Loading...
HomeMy WebLinkAboutCOHOE LT 5 Municipality of Anchorage Page DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVI'CES DIVISION P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744 On-Site Wastewater Disposal System and/or Well Inspection Report Permit Number: -~/,0' 95'0 P_t y PID Number: o 15'o5'11 "'l Name: Wastewater System: Q New ~ Upgrade *UUr~,~: ABSORPTION FIELD Phone: ~ K '~ Z Y~ [ No. of Bedrooms: ~ ~ Deep Trench ~ Shallow Trench ~ Bed ~ Mound ~ Other Total Depth from original grade: LEGAL DESCRIPTION SoilRating: ~', ~5' GPD/Sq. Ft. Lot: ~ Block:-- Subdiv~ion:~o~O~ Depth to pipe bottom~,~from original grade: Ft. Gravel depth~,j~beneath~,o~pipe Ft. Township: I Range: I Section: Fill added above origlna[grade: Gravel length: ~ Ft. ~ ~ ~ ~' ~ /~0 ~Ft, I I WELL: ~N, ~.~ Q New ~ Upgrade Gravelwidth: Number of lines: 1Oistancebetweenl[nes: Classification (Private, A,B,C): Total Depth: Cased To: Total absorption area: Pipe material: Driller: Date Drilled: Static Water Level: Installer: Date installed: Yield: GPM J.um. Se,~: F,. Icasing He'ghtAb°v. Gr°u"u:Ft. TANK SEPARATION DISTANCES ~ s.pti~ ~ Ho,~ing ~ S.T.E.,. TO Septic Absorption Lift Holding Public/PrivateManufacturer: Capacity in gallons: From Tank Field Station Tank ' Sewer Lines ~ ~ ~ ~ ~ ~ / Material: Number of Compartments: Surface LIFT STAT I 0 N Lot Size in gallons: ~ Manufacturer: I Curtain Pump Make & Model I Electrical Inspections performed by: Drain Remarks: ~c ~n~ m~c~ ~ ~n~ ~ BENCH MARK ~ ~1 ~ ~ ~ (O~'~,~u~j ~ ~ ~ Location and Descriptio~ Inspections performed by: W/aArp Wech f~r Dates: 1st p/ /~/gs' ~ w p ~= ~' ~ . '~.: '~ Reviewed and approved ~¢ ] rV ~v~ Date: ~ ~ , .... V ~:' 72-013 (Rev. 9/91) MOA 25 PERMIT NO: SW950214 PAGE 2 OF 2 PID NO: 01505117 ~ FROM: COR."A" COR."B" COR."C" / / SWING TIES TO" M.T. "E" 46' 43.5' -- C.O. "F" 78' 47' ~ STRUTZ C 0 "G" 77' 84' T.H. M~T~ "H" 75.5' 82' ~ AVENUE . ~ ORIGINAL \ \ "F"~ '~-TRENCH ~"B'' 4BDRM~ IL'- ~ TRENCH ~o. "BULL RUN" o~,.,,~,, X~,~,~ ~ ~_mv~RL~E~,~ HOUSE X LOTS Or-%~lVlr-,~l I_.~.,~ X ~, XVALVE'I" WITH 8.1' ~,~ '~,,,,~.c--~ IT') WITH 9,o' GRAVEL INSPECTED AND FOUND TO BE OKAY IL_ PLAN VIEW SCALE: 1" = 30' - 0" / 27' TRENCH SEGMENT T.H. #1 " ELEV, 84.2 M,T. DRY ~"~J' 18' B.G.L PROFILE VIEW NOT TO SCALE EXISTING FIBERG~SS SEPTIC TANK LOT 5, COHOE S/D SEPTIC SYSTEM UPGRADE AS-BUILT INSPECTION REPORT FLATTOP TECHNICAL SERVICES SCALE: AS-SHOWN 14530 ECHO STREET DRAWN BY TFM ANCHORAGE, ALASKA 99516 OCTOBER. 1995 PAGE 1 OF 1 MUNICIPALITY OF ANCHORAGE DEPARTMENT OF HEALTH AND HUMAN SERVICES P.O. BOX 196650, 825 "L" STREET, ROOM 502 ANCHORAGE, ALASKA 99519-6650 ON-SITE WASTEWATER DISPOSAL SYSTEM (UPGRADE) PERMIT PERMIT NUMBER:SW950214 DESIGN ENGINEER:FLATTOP TECHNICAL SERVICES OWNER NAME:EDMONDSON TIMOTHY L & KAREN A OWNER ADDRESS:9360 STRUTZ AVE ANCHORAGE, AK 995=7 PARCEL ID:01505117 DATE ISSUED: 8/11/95 EXPIRATION DATE: 8/11/96 LEGAL DESCRIPTIOM: COHOE LT 5 LOT SIZE: 19017 (SQ. FT.) NUMBER OF BEDROOMS: 4 THIS PERMIT: THIS PERMIT IS FOR THE CONSTRUCTION OF: DISPOSAL FIELD /SEPTIC TANK SYSTEM ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH: 1. THE ATTACHED APPROVED DESIGN. 2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS 15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (iSAAC80) . 3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY CALLING 343-4744 ( 24 HOURS ) (NOT REQUIRED FOR WELL ONLY PERMIT) 4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING WEATHER MUST BE EITHER: A. OPENED AND CLOSED ON THE SAME DAY B. COVERED, SEALED AND HEATED TO PREVENT FREEZING 5. THE FOLLOWING SPECIAL PROVISIONS. SPECIAL PROVISIONS: CIVIL & ENVIRONMENTAl, ENGINEERING * ENERGY CONSERVATION & ANALYSIS THEODORE F. MOORE, P.E. 14530 ECHO ST. PH: (907) 345-1355 August ?, 1995 ANCHORAGE, ALASKA 99516 M.O.A. DHHS P.O. Box 19-6650 Anchorage, AK 99519 Dear Sirs: The purpose of this letter is to provide the required design narrative in support of our application for a permit to upgrade the wastewater disposal facilities on Lot 5 of Cohoe S/D, located at 9360 Strutz Avenue. The present soil absorption trench is no longer able to accept the effluent emanating from the residence. Soils logs, perc test results, a site plan, design drawings and specifications are enclosed for your review. The proposed system will be constructed between test holes/ti and #2. As can be seen from the soil log for test hole #1, the native material between 3.5' and 18' below ground level is a gravelly silt with a perc rate of 20 minutes per inch. Because the permeability of this stratum is quite variable, we have designed the soil absorption trench on the basis of a perc rate of 60 minutes per inch which correlates to a soil application rate of 0.45 gpd/square foot. Thus, this 4 bedroom residence requires a total absorption area of (4 x 150)/0.45 = 1334 square feet. The proposed trench has been designed for maximum utilization of the readily available area and has a total effective absorption area of 1600 square feet. The topography of the lot slopes gently towards the west at approximately 2%. Test hole #1 has a total depth of 18 feet and the monitor tube was dry two weeks later, despite several days of rain and the fact that the test hole excavation had not been completely backfllled. In the course of excavating test hole g2 to verify the continuity of soils in that area small seeps of septic tank effluent were encountered at approximately 12 feet. The monitor tube in for this test hole did accumulate some fluid at the 13 foot depth, however this appears to be effluent from the existing septic system rather than groundwater. The lots in this subdivision and the adjoining Hanshew Heights subdivision are served by community water systems for which the wells are greater than 200 feet away. The proposed project will have no significant impact on present or futm'e water supply and wastewater disposal systems serving adjacent properties, nor will it have any significant impact on reserved space- surface and subsurface, or on drainage. Please give me a call at 345-1355 if you have any questions on this submittal. Ted Moore, P.E. O SEPTIC SYSTEM O O LOT 3 LOT 4 ILl LOT8 I ~- LOT 7 LOT 4E ) ~k_ HANSHEW HTS. ~-EXISTING SOIL ABS. TRENCH ~, SYSTEM ~' , ' LOT 5 HANSHEWHT. ~ ' ~.H. - ~ ,,.' DIVERTER VALVE- ¢1 %NEW 1250 GALLON SEPTIC TANK UNDEVELOPED LAND LOT 5, COHOE S/D SEPTIC SYSTEM UPGRADE SITE PLAN FLATTOP TECHNICAL SERVICES 14530 ECHO STREET ANCHORAGE, ALASKA 99516 1 INCH = 4O FEET DRAWN BY TFM AUGUST, 1995 NOTE: THIS IS NOT A SURVEYED PLAT. ALL LOCATIONS SHOWN ARE APPROXIMATE. OF TRENCH EXCAVATION CLEANOUT (TYPICAL) 4" DIA. ASTM F-810 PERF PIPE DIA. ASTM D-3034 PIPE MONITOR "A" NEW 1250 GALLON SEPTIC TANK PLAN VIEW SCALE: 1" = 15' - 0" MONITOR TUBE .CLEANOUT -- MOUND BACKFILL 12" GROUND -- BACKFILL MATERIAL -- FILTER FABRIC DIA. F-810 PERF. PIPE -- 1/2" - 2 1/2" SEWER GRAVEL OFTRENCH SECTION "A - A" SCALE: 1" = 5'- 0" LOT 5, COHOE S/D SEPTIC SYSTEM UPGRADE PLAN AND CROSS-SECTION FLATTOP TECHNICAL SERVICES 14530 ECHO STREET ANCHORAGE, AK, 99516 SCALE: AS SHOWN DRAWN BY: TFM AUGUST, 1995 Flattop Technical Services 14530 Echo Street, Anchorage, AK99516 Phone (907) 345-1355 Lot 5, Cohoe S/D 9360 Strutz Avenue Wastewater disposal system installation Specifications 1.0 General: 1.1 The scope of the project consists of installation of a new 1250 gallon septic tank followed by 100 lineal feet of soil absorption trench containing a total of 8.5 feet of sewer gravel. 1.2 Construction shall be as depicted on the approved site plan'and design drawings. Minor deviations from these drawings may be allowed or required by the engineer conducting the inspections. All construction procedures and material specifications shall confmzn with Municipal and State requirements. All separation distances shall be in conformance with Municipal requirements, unless specifically waived. 1.3 The contractor shall be responsible to obtain any necessary utility locates, and to work around any buried utilities. 1.4 The contractor shall provide adequate cover material and rough grading over all system components to ensure that proper drainage is achieved after settlement and that there are no residual depressions. Insofar as possible the contractor shall minimize damage to trees and existing lawn areas. 1.5 Unless specifically agreed otherwise, the homeowner shall be responsible for finish grading after the soil is compacted, as well as placement of topsoil and reseeding all areas disturbed by the construction. 1.6 The property owner shall be responsible for determining the location of property lines so as to achieve the required 10 foot separation distance. 2.0 Septic Tank: 2.1 The existing septic tank may be retained in service, only if it's structural integrity has been verified by the inspecting engineer, and if it has functional cleanout pipes with airtight caps, allowing pumping access to each compartment. Any existing septic tank or seepage pit which is not retained in service must be properly abandoned by thoroughly pumping, removing the top and backfilling with soil. 2.2 The new 1250 gallon, 2 compartment septic tank shall be Municipally approved and shall be set level on undisturbed soil. Each compartment shall be equipped with a watertight manhole cover and a 4" cleanout. If the tank is buried less than 4 feet, it shall be insulated with 2 inches of approved burial type, rigid insulation. 2.3 All pipe connections to the tank shall be equipped with waterproof mechanical couplings. The waste line from the residence to the septic tank shall have a minimum slope of 1/4'" per foot, and the waste line between the tank and the soil absorption system shall have a minimum slope of 1/8" per foot. A cleanout shall be installed within 5 feet of the building foundation, and a double cleanout shall be installed within 5 feet downstream of the septic tank. 2.4 A "Bull Run" diverter valve shall be installed downstream of the septic tank allowing subsequent reconnection to the original U'ench at a future date, if desh'ed. 3.0 Soil absorption system: 3.1 The soil absorption system shall be constructed by excavating 100 lineal feet of soil absorption trenches to a depth of 12 feet below original ground level in the vicinity of test hole :gl. The exact orientation of the trenches shall be field adjusted to minimize damage to existing U'ees. 3.2 The bottom of the excavation shall be level. Any compacted or smeared surfaces shall be raked to promote maximum infiltration. 3.3 A total of 8.5 feet of approved sewer gravel shall be placed in the bottom of the excavation with the perforated disu'ibution pipes'laid level such that the pipe inverts are no less than 8.0 feet above the bottom of the sewer gravel. Sewer gavel shall be 0.5" - 2.5" screened gravel, with less than 3% passing the #200 sieve. 3.4 Monitor tubes and cleanout pipes shall be of 4" diameter and installed in the locations shown on the design drawings. The portion of the monitor tube extending through the sewer gravel shall be perforated. 3.5 Approved filter fabric shall be placed over the entire top surface of the sewer gravel. A minimum of 2 feet of soil cover is to be placed over the filter fabric. If the soil cover thickness is less than 3 feet, two inches of rigid, burial type insulation is to be placed over the entire top surface of the gravel, in addition to the filter fabric. 3.6 The top surface of the cover material shall be raised a minimum of 12 inches higher than the surrounding terrain to allow for subsequent settlement, and shall be graded to smooth contours. Fill slopes shall be no steeper than 3:1. 3.7 Unless specifically agreed otherwise the homeowner shall be responsible for mu'anging to have the site finish graded after the backfill material has stabilized, and for placement of adequate topsoil and seed to promote revegetation of areas disturbed by the construction. 4.0 Inspections: 4.1 A minimum of 4 engineering inspections will be required during the course of the project: (1) initial stakeout with the contractor to establish the location of the system and to discuss the plans, specifications and construction procedures, (2) after the native material has been excavated to expose the infiltrative surface to ensure that it is level and at the right elevation, and conforms with the soil test information, (3) after the sewer gravel is in place and the distribution pipes have been laid and connected up to the septic tank, but prior to placement of insulation or filter fabric, and (4) after rough backfill and grading is complete. The septic tank requires one inspection after iris set level and the piping connected, but prior to backfill. This inspection may be incorporated with any of the above inspections. 4.2 The installer shall coordinate the timing of the inspections with the engineer sufficiently far in advance to ensure the availability of the engineer. TEST HOLE # LEGAL DESCRIPTION: DATE PERFORMED: PERFORMED FOR: DEPTH (feel 1 8 COMMENTS: FLATTOP TECHNICAL SERVICES 14530 ECHO ST. ANCHORAGE, ALASKA 99516 SOILS LOG -- PERCOLATION lEST Lot 5~ Cohoe S/D July 19, 1995 Tim Edmondson Pt SLOPE GM Brown silty sandy gravel ML Gray/Brown gravelly silt Sidewalls do not smear Becomes denser with depth Depth to Groundwater Date No groundwater 7/19/95 Moaitor tube dry 8/1/95 B.H. Clock Net Time Percometer Not Drop Date Reading Time (minutes) Reading (inches) ,7/19 12" Presoak 4:35 7/20 Start 3:13 23 9/16 #1 3:43 30 21 1/4 2 5/16 Add water 3:43:30 23 9/16 ~- #2 4:13:30 30 21 11/16 1 7/8 Add water 4:14:00 23 5/8 #3 4:44:00 30 22 0/16 1 5/8 Add water 4:44:15 23 5/8 #4 5:14:15 30 22 1/16 1 9/16 PERCOLATION RATE 20 (minutes/inch) PERC HOLE DIAMETER 6" TEST RUN BETWEEN 6.0 FT AND 6.5 FT Recommend designing on basis of 60 minutes/inch, because another perc test at this same depth was slower than 60 rain/inch, PERFORMED BY FLATTOP TECHNICAL SERVICES. I ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE, CERTIFY THAT THIS TEST WAS PERFORMED IN TEST HOLE # FLA'I-rOP TECHNICAL SERVICES 14530 ECHO ST. ANCHORAGE, ALASKA 99516 SOILS LOG -- PERCOLATION TEST LEGAL DESCRIPTION: Lot 5, Cohoe S/D DATE PERFORMED: July 19, 1995 PERFORMED FOR: Tim Fdmondson DEPTH (feet) Pt SM Reddish sandy loam GM Sandy silty gravel Dense, very hard digging 11 ML Gravelly silt Similar to test hole #1 Hard digging Small seeps of effluent at east end of test hole '~--at 12' - 13' below ground (from original trench) B.H. SLOPE Depth to Groundwater Date No groundwater 7/19/95 Fluid at 13' b.g.1. 8/1/95 o, T.H. Clock Net Time Percometer Net Drop Date Reading Time (minutes) Reading (inches) 7/20 12" Presoak Start 4:06:30 22 1/4 #1 4:16:30 10 24 3/8 2 5/8 Add water 4:17:20 21 3/4 #2 4:27:20 10 24 1/8 2 3/8 Add water 4:28:00 22 1/4 #3 4:38:00 10 24 0/8 1 3/4 PERCOLATION RATE 6 (minutes/inch) PERC HOLE DIAMETER 6" TEST RUN BE'I'WEEN 2.0 FT AND 2.5 FT COMMENTS: This pew test was conducted in a shallow, hand dug. test hole located approximately 20 feet west of test hole #1, The fluid which was monitored in this test hole is almost surely not groundwater - rather effluent from original trench. See monitoring of deeper T,H.#1 FLATTOP TECHNICAL SERVICES, I~--'~,,.,~ ~ CERTIFY THAT THIS TEST WAS PERFORMED IN PERFORMED BY ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: GREA R ANCHORAGE AREA BOR( SH Department of Environmental Quality 3330 C Street Anchorage, Alaska 99503 INSPECTION REPORT ON-SITE SEWAGE DISPOSAL SYSTEM NAME ~ LOCATION MAILING ADDRESS LEGAL DESCRIPTION SEPTIC TANK: DISTANCE FROM WELL INSIDE LENGTH MANUFACTURER ~'UL k ~,~' .~' MATERIAL INSIDE WIDTH ""'- LIQUID DEPTH NUMBER OF COMPARTMENTS LIQUID CAPACITY/~-5~ GALLONS. :; DISTANCE FROM WELL ~--OO¢'¢' FOUNDATION NEAREST LOT LINE__ TOTAL LENGTH / OF LINES ~t... ? NUMBER OF LINES I DISTANCE BETWEEN LINES ~ TRENCH WIDTH ~IN. TOTAL EFFECTIVE ABSORPTION AREA t~' ~oO SQ. FT. LENGTH OF EACH LINE ~'~'/ DEPTH OF FILTER DEPTH: TOP OF TILE TO FINISH GRADE,~.I ~ I MATERIAL BENEATH TILE (~t ~ _ 14~> ABOVE TILE ¢ IN. WELL: BUILDING FOUNDATION__ CESSPOOL APPROVED CONSTRUCTION ~ P f)//~ U ~' ~--"J DEPTH NEAREST LOT LINE_ DISTANCE FROM: OTHER SOURCES __ DISAPPROVED-- NEAREST SEPTIC SEEPAGE , SEWER LINE__, TANK '~d)¢~' ,-+ SYSTEM ~(~) r .iF. REMARKS DISTANCES: INSTALLED BY: SEWER LINE DEPTH: 2t .- ,.¢ / PIPE MATERIAL: LOT SLOPE: ~0,,.,~. REMARKS: Form EQ-032 DIAGRAM OF SYSTEM DATE <~' /'~¢ h~~"'APPROvED ~ ~'~ ~ G.A.A,B. GRE. ;R ANCHORAGE AREA Bo,, JGH  DEPARTMENT OF gNVlRONM. ENTAL QUALITY PERMIT NO. ;3330 "C" STREET ANCHORAGE, ALASKA 99503 TELEPHONE 274-456 I C ,. .,, .., SEWAGE DISPOSAL SYSTEM APPLICATION AND PERMIT NAME OF APPL,OANT /2,¢/¢; 15' ~ SEEPAGE "it D"AiN FIELD OTHER INSTALLATION OF: SEPTIC TANK SO'L TEST RESULTS ~ 4/O fl NOTE: THIS PERMIT IS NOT VALID WITHOUT SOIL TEST FINAL INSPECTION: 24, HOUR NOTICE REQUIRED. BACKFILLING OF ANY SYSTEM WITHOUT FINAL INSPECTION BY THE DEPARTMENT OF ENVIRONMENTAL QUALITY AUTHORITY WILL BE SUBJECT TO PROSECUTION. MINIMUM DISTANCES, REQUIREMENTS FOUNDATION TO SEPTIC TANK J~' [ .. SEEPAGE AREA SIZE DIAGRAM OF SYSTEM FOUNDATION TO SEEPAGE PIT DRAIN FIELD SEpT,,=TANKTOSEEPAGEP,TWALLb._./' . SEPTIC TANK ~ O '" , SEEPAGE PIT ~ O . DRAIN FIELD TO NEAREST LOT LINE. WELL TO SEPTlC TaNk /~ SEEPage PIT DRAIN FIELD / ~ ALSO CONSIDER AREA WELLS. WATER MAIN TO SEPTIC TANK /~ / SEEPAGE PIT DRAIN FIELD ~EPTIC TANK, , SEEPAGE PIT ~ , DRain FIELD./~ / , TO RIVER, LAKE, STREAM. CAST IRON INTO AND OUT OF SEPTIC TANK AND INTO CRIBCROSSING GAP Of EXCAVATION 5 Feet intO UNDISTURBed SOIL. 4 INCH D~AmETER CAST IRON SIPHON PIPES on SEPTIC TANK AND SEEPAGE Pit FITTED WITH AIRTight REmOVA"LE CAPS. / ~ ~] K ~ OONFORM TO BOROU6M~EGObATIONS REGARDIN~ INsTALbATION. DESCRIBED~SY~TE Mi~[S IN__ACCORDANCE WITH SAID CODE. DATE ~ L~ APPLICANT'S SIGNATURE - GREATER ANCtlORAGL AREA UORUUGi, Department of Lnvi ronlnen La] Qual i ty 3330 "C" Street Anchorage, Alaska 99503 lhis form reports: Soils log ..... ~ Percolation 'test ' [:[~1 ' / .. I 10- 11 - 12- 13- Was ground water encountered? . ~ ..... If yes, at what depth? Reading Date Gross Time Net Time Depth to Water Net iJrop Pe rcol a t i o n -r-aYe- ................. inYn'u-t-e-. ,.Proposed installat]~'~-n-i'-"S-e-e~a-'.qe Pit Drain Field De i t trenct~ Deptti of Inlet _ _ p_tlT-~'¥OYt¥"-O:f% or __ COMMENTS: ..... ~,.~. a'~:: Performed '~}-.' - - :--dE-Z'" -~a~e :--~-t-I1-t~-'.~