open space in addition to residential lots.
Our description narrative follows. We feel this
project is appropriate for the site and in keeping with the
community' s developing character. We ask you for your
support.
Sincerely,
William C. Hagmaier
Project Engineer
WCH:dd
EAGLE RIVER ANCHORAGE HOMER
(~694-9848 (~349-6~1 (~235~179
TR 2
190
$
14
13
12
. rR
3
7
AREA
MAP
BAVARIAN HEIGHTS SUBDIVISION CLUSTER DEVELOPMENT
A. SITE DESCRIPTION:
This site is located in the Hillside area north of
Rabbit Creek Road and west of Prator Street. The area en-
closed by this development contains 50 acres. The topo-
graphy in the eastern half of the development has an average
slope of approximately 13%. Vegetation in this area is com-
posed of black spruce, white spruce and cottonwood trees
with isolated stands of birch and alders. The south central
half of the property has a slight slope of 2% to the west,
with vegetation restricted to sedges and marsh grass with in-
termittent stands of black spruce and birch trees. This
portion of the site. is noticeably affected by a surficially
saturated peat condition. The northern half of the site
varies topographically from a negative 13% grade on the east
side of the property westerly to a saturated peat bog locat-
ed in the north central portion of the site° The northwest
corner of the site is typified by a 20' knoll with side
slopes approximating 14%.
The property is zoned R-6 as is all the surrounding pro-
perty adjacent to this subdivision°
Access to and from the property is excellent and will
be via Northfield Drive to Rabbit Creek Road.
The property is owned and will be developed by Bridget
Enterprises of Eagle River.
B. PLANNING OBJECTIVES:
The petition area is currently zoned R-6, suburban resi-
dential district (large lot). The R-6 district is designed
to encourage residential development while at the same time
preserving and enhancing those physical and environmental
features which add to the desirability of suburban living.
As the site is presently zoned, the minimum lot size is 1
1/4 acres. Due to soil conditions (predominantly clay and
hardpan silt) the present zoning allows little flexibility
in lot layout and in siting the dwelling units.
The primary planning objective of the proposed cluster
development is to provide single family residential dwelling
units with minimum environmental disturbance.
The existing soils on this property preclude standard R-6
residential development because of their impervious nature
in terms of septic waste disposal. It is this feature that
has dictated our planning objectives as follows:
a) retain a ~ignificant portion of the site in its
natural state.
b) provide quality housing to the public at the most
affordable cost.
c) minimize aesthetic disturbance to adjacent areas by
providing screening easements and greenbelt areas.
These objectives cannot be met under the current R-6
zoning. Approximately half of the 50 acres is totally
unsuitable for a typical R-6 lot with both on site waste
disposal system and water well. Because the existing soils
totally preclude development: under this zoning, a community
~ter system is required to serve any development on this
tract of land. The economics of constructing a community
water distribution network and corresponding pumphouses
dictates the fact that the density must be maintained at the
R--6 level with the homes clustered within the area of
suitable soils° The plan that has been submitted for this
subdivision has taken into account all technical, economic
and aesthetic considerations, as listed above in our
planning objectives. The optimum solution to the
constraints upon this property is a clustered community of
open space and residential homes with a community water and
on-site septic system. We are therefore requesting a
density of 0.8 dwelling units per acre in order to meet the
planning objectives that we have outlined above.
C. PROJEC~ DESCRIPTION:
The project will consist of 40 single family dwellings
with an average lot size of 23,000 sq. ft. Each home will
have its own private yard[ and quick access to the open space
area. In addition, an internal greenbelt along all roads
within the subdivision will be maintained by use of
setbacks. This will decrease the visual clustering of the
project and provide a more private identity to each of the
individual residences. The final aspect of this PUD is the
retention of undisturbed open space at the north central and
southerly areas within the property%
F_28
The construction of individual residences will be gover-
ned by the architectual control committee and by the coven-
ants, conditions, and restrictions for Bavarian Heights°
The covenants, conditions and restrictions for this subdivis-
ion are attached with this report.
D. OPEN SPACE:
The tract of land that currently exists off Rabbit
Creek Road lies in a a relatively undisturbed and natural
state. It is the petitioner's intent to leave the land in
its natural state as much as possible. With the exception
of roads and residential home sites, the site will be left
in its natural state. Incorporated within the covenants
will be provisions to restrict the amount of land that can
be cleared for home construction.
There will be two types of open space provided
in Bavarian Heights Subdivision. The first type will be
held in private ownership by the owners of Lots 1-40. The
private open space will be approximately 19,500 Sqo ft. per
lot which excludes the main structure, driveways and parking
aprons. The second type of open space is undisturbed native
vegetation which is held in common by the Homeowners
Association. This open space is intended to preserve the
natural surroundings while, at the same time, serving as a
buffer to the adjacent areas. These areas are shown as
Tract A, B, and C. Total acreage of the undisturbed open
space is 21.65 acres.
029
E. LANDSCAPING:
The natural vegetation on the site consists of four
major plant associations: mixed white spruce/deciduous
forest~ black spruce forest, scattered birch and alder, and
a shrubby wet bog area.
Following the drainage pattern, the white spruce/
deciduous forest is found along the eastern ridge of the
property. Acting as a natural and visual buffer between the
Baw~rian Heights Subdivision and adjacent ].and owners, a
25-ft. building setback has been established to retain its
character. A very nice stand of mature black spruce is
found
along the southwest property line. The shrubby wet bog is
found at the north central property line and has been left
in its natural state. By allowing for ~xistlng drainage
patterns and · ' ·
· establishing a proper development buffer around
it, the integrity of the bog will be maintained. Like most
of Alaska's natural enw[ronment, the existing vegetation is
sensitive to development. To minimize impact on the
landscape, ali. manmade cuts will be as minimal as possible
and will be seeded and restored to a natural state.
In addition to preserving the existing vegetation found
on the site, an accent planting area has been provided at
the entrance to the subdivision. This landscaped area, with
a 6~ft. wood frame, earth mounding and identification sign,
sets the mood for the subdivision along with providing
separation from existing houses. Plants, selected for their
color and ornamental characteristics, will include
crabapple, mountain ash, mayday, birch, juniper, roses,
lilac, honeysuckle, and cottoneaster.
It is the intent of Bavarian Heights Subdivision to
convey a natural park-like atmosphere through proper land
use. This will be accomplished by minimizing impact on the
existing natural environment, incorporation of development
setbacks and maintenance of buffer vegetation.
F. PUBLIC UTILITIES:
Ail utilities for this cluster development will be
installed by the developer (with the exception of on-site
septic systems). The water system serving this subdivision
wilt be a community system consisting of three to four
wells, a pump house and a distribution system which will
meet municipal and state D.E.C. criteria. The water rights
for this property have been permitted by the Department of
Natural Resources in the amount of 31,500 gallons per day.
The Homeowners Association will be responsible to sign a
contract with a licensed laboratory for the monthly
samplings of the water system.
The covenants, conditions, and restrictions for
Bavarian Heights Subdivision provide for a monthly
assessment to be levied on each homeowner for maintenance of
the community facilities as may be necessary. This monthly
assessment will be utilized to pay for all road maintenance
that may be necessary, monthly sampling of the water system,
maintenance on the water distributioa systems, and main-
tenance on all open areas that are held in common by the
homeowners of Bavarian Heights Subdivision~ These monthly
assessments will be put into an escrow account and will
require two signatures for dispursement of any funds. This
method should insure that sufficient monies are available at
such time as any major expenses would occur.
Electrical service to this subdivision will be provided
by C.E.A., gas service by Alaska Gas, and telephone service
by A.T.U.
G. TRAFFIC ANALYSIS AND VEHICLE CIRCULATION:
Access to this subdivision will be from Rabbit Creek
Road via Northfield Drive. Internal circulation will be
attained by traffic flow on Northfield Drive which will
also serve as the main residential thoroughfares. It is the
petitioners intent to upgrade Northfield Drive to a strip
paved road from Rabbit Creek Road to this subdivision. In
addition, all internal, roads will be strip paved with
drainage control. Based on current estimates of driving
habits, the proposed ~0 lots would generate 320 vehicle
trips per day on Northfield. The capacity of Northfield
Drive when improved by the petitioner will more than handle
the increased traffic flow. No on-street parking will be
allowed on any streets. The front yard setbacks for the R-6
zone haw~ been maintained and thus all parking will be
restricted to driveways only.
H. SITE DRAINAGE:
Site drainage will be accomplished by use of roadside
ditching and subdrainage throughout the property. Each road
prism will incorporate a subdrain to receive any and all
groundwater. In addition all roadside drainage that
infiltrates into the adjacent road prism will also be
disposed of through the subdrainage system. The outfall for
the drainage system will be via drainage easement to the
headwaters of Gold Creek. Ail downstream drainage culverts
have been examined and have been rated as more than
sufficient to pass this minimal addition to the present
flow. It has been estimated by drainage modeling that the
quantity of water resulting from this subdivision is 1,07
cfs. The current flow of water in this drainage ditch/creek
is approximately 2.-3 cfs., most of which presently
originates from this property as a groundwater source.
]DEVELOPMENT SCHEDULE:
It is the petitioner's intent to complete the develop-
ment of the roads, water system, and other utilities during
the 1983 construction season. Additionally any landscaping
will be completed during 1983 if possible. If the
landscaping cannot be completed before August 15, 1983, this
work will be delayed until the 1984 season.
Paving will not be performed until the 1984 construction
season in order to allow for any secondary consolidation of
the roadway during the first year. Development and
construction on the individual .lots will be by the private
lot owner and will occur over the next three (3) years
(estimated).
C'32
J. ENVIRONMENTAL CONCERNS:
During the development of the project careful
consideration will be given to air quality and noise impact
in order to minimize the interim disturbance during
construction. All equipment will be suitably muffled and
the access road into the project, Northfield Drive, will be
treated with CSS-1 to minimize any dust.
K. OWNERSHIP:
Lots 1 through 40 will be offered for sale to the
public. Ownership of the individual lots will transfer to
the private owner. Tract A, B and C will be held in common
ownership by the new Bavarian Heights Home Owners
Association for use by its members and their guests.
L.. CLUSTER DEVELOPMENT STRUCTURE:
Attached with this application is a preliminary copy of
the Protective Covenants and the Home Owners Association
Agreement for the proposed subdivision. As described in the
covenants, a home owners association will be formed. The
purpose of the association will be to maintain the common
areas and to carry out the intent of the covenants. The
association may adopt bylaws and elect officers to conduct
its affairs, make improvements to the subdivision, bring
legal action to enforce the covenants and other type of
lawful actions. The agreement also provides for common us-
age of Tract A, B,and C, by all residents of Bavarian
Heights Subdivision.
M. PARKING:
There will be no roadside parking allowed. Ail lots
will have adequate driveways and parking areas to preclude
any roadside parking. (All road within the subdivision will
be signed with "No Parking" signs.)
N. TRASH DISPOSAL:
Roadside trash disposal service will be provided to the
project area by Anchorage Refuse on a weekly basis as is
provided to similar projects throughout Anchorage.
O. MAIL SERVICE:
Mail delivery boxes will be placed at roadside
locations by the builders of each respective lot with the
Post Office providing delivery service.
DRAWT
PROTECTIVE CONENANTS, CONDITIONS AND
RESTRICTIONSt HOMEOWNER'S ASSOCIATION
BAVARIAN HEIGHTS SUBDIVISION
PART A. PREAMBLE.
KNOW ALL MEN BY THESE PRESENTS, that whereas the
undersigned is the sole owner of properties comprising
BAVARIAN HEIGHTS SUBDIVISION, and
WHEREAS, the undersigned, desires to assure the
continued development of BAVARIAN HEIGHTS SUBDIVISION, on a
high level for the benefit of the future property owners
and, for protection of property values therein, does desire
to place on and against certain real property within
BAVARIAN HEIGHTS SUBDIVISION certain protective covenants
regarding the improvements and/or use of the same;
NOW THEREFORE, the undersigned does hereby establish
and file for record the following declarations,
reservations, protective covenants, limitations, conditions
and restrictions regarding the use and/or improvements of
the property located in BAVARIAN HEIGHTS SUBDIVISION, and
located in the
Anchorage Hecording District, Third Judicial District,
State of Alaska, filed as Plat No. , of said
records which said plat makes reference to these
convenants.
PART B. AREA OF APPLICATION
B-1. FULLY ~ROTECTED HESID~NTIAL/RECREATIONAL AREA.
The covenants in Part C in their entirety shall apply to
lots of BAVARIAN H~IGHTS SUBDIVISION.
all
Lots shall mean and refer
shown upon any recorded plat or
HEIGHTS SUBDIVISION.
to any numbered plot of land
subdivision map of BAVARIAN
B-2. EFFECTIV~ DATE. The restricted covenants,
limitations and conditions hereinafter set forth and
applicable to the residential area hereinabove describeo
shall take effect concurrently with, and not until, the
recording of the plat for BAVARIAN HEIGHTS SUBDIVISION,
consisting of 75 lots, as more particularly described in the
preamble hereto. Any lawful but nonconforming use of any
lot existing'as of the date hereof shall be permitted to
continue, provided that after such time as such use ceases,
no such unconforming use shall be permitted thereafter to be
reinstituted.
PART C. RESIDENTIAL AREA CONVENANTS
C-la. SINGLE FAMILY RESIDENTIAL PURPOSES. No lot
shall be used except for residential purposes. No building
shall be erected, placed, altered or permitted to remain on
any lot other than one detached single family dwelling and a
private garage for not more than thTee cars. Temporary or
surplus buildings may not be placed on any lot: to be used as
a utility shed unless its appearance is equal to the home's
standard, utilizing proper foundation and siding.
C-lb. MOBILE HOMES. No mobile homes or travel
trailers shall be utitlized for residential purposes within
the subdivision. Travel trailers may, however, be stored
while not in actual recreational usage upon the property
belonging to any person or persons who may subsequently
acquire property in the subdivision..
C-2. UTILITIES. No domestic water wells shall be
constructed upon any lots in the subject subdivision nor
shall any private sewage disposal system be allowed upon any
lot contained within the subdivision.
C-3. DWELLING COST, QUALITY AND SIZE. No single
family dwelling shall be permitted on any lot which has an
appraisal value of less than $75,000.00, based upon 1982
costs, exclusive of t~e lot. The square footage of any
dwelling building shall not be less than 800 square feet per
level in the event that there is more than one level to the
subject structure and in the event that there is no .more
than one level to the subject structure, a minimum of 1,000
square feet shall be required for a structure, excluding
open porches, carports and garage. Construction of all
houses shall be at least equalto the present F.H.A. minimum
building standards. The appraised figures are based upon
cost levels pertaining on the date of these covenants being
recorded, it being the intention and purpose of the
convenant to assure that all dwellings shall be of a quality
of workmanship and materials substantially the same or
better than that which can be produced on the date these
covenants are recorded at the minimum cost stated herein.
037
C-4. CONSTRUCTION COMPLETETION REQUIREMENT. Ail main
dwellings must have a finished exterior within six (6)
months.
from th~ start of construction and be full~ completed within
one (1) year from the start of construction. All out
buildings must be fully completed in six (6) months time.
C-5. BUILDING LOCATION.
be as follows:
Setbacks for all lots will
FRONT BACK SIDE
Lots 1-9, 11-40 50 25 15
Lot 10 25 15 50
C-6. TREES. No owner shall be permitted to
completely clear a lot on which standing trees of size and
beauty exist. Space may be cleared to provide for
construction and trees may be thinned so long as the maximum
natural beauty and aethetic value of the trees is retained.
C-7. FENCES AND SIGHT DISTANCES AT INTERSECTIONS. No
fence of any kind may be installed in violation of any State
statutes or Municipal ordinances presently enacted or as may
be hereafter amended.
C-8. UTILITIES AND BASEMENTS. The platted utility
easements shown on this plat shall be used for utility
purposes, power lines and telephone lines and utility
employees shall have the right of access to same. This
restriction shall be deemed a permanent easement for that
purpose. The grantor specifically reserves the same as a
utility easement, and no fence or other permanent or
semi-permanent structure shall be erected on or within the
area reserved. The easments and rights granted, or to be
granted the utility companies, providing said services
include the continuing right to prevent future act of any
person on or in said described land; and for this purpose
the said utility companies shall have the right to remove
any trees planted or transplanted or structures erected or
created subsequent =o the date hereof, which infringe upon
or extend into the reserved area/ together wi~h the right of
ingress and egress from and passage on and over said land
for the purpose of effecting and maintaining such utility
service, but reserving to the individual lot owners such
use, rights, and privileges in said land as may be exercised
and enjoyed withou~ interference with or abridgement of the
rights granted said utility companies. The costs of removal
of any encroachment proscribed herein and any legal
proceedings related thereto shall be born by the party
creating such encroachment except that the costs of removing
any natually occuring vegetation shall be the responsibility
of the utility company desiring such removal.
C-9. SIGNS. No sign of any kind shall be displayed
to the public view on any lot except one sign of not more
than five (5) square feet advertising the property for sale
or rent, or signs used by the builder to advertise property
during construction and sales period.
C-10. NUISANCgS. No noxibus or offensive activity
shall be carried on upon any lot, nor shall anything done
thereon which may be or may become an annoyance or nuisance
to the neighborhood. No trade or business of an offensive
nature shall be permitted upon any residential lot.
C-1io LIVESTOCK. No animals or livestock of any kind
shall be raised , bred or kept On any lot; except ~t]at dogs,
cats or o~her normal household pets may be kept, provided
that =hey are not kept, bred or maintained for any
commercial purpose. Ail doge shall be restrained, as
necessary, to prevent their becoming nuisances.
C-12. TEMPORARY STRUCTURES. No structure of a
temporary nature, tent,shack or quonset hut or barn shall be
used on any lot at any time as a residence. No trailer
homes other than those used for camping purposes may be
parked on any lot and they may not be used as a dwelling or
home.
C-13. GARBAGE DISPOSAL. No trash cans, garbage cans,
trash barrels, boxes or other refuse containers shall be
placed or maintained on or along the side or end of any lot
fronting upon, or adjacent to, a streett with the exception
that patrons of a garbage pickup service may place such
containers bearing trash or garbage for pickup upon the end
or side of the lot fronting upon the street on which the
garbage is picked up on the day designated by ordinance,
resolution or contract for the pickup of garbage at such
lot. No burning of trash, garbage, refuse or other waste
shall be permitted upon the street front and/or side of any
lot at any time, and such burning on the rear of lots shall
De permitted only in accordance with the appropriate health
and safety laws or ordinances or the Municipality of
Anchorage.
C-14. INOPERABLE VEHICLES. No inoperable vehicle
shall be parked or maintined upon any lot or within any
street, alley or easement adjacent to any lot in the
aforedescribed subdivision. A vehicle temporarity
inoperative for repair by the owner or under the owner's
direction for a period not exceed thirty (30) days (subject
to availability of parts) shall not be considered a
violation of this provision.
C-15. SNOWMOBILES. Snowmobiles shall not be operated
on the streets or utility easements of this subdivision
except for ingress or egress to the nearest open space or to
the nearest areas not disapproved for snowmobile operation.
NO snowmobile operations shall Oe conducted between the
hours of 10:00 o'clock P.M. and 7:00 o'clock A.M.
C-16. TERM. These covenants are to run with the land
and shall De binding on all parties and all persons claiming
under ti~em for a period of 25 years from the date these
covenants are recorded, after which time said covenants
shall be automatically extended for successive periods of 10
years unless an instrument signed by a majority of the then
owners of the lots has ~een recorded agreeing to change said
covenants in whole or in part. A majority of the lot owners
in the subdivision can make addition, deletions or
amendments to the covenants.
¢'30
C-17. ENFORCEMENT. Enforcement shall be by
proceedings at law or in equity against: any person or
persons violating or attempting to violate any covenant,
either to restrain violation or to ~ecover damages.
C-18. SEVERAB,ILITY. Invalidation of any one of these
covenants by judgment or court order shall in no way affect
any of the other provisions which shall remain in full force
and effect.
PART D. HOMEOWNER'S ASSOCIATION
D-1. MANDATORY MEMBERSHIP. A Homeowner's Association
is being established to provide for the water systems,
sewage disposal systems, maintenance and repair of public
roads, maintenance of recreational area, drainage, street
lights, and street signs serving the properties until a
government body assumes those responsibilities, and to
provide rules of operation and control of the subdivision.
Every purchaser, his heirs, assigns and successors in the
ownership of lots in this subdivision agrees as a condition
of purchase that he is automatically a member of the
Homeowner's Association. He will abide by the policies now
set and as later may be amended by majority decision. He
will support such policies and will pay such assessments as
may from time to time be levied. The Homeowner's
Association will be operated by the sudivider until such
time as more than 50 percent of the lots subject to
Association 3urisdiction have been conveyed to the ultimate
consumers (contractors and other purchasing any of said lots
for resale shall not be deemed to be "ultimate consumers"),
or October 31, 1985, whichever first occurs, at which time
the Association will be activated aad there will be an
election of officers and Executive Committee and dues will
be established and levied as determined ~y the ~xecutive
Committee.
D-2. VOTING RIGH'~S. The Association shall have one
class of voting rights. Each owner of a lot, whether suc[%
owner is an intity, person, or more than one person, shall
be entitled to one (1) and only one vote for each lot owned.
When more than one person holds an interest in any lot, such
persons shall decide among themselves how the~vote for such
lots shall be exercised. Eligible votes may De cast on all
matters t~at may come before a meeting of the Association.
04i
D-3. CREATION OF THE LIEN AND PERSONAL OBLIGATION OF
ASSESSMENTS. The lot owners for each lot owned within the
subdivision hereby covenant, and each owner of any lot by
acceptance of a deed therefor, whether or not it shall be so
expressed in such deed, is deemed to covenant and agree to
pay the A~sociation: (1) Annual assessments or charges,
and (2) Special assessments for capital improvements, such
assessments to be established and collected as hereinafter
provided.
D-4. CONVEYANCE AND SUBORDINATION. The Association
shall have the power to assess fees to the lot owners to
achieve the objectives'of the Homeowner's Association. The
lien of the assessments provided for herein shall be
subordinate to the lien of any mortgage. Sale or transfer
of any lot shall not affect the assessment lien. However,
the sale or transfer of any lot pursuant to mortgage
foreclosure, or any proceeding in liey thereof, shall
extinguish the lien of such assessments as to payments which
become due prior to such sale or transfer. No sale or
transfer shall relieve such lot from liability for any
assessments thereafter becoming due or from the lien
thereof.
D-5. ANNUAL ASSESSMENTS. The Association will be
operated by the subdivider until such time as more than
50% of the lots subject to Association jurisdiction have
been conveyed to the ultimate consumers (contractors and
others purchasing any of said lots for resale shall not De
deemed to be "ultimate consumers") , or October 31, 1985,
whichever first occurs. Tl~e fiscal year for assessments
shall be from November 1st through October 31st. Upon
purchase of a lot or lots by a purchaser, the purchaser
shall, at the time of closing, pay the pro rata annual
assessment remaining for the fiscal year's assessment plus
one full annual assessment fee of $ which will
cause purchaser's annual assessment to be paid through
October 31st of the year subsequent to purchase. The
subdivider will not pay any assessments for unsold lots but
will make up any deficits in the maintenance expense until
such time as all lots in the subdivision have been sold. At
such time as the Homeowner's Association is activated, the
soard of Directors may fix the annual assessments.
O42.
D-6. EMERGENCY PROVISION. The Board of Directors may
fix an Emergency Assessment, not in excess of
per lot, by 'a two-thirds vote of the entire membership of
the Board. The Board of Directors shall have sole
discretion as to what constitutes an emergency so long as
such discreation is exercised justly and reasonably. Such
assessment shall only be fixed at a duly constituted meeting
of the Board, when~
a. Conditions do not allow time for a special or
regular meeting of the Association membership to be called,
and
b. An emergency exists which requires immediate &ction
(endangers life, property, or use of the properties), and
c. The Association's funds are not adequate to pay to
cost of action to be taken.
D-7. SPECIAL ASSESSMENTS FOR CAPITAL IMPROVEMENTS.
In addition to the Annual and Emergency Assessments
authorized above, the Association may levy, in any
assessment year, a Special Assessment applicable to that
year only, for the purpose of defraying, in whole or in
part, the cost of any construction, reconstruction, repair,
or replacement .of a Capital Improvement or upon public
roads, including rights-of-way, serving the subdivision,
including fixtures and personal property related thereto,
PROVIDED THAT any such assessment shall have the assent to
two-thirds of the lot votes represented at a meeting duly
called for this purpose.
D.-8. NOTICE REQdlREMENTS. written notice of any
meeting called for the purpose of taking action authorized
under Sections D-5 through D-7 shall be sent to all memDers
not less than fifteen (15) days nor more than thirty (30(
days in advance of the meeting. At the first such meeting
called, the presence of members or of proxies entitled to
cast sixty percent (60~) of all votes shall constitute a
quorum. If the required quorum is not present, another
meeting may be called subject to the sa~e notice
requirements and the required quorum at the subsequent
meeting shall be one-half of the required quorum at the
preceeding meeting. No such subsequent meeting shall be
held for more than sixty (60 days following the preceding
meeting.
04u
D-9. UNIFORM RATE OF ASSESSMENT. Both Annual and
Special Assessments must be fixed at a uniform rate for
lots and may be collected on a monthly, semi-annual, or
annual basis by the subdivider or the Association.
all
D-10. DATE OF COMMENCEMENT OF ANNUAL ASSESSMENTS, DUE
DATES. The first Annual Assessment shall be'paid as set
forth in paragraph D-5 above. The Board of Directors shall.
fix the amount of the Annual Assessment against each lot at
least thirty (30) days in advance of each Annual Assessment
period. Written notice of the Annual Assessment shall be
sent to every owner subject thereto. November 1 shall be the
date Annual Assessment are due and payable. The Association
shall upon demand, and for a reasonable charge, furnish a
certificate signed by an Office of the Association setting
forth whether the assessments on a specified lot have been
paid.
D-il. EFFECT OF NONPAYMENT OF ASSESSMENTS: REMEDIES
OF THE ASSOCIATION. Any assessment not paid within thirty
(30) days after the due date shall bear interest from the
due date at the rate established by the Board of Directors.
The Association may bring an action, at law, against the
owner personally obligated to pay the same, or foreclose the
lien against the property. No owner may waive or otherwise
escape liability of the assessments provided herein by
non-use of the Common Area or abandonment of his lot.
D-12. TERMINATION OF ASSOCIATION. The Association
shall be terminated upon the condition of a governmental
agency causing to be created a Public Service District which
will provide for the maintenance and repair of streets
located within the subdivision.
DATED this day of , 1982.
By.
Its
STATE OF ALASKA )
) SS.
THIRD JUDICIAL DISTRICT )
THIS IS TO CERTIFY that on the d-%y
of . , 1982, before me, the un--d,
a Notary Public fo~-the Stats of Alaska, duly commissiened
and sworn, personnally appeared . _,
to me known and known to me to be the identical individual
described in and who executed the within :~nd foregoing
instrument and acknowledged that he signed the same as the
free and voluntary act and deed of ,
for the uses and purposes therein mentioned.
GIVEN U~]DER MY HAND and official seal the day
and year last above written.
044
Notary Public in and for Alaska
~y commission expires:
February 21,
S
& ENGINEERS, INC.
$
7125 OLD SEWARD HIGHWAY ' ANCI'IORAGE,.ALASKA 99502
1983
046
Jerry Weaver
Platting Officer
Municipality of Anchorage
Pouch 6-650
Anchorage, Alaska 99502
Dear Mr. Weaver:
The following narrative is a drainage and hydrology
analysis for Bavarian Hts. Subdivision. This letter is in-
tended to quantify and qualify the existence of surface
drainage, groundwater, wetlands, and to some extent the com-
munity water supply for this subdivision.
The 50 acres proposed for development is vegetated with
a variety of native grasses and trees including alders,
birch, black spruce and white spruce. The topography for
the area shows a hill along the east boundary for this prop-
erty and a predominant knoll located in the northwest corner
of the property. The precipitation equivalent for both rain
and snowfall in this area is approximately 15--20 inches per
year depending upon the year. The precipitation falling
within the area of the subdivision and the adjacent sub-
divisions flows in a westerly manner across Bavarian Heights
Subdivision. This westerly flow of water across the surface
of this 50-acre tract eventually finds its way to the
headwaters of Gold Creek, located approximately 1200 feet
west of Bavarian Heights Subdivision. The drainage basin
for this area encompasses the 50 acres of the proposed
Bavarian Heights Subdivision and an additional 20-30 acres
east of Bavarian Heights Subdivision. The runoff from the
property to the east is minimized due to the existence of a
perenially flowing stream approximately 800 feet
east/northeast of this subdivision which intercepts the
surface water runoff from the upper hillside and channels it
into Rabbit Creek.
The amount of drainage originating from this fifty
acres will not be changed by the addition of this
subdivision. The only thing that will be changed will be
the length of time for the drainage to reach Gold Creek.
Pzesently this flow reaches the creek by overland flow,
whereas within the proposed subdivision it will reach the
creek through a series of storm drains, grassed swales and
drainage ditches.
EAGLE RIVER ANCHORAGE HOMER
(~h694-98~ (~9,5~1 (~235~179
Page 2
S & S Engineers, Inc.
Bavarian Hts. Drainage;
February 21, 1983
~1119
It is estimated that this subdivision will result in
approximately 5.48 acres of impervious area. (2.73 acres of
road area, 1.83 acres of homes, and 0.92 acres of driveways
and other impervious areas). The drainage resulting from
this additional impervious area will be channeled to the
grassed swales adjacent to the roadways, in accordance with
the road standards of Public Works Engineering° Engineering
calculations presently put the total amount of surface
runoff from this drainage basin to Gold Creek at
approximately 11.20 cubic feet per second. The addition of
the 5°48 acres of impervious area would change the resultant
creek hydrograph in that an additional 1.07 cubic feet per
second of runoff would reach the creek sooner vim the
grassed swales and storm drainage system.
The proposed subdivision partially lies within a stand-
ing water area described on page 16 of the Hydrologic Study
of the Hillside Area~ prepared for the Borough, by the U.S.
Geological Survey in 1975. However, as stated on page 17 of
this study, "field inspection is invaluable in evaluating
any potential surficial drainage problem." The study goes
on further in stating that "the peat material on the surface
can act as a sponge in that it may be saturated one or two
feet beneath the surface. The material below the peat,
however, may not be saturated. If wet muskeg is removed and
adequate surface drainage provided, these lands may be made
suitable for development". This is the very condition that
exists within this subdivision, as can be seen by the soil
profiles included with the packet. Approximately half of
this property is overlain by one to three feet of saturated
peat with a very dense glacial till located just beneath the
peat. The surface drainage provided by the roadway system
and the underground storm drain system will definitely
intercept the surface water presently saturating this peat.
On page 28 of this same study, this area has been mapped out
as being highly susceptible to surface and ground water
pollution. The map of that area on page 28 coincides
identically with the map on page 16. This designation of
high susceptibility exists because it assumes that any
conventional septic system installed in this area would
discharge into a heavily saturated and permeable ground.
Page 3
S & S Engineers, Inc.
Bavarian Heights Sub.
February 21, 1983
~1119
However, field investigation on this sit~ has revealed that
it is only the surficial area of peat that is saturated. An
engineered drainage plan for this subdivision will result in
the "drying out~ of this surficially saturated muskeg.
This proposed subdivision lies partially within Wet-
lands Management Plan, Area #30; however, this area has been
classified as acceptable for mixed development. In
addition, a Nationwide Wetlands Permit was issued by the
Corps of Engineers on August 19, 1981. The area of
principal concern to the Corps was the north-central portion
of this property which has been tracted out and will be left
in its natural state.
The co~nunity water supply system has three wells, a
ceatral pumping house and the distribution system of pipes.
The three wells currently have a combined[ pumping capacity
of 133 gallons per minute. The primary well is an artesian
well rated at 88 gallons per minute, located in the
southwest corner of the subdivision. The second well rated
at 37.5 gallons per minute, is located at the entrance of
the subdivision, adjacent to Northfield Drive. The third
well, rated at 7.5 gallons per' minute, is located midway
between the first and second wells and approximately 150
feet north of the south property line. Ali. three wells are
located approximately 500-900 feet away from any private
well. All three wells vary in depth from 140' to as deep as
210 feet. The effect of the proposed community well system
upon the aquaifers currently serving residents along both
the Prator and Mercedes Hill areas has been evaluated by the
Dept. of Natural Resources under the ~ter rights permitting
processes and this department has granted water rights of
31,500 gallons per day for this subdiw[sion.
O40
Page 4
S & S Engineers, Inc.
Bavarian Heights Sub.
February 21, 1983
Job ~1119
The community water system as proposed is of sufficient
capacity to service the proposed subdivision and has
sufficient horizontal and vertical separation from
any on-site wastewater disposal system. In addition, all
the requirements of all responsible agencies governing the
water systems have been complied with.
The information contained in the above narrative is
the result of numerous site investigations, engineering anal-
ysis, and research. If there is any additional information
your department requires concerning the drainage or hydrol-
ogy of this proposed subdivision, please fsel free to call
us at 349-6561.
Very truly yours,
/'John E. Swanson, P.E.
William C.~agm~r
Engineer
JES:WCH:dd
February 22,
S
& ENGINEERS,, INC,,
7125 OLD SEWARD HIGHWAY · ANCHORAGE, ALASKA g9502
1983
05O
Jerry Weaver~ Platting Officer
Municipality of Anchorage
Pouch 6-650
Anchorage, Alaska 99502
Re: Bavarian Heights Subdivision Drainage Plan
Dear Mr. Weaver:
The following narrative is a discussion on the drainage
plan proposed for Bavarian Heights Subdivision. This
drainage plan has been engineered so as to lower the water
table in the areas susceptible to ground water contamination
from on-site septic tanks.
The drainage system proposed for this development is
shown as a blueline drawing attached to the subdivision
plat. The drainage system will be composed of both fin
drains and CMP storm drainage. Both types of proposed
drainage are shown on the attached drainage plan. The fin
drains will be utilized to intercept the high ground water
and lower the groundwater elevation by re-directing the
drainage through the subdivision The drainage system will
then discharge this water to the headwaters of Gold Creek,
which is where the present groundwater ultimately ends up.
The drainage system as proposed has not increased the amount
of drainage to Gold Creek. The purpose of the drainage
system is only to permanantly de-water and lower the
existing ground water to an elevation acceptable to Dept. of
Environmental Protection so that on-site septic systems will
function properly, and not contaminate the existing ground
water.
The fin drain system consists of sections of a flexible
vertical fin made of deeply dimpled high strength styrene
sheet enveloped in a non-woven polypropelene filter fabric.
Perforated plastic pipe is inserted into each unit and
connected, forming a continuous drainage curtain. Each
section of pipe has a flap of fabric that overlaps the
adjacent section, preventing any movement of soil into the
system. The vertical fin provides channels on both sides,
permitting water to flow vertically to the perforated pipe
at the base of the fin.
EAGLE RIVER ANCHORAGE HOMER
(907) 694-9846 {9~7) 349-6561 (907) 235-8179
Page 2
S & S Engineers, Inc.
Bavarian ~eights Drainage
February 22, 1983
System; Job 1119
Upon entering the perforated plastic pipe, the water is then
conveyed to the drainage system as shown on the attached
drawings.
As can be seen from the attached drawings, the fin
drains will be utilized to lower the groundwater table by
installing these systems upstream of the affected areas.
Thusv the fin drain system and connecting storm drainage
will act as both a groundwater barrier and drainage
conveyance system.
The drainage plan as proposed~ was engineered so as to
mitigate any impact on the area of standing water in the
north-central portion of this subdivision. At the present
time, as can be seen from the test hole logs and soil
profiles accompanying this report, the water from this bog
flows toward the headwaters of Gold Creek through a series
of sand and sandy gravel deposits, running in a
south-westerly direction across this property. The table
below shows the engineering coefficients of permeability for
the soils through which the water presently runs in
comparison with the permeability coefficient for. the fin
drain. As can be seen from the table, the permeability
coefficients are relatively equal. The permeability of the
filter fabric is in fact less than some of the existing
soils° Thus, the installation of this fin drain and storm
drainage plan will not have any detrimental effect on the
bog in terms of lowering the water table.
FILTER MEDIA
COEFFICIENT OF PERMEA
BILITY (PT/SEC.)
Clean Gravel (GW) .16 - .32
Coarse sandy gravel
(GP/SM), (SW), (SP)
.013 - .10
Medium Sand (SP/SM), (SW/SM) .0016 - .005
Filter fabric for fin drain .1
Page 3
S & S Engineers, Inc.
Bavarian Heights Drainage System; Job ].119
February 22, 1983
The drainage system as proposed will lower the ground
water table in the affected area without disturbing any of
the adjacent areas. The drainage system as proposed will
lower the groundwater table a minimum of 4' below soils
acceptable for on-site septic systems, in conformance with
the requirements of 'the Dept. of Health and Environmental
Protection. There is adequate slope across the property and
to Gold Creek to convey this water without any engineering
constraints. The system as proposed provides for an
economical and environmentally safe development, as well as
insuring that there will be no detrimental effect upon any
of the adjacent lands.
I hope the foregoing discussion will help alay your
fears as to the intentions for drainage and on-site septic
system installations within this subdivision. ~f you have
any questions regarding the proposed engineering design, the
specifications, engineering analysis or construction
details, please feel free to call me at 694-9846°
Sincerely,
William C. ~agmaier
Engineer
WCH:dd
& ENGINEERS, lNG.
7125 OLD SEWARD HIGHWAY" ANCHORAGE, ALASKA 99502
February 18, 1983
054
Mr. Rexford Turner
P.O. Box 589
Eagle River, Alaska
99577
RE: Preliminary soils exploration and percolation tests
for Bavarian Heights Subdivision.
Dear Mr. Turner:
The information contained in this report is the result
of our preliminary soils investigation on the Bavarian
Heights Subdivision, upper Rabbit Creek Road area. Our
investigation included the review of previous soils
investigations, research of soils data on surrounding
property, and field examination with backhoe test pits.
Forty-four test pits were excavated and examined during
October and November of ].981. The test pits were logged and
representative samples were taken. These varied in depths
from 12 to 21 feet and were spaced throughout the proposed
subdivision area.
Prior to this report, eight perc tests were performed
by Moening, Gray, and Associates during July of 1979, eight
test pits were excavated and examined during September of
1978 by Moening, Gray and Associates, and feur test pits
were logged by John M. Lambe during December of 1977. The
test pit locations for all projects are shown on Figure 1.
In all cases, subsurface examination was accomplished with
backhoe equipment.
Surface drainage throughout the area is in a westerly
direction except for the north central area of the property
where a southerly trending swale occurs between the east
ridge and a small hill to the west. Drainage is excellent
along the easterly ridge and small hill. Drainage in the
afore-mentioned swale and southwesterly corner is moderate,
due to the lack of suitable outfall. The water tends to
percolate into the existing gravel underlying the southwest
corner of the subdivision.
EAGLE RIVER ANCHORAGE HOMER
(907) 694.9846 (9~7} 349,8881 (907) 235-8179
Page 2
S & S Engineers, Inc.
Bavarian Heights Soils Report;
February 18, 1983
Job 1119
The surficial soils in this area were deposited during
the final glaciation. The primary depositional agents
included ice, streams, outwash, and ponds. These produced a
somewhat complex series of materials varying widely in
character.
The northern half of the ridge extending along the east
side of the property consists of several feet of silts and
silty sandy gravel overlying a fairly well graded sandy
gravel to gravelly sand. This material was quite dense and
had a moderate to low moisture content with no water table
conditions encountered. A slight water seep was encountered
at 7' - 8' deep in three of the test holes dug. The
percolation tests performed in this area were acceptable for
on site waste disposal systems.
In the southeast corner of the property, soils consist
of a bluish gray sandy silt to clayey silt. The deposit is
essentially impervious. It has a low moisture content and
very firm consistency except were it is in contact with
surface water. Test pit information indicates the silts and
clay are underlain by a very dense sandy gravelly cobble.
This material is also impervious. None of the perc tests
performed in this area met the Municipal Standards for waste
disposal systems.
The small hill and side slopes in the northwest portion
contain a thin veneer of silty sands overlying stratified
sandy gravel to gravelly sand. These sands and gravels
contain some very thin and apparently discontinous silt beds
or lenses. The materials have a low moisture content and
all test holes performed in this area will meet the existing
Municipal criteria for on site waste disposal systems. The
southwest corner of the property consists of gravelly cobble
to sandy gravel which is overlain by a thin two foot veneer
of silty sandy clays. In some locations closer to the
southwest corner of the property the gravel comes entirely
to the surface. These gravels are very pervious and at this
time a water table exists in this area varying from three
feet to nine feet. With proper drainage considerations,
this area could meet the existing Municipal criteria for on
site waste disposal systems.
Page 3
S & S Engineers, Inc.
Bavarian Heights Soils Report;
February 1.8, 1983
Job 1119
We conclude that the area under consideration known as
Bavarian Heights Subdivision is unsuitable for the most part
under its present zoning for subdivision development. A
cluster development or PUD is recommended. As can be seen
from the attached drawing, approximately 60% of the proposed
subdivision property has ground that is unacceptable for on
site waste disposal systems due to poor soils ahd/or
groundwater conditions. A comprehensive drainage plan
engineered for this 50-acre parcel would allow the use of
on-site waste disposal systems on an additional 20-30% of
this acreage.
Drainage characteristics should be addressed during
initial subdivision design. This is particularly important
in the southwest corner of the subdivision where surface
drainage improvements will be required° The water in the
southwest corner of the subdivision apparently comes from a
combination of surface flow off of the hill to the east and
deep ground water flow coming out of the peat bog in the
north central portion of this subdivision. Depending upon
road configuration and subdrain placement, this area could
very easily be permanently dewatered. ~here are also some
sporadic water seeps at varying depths located along the
hill on the east side of the property and the mid central
portion of the property. These water seeps are for the most
part quite deep and should not interfere with any
residential home foundations, nor any on site septic
systems.
Foundation subbase material will vary and also require
individual attention prior to construction. For example,
materials on site vary in frost susceptibility from NFS to
F-4. Consistency of the granular material appears to be
generally medium dense to dense. The finer materials or
cohesive soils appear to range from stiff to w~ry firm.
Where exposed to excessive moisture, commonly near the
surface, the cohesive ~terials are soft. Because of the
wide variety of soils within this large 50-acre tract, it is
recommended that all foundation designs be subject to
engineering analysis prior to foundation construction.
Page 4
S & S Engineers, Inc.
Bavarian Heights Subdivision; Job 1119
Pebruary 18, 1983
We appreciate conducting this preliminary examination
for you and ask that you contact us if any additional
information is required at 349-6561.
Will~am C~- Hagma-i~er
Engineer
TRS:WCH:dd
u5~;
REPRESENTATIVE SOIL PROFILES
AND
PERCOLATION TESTS
BAVARIAN HEIGHTS SUBDIVISIO~T
Soils Test
TABLE 1
TEST HOLE #
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
30
31
32
33
34
35
36
37
38
39
4O
41
42
43
44
TOTAL DEPTH
11.0 ft.
13.0 ft.
1~.0 ft.
11.0 ft.
10.0 ft.
13.0 ft.
11.0 ft.
11o0 ft.
1~.0 ft.
13o5 ft.
10.5 ft.
12.0 ft.
10.5 ft.
13.5 ft.
13.0 ft.
12.0 ft.
11.5 ft
~2.5 ft
11.5 ft
13.5 ft
19.0 ft
15.0 ft
12.0 ft
10.0 ft ~>
10.0 ft. '
18.0 ft.
11.0 ft.
9.0 ft.
15.5 ft.
10.0 ft.
14.0 ft.
16.5 ft.
10.0 ft.
13.0 ft.
10.0 ft.
13.0 ft.
10.0 ft.
17.0 ft.
13.0 ft.
11.0 ft.
11.0 ft.
11.0 ft.
12,0 ft.
SOIL CLASSIFICATION PERC. RATE
SM/ML
.ML
SM/G
SM/G
SM/GM
nL/CL
SM/ML
SM/ML
SP/GM
GW/SP
SM/GM
SP/GM
~/~
SM/GM
SM/sp
GP
SP
GP/SP
SM/SP
GM/GP
GW/GM
SP
SP
SP
GW
GW
GW
SP/GP
SM/Sp
GW
GW
GM/SM
G: /SP
SM/ML
GW
6p/sp
ow
GW/SW
ML/CL
nonpercable
nonpercable
nonpercable
nonoercable
,nonpercable
nonpercable
nonpercable
nonpercable
22 min./in (water seep
8.6 min/%n
40 min/in
48 min/in (water seep, 8 )
12 rain/in (water seep, 8')
34 rain/in
nonpercable
nonpercable
nonpercable (water seen,6
nonpercable
nonpercable(water seep, 6
visual perc(water seep,6'
visual perc(grd, wtr.,ll'
visual perc(grd, wtr.,3')
nonpercable(water seep,7.?
17 min/in(water seep,
11.4 min/in(seep, 11.5')
7.5 min/in
5.7 min/in
visual perc(grd.wtr.,5')
2.5 min/in
visual perc
7.5 min/in
visual perc
60 min/in
visual perc
visual perc
8.8 min/in
88 min/in
26.6 min/in(wtr, seep
nonpercable
visual perc(Erd, wtr. 9'
visual perc
visual perc(~rd, wtr, 3'
visual perc(grd, wtr. 6'
nonpercable
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Alaska 99502
PERCOLATION
TEST
PERFORMED FOR:
LEGAL DESCRIFTION:
Bruton Subdivisinn HnlA ~l
Section 35, T12N, R3W, SM
DATE PERFORMED:
Ant ?q lqR1
1
2
3
4
5
6
7
8
g
10
11
12
13
14
15
16
17
18
19
20
COMMENTS
PT
SM/ML
Brown Silty clay with
some cobble
GM
Gray hardpan gravelly
silt very dense,
SM/ML
Gray silty clay
very stiff clay
9:20
9:50
10:15
10:50
· 11:20
12:00
SLOPE
SITE PLAN
WAS GROUND WATER
ENCOUNTERED? NO
IF YES, AT WHAT /
'O
P
10/29 0 ~l 0 0
#1 10/29 30 Min. 30 Min 1/4" I/4"
--#2 10/29 55 Min 55 Min 3/8" 3/8" '
#3 10/29 90 Min 90 Min 1/2" 1/2"
~4 10/29 120 ~in 120 ~4in 1/2" 1/2"
PERCOLATION RATE
TEST RUN DETWI"EN
NonDercab] e (mlnut.t/inch)
7 , FT AND 0-- FT
ENGINEERS-SURVEYORS
7125 Old Seward Highway
^nchora~e, Alaska .n950~
PERCOL.AT3ON
TEST
PeR~OmMEO ~Om: Bruton Subdivision TH #2
DATEPERFORMED: October 29, 1981
LEGAL DESCRIPTION.'
Sec. 35~ T12N~ R3W., SM
PT
ML
Gray Silty Sandy
Clay
Very dense
SLOPE
SITE PLaN
I0
11
12
13
14
15
16
17,
18-
19-
20-
COMMENTS
PERFORMED
WAS GROUND WATER ~10 ~
ENCOUNTERED? O
P
· e
IF YES. AT WHAT ....
DEPTH?
Reedimg gate Gross Net De,th to Net
Time Time Water Oroo
#0 lU/~ u' u u 0
#1 " 30 min 30 min l/a" 1/4"
#2 " 70 min ~0 min 1/2" 1/4"
~3 " 110 min 40 min 1/2" 0
#4 " 150 min 40 min 1/2" 0
9:00
9:30
IO:.IO
10:50
11:30
PEnCOLAT~O~ ~ar~ nonpercable I~.u,,,/~
TEST RUN OET;V'~E~ 7 ~T AND 8 FT
Surface water entering excavation
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Alaska 99502
PI:RFO~M ED FOR;
Bruton Subdivision TH #3
DATE PeR f-'ORMED;
LEGAL DESCRIPTION:
Sec. 35, TI2N, R3W, SM
[] $OI~S LOG
PERCD[.ATION
TEST
October 29, 1981
C 6 2
1
2
3-
4-
5-
6-
7-
8-
9-
10-
11
13
14
15-
16
17
18
19
20
COMMENTS
PT
SM
Blue Gray
Silty sand
SM/GM
Grayish, moist
sandy silt with'
SLoPe
SITE PI.AN
9:30
10:10
10:45
11:15
ENCOUNTERED? NO
O
IF YE'S, ATWHAT , e
DEPTH?
#0--'- 10/29 0 o o u --
#1 " 40 40 3/8" 3/8"
~2 75 35 i/2"
#3 " 105 30 1/2" 0
Surfac Water Iifiltrat~on Ruined Peic.
P£RC:OLATION flare Nonpercabl e (minute,Ii.h)
Test muN e~TV~EN --~ . ~T ANO 7 PT
Surface water entering excavation
ENGINEERS-SURVEYORS
7125 Old Seward Highway
^nchora~e, Alaska 9950~
PERCOLAT)ON
TEST
PERFORMED FOR.'
Bruton, Subdivision TH #4
DATe PERFORMED: Bctober 29, 1981
LEGALOESCRIPTION.' Sec. 35) T2N~ R3W~ SM
1 PT
4
5
6
7
CL
Blue silty clay
SM/GM
Blue Gray sandy
silt
very dense
cobble intermixed
in silt
eLoPe
SITe Pt.AN
10
11
12
13-
e.coU.TE.eo? .
IF YES. AT WHAT E
QEPTH? ....
14-
15-
16-
17-
18-
lg-
20-
Reading Oete Gross Net Oei3th to Net
Time Time Water Drop
0 IU/ZD U U U U
#l " 30 30 0 0
F~ OU JU U U
#3 " 100 40 O 0
9:40
10:10
10:40
11:20
11:50
PERCOLATION EATE
TEST RUN ¢3ET~F~J
Surface water entering excavation
,,~' ~"~ C~TI~IE~ ~Y: ~'~,_
Nonpercabl e (m~.u,.,/i~h)
7 8
FT AND FT
ENGINEERS-SURVEYORS
7125 Old Seward Hi0hway
Anchorage, Alaska 9050~
SOILS LOG
PERCOLATION
TEST
PERFORMED FOR= Bruton Subdivision TH #5
· DATE PI-'RFORMED: October 29, 1981
LEGAl. DESCRIPTION.'
1 PT
2
ML
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
COMMENTS
Sec. 35, T12N~ R3W~ SM
Brown silty clay
SM
Brown silty sand
SM/GM
Dark brown gravelly
silt
10:00
10:45
11:20
11:50
12:20
SLOPE
SITE P [..AN
WAS GROUND WATER S
P
IF YES, AT WHAT
DEPTH? .....
Reading Date Time Time
O 1U/X~ U
#1 " 45 45
#2 80 35~
#3 " 110 30
#4 " 140 30
1/4"
1/2"
1/2"
Drop
u
1/4"
1/4"
0
1/2"
PERCOLATION RATE'
TEST RUN 13ETW~EI~J
Nonpercable (minut el/Inch)
5 ~T ANO ---2/--- ~'r
ENGINEERS-SURVEY6RS
7125 Old Seward Highway
^nchora~e, Alaska 99502
065
SOILS LOG
PERCOLATION
TES'T
PERFORMED FOR: Bruton Subdivision TH #6
OATE PERFORMED:October 29, 1981
LEGAL DESCRIPTION:
1 PT
2
3-
4-
5-
6
7-
8-
9-
10-
11
13-__
14-
15-
16-
17-
18-
lg-
20-
COMMENTS
Sec. 35, T12N, R3W~ SM
ML
Light Brown
silty clay
CL
Blue silty clay
SM
Silty sand with cobbles,
dense
Large persentage of fines
SLOPE SITE PLAN
WAS GROUND WATER
ENCOUNTERED? r~]o ,
IF YES, AT WHAT
DEPTH?
0 10/29 0 0 0 0
#1 " 30 30 0 0
#2 " 60 30 0 0
~q qilY~m~ wRt'o~ crnfmminRtin
10:15
10:45
I1:15
TEST ~U~
Surface water entering excavation
NonDercabl e (mlnute,/inch)
7 ,. T*NO 9 ,PT
ENGINEERS-SURVEYORS
7125 (~ld Seward Highway
Anchorane, Alaska 9.n502
PERFORMEDFOR:.
Bruton Subdivision TH #7
DATE PERFORMED:,
LEGAL DESCRIPTION;
SEC. 35, T12N, R3W, SM
[-I SO~LS LOG
PERCOL^TION
TE~-T
October 29, 1981
O66
4-
5-
6-
7-
8-
9-
10-
11
13-
14-
15-
16
17
18
19
20
COMMENTS
PT
SM/ML
Blue gray silty
sand and clay
moist
SLOPE
WAS GROUND WATER
ENCOUNTERED? NO
IF YES, AT WHAT ..... '
DEPTH?
:L1:10 0 10/29 0 0 0 0
11:50 #1 " 40 40 1/4" 1/4"
12:30 #2 80 -=4-0- 1/2" 1/4"
12:50 #3 " 100 20 5/8' 1/8"
Sur"ace water :onfaminatlon
pERCOLATION RArE nonpercabl e
5 7
TEST RUN ~ST~/~F~ F'r ANO -- , FT
Surface water enterin9 excavation
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorage, Alaska 99502
/-~ SOILS LOG
06 7
[] .PERCOLATION
TEST
PERFORMED FOR:
LEGAL DESCRIPTION:
Bruton Subdivision TH #8
Sec. 35, T12N, R3W, SM
DATE PERFORMED:
October 29, 1981
4-
5-
6
7
8
9
10
11
12
13
14
15
16
17
18
!9
2O
COMMENTS
PT
SM/ML
Blue silty clayey
sand, very moist
10:30
11:00
11:30
11:50
SLOPE
SITE PLAN
WAS GROUND WATER
ENCOUNTERED?
IF YES, AT WHAT
DEPTH?
P
E
Readin~ Date Gro~s Net Depth to Net
Time Time Watar Droo
0 10/29 0 0 0 0
#1 " 30 30 1/8" 1/8"
#2 ,, 60 30 1/8" ~
~ Clrr¢;~r~ w~r r'~n~nmi~atilln
PERCOLATION RArE
TE.qT RU~ eET~d
Surface water entering excavation.
NonDercabl e (minutes/in,:h)
6 8
FT AND FT
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Elaska
PERCOLATION
'rEST
PERFORMED FOR:
Bruton Subdivision
TH #9
October 29, 1981
DATE PERFORMED:-
Sec. 29, T12N, R3W, SM
1
2
3
4
7
8
10
11
12
13-
14-
15-
16-
17-
18-
19-
20-
COMMENTS
PT
SP
Black sand Moist
GM/ML
Brown si'lty gravel,
with cobble, dense
SITE PLAN
ENCOUNTERED? yes ~
water seep at 6.0' p
· E
0 10/29 0 0 0 0
1 " 30 30 1 1/2" 1 1/2'
2 " 60 30 2 3/4" I 1/4"--
1I:30
12:00
12:30
F~cot.~loN R^~ 22 min/in im~,,ut,,/)~)
5 7
TEST RUN ~T'~F.,I'd F'r AND ~ . ~T
Black sand lenses interspersed in the silty gravel
ENGINEERS-SURVEYORS
7125 Old Seward Highway
· ^nchorane, Alaska ~9502
SO~LS LOG
. PERCO/_AT1ON
TEST
063
PERFORMED FOR: Bruton Subdivision TH #10
Sec. 35, T12N, R3W, SM
LEGAL DESCRIPTION:
1
2
3
4
5
6
7
8-
9-
10-
11
13
14-
15-
16-
17-
18-
19-
20-
COMMENTS
PT
SM/GM
Silty sandy gravel,
dense, wfth cobble
GW/SP
Black sand~ gravel
SLOPE
SITE PLAN
SM/GM
Silty sandy-gravel
WAS GROUND WATER
ENCOUNTERED? NO
IF YES, AT WHAT
DEPTH?
P
Gross Net Depth to Net
Reading Date Time Time Water Droo
0 10/29 0 0 0 0
1 " 15 15 2" 2"
2 " 30 15 ~" 2"
3 " 45 15 5 3/4" 1 3/4"
4 " 60 15 7 1/2" I 3/4"
11:45
12:00
12:15
12:30
12:45
8.6 min/in
P£RCOLATID N RA~'E {minut~s/i~h)
7 9
ENG I NEERS-SURVEYORS
7125 Old Seward Highway
Anchorage, Alaska .n.n50~
SOILS LOG
PERCD LATIDN
TES-F
PERPDRMED FDR: Bruton Subdivision TH #11
DATE PERFORMED: October 29, 1981
LEGAL DESCRIPTION:
Sec. 35, T12N, R3W, SM
070
1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19-
20-
COMMENTS
PT
SM/GM
Silty sandy gravel
SLOPE
SITE PLAN
r-
WAS GROUND WATER NO ~'-
ENCOUNTERED? ,
IF YES. AT WHAT
DEPTH?
0 10/29 0 0 0 0
1 " 30 30 1 1/4" I 1/4"
2 " 60 30 2 3/4"
3 " 9~ 30 3 1 _
4 " 180 30 3 3/4" 3/~"
12:00
12:30
1:00
1:30
2:00
PERCOLATION RATE' 40 min/i n .(mlnutll/i~<h)
TEST RUN GET'~V~E~J ~ ~ - FT AND ----.~.-. FT
Sandy ]enses ~nterspersed in s~lty 9rave] 2" - a" lenses
ENGINEERS-SURV. EYORS
7125 Old Seward Highway
Anchorage, Alaska 99502
PERFORMED FORt.
Bruton Subdivision
TH #12
DATE PERFORMED=
LEGAL, DESCRIPTION:
Sec. 35, T12N, R3W, SM
07
.PERCOLATION
TEST
October 29, i981
1
2
3
4
5
6
7
8
9,
10
11
13-
14-
15-
16-
17-
18-
19-
20-
PT
GM/ML
SP
Black Sand
(water seep at 8')
ELOPE
SM
SITE PLAN
Brown Sil.ty
Sand
WAE GROUND WATER S
ENCOUNTERED? NO ~
only a water seep at 8~ P
· E
IF YES, AT WHAT
DEPTH?
12:30
1:00
1:30
2:00
#0 10/29 0 0 0 0
#1 " 30 30 1/2" 1/2"
#2 " 60 30 I 1/2"
#3 " 90 30 1 5/8" 5/8"
48
PERCOLATIDN RATE'
5
TEST RU~ ~ETW~C~I , FT AND
COMMENTS GM/HL material was perced because of the water seep at 8'
perc at better than 15 min/in.
7
, FT
The SP material will
ENGINEERS-SURVEYORS
7125 ~ld Seward Highway
Anchorage, ~.laska ~0502
PERFORMED FOR:.
Bruton .Subdivision TH #13
DATE PERFORMED:
L~[GALDESCRIPTION; Sec. 35, T12N, R3W, SM
~'J PERCO~-ATION
October 29, 1981
072
1
2
3
4
5
6
7
8
9
lO
11
13-
14-
15-
16-
17-
18-
19-
20
COMMENTS
PT
SM
Brown silty sand
~P
Brown sand dense,
moist
(water seep at 8')
Brown silty sand
with cobble
1:00
1:15
1:30
1:45
2:00
· SLOPE
WAS G~DUND WATER
ENCOUNTERED? NO
only a water seep at 8'
IF YE~E, AT WHA'r
DEPTH? · ' .....
0 10/29 0 0 0 0
1 " 15 15 1 1/2 1 1/2
2 " 30 15 3 I 1/2
3 " 45 15 4 1/4 1 1/4
4 " 60 I5 5 I/2 I I/~
pERCOlATION FIAT~' 12 rain/in .(minut,dh'~h!
TEST RUN {3ETW~EE.~ -- 5 . PT AND __7 . FT
ENG I NEERS-SURVEYORS
7125 Old Seward Hight,!ay
^nchora~e, t~.laska 99502
[] SOILS LOG
[] PERCOLATION
TEST
(_)72
PERFORMED FOR:
Bruton. Subdivision
TH #14
DATE PERFORMED: October 29, 1981
LEGAL DESCRIPTION:
1 PT
2
3
4
6-
7-
8-
9-
10-
11
13-
14-
15-
16-
17
18
19
20
COMMENTS
Sec. 35, T12N~ R3W, SM
SM
Brown silty sand
~M/GM
Sandy gravelly silt
SLOPE
SITE PLaN
1:15
1:45
2:10
2':45
3:00
3:30
WAS GROUND WATER S
ENCOUNTERED? NO L
IF YES, AT WHAT
DEPTH? ......
o o o
1 3n 30
2 " 55 25 2"
3 " 90 35 2 3/4" 3/~"
a " 105 15 3 1/4
5 " 135 30 3 7/8 7/8
TEST RUN DET'A/~F.~J 7 · FT AND 9 -PT
O7
n co
ENG IHEERS- SURVEYORS
7125 01d Seward Highwa,,
Anchorage, 2.1aska 99502
[] PERCOLATION
TEST
~Em~ORMEO Fom: Bruton Subdivision TH #15
DATE PERFORMED: October 29, 1981
1
2
4
5
6
7
8
9
HL
10
11
12
13
14
15
16
17
18
19
20
COMMENTS
Sec. 35, T12N, R3W, ~M
Surface water at 5'
SITE' PLAN
Yel 1 ow-brown
silty clay
WAS G~OU~O WATER
IF YES, AT WHAT
DEPTH?
PERCOLA'rlO N I{^TE
Nonpercabl e _ (mlnut .I/ira:h)
FT AND -- FT
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorage, Alaska ~9502
SOILS LOG
0.7S
PERFORMED FOR: Bruton Subdivision
TH #16
DATE PERFORMED: Qctober 29~ 1981
LEGAL DESCRIPTION.'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SEC 35. T12N. R3W. SM
PT
SM/GM
Brown silty gravel
groundwater/surface
seep at 4'
SLOPE SITE PLAN
WAS GROUND WATER Yes
ENCOUNTERED?
IF YES, AT WHAT 4~
DEPTH?
Oro$~ Net Depth to Net
Reading Dete Time Time Water Drop
PERCOLATION RATE Nonpercable
(mlnute~/i~ch)
FT AND
, FT
COMMENTS
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorage, ~.1 aska
PERCOlATiON
TEST
PI=RFORMEDPOR: Bruton Subdivision TH #17
OATEPERFORMED: nctober 29, 1981
1
2
3
4
5
6
7
8
9
10
11
12
13
14-
15.-
16-
17-
19-
PT
SEC. 35~ T12N~ R3W~ .SM
' SM/GM/SP
Brown silty sandy
gravel with sand seams
'SP
SP~-~_-water seepage
SM- through sand lens and
along silt bed
20-
SP
SLOPE
SITE PI_AN
ENCOUNTERED?
L
water seepage at 6'
IF YE~, Al' WHAT
DEPTH?
pERCOLATION EATE Honpercabl e (minute=linch)
TEST RUN D~TV~/~E,F,J ~ ,~ JOT ANO FT
ENGINEERS-SURVEYORS
7125 01d Seward Highway
Anchorage, Alaska 99502
r'l SOILS LOG
I"'1 PERCOLATION
TES-T
PERPORMED FOR:. Bruton Subdivision TH #18
DATE PERFORMED: October 29~ 1981
LEGAL DESCRIPTION:
1 PT
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
COMMENTS
SEC. 35, T12N~ R3W, ~M
Brown sandy silt dense
SLOPE
SITE Pt_AN
3:00
3:25
3:45
4:15
4:45
WAS GROUND WATER
ENCOUNTERED? NO
P
· E
IF YES. AT WHAT
DEPTH?
0 10/29 0 0 0 0
1 " 25 25 1/8" 1/8"
2 " 45 20 1/4" 1/8"
3 " 75 3n 1/4" O
4 " 105 30 3/8"
PERCDLATIO N RATE Nonpercabl e , Iminut e~/i~h|
TEST RU~,J GET'~,~EI~,I 7 , FT AND 9 ;T
ENG INEERS-SURV~YORS
7125 (lld Seward Highway
Anchorage, Alaska .n.n5n. 2
SO~LS LOG
PERCOLATION
TeET
078
PERFORMED FOR:. Bruton Subdivision TH #19
oATePeR~oR~eo:~Gtober 29, 1981 _
LI:OAc OES:RI~I'ION:__ SEC. 35. T12N. R3W, SM
1 PT
7-
8-
ML
Silty Clay
Silty sandy cobble
SP Brown sand
SM/GM
Silty sandy cobble
SLoPe
I0~
11
13
14
15
16
17
18
19
20
COMMENTS
WAS GIqOUNO WATER NO S
eNCOUNTERED? L
O
Water Seepage at
IF YES, AT WHAT e
DEPTH?
pERCOLATiON RATE ,qonpercabl e (mimut.,/ir~ch)
TEST RUN ~)~T~/EEJ~j -- ,-- Fl' AND -- , FT
Non~ercable due to water seepa0e
ENGINEERS-SURVEYORS
7125 ~ld Seward Hinh~,~av
Anchorane, 2,1aska 99592
so, s LOG 07:3
PERCOLATION
TEST
PEREORMED FOR: Bruton Subdivision TH #20
DATE PERFORMED: October 29, 1981
LEGAt. DESCRIPTION.'
1
2
3
4
5
6
7
8-
9-
10
11
13-
14
15
16
17
18
19
2O
COMMENTS
SEC, 35, T12N, R3W, SM
PT
GP
~ Sandy gravel
-- saturated
CL
Gray clay moist
SLOPE
SITE PlAN
CL
WAS GROUND WATER $
ENCOUNTERED? NO ~
Gray caly (surfa~ ?~r seepage) p
very dense ~F YES, AT WHAT E
DEPTH? ........
Reading Date Gro~s Net Depth to Net
Time Time Water Drop
PERCOLATIOHRATE Nonpercable (minut es/i~,ch)
TEST RUN DET'vkrEE.~'4 FT AND FT
Nonpercable due to surface water seepage
See Pictures #9 & 10
PERfOrmeD ~¥: -~5~ C~,~,E~ .¥~ ,.-_-~'~ DATe: /~,,,~-~.,,f.<,'
ENGI'NEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Alaska 99502
SOILS LOG
PERCOLATION
TEST
'ERFORMI:O FO~:. Bruton Subdivision 'TH #21
DA-ri: pi:F~FOFiMI:D; October 29, 1981
1
2
3
4
5
6
7
9-
10-
11
13-
14-
15-
16-
17-
18-
19-__
20-
PT
SEC 35, T12N, R3W~ SM
:OMMENTS
See pies 4-8 .
CL
Yellow silty clay
SP
Black sand saturated
SLOPE
SITE PLAN
WAS GROUND WATER S
ENCOUNTI:RED? Yes ~L
P
· E
IF YES. AT WHAT
OI:PTH? 11 ft.
PERCOLATIO h' R,~,TE' ~lo~l~rcB~l ~ _ (rninute~/ir, ch]
TEST RUN D,~T'A/~'Nj -- ,. FT AND --, FT
The percable soil (SP) was saturated preventing any perc test.
Sample end Test Eumber
Sheet Number
SIEVE ANALYSIS
DATA AND COMPUTATION SHEET
Weight of S~ple
Sieve O'~enin~s Weight Cumulative
Inches Millio Sieve Retained Percent Percent
· meters Mesh in Grams Retained Yiner
2. O0
1.50
1. 050 26.67
0.742 18.85 '
o. ~85 L~. 33 ~/Z" 0 ':' 0 ~ I oo °--~
C. 371 9.42~
O. 263 6. 680 ~
0.185 4.699 4 0 ~ 0~ l~~
O. 131 3. 327 ~
C. 093 2. 362 ~
o. 065 z. 65z zo O ~ ~ ~ / ~o *~
0.046 1.168 ~
O. 0328 O. ~3 ~
O. ~32 0. 589 ~
0.0164 0.417 ~ ~ Z ~ ~ ~ ~ O~
O, 0116 O. 295 ~
o. ~ o. 208 ~
o.~s o. 247 zoo I 5~ WO °~ ~0~
O. ~42 O. 104 ~
0. ~18 O. 046 ~
T~AL
R~mRES:
SOILTEST INCORPORATED . 2205 LEE STREET · EVANSTCt4, ILLINOIS,
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Alaska .rig502
PERFORMED FOR:
Bruton ~ubdivisio~ TH #22
DAl~E PERFORMED:
LEGAL DE$CRIFTION: SEC. 35, T12N, R3W, SM
TEb-I'
October 30, 2981
1
2
3
4
5
6
7
8
9
10-
11
13-
14-
15-
16-
17-
18-
lq-
20-
COMMENTS
PT
ML
GP
SP
Silty clay
Gravelly cobble
Gray sand
saturated
~LOPE
SITE PLAN
SM
Silty sand
WAS OROUND WATER Yes
ENCOUNTERED?
IF YES, AT WHAT
SH DEPTH? ...~
Black silty
sand
Reading Date Gross Net C)eplh to
PERCOLATION RATE nonpercabl e minutes/ r,ch)
TEST RUN ~3~T',v~F.~J FT AND -- I=T
The percable soi'ls (GP and SP) were sat'urated, p~'evaDtiDc~ aDy pert test.
(see pic. #10)
~ame:
Sample and Test Number
Sheet Number
SIEVE ANALYSIS
DATA AND COMPUTAT~0N SHEET
Weight of Sample ~_~0£
Sieve O)enin~s Weight Cumulative
Inches Milli- Sieve Retained Percent Percent
meters Mesh in Grams Retained ~iner
2.00
1.50
1.050 25.6?
0.742 18.85
0.371 9.422
0.265 6.680
O. 185 4. 699 4 6 ~ ~-- 2~ 6__~ ~ U ~.__Z
O. 131 3. 327
C.093 2.362
0.065 1.~5z zo I 4~! ~--~
0.046 1.168 /14'
0.0328 0,833
0.0232 0.589
o.o~64 o.417 ~+0 z~l ~_~
0.0116 0.295
o. o0~ 0.208
0.00~8 0.147 lOO t %~2~
0.0041 0.104
0.0029 0.074 200 l~SZ k
0.0018 0,046
~ f~ ~ 2_540± i O0o..~
TOTAL
S01LTEST INCORPORATED . 2205 LEE STREET · EVANSTON, ILLINOIS,
PERFORMEO FOR:.
ENG I NEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Alaska 99502
Bruton.Sobdivisioh TH #23
[] . PERCOLATION
TEST
DATe PERPORMED; ~lctober 23, 1981
LEGAL DESCF~IPTION: SEC. 35, T12N, R3W, SM
4
5
7
8
9
10
11
12
13
14
15
16
17
18
19
2O
;QMMENT$
PT
SH
Brownish/gray silty sand
Dense
SP~Black sand
~Water seep along clay layer
CL
Blue gray dense clay
SLOPE
SITE PLAN
WASGROUNDWATER
ENCOUNTERED? NO
Water seep along clay layer
I~ YES, A? ~HA?
DEPTH?
P£RCOLATIO N RATE
TEST RUN
Nonpercable due to water seepage.
Non0ercab'le . Irni~ut,,/h~.ch)
AND __ , FT
rlH¢o
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Alaska 99502
PERFORMED FOR: Bruton Subdivision ' TH #24
DA~E PERFORMED:
LEGAL DESCRIPTION: SEC. 35, T12N, R3W, SM
SOILS LOG
TEST
qctober 30, [981
1
2
3
4
7
8-
9-
10
11
12
13
14
15
16
17
18
20
PT
ML
GM/GP
SM/ML
Water seep along
silty layer
1:25
2:00
2:15
2:30
2:45
3:00
3:15
3:30
SLOPE
WAS GROUNO WATER
ENCOUNTERED? NO
SITE PLAN
IF YES, AT WHAT
DEPTH?
0 10/30 0 0 0 0
1 " 35 35 2" 2
2 50 lb b" 1
3 65 15 4 1/8" 1 1/8"
4 80 lb b 1/8" 1
5 95 15 6 1/8" 1
6 110 15 I 7/8"
7 125 15 7 7/8 7/8"
PERCOLATION RATE
TEST RUN D.~ T',~,~E.~J
17 rain/in. I~,,,/~:~!
6 FT AND ~ FT
COMMENTS
Suhd].v2. slon
t. EGALDESCR.'TION: SEC, 35, T12N, R3~Y, SH
ENGINEERS-SURVEYORS
7125 gld Seward Highway
Anchorage, Alaska 99502
SOILS
PERCOLATION
TEST
TH #25
DA'~E PERFORMED: October 30, 198--1
1
2
3
4
5
6
7
8
9
10-
11
13
14-
15-
16.-
17
18
19
20
PT
6w/6
Brownish gray gravel
with traces of fines
-~ water seep along
silt bed
Silty Sand
1:45
2:00
2:15
2:25
2:35
2:45
SLOPE
SITE PL..AN
WAS GROUND WATER
ENCOUNTERED?
IF YES. AT WHAT
DEPTH?
"2 10,/,30
Time
0
15
30
4O
5O
6O
Net
Time
U
15
15
10
10
10
1 1/2"
2 1/2"
3 1/2
4 5/8
5 1/2
1 1/2"
1
1 1/8 -
7/~{
PEF',COLATIO N RATE
TEST RUN ~DETV,/E E.~J
11.42 min/in,
4 FT AND
COMMENTS
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorage, Alaska 99502
PERFORMED FOR:,
LEGAL DESCRIPTION=
Bruton Subdivision 'TH #26
SEC. 35, T12N, R3W, SM
DATE PERFORMED:
~ SOILS LOG
087.
[] . PERCOLATION
TEST
October 30, I~R1
1
2
3
4
6-
7
9
10
11
12
13
14
15
16
17
18-
19-
20-
PT
SM
Silty sand
SP
Gray sand
COMMENTS
PERFORMED BY: ~.~
2:15
2:30
2:45
3:00
3:15
SLOPE
SITE PLAN
ENCOUNTERED? NO ~
P
E
IF YES, AT WHAT ......
Reading Date Gross Net Depth to Net
Tim~ Time Water Drop
0 10/30 0 0 0 ()
1 15 15 2 1/8" 2 1/8
2 30 15 ~ 1/8 2
3 45 15 6 1/8 2
4 60 15 8 1/8 2
PERCOLAT~O H RATE
TEST RUN J~J[T~-~[ EJ~J
7.5 min/in. Imlnu,,,/~h~
7 ~T AND 9 FT
DATE:
ENGINEERS-SURVEYORS
7125 Old Seward Highway
^nchora~e, Alaska 99592
~] SOILS LOG
.08S
[] PERCOLATION
TEST
PERFORMED FOR:
Brutom 'Subdivisfon TH #27'
OATE PERFORMED: November 2,. 1981
1
2
-3
4
5
7
8
9
10
11
12
13
14
15
16
17
18
lg
20
:OMMENTS
PT
SEC. 35, T12N, R3Wt SM ,
SM
Sandy silt
SP
Gray sand
SM/M1
Gray sandy,
clayey silt;
SP
Gray sand
Dense
3:25
3:35
3:45
3:55
4:05
4:15
4:25
SITE PLAN
WAS GROUND WATER
ENCOUNTERED? NO
IF YES, AT WHAT
DEPTH?
11/2 0
10 10 2" 2
ZO
30 10 6 1/8" 2 1/8
40 10 8 1/8" 2
50 10 9 7/8" I 3/4
~u lu ~.L 5/~ J. 314
PERCOLATION flATE ~. 7 m'~n~L__. .(m;nuledlrx;h)
TEST RU~ 5ET',~E~FJ t4 FT AND 16 FT
ENGINEERS-SURVEYORS
7125 nld Seward Highway
Anchorage, ~.laska 9950~
SOILS LOG
PEF~CO LATION
TEb-'T
PERFORMFD FOR: Bruton Subdivision ' TH #28
{.EGALDESCRIPTION: SEC. 35, T12N, R3W, SM
DATE PERFORMED,' November 2~ 1981
1
2
3
4
6-
7
8
9
10
11
12
13
14
15
16-
17-
I8-
19-
20-
PT
SM
Sandy Silt
SP
Gray sand
ML
Gray silty clay
Surface water
and
ground water
infiltration
SLOPE SiTE P~AN
WAS GROUND WATER S
ENCOUNTERED? Yes L
IF YES, AT WHAT 5 ~ , E
Nonaercable due to water seepaqe
T~$T RUN ~TY,/I[~J~ ~T AND FT
:OMM~NTS Groundwater appears to result from water seed buildup in sand lens .lust above the'
silt/clay layer
E"NG I N EERS- SURV EYORS
7125 Old Seward Highway
Anchorane, Alaska 99502
E]
SOILS LOG
.
· PEF~COLATION
TES~r
PI;RFO~qMED FOR:
LI-'GAL DESCRIPTION;
1 PT
3
4
5
6
7
8
9
10
11-
12-
13-
14-
15-
16-
17-
18-
19-
20-
;OMMENTS
Bruton SubBivision ' TH #29
_ SEC. 35. l'12N. R31.h ~M
GM
Brown silty gravel
GW
Gray brown will
graded gravel
· OATE PE~tFOR~ED: November 2, 198!
SLOPE
SITE Pt. AN
WAS GRQUNO WATER S
11/2 0 0 0 0
30 15 12 6
refille{ hole with water
11/2 0
45 15 6
60 15 12 6
3:00
3:15
3:30
3:30
3:45
4:00
P~RCOLATIOH RATE 2.5 mi n/i n (mimute$/i~ch)
TEST RUt,/ 13ETV~E.FJ B ~T ANO 8~. ¢T
Sample and Test Eumber
Sheet Number
r'91
SIEVE ANALYSIS
DATA AND COMPUTATION SP~ET
Sieve 0 lenin,s Weight Cumulative
Inches Milli- Sieve Retained . Ferc ent Percent
meters Mesh in Grams Retained ~iner
2. O0
1.5C
1. 050 26.67
0,742 18.85
o.~ ~.~s Y'z" 2_ ~.7'7~- '9'7 ~ 5Z +~
C. 371 9. 423
O. 263 ~. 680 ~
0.18~ 4.699 4 ~U Z~ ~ ~ 4 ~o%
O, 131 3. 327 ~
C.093 2.362 ~ ~
0.046 1,1aa ~
o. o32s o. ~3 ~
O. ~32 O. 589 ~
0.0164 0.417 ~0 ~~ ~4~ [~ ~
0.0116 0.295 ~
o. ~ o. 2oa ~
o. ~a o. ~7 ~oo ~ G ~ ~ ~ q U ~ ~ ~
O. ~41 O. 104 ~
O. ~18 O. 046 ~
~::~ ~ ~ ~7 ~9~ I O0~ O~
T~AL
SOILTEST INCORPORATED . 2205 LEE STREET · EVANSTON, ILLINOIS, U.,,.%A.
ENGINEERS-SURVEYORS
7125 ~ld Seward Highway
Anchorane, Alaska 99502
PERFORMED FOR:
Bruton Subdivision. 'FH #30
DAI:E PERFORMED:
SEC. 35, T12N, R3W, SM
LEGAL DESCRIFTION:
[] SOILS LOG ,~
·
[] ·PERCOLATION
TEST
November 2, 1981
1
2
3-
4-
5-
6
7
8
10
11
12
13
14
15
16
17
18
19-
20-
COMMENTS
PT
GW
Sandy gravel
SM
Silty sand
Performed visual perc
SITE PLAN
V/AS GROUND WATER S
ENCOUNTERED? ~'lO oL
P
IF YES, AT WHAT E
DEPTH? .......
PERCOLATION ~^TE Visual perc.
TEST RUN ~E'r',~E~I FT AND
actual oerc est. 2.5 min/in
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorane, Alaska 99502
PERCOLATION
TEET
PERFORMED FOR:
Bruton Subdivision '
TH #31
DATE PERFORMED: November 2, 1981
LEGAL DESCRIPTION:
SEC. 35, T12N~ R3W~ SM
1 PT
GM
3- Silty gravel
4-
5-
6
GW/GM
7 Well graded gravels
with some fines
8
SLOPE
SITE PLAN
10
11
12
13
14
15
17
18
Ig
:OMMENTS
2:30
2:45
3:00
3 15
3:30
WAS GROUND WATER
ENCOUNTERED? NO
P
E
iF YES, AT WHAT
DEPTH?
11/2 0 0 0 n
15 15 2 1/4 2 1/4
3n 15 a 1/~ 1 7/~
45 15 6 1/8 2
60 15 7 1/~ Z
PERCOLATIO H RATE
7.5 min/in (~..,,,/i~)
7 ~T ANO 9 FT
ENG I NEERS- SU RV EYORS
7125 Old Seward Highway
^nchora~e, Alaska 99502
[] SO~LS LOG
094
[] PERCOLATION
TES'T
PERFO)~MEO FOR: BrutOn Subdivision
TH #32'
DATE PERFORMED: November 2.' 1981
SEC. 35, T12N, R3W, SM
LEGAL DESCRIPTION:
1
2
3
4-
5-
6-
7
8
9
10
11
12
13
14--
15
16
17
18
19
20
PT
SP/GP
Grayish, tan sand
with gravel
SP
Silty sand
SLOPE
WAS GROUND WATER
ENCOUNTERED?
IF YES, AT WHAT
DEPTH7
SITE PLAN
Reading
Actual perc est is appro. 4-5 min/in.
Net
Visual Perc on SD/GP soils
TEST ~U~ ~TV,~F.~ ~'r A~O
Performed visual perc on SP/GP soils
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorage, Alaska 99502
n soils LOG
n PERCOLATION
TEST
PERFORMED FOR=
8ruton Subdivision . TH #33
November 2, 1981
DA~E PERFORMED:
~ALDESCm~T~O.: SEC. 35, T12N, R3W, SM
O95
1
2
3
4
5
6
7
9
lO-
11
13-
14-
15-
16
17-
18-
19-
:OMMENTS
PT
SM
Brown silty sand
SP
Brown sand
SM
Brownish silty sand
SP
Brown/gray sand
HL
Silty sandy clay
SP
Brown sand
SM/ML
Brown sandy
clayey silt
1:55
2:30
2:50
3:20
3:45
4:15
4:45
SLOPE
SITE PLAN
I i
WAE GROUND WATER NO
ENCOUNTEREO?
P
E
IF YES, AT WHAT
DEPTH?
11/2 U U U U
35 35 5/8" 5/g
b5 zu 1" 3/~
85 30 1 1/2" 1/2
110 25 2" 1/2
140 30 2 1/2" 1/2
170 30 3" 1/2
PERCOLATION RATE
TEST RUN DETV-.~F4KJ
60 mi n/in
6 ~T
end Teet Numher~,
Sheet Number ~
SIEVE ANAL~S~[S
DATA AND COMlmO'rATTON SPIE~T
Weight of Sample__ ~ ~ ~O! gm.
-- Sieve 0{,enin~s Weigh~
Inches Milli- - Sieve Retained _
meters. Mesh in Grams Retai
2. O0
1.5C
1. 050 26.67
O. 742 18.85
C. 371 9. 423
o. 25~ ~. 6so
O. 131 3. 327
C.093 2.3~2
0.065 L65~. lO t ~j 2_ 4-'-
0.046 1.168
O. 0328 O. 833
0.0232 0.589 . ~8
0.0116 0.295
o.ooea 0.208
O. 0058 O. 1.7 100 L~ OZ$ 2 7
0. C041 O. 104
0.0029 o.07~ 200 Z. 5~,-7~
O. 0018 O. 046
TOTAL
Cumulative
Percent
~[ner
09_°
SOILTEST INCORPORATED . 2205 LEE STREET · EVANSTON, ILLINOIS, U..S.A..
Brutbn Subdivision
SOILS LO~
ENGINEERS-SURVEYORS
7125 Old Seward HiDh,,,:ay
Anchorage, Alaska 99502
PERCOLATION
TEST
TH #34
November 2, 1981
LSOALDESCRIPT)ON: SEC, 35, T12N, R3W, SM
4
6
7
8
9
10
11
13-
14-
16
17
18
lg
20
PT
SW
Well graded sandy
gravel
SM
Silty sdnd
GW
Sandy gravel, gray
SLOPE
SITE PLAN
WAS GROUND WATER
ENCOUNTERED;"
'0
IF YES. AT WHAT
DEPTH? .......
Visual Perc.
Performed visual perc; similar soil to TM #29 & TH ~30
ENGINEERS-SURVEYORS
7125 Old Seward Highway
2.nchorane, 2.1ask'a 99502
Bruton Subdivision
PERFORMED FOR:,
· TH #35
DATE PERFORMED'.
LE~ALOESCm~nON: SEC. 35, T12N, R3W, SM
[] so)cs
¢'1 , PERCOt-AT)ON
TEST
November 2, 1'981
1
2.
3
4
5
6
7,
8-
9-
10-
11
14-
15-
17-
18-
19-
20-
COMMENTS
PT
SM
Silty,sandy, gravel
GW
Brown sandy gravel
WAS GROUND WATER
ENCOUNTERED? -- NO
IF YES. AT WHAT
DEPTH?
PERCOLATION R^r~ .Visual Perc.
TEST RUN (3E"('~fEEJ',J FT AND
Performed visual perc; similar soil to TH#'s 29, 30, 34
. FT
ENG I N EERS- SURV EYORS
7125 {~ld Seward Highway
Anchorame, A. laska 9950~.
SOILS LOG
09'-3
· PERCOLATION
TEST
PERFOnMED Fort:. Bruton Subd.ivision TH #36
DATE PERFORMED: November 2, 1981
LEGAL DESCRIPTION:
1
2
3-
4
5-
6
7
8
SEC. 35, T12N, R3W, SM
PT
SM/GM
Silty sandy gravel
GUI
Gray sandy gravel
some fines
SLOPI
S~TE PLAN
,,, F
10
11
12
13
14
15-
16-
17-
18-
20-
WAS GROUND WATER S
ENCOUNTERED? DIO ~
P
IF YES, AT WHAT E
DEPTH? .....
0 11/2 0 0 0 0
i " 20 20 4 1/8"
2 45 25 5 7/8" 1
3 55 10 7 1/8" 1
4 " 65 10 8 1/4" 1 1/8
2:30
2:50
3:15
3:25
3:35
P£F[COLATIOH J~Arff 8,8 min/in (m;mut,s/ir,c~)
RUN O~TV~ 6 PT AND--8 FT
ENGINEERS-SURVEYORS
7125 (~ld Seward Highway
Anchorame, Alaska 99502
FOR: Bruton Su,bdivision TH #37
DATE PERFORMED:
LEGALOE$¢RIFrlON: SEC, 35, T12N, R3W, SM
m so, s oc; i O0
November 3, 1981
1
2
3
4
5-
6-
7-
8-
9-
10-
11
14-
15-
17-
20
PT
GM/SM
Gray brown gravelly silt
SITE PLAN
WAS GROUND WATER NO ~
ENCOUNTERED? O
IF YE~, AT WHAT
DEPTH?
P
11/3 n 0 0 0
30 30
lb 4b
165 90
285 120 3 1/4"
10:15
10:45
11:30
1:00
3:00
88 min/in
Sample and Teat }~umber
Sheet Number
1
Sieve .0 ~enin~s Weight Cumulative
Inches Milli- Sieve Retained Percent Percent
meters Mesh in Grams Retained .[iner
2. O0
1.50
1. 050 26.67
O. 742 18.8§
C. ~71 9.42~
0.263 ~.680
0.185 4.699 4
C. 131 5. 327
C. 093 2. 362
O. 046 1.. 188
O. 0328 O. ~3
O. ~32 O. 589
O. 0116 O. 295
o. ~ o. 208
0.0029 o. o74 200 ZOOo~ 71 ~ ~7z~,
O. ~18 O. 048
T~AL
SOILTEST INCORPORATED · 2205 LEE STREET . EVANSTON, ILLINOIS,
ENGINEERS-SURVEYORS
7125 Old Seward High,a,.,.
Anchorage, Alaska 99502
[] soIts t. O~ o~
{~ PERCOLAT)ON
~ERFORMEO FOR: Bruton Subdi'visio~ TH #38
DATE PERFORMED: November 3~ 198I
LEGAL DESCRIPTION:__ S~C. 35. T12N, R3H. SM
PT
GM/SM
Silty cobble
4
_uil
samplr~
ken
?
8
9
lO
11
12
12
14
17
18
20
SP/GM
Sandy cobble
water seep along
silt layer
GM/ML
Silty cobble
SLOPE
.'OMMENT$
ENCOUNTERED~ Yes L
0
P
IF YES, AT WHAT E
DEPTH? 7'
0 11/3 0 0 0 0
1 " 30 30 2" 2"
2 60 ~U 3 1/8" 1 1/8
3 150 90 6 1/4" 3 1/8
4 270 120 empty
4 refill 0 0 0 0
5 ~o ~u ~ ~/8 i i/8
10:30
11:00
11:30
1:00
3:00
3:90
3:30
26.6 min/in
~.5 6.5
ENG I FLEERS- SURVEYORS
7125 Old Seward Highway
Anchorage, /~,laska 99502
PERCOLATION
TEST
PERFORMED FOR: Bruton Subdivision TH #39
LEGAL DESCRI~ION: SEC. 35, T12N, R3W, SM
DATE PERFORMED: November 3, 1981
1
2
3
4.
5
6
7
8
9
10
11
13-
14-
15-
16
17
18
19
2O
PT
SM/ML
Gray, silty clay
with some cobble
Very dense
SLOPE
WAS GROUND WATER S
ENCOUNTERED? N0
P
IF YES, AT WHAT . E
DEPTH?
SITE PLAN
PERCOLATION RATE Honoercable (rn;nut,$/inch)
FERFOR~,!EO BY: /.~.,.,~J~ CERTIFIED
ENGINEERS-SURVEYORS
7125 ~ld Seward Highway
Anchorane, Alaska 9950~
[] SOILS LOG
CJ PERCOLATION
104,
PERFORMED FORt Bruton Subdivision TH #40
DATE PERFORMED: November 6, 1981
LEGAL OE$CRIPT1ON:
1 PT
2
3
4
6
7
8
10
11
13-
14-
15-
16
17
18
19
20
SEC. 35, TI~N~ R3W?.SM
SM
Tan silty sand
GW
Sandy gravel,
moist
SLOPE
SITE PLAN
Water flow
thru gravel, no
underl],ing silt bed
WAS GROU~O WATER Yes s
ENCOUNTERED? ,
IF Y~S, AT WHAT
OEPTH?
pI[RCOLATIONRATE Visual Perc.
TEST RUN ~3~T~,~EJ'J ....... __ FT ANt) ........ FT
Performed visual perc; soils similar ~o TH #10
COMMENTS
PERFORMED FOR:.
Bruton Subdivision
ENGINEERS-SURVEYORS
7125 Old Seward Highway
Anchorage, Alaska 995n.~.
[] SO~LS LO(;
10S
[] . PERCO [-ATION
TEST
TH #41
DATE PERFORMED: November 6, I981
LEGAL DESCRIPTION; SEC° 35, T12N, R3W, SM
1
2
3-
4~
6-
7
8
9
10
11
~2
13
14
15
16
17
18
19
20°
PT
SM
Silty sand
GP/SP
Gray sandy gravel
ML
Brownish gra'y silt
COMMENTS Performed visual
SLOPE
SITE PLAN
WAS GROUND WATER
ENCOUNTERED? NO
IF YES. AT WHAT
DEPTH?
Gro~s Net De01h to Net
Date Time T~me Water Drop
PERCOLATIOH RATE Visual Perc. (m~nut=~/i~h)
TEST RO~ DET',~ .... PT AND ..... FT
perc. soils similar to Th #27 and 26
Date: _ Sheet Number
SIEVE ANALYSIS
DATA AND COMPUTATION SHEET
Wei~h~ or S,~p~e I~o(,~. 5"-' .~.
Sieve Openings Weight Cumulative,
Inches Milli- Sieve Retained Percent Percent
meters Mesh in Grams Retained ~iner
2.00
1. 050 26.67
C. ~71 9.
O. 2~ 6. 680
O. 185 4,699
O. 131 3. 327 6
C, 093 2. 562 8
o. o~6 L ~6e ~4
O. 0528 O. ~5 20
0.~5~ 0.589
O. ~ O. 208 65
Passed ~.esh Sieve
T~AL
SOIl. TEST INCORPORATED · 2205 LEE STREET · EVANSTON, ILLINOIS, U..S.A.
ENGINEERS-SURVEYORS
7125 ~ld Seward Highway
Anchorage, Alaska 9950~
[] SOILS LOG
[] PERCOLATION
TEST
10
PERFORMED FOR: Bruton Subdivision
TH #42
DATE PERFORMED: November 6, 1981
LEGAL DESCRIPTION:
1
2
3
4
5-
6-
7-
8-
9-
lO-
11
13-
14-
16-
17
18
19
20
PT
GW
·
SEC. 35~ T12N, R2W, SM
. Brownish orange
sandy gravel
COMMENTS Nonpercable due to. groundwater.
in TH#'s 30 & 31
SLOPE
SITE PLAN
WAS GROUND WATER Yes s
ENCOUNTERED? ~
P
E
IF YES. AT WHAT 3 ~
OEPTH~
PERCOLATION RATE Nnng~rR~b]~ (minut.s/i~h)
TEST RUN DET~A/~Cr-~I , PT AND , FT
However gravel is similar to soil found
ENG I NEERS-SURV,~iYORS
7125 ~ld Seward Highway
Anchorage, Alaska 90502
g-I EOILS LOG
[] PERCOLATION
TEST
PERFORMED FOR: Bruton Subdi'vision TH #43
DATE PERFORMED: November 6, 1981
SEC. 35, T12N, R3W, SM
LEGAL D ESCRIFTION:
3
4
5
6
7-
8
9
10
11
12
13
14
15
16
17
18
19
2O
COMMENTS
TH #29
PT
ML
Silty sandy clay
-- GW/SW
grayish brown.
sandy gravel
SLOPE
SITE PLAN
WAE GROUND WATER S
ENCOUNTERED? Yes __ ~
P
E
IF YES. AT WHAT
DEPTH? 6' _
PERCOLATION RArE._Nonperca bl e (minut,t/irmh)
TEST RU~ J3ET'A/EE~J ....... FT AND ....... FT
Nonpercable due to groundwater. However gravel is similar to soil found in
]')ate:
SIEVE ANALYSIS
DATA AND cOMPUTATION SH~T
Sample and Test Number
Sheet Number
100
Weight of Sample I~/Q~'~. gm.
Sieve 0 lenin~s. Weight Cumulat ire
Inches Milli~ Sieve Retained Fercent l:ercent
meters Mesh in Grams Retained
Finer
2.00
1.50
O o 742 18.85
C. 371 9. 423
O. 263 6. 680 3
0. 185 4. 699 4
O. 131 3. 327 6
C. 093 2. $E2 S
0. 046 1.1~8 14
O. 0328 O. 553 20
O. 0232 O. 589 28
0.0164 0.41'2 35
0. 0082 0. 208 65
O. CO41 0. 104 150
0.0029 0.0'24 200 ~ , ~ ~,~--, 50~ ~, 0-.~-
O. 0018 O, 046 300
TOTAL
SOILTEST INCORPORATED . 2205 LEE STREET . EVANSTCH, ILLINOIS,
ENGINEERS-SURVEYORS
7125 ~ld Seward Highway
^nchora-e, Alaska 99502
SOILS LOG
PERCOLATION
3'EST
PERFORMED FOR: Bruton Subdivision TH"#44. '
DATE.Em:ORMeD:__.N0vember 6, 1981 __
LFGALDESCRIPTION:____~SE._C. 35. T12N. R3W. SM
1 PT
4-
6-
7-
8-
9-
10-
13
14
15
16
17
18
19
20
ML/CL
Gray silty clay
moist
SLOPE
SITE PLAN
WAS GROUND WATER No
ENCOUNTI.-'R ED?
IF YES, AT WHAT
DEPTH?
PERCOLATIOHI{ATE Nonpercable ,(mlnu~es/ir~h~
Inpervious clay very similar to TH #2 and TH #3
LOG OF BORING NO.
PROdECT BRUTON SUBDIVISION DATE June, 1979
'I"YPE BORING Solid Flight Auger SURFACE ELEVATION 821'
LOCAT;ON See Map COMPLETION DEPTH 11'
~ I~/PT Silts, sandy silts with some gravels,
'Burr ~:o light: bro,rn, moist.
"...~ Sands and sandy gravel, gray, damp. x
-5 .... xl 5
".O. X
O: 'May ¢ont:ain some random cobbles.
~'.. Encounter soma larger gravels or cobbies.
~0 ~:'". x 2~
' ' · Refusal x
. . MOENING-G~ & ASSOC.~ ANCHORAGE~ ALASKA
PROdECT
TYPE BOE
LOCATION
i7' tr
~ING
s~/~
sH/~
LOG OF BORING NO.
Bruton Subdivision
Solid Flight Auger
See Map
DATE June, 1979
SURFACE ELEVATK~ 822'
C~PLETION DEPTH 11'
SOIL DESCRIPTION
'Silt'with some sand and gravel, soft,
Color of silt changes to gray.
Gravel with sandy silt, dense.
Sandy silt, gray, firm.
11;'
~ 0 2:.
x
x 1
x
x
x 2
x
x 3
MOENING-G~ Et ASSOC.~ ANCHORAGE~.A~SKA
LOG OF BORING NO. M-5
PROdECT Bruton Subdivision DATE June, 1979
~'YPE BORING Solid Flight Auger SURFACE ELEVATION 820'
LOCATION See Map COMPLETION DEPTH 19'
z
~ ~ ~ SOIL DESC. R'PTION
ii I pT Peat, dark brown, very soft, wet, fibrous __
l/ near the surface but changes to an amorphous
· -peat with an increase in depth°
.~ ML/SM Silt with gravel blue-gray, stiff, ix
' Ix 1
X
X
· 20 2~
-- MOENING-GREY ~ ASSOC.~ ANCHORAGE, ALASKA
LOG
OF BORING NO.
PROdECT
TYPE BORING
LOCATION
Bruton Sub divi.~ion
Solid Flight Auger
See Map
DATE June, 1979
SURFACE ELEVATION 805 '
COMPLETION DEPTH 14 '
SOIL DESCRIPTION
PT/ML'
'Water on the surface.
Organics and peat, dark brown, fibrous t:o
amorphous.
SM/ML Silty sand, loose, brown, wet.
PT Peat, dark brown, amorphous.
SM/ML Sandy silt with gravel, stiff and dry.
MOENING-GREY 8 ASSOC. j ANCHORAGP',ALASKA
115
LOG OF BORING NO. A
PROJEGT Bruton Subdivision DATE September 28, 1978
TYPE BORING Backhoe .SURFACE ELEVATION 816
LOCATION Lot 6 COMPLETION DEPTH 14~"
SOIL DESCRIPTION
Sandy silt to silty sand. Reddish brown with
some organics.
SM/ML Silty gravelly sand to Mravelly silt. Light
brown. Low moisture content.
GM Silty sandy 'gravel.
Gl.i/GP
Sandy gravel, light brown.
Low moisture content.
Sandy gravel with cobbles. Dense.
Contains some random discontinuous fine
layers.
Low moisture content.
gravel
MOENING-GREY B ASSOC.~ ANCHORAGE~ALASKA
LOG OF BORING NO. B
PROJECT Bruton Subdivision DATE September 2~
TYPE 13ORING Backhoe SURFACE ELEVATION
LOCATION ~,-5 NW COMPLETION DEPTH
m~ ~ SOIL DESCRIPTION
C~.-
~ ML/?T Sandy silt with some organics.
I~ Silt and sandy s±lt, brown. Contains some
d±seontinuous gravelly and cobbly lenses.
--- Moderate to low moisture content.
---
· fine t:o medium gravel
,:,.;:~. SW Sand with interbedded6,'
.~:..::~ lenses oz' beds 2" to thick.
i:;':'.;;?Low moisture content.
q.+3 ~ --Medium dense to dense.
:¥:::,.?
20
MOENING-GREY ~t ASSOC. ~ ANCHORAGE~ AL/
11o
1¢78
806
14~
ASKA
LOG OF
PROJECT Bruton Subdivision
TYPE BORING BaCkhoe
LOCATION L-2 Center
BORING NO.
C
1 1'7
DATE September 28, 1978
SURFACE ELEVATE)N 806
COMPLETION DEPTH 12N'
SOIL DESCRIPTION
ML~PT Sandy-silt'with organics.
ML
"Silt ~ith some sand,light-Brown. Contaihs
some thin gravels &.cbbble lenses.
Mbist.
~P/ML
Sand, m&dium to fine-grained, with random
thin lenses or beds of gravels.
Also contains some thin interbedded silts.
Dry to moist except at depth where water
table is perched on a silt layer.
Water Table
MORNING-GREY ~ ASSOC., ANCHORAGE, ALASKA
LOG
PROdEGT Bruton Subdivision
TYPE BORING Backhoe
LOCATION Hill Top-L 7
OF BORING NO. E
DATE Septembe=: 28, 1978
SURFACE ELEVATION 843
'COMPLETION DEPTH 15~'
118
SOIL. DESCRIPTION
MI,/PT Silt, red to yellowish brown.
Sandy silt to silt, light brown.
Low 'moiJture co,lent. '
Upper part contains some root fragments.
' G'~ Gravelly sand to sandy grave]..
Contains some thin be~s of fairly
homogeneous medium to fine gravels, &
interbedded sands.
Little to no fines.
Materials generally med:Lum dense to dense.
Materials same as above.
MOENING-GREY & ASSOC.~ ANCHORAGE~ ALASKA
LOG OF BORING NO. F
112,,
PROdECT Bruton Subdivision DATE September 28, 1978
TYPE BORING Backhoe -SURFACE ELEVAT~DN 815
LOCATION L-3 & Northfield Dr. COMPLET;ON DEPTH 13'
O SOiL DESCRIPTION n
//~/~.// ML/PT ' Silts with organics, reddish broWn,
//~/,, :/ wet from surface runoff.
'~/~/ CL/ML Clayey gravelly silt, bluish gray.
~/~ Generally dry & very firm.
/;7~ Contains some cobble sized materials,
5.~__,. sub-angular to sub-rounded.
· '" SP Sand, gray, med±um to fine grained, medium
..... dense to dense.
Note l Water coming into excavation from
surface runoff. :
.15~ .15 -
-20 20-
MOENING-GREY 8~ ASSOC., ANCHORAGEjALASKA '
LOG OF BORING NO. H
PROJECT Bruton Subdivision
DATE September 28, 1978
TYPE BORING Backhoe
LOCATION L-Il, E. Side
.SURFACE ELEVATION 838
COMPLETION DEPTH 9'
ML/PT
SM
ML-SP/SW
red & brown.
gray brown,
content.
& may contain
& generally well 5
bed.
xcept sands
SOIL DESCRIPTION
Salidy silt with organics,
Wet from surface runoff.
Silty sand'to sandy Silt,
moderate'~to'low moisture
Alternating beds of sand
Silt-light gray to brown
some fine sands.
Sands-light brown to gray
graded.
Water seepage along silt
Materials same as above
more prevelant.
MOENING-GREY B~ ASSOC.~ ANCHORAGE~ ALASKA
122
CASE: S-6S75 BARVARIAN !IEIGqT$ 5UEDIVIS[ON,
BLOCK 1, LOTS ~ THROUGH 9, TEACT
BLOCK 2, 50TS ~ THROUGH iq, TRACT ~,
BLCCK 3, 5OT$ 1 THROUGH 13, T~CT C
WITH L'ACATIgN
=-- ' .r ~ -,.' -~.:,~.~_..~.~ {: . .i holds publiche~r~:gco,-ce',~:':
..... ~m.~. _
If ,Fou would like t(;: mnlent on ti~e pro;
MUNICIPALITY OP ANCHORAGE
POUCH 6-650
ANCHORAGE, ALASKA 99502
(907) 264-4111
017,-'092-16
COMBS ROBERTS T
SRA BOX 465-P
ANCH
AK 9 9 5 0--/- ......
..... -:. ~,!.! ~
RABBIT cReeK COHHURIT¥ ceuNcIL
The Municipality of Anchorage Platting Board will hold a public hearing concerning this
matter at 7:30 p.m. APR ~ 0 .~8~q,, in tile Assembly Hall, 3500 East Tudor Road,
Anchorage, Alaska.
This will be the only public hearing before the Platting Board on this petition and you are
invited to appear and voice your opinion.
If you would like to comment on the proposed petition, this form may be used for your
convenience. Mailing address: Municipal Planning Department, Pouch 6-650, Anchorage,
Alaska 99502.
Further information is awfilable from tile Planning Department, telephone 264-4267.
/
l
MUNICIPALITY OF ANCHORAGE
POUCH 6-650
.ANCHORAGE, ALASKA 99502
(907) 264-4111
O! 7-092.-17
) poSTOVERBox 387 JAMES W & THERESA
]'t,~ ~NCHORAGE AK 99510
TOTAL AREA:
LOCATION:
CURR~HT LEGAL~
BLOCK 1, LOTS 1 THROUGH 9, TRACT A,
BLOCK 2, LOTS ~ THROUGE 18, TRACT B,
BLOCK 2, tOTS 1 THROUGH 13, TRACT C
WITH VACATION
the B,L~, NE~4, NW~4 and Ni~, BE~4, Nwl/4 and
RABBIT CHEEK COMI4UNIT¥ COUNCIL
The Municipality of AncbarDge Platting Board
matte at 7:30p.m. APR 2 0 i,983
Anchorage, Alaska
will ho!d a public hearing concerning this
in the Assembly Hall, 3500 East Tudor Road,
This will be the only public hearing before the Platting Board on this petition and you are
invited to appear and voice your opinion.
If you would like to comment on the proposed petition, this form may be used for your
convenience. Mailing address: Municipal Plannin9 Department, Pouch 6-650, Anchorage,
Alaska 99502.
Further information is available from the Planning Department, telephone 264-4267,
ADDt~ESS:
Board for the ~unicipallty of Anchorage.
2. The Platting Board for
Anchorage shall, at its next regular
~resented with the Judgment of the Court,
the Municipality of
meeting after being
approve the plat which
is attached to
below listed conditions.
he necessity of further
xcept for the purpose of
3. Approval of
this Stipulation and the Judgment subject to the
Approyal shall be immediate and without
public hearings or Board deliberation
approving said plat.
the attached plat shall be preliminary
,lat approval and the Platting Board shall issue a final plat
.on Appellant's completion of the conditions for final plat
approval as set forth in the Stipulation entered into by the
~arties on this Judgment bases thereon.
4. The development described in the attached plat
~hall be carried out in two phases: the first involving the
evelopment of 27 lots (out of a total of 40 lots) which lots
,ill have no high water table problems and which lots are
zonsidered dry lots; the second phase involving the remaining 13
lots which do have a groundwater problem. It shall not be
necessary to have completed both phases prior to issuance of
final plat approval on phase I of this development project. At
time as the conditions for final plat approval have been
24 ompleted for phase I, final plat approval shall be granted by
he Platting Board for the Municipality of Anchorage, even though
he conditions for final approval of Phase II have not yet been
satisfied. At such time as Phase I has been completed and a
final plat has been approved and recorded, Appellant shall be
free to convey any..or all of the 27 lots comprising Phase I of
he development. No further public hearings shall be required
or final plat approval of either Phase I or Phase II. At such
ime as the additional conditions of final plat approval for
'hase II, such final approval sh~ll be granted b~ the Pl~tting
;oard for the Municipality of Anchorage.
5. The specific conditions under which a preliminary
~lat sha].l issue-and which shall be successfully completed for
3O
2
BRIDGER
VS
IN THE SUPERIOR COURT FOR THE STATE OF ALASKA
THIRD JUDICIAL DISTRICT AT ANCHORAGE
ENTERPRISES
Appellant,
~UNICIPALITY OF ANCHORAGE
ASSEMBLY/BOARD OF ADJUSTMENT
Appellee.
Case No. 83-8313 Civil
)
)
)
)
)
)
)
)
)
)
)
)
)
)
JUDGMENT
~1o~o o~ Alas~o, Third Dl~rl~
Clerk of lh~rlal Court¢
On April 4, 1985, the Court, the Honorable J. Justin
lipley presiding, heard oral argument op the issues raised by the
5ppellant and the responses thereto by the Appellee. The Court,
having considered the pleadings to date, the file, the briefs and
having considered the exhibits and affidavits filed herein ruled
from the bench the Platting Board would be ordered to issue a
)lat to the Appellant based upon certain conditions and that the
)arties could agree to to inclusion of certain other conditions
)r::.the Cd, hrt!~..would later resolve those conditions not stipulated
~ par t~i e~s' '
;0 b the ~
:.. The parties have entered into a stipulation setting
forth the Court's fi.ndings and conc].usions and the agreements of
the ,:parties econcerning those matters not specifically ruled
by the_.Court. As a result of the foregoing,
IT IS ORDERED, ADJUDGED ^NI) DECREED that:
npon
I. The Appellant is'determined to be the prevailing
y to this'appeal based upon a finding by the Court that the
:ecord as a whole lacks substantial evidence forming a reasonable
asis for refusal of preliminary plat approval by the Platting
6
®
20
22
23
24
2&
29
3O
Phase I are as follows:
p/a. Resolving
k/'b. Obtaining
Engineers, if required.
c. Providing
utility easements;
a wetlands permit from the Corps
a soils report from a
soils engineer indicating .which lots may require
foundations, and placing an appropriate note on the plat.
d. Resolving drainage and drainage easements
Public Works Engineering.
e. Resolving the need for footing
footing drain stubouts with Public Works Engiaeering0
of
control
required
being a
registered
engineered
with
drains, and
/ f. Providing a soils, sedimentation, and erosion
plan prior to plat recording. This condition may be
by the below referenced subdivision agreement 9n lieu of
condition that must be satisfied prior to plat approval.
g. Removing the well from the right-of-way or
noving the right-of-way outside the well location.
h. Resolving the need for any temporary
~urnarounds
Northfield
with Public Works Engineerisg.
i. Resolving the location of the intersection
Drlve and Pickett Street with Pablic Works
~//j. Entering into a subdivision agreement for:
1) Creation of Appellant's Community Water
System.
interior standards.
of
2) Subdivision agreement to construct all
(3) Northfield Drive to suburban access
the subdivision to Rabbit Creel< Road (strip
inclusive as set forth in Paragraph 5 above.
b.' Installing the under drain
system and
of conditions a through j,
:tandards from
,aving only);
6. The specific
)let shall issue and which shall
~hase II are as follows:
a. Completion
conditions tinder which a preliminary
be successfully completed for
,. ( (
monitoring that under drain system for a period of 24 months with
final resolution from the Departments of llealth and Public Works
to determine tile effectiveness of the under drain system and the
ability of each of the i3 lots subject to this condition to
function with an on-site septic system.
7. Tile monitoring requirement
as set forth in
Paragraph 6 above shall be a requirement for the 13 lots of Phase
II only. Because the monitoring must extend over a 24 month
period, it will be impossible to make applicatioa for final plat
approval within the normal 18 month period. As such, the time
for final plat approval shall be extended to 30 months :for
:ompletion of the Phase II
plat spproval.
8. The preliminary plat shall issue
Turner, successor to Bridger Enterprises.
9. Tile Appellant shall be free to ina
the Court for attorney fee~ as the
DATED this ~5~ day of
conditions and application for final
to Rexford L.
~on to
preva
EY
~r Court Judge
Cleric o£ tk¢ 2}ri02 ~Co~g~ at J, nchorago
Received a copy of ~is
Judgln~at on tile ~-~_-- (lay
of _~J3~-3 7-- , 1985.
TItlRD JUDICIAl, DISTRICT AT ANCHORA~
~RIDGER ENTERPRISES
Appellant,
VS
UNICIPALITY OF ANCHORAGE
;SEMBLY/BOARD OF ADJUSTMENT
Appellee.
No. 83-8313 Civil
)
)
)
)
)
)
)
)
)
)
)
)
)
)
JUDGMENT
Clerk of (he~.daI CoUrL~
BY'*'-"-~--_.~__._.__..Dopu~/
RECEIVED
JAN 2 9 1986
Municipal Al:tomey
On April 4, 1985, the Court, the Honorable J. ,Justin
Ri~ley presiding, heard oral argument: on the issues raised by the
Appellant and the responses thereto by the Appellee. The Court,
having considered the pleadings to date, the file, the briefs and
considered the exhibits and affidavits filed herein ruled
the bench the Platting Board would be ordered to issue a
to the Appellant based upon certain conditions and that the
.arties could agree to to inclusion of certain other conditions
~r the Coh~t-~tou].d later resolve those conditions not stipulated
to by the partie~.''~
rom
let
a stipulation setting
forth the Court's fi.ndings and conclusions and the agreements of
~he :parties· ~oncernmng those matters not specifically ruled upon
~y the Court. As a result of the foregoing,
IT IS ORDERED, ADJUDGED AND DECREED that:
':The parties have entered into
1. The Appellant is determined to be the prevailing
~arty to this appeal based upon a finding by the Court that the
'ecord as a whole lacks substantial evidence forming a reasonable
)asis for refusal of preliminary plat approval by the Platting
Board for the biunicipality of Anchorage.
2. The Platting Board for the Municipality of
Anchorage shall, at its next regular meeting after being
~resented Qith the Judgment of the Court, approve the plat which
.s attached to this Stipulation and the Judgment subject to the
below listed conditions. Approyal shall be immediate and without
~he necessity of further public hearings or Board deliberation
~t for the purpose of approving said plat.
3. Approval of the attached plat shall be preliminary
~lat approval and the Platting Board shall issue a final plat
pon Appellant's completion of the conditions for final plat
~pproval as set forth in the Stipulation entered into by the
~arties on this Judgmen't bases thereon.
4. The development described in the attached plat
~hall be carried out in two phases: the first involving the
development of 27 lots (out of a total of 40 lots) which lots
11 have no high water table problems and which lots are
considered dry lots; the second phase involving the remaining 13
lots which do have a groundweter problem. It shall not be
~ecessary to have completed both phases prior to issnance of
final plat approval on phase I of this development project. At
such time as the conditions for final plat approval have been
completed for phase I, final plat approval shall be graeted by
the Platting Board for the Municipality of Anchorage, even though
the conditions for final approval of Phase II have not yet been
atisfiedo At such time as Phase I has been completed nnd a
inal plat has been approved and recorded, Appellant shall be
'ree to convey any .or all of the 27 lots comprising Phase I of
~he development. No further public hearings shall be required
!or final plat approval of either Phase I or Phase II. At such
time as the additional conditions of final plat approval for
~hase II, such f'inal approval shall be granted b~ the Platting
~oard for the Municipality of Anchorage.
5. The specific conditions under which a preliminary
,lat shall issue-and which shall be successfully completed for
4
7
9
24
25
Phase I are
Engineers, ~if
soils eagiaeer
foundations,
from the
as follows:
a. Re~olving utility easements;
b. Obtaining a wetlands permit
required.
c~ Providing a soils report from $ registered
indicating which lots may require engineered
and placing an appropriate n,ote on the plat.
d. Resolving drainage and drainag~ e~sements with
Corps of
having
Public Works Engineering.
e. Resolving tile need for footing
footing drain stubouts with Public Works Engineering.
f. Providing a soils, sedimentation, and erosioa
control plan prior to'plat recording. This condition may be
required by the below referenced subdivision agreement in lieu of
being a condition that must be satisfied prior to plat approval.
g. Removing the well from the right-of-way or
the right-of-way outside the well location.
h. Resolving the need for any temporary
turnarounds with Public Works Engineering.
i. Resolving the location of the intersection of
Northfield Drive and Pickett Street with Public Works
j. Entering into a subdivision agreement for:
(1) Creation of Appellant's Community Water
drains, and
~ystem.
(2) Subdivision
agreemeat to construct all
ieherzor standards.
~a ]1 (3) Northfield Drive to subarban access
taadards from the subdivision to Rabbit Creek Road (strip
aving oaly);
6.
~lat shall issue and which shall be
~hase II are as follows:
a. Completion of
inclusive as set forth ia Paragraph 5 above.
b.' Installing the under drain
The specific conditions under which a preliminary
successfully completed for
conditious a through j,
system and
3
I bereb',2~'~~
envy' 05 tbt'
monitoring that under drain system for a period of 24 months with
final resolution from. the Departments of Health and Public Works
to determine the effectiveness of the under drain system and the
ability of each of the 13 lots subject to this condition to
function with an on-site septic system.
7. The monitoring requirement as set fo~:th in
Paragraph 6 above shall be a requirement for the 13 lots of Phase
II only. Because the monitoring must extend over a 24 month
~eriod, it will be impossible to make application for final plat
pproval within the normal 18 month period. As such, the time
or final plat approval shall be extended to 30 months for
ompletion of the Phase II conditions and application for final
olat approval.
8. The preliminary plat shall issue to Rexford L.
'urner, successor to Bridger Enterprises.
9. The Appellant shall be free to m~ ~on to
~he Court for attorney fee~ as the preva
DATED this ~0 day of
EY
)r Court Judge
;atAnchorag~
By;
Date/
~ceived a copy of ~is
~nt on the ~--~-- day
7" , 1985.
~S CRARY ~