HomeMy WebLinkAboutFIRE LAKE #2 BLK 2 LT 8
Municipality of Anchorage Page I of 2-.
DEPARTMENT OF HEALTH AND HUMAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744
On-Site Wastewater Disposal System and/or Well Inspection Report
Permit Number: .5'/V~/¥OZ(-,~ PID Number: ~-,, ........
Name:~~C ~-, ~c~ Wastewater System: ~ New ~ Upgrade
Address: ABSORPTION FIELD
/~// ~v~= ~.
Phc~;: - No. of Bedrooms:
~ ~/V~, ~ ~ ~ ~DeepTrench ~ShallowTrench ~Bed ~Mound ~Other
· Total Depth from original grade:
LEGAL DESCRIPTION SollRating:/.~ ~,o/sq.,~. 7
Lot: Block: Subdiv~ion: Depth to pipe bottom from original grade: Gravel depth beneath pipe
~ ~ ~ ~ ~ ~ / Ft. ~ Et,
Township: ..... ~ Range: ~ Section: Fill added above original~, 7 ~Ft.grade: Gravel length: ~ Ft.
I
I
WELL: ~ New ~ Upgrade Gravel width: ~ ,~Ft. Number /°f lines: Distance~between lines:Ft.
Classification (Private, A,B,C): Total Depth: Cased To: Total absorption area: Pipe material: ~
~/V~ Ft. Ft. ~ SQ. Ft. ~ ~
~riller: Date Drilled: St~ticWater Level: nstailer: Date installed:
Yield: Pump Set at: Casing,.~¢~*~o~. ~,o~,,: TANK
GPM Ft. Ft.
SEPARATION DISTANCES ~Septic D Holding D S,T.E.P.
To Septic Absorption Lilt Holding Public/Private Manufacturer: Capacity in gallons:
From Tank Field Station Tank Sewer Lines ~~ ~
Number of Compa~ments:
Welk /~ / /~ ~ ~ I~ Material:~
Sudace ~
Water /~ ,+ /~ '> - ~ LIFT STATION
Lot ,~ Size in gallons: ~ Manufacturer: ~
Line /O 1~ /~ - ~
Foundation ~,~ ,/ "Pump on" level a~f'" level at:
Cu~ainDrain -~{r ~()~ _ ~el J Electrical lnspections performed by:
Remarks: /~¢ /~ ~ ~ ~/~¢~ BENCH MARK
Location and Description:
I Assumed Elevatl°n~
Inspections performed by: ~:~, ~?. ~.,~.w~w Dates: 1st /~-/- Y ~. .,,,:., ..............
_ 2nd /C-X-ed/ 'i;,, .3,~ ROBERT C. COWAN
U~e~ . ~<:;,.., cE-~8o~
Department of Health~H ~ces approval '~'"":'", , '" ~x'
Rewewed and approved by: Date.
72-013 (Rev. 9/91) MOA 25
Permit No.Sw940566
2 2
Page of.
Municipality of Anchorage
DEPARTMENT OF HEALTH AND HUMAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744
On-Site Wastewater Disposal System and/or Well Inspection Report
.... FIRE LAKE SUBD.#2, BLOCK 2, LOT 8
Legal L)escnpz~on: PID No.: 05155116
CO1 C02
FINAL GRADE
(CO2&
MT2)
NEW
1000 GAL
SEPTIC
~ TANK
N,T~S. 77.8
I~2.8' NO WATER~!FOUND
(COl&
COZ)
il A B
~CO 1L4
;Or 56.6 32.3
ZO2 56,5 35.1
~03 58.8 40.8
Z04 72.8 66.8
~iT1 58.8 40.8
MT2 ~3.0 67.3
SCALE f' = 40'
--~-NEW 1000 GAL. SEPTIC TANK
;SEAL
ROBERT C. COWAN
CE-8801
72-013 A (1/93) *
PAGE 1 OF 1
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH AND HUMAN SERVICES
P.O. BOX 196650, 825 "L" STREET, ROOM 502
ANCHORAGE, ALASKA 99519-6650
ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT
PERMIT NUMBER:SW940366
DESIGN ENGINEER:S & S ENGINEERING
OWNER NAME:RANDALL WALLACE E
OWNER ADDRESS:13611 SAVAGE DR
EAGLE RIVER, AK 99577
DATE ISSUED: 9/26/94
EXPIRATION DATE: 9/26/95
PARCEL ID:05135116
LEGAL DESCRIPTION: FIRE LAKE #2 BLK 2 LT 8
LOT SIZE: 49500 (SQ. FT.)
NUMBER OF BEDROOMS: 3 THIS PERMIT: 3
THIS PERMIT IS FOR THE CONTRUCTION OF:
DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM
ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH:
1. THE ATTACHED APPROVED DESIGN.
2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS
15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL
REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AAC80).
3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS
PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY
CALLING 343-4744 (24 HOURS)
4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL
ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING
WEATHER MUST BE EITHER:
A. OPENED AND CLOSED ON THE SAME DAY
B. COVERED, SEALED AND HEATED TO PREVENT FREEZING
5. THE FOLLOWING SPECIAL PROVISIONS.
SPECIAL PROVISIONS:
RECEIVED BY:
/
/
DATE:
DATE:
ROBERTSHAFER, P.E.
September 12, 1994
CIVIL ENGINEERS
(907) 694-2979
FAX 694-1211
HEALTH AUTHORITY
APPROVALS
SEWER & WATER
MAIN EXTENSIONS
SEWER & WATER
INSPECTION
ENGINEERING STUDIES
AND REPORTS
WELL INSPECTION
& FLOW TEST
SITE PLANS
ROAD DESIGN
SOIL TEST
PERCOLATION
TEST
STRUCTURAL &
MECHANICAL
INSPECTIONS
ON SITE
WASTE WATER
DISPOSAL SYSTEM
DESIGN
MUNICIPALITY OF ANCHORAGE
Department of Health and H~man Services
P.O. Box 196650
Anchorage, AK 99519
REFERENCE: Lot 8; Block 2; Fire Lake Subdivision #2
;to ae,~tue ,tJae l~tolvoae~l th~tee be.~L~oom hou,~e on ~ ¢ei~e,te. ne. exd ~o~.
Test holes were excavated and percolation t~sts performed. The
approximate location of the test hol~s are located on the attached
site plan. The monitoring tubes within the test holes have been
checked and found to be dry.
This property has enough area for a future septic upgrade which can be
seen on the attached site plan. We do not anticipate any adverse
effects on n~ighboring properties by the installation of the proposed
septic sytsem.
If you have any questions, or require additional information for your
review, please contact us.
Sincerely,
ROBERT C. COWAN, P.E.
RCC/JA/gk
17034 NORTH EAGLE RIVER LOOP · SUITE 204" EAGLE RIVER, ALASKA 99577
1" =50'
SUALE
SITE PLAN
SAVAGE DRIVE
I
0
0
0
[-.q
10' UTIL ESMT
PERFORMED FOR:
· E~A~- DESCR,PT,ON'.~;
6
7
8
9
10
11
12
13
.' (ENGINEER'S SEAL)
Township, Range, Section'.
14
15
16-
17-
18-
19
Municipality of Anchorage
DEPARTMENT OF HEALTH & HUMAN SERVICES
825 "L' Street, Anchorage, Alaska 99502-0650
SOILS LOG -- PERCOLATION TEST
WAS GROUND WATER
ENCOUNTERED?
SLOPE SITE PLAN
IF YES, AT WHAT
DEPTH?
Depth t° Water Alter "fx'"") ' Dale:
Monitoring? L.,,4 ~,,~'
Gross Net Depth to Net
Reading Date Time Time Water Drop
~:1 ~p~ - ~ Y~" --
'. ~S ~ " ~'1~"
:ff~ ~ ,, ~% ~,'
PERCOLATION RATE __ (minutes/tach) PERC HOLE DIAMETER
TEST R~N ~ETWE% 3,S.:'~'~-~ ~/,S' FT
COMMENTS
S & S ENGINEERIN~ /~/
PERFORMED BY: 170~ ~e ~Y~ ~ ~C3~ ~. ~1/// ~~ CERTIFY THAT THIS TEST WAS PERFORMED IN
ACCORDANCE WI~[~E~~AL GUIDELIN~ ON THIS DATE. DATE:
72-008 (Rev. 4/85)
ON-SITE ~IASTE~IIATEE OISPOSAL $¥$TEU
UATER~AL SPEC~F[C^T~ONS
REFEI~ENCE: Lot 8i Block 2; Fire Lake Subdivision #2
GENEI~A L:
I. The scope of this project includes the installation of a 1000 gallon
septic tank and a leachfi~ld trench to s~rve the proposed three bedroom
residence located on the referenced property.
2. Construction shall be in accordance with the approved site plan and
design drawings, Municipal permit with any special provisions or
conditions, and all applicable State and Municipal Wastewater Disposal
Regulations.
3. The contractor shall be responsible for obtaining any necessary
underground utility locates.
4. U~ess specifically agreed otherwise, the property owner shall be
responsible for final grading areas subsequently depressed from soll
settling. On all leachfi~ld mound systems, the property owner shall be
responsible for ensuring a satisfactory vegetation growth over the
mounded area.
5. Contractors installing wastewater disposal systems must be certified by
the Municipal Health Department for system installations. Owners
installing their own systems must also receive prior approval from the
Municipal Health Department.
SEFFIC TANK INSTALLATION:
I. A septic tank is to be constructed by a certified septic tank
manufacturer. Construction sha.~ include ~o 4" cleanot~f'_~ for pumping
access.
2. The septic tank shall be sufficiently bedded to prevent settling or
shifting of the tank.
3. All standpipes on the septic tank shall extend a minimum of 12 inch~s
above final grade.
4. Septic tanks installed with less than 4' of cover shall be insulated.
Page Two
Lot 8; Block 2; Fire Lake Subdivision #2
September 9, 1994
A foundation cleanout shall be installed one to four fe~t from the
building foundation. In the line between the tank and the l~achfield
there shall be two adjacent clganouts (unless an effluent pumping system
exists within the septic tank). These cleanouts shall be located on
undisturbed soil not more than 10' from the tank. The first cl~anout,
in line, shall be to clean toward the leachfield. The second cl~anout
shall be to clean toward the septic tank.
Final grading over the septic tank shall be such that a positive slope
exists away from the septic tank.
ABSOgFFION TRENCHI~INFIEL~ INSTALLATION:
Excavate the proposed trench to the dimensions shown on the design. The
bottom of the excavation shall be within 2 inches of level. If the
sidewalls of the excavation become smeared, they must be raked or
scratched (roughed-up) before gravel (sewer rock) placement.
Once the gravel is installed, the distribution pipe is to be installed
level with the perforations faced downward. Gravel is then to be placed
over the distribution pipe to provide a minimum of 2 inches of cover
over the pipe.
A silt barrier must be installed b~Cween the final gravel layer and the
native soil backfill. Ensure the silt barrier covers the entire gravel
surface before placing backfill.
Monitor tubes shall be of four (4) inch diameter and installed
approximately in the locations shown on the design. The portion of the
monitoring tube extending through the gravel shall be perforated from
the bottom of the trench to the invert of the distribution pipe. This
is equivalent to the effe~ve depth of the gravel as noted on the
design.
Backfill over the final gravel layer must not be less than twenty-four
(24) inches. Insulation must be installed when the backfill depth is
less than thirty-six (36) inches. The finish grade over the trench must
be mounded to prevent the formation of a depression after settling.
MINIMUM
I.
MATERIAL SPECIFICATIONS:
Any Septic tank proposed for installation must
Municipally approved septic tank manufacturer.
be constructed by a
Page Three
Lot 8; Block 2; Fire Lake Subdivision #2
September 9, 1994
2. The following pipe materials are approved for use in septic system
installations in the Municipally of Anchorage:
THpe of Pipe Perforated
Solid
Cast Iron Yes Yes
ASTM D3034 (PVC) Yes Yes
ASTM F810 (HDPE) Yes No
ASTM D2662 (ABS) Yes Yes
Use of a type of pipe other than listed above must be approved by the
inspecting engineer.
Insulation shall be at least 2" thick extruded direct burial polystyrene
(Dow Chemica~ Company Styrofoam HI or equal).
Septic tank inl~s and outle~ shall be fitted with watertight couplings
(Caulder, Fernco, or equal).
A permeable nontoxic silt barrier (Typar 3401, Mirafi 140/N, or equal)
must be instated between the final leachfield gravel layer and the
r~ive soil backfill.
All leachfield gravel (sewer rock) shall be 0.5"-2.5" screened gravel
with less than 3% passing the #200 sieve.
When sand is being used as a filter material, its gradation
spe~fications must conform to current M.O.A. or D.E.C. requirements.
I~SPECTIONS:
Typically there will be a minimum of three (3) inspections required during the
installation of the wast.water disposal system. These inspections will occar as
follows:
The first inspection must be conducted after the excavation of ditches,
pits, trenches, or bed~ and before the installation of any gravel. A
septic tank may be set in place, but may not be backf~lled before this
inspection.
The second inspection must be conducted after the placement of the silt
barrier, gravel, distribution lines, standpipes, cleanouts, and
insulation, but before the placement of any other backfill.
Page Four
Lot 8; Block 2; Fire Lake Subdivision #2
September 9, 1994
3. The final inspection is to occur upon final grading of the property.
Often there will be more than these 3 inspections required, ~specially with the
installation of multiple trench~s, sand filters, pressurized distribution
systems, etc. Thu~, the inspecting engineer is to be contacted at least 24
hours prior to the start of construction. If necessary, a pre-construction
me~ting w~ take place on-site. The inspecting engineer will not coordinate,
direct or control in any way the contractor's activities.
The owner shall contract with the contractor to perform the work outlined in
these specifications and plans and in accordance with the attached M.O.A.
permit. There will be no contractual arrangement existing b~tween the
contractor and S & S Engineering. S & S Engineering shall be the owner's
representative and will inspect the work ~ stated above to document the
contractor's activities. Final acceptance of the contractor's work rests with
the owner and the M.O.A.
S ~ S Engineering shall have no liability to the owner or to others for acts or
omissions of the contractor or any oth~ p~rsons p~rforming work on this project
or the failure of the contractor to carry out the work in accordance with these
construction documents. S & S Engineering's inspecting engineer will not be
r~sponsible for the construction m~ans, m~thods, techniques, sequence,
procedures or the safety precautions incident to this project.
CONTRACTOR/INSTALLER