HomeMy WebLinkAboutFASSLER Lots 1-6 S-7260 & S-7260A
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION
Environmental Health Division
t ' ./; ~ ~ CASE REVIEW WORKSHEET
CASE NUMBER: /~r~ '"'~ / ~'~ j~ ,IiDA)-ERECEIVED: COMMENTS DUE BY:
S-7260A~ ~' ' ~-(">',~,t~¢~,l._,[t~,October 31, 1984 November 19, 1984
SUBDiV;SION OR PROJECT TITLE:
Lots 1 - 6 Fassle~ Subdivision
WATER AVAILABLE
,~.'~COMMUNITY WATER AVAILABLE
PUBLIC SEWER AVAILABLE
COMMENTS:
DEPT. OF ENVIRONMENTAL CONSERVATION
ANCHORAGE/WESTERN DISTRICT OFFICE
437 'E' STREET, SUITE 303
ANCHORAGE, ALASKA 99501
BILL SHEFFIELD, GOVERNOR
274-2533
May 19, 1986
David R. Dayton, PE
.SR 1 Box 1026
.Chugiak, Alaska 99567
SUBJECT: FASSLER SUBDIVISION, Water Improvements
Waterline Extension o¢ OAWN WATER CO. to 6 Lots
8621-FA-135
Dear Sir:
We have reviewed the plans and speci¢ications ~or the subject
project and are hereby issuing this letter and a "Certi¢icate
to Construct" which constitutes written approval required by
A,S, 46.03,720(a) ¢or construction o¢ the water system. Final
approval will require the submission o~ Engineered as-built
plans.
Inspection and sign o¢¢ o¢ as-built plans shall be per¢ormed by
a Pro~essional Engineer registered in the State o~ Alaska.
Arrangements Cur this inspection work is the responsibility o¢
the developer. In addition, the owners signature, address and
telephone number is required.
The "Certi¢icate to Operate" the water system will be issued
when the Department has approved the applicant's as-built
plans.
Any {uture expansion o{ the subject project will require
additional approval ~rom this o~¢ice. All ~uture
correspondence should include the above assigned project
number.
Sincerely,
~, PE
District Engineer
SWE:pkk
ENCLOSURE
PUBLIC WATER SYSTEMS
· ::,: i:,..i A: *:.APPROVAL TO CONSTRUCT
. ~. : .. ~ Plans:for. the.construction or modification of //~
' ,~/~-
· ~Y ~'. ..... '; /]]',~ ~ ~ . h,ve been reviewed and are
,.Alaska, submitted/n accordance with 18 AAa 80.100
'. · . ~ approved.
· ~ ' ~ co~dltlonallyapproved (see attached conditions).
· If construction has no~ed within two years of the approval date, this oertlflaate Is void and new, plans.and
.specifications must be sUbm tted for review a~d approval before construction.
'~ ; .' .. B.':i APPROVED CHANGE ORDERS
' .' ' Change (contrect order no. or deecrlptlve reference)
Approved by Date
C. APPROVAL TO OPERATE
The "APPROVAL TO OPERATE" section must be completed and signed by the Department before any water
is made available to the public.
The construction of the
public
water system was completed on (date). The system Is hereby
granted interim approval to operate for 90 days following the completion date.
BY TITLE DATE
As-built plans submitted during the interim approval period, or an Inspection by the Department; has.confirmed
the system was constructed according to the approved plans. The system is hereby granted final approval to
operate.
BY
TITLE
DATE
18.0407 (Rev. 11183)
DISTRIBUTION: I. WHITE · ENGINEER (Complete Section C) 2, YELLOW -WATER SYSTEM FILE (Complete Section C)
3. PINK - ENGINEER/MUNI.BOROUGH (Complete Section C)
4, GOLDENROD · MUNI.BOROUGH (Con)plete Section A)
MUNICIPALITY OF ANCHORAGE
, DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION
Environmental Health Division
CASE REVIEW WORKSHEET
CASE NUMBER: DATE RECEIVED: COMMENTS DUE BY: /~
$-7260 August 31, 1983 September _?~, 1983
SUBDIVISION OR PROJECT TITLE:
Lots 1 - 6, Fassler Subdivision /
l/~, ,, ~/~ _~ .~
~IC WATER AVAILABLE ( //,~ ~'~C SEWER AVAILABLE , ~
~ Y~ COMMUNITY W~R ~ILABLE ~' /.(~ ~ ~;~' / I
71-014 {Rev. 5/83)
Case #
WASTEWATER DISPOSAL
Public Sewer
CHECKLIST
SU~DI~VIS ION REVIEW
Community Onsite Sewer
Zoned
~"-Single-family Onsite
Soil tests stamped by engineer, si~ned, dated, identified, etc.;
Sufficient soil tests to characterize minimum of 50% of subdivision
in probable absorption field areas;
Soil test locations accurately identified;
Perc test data adequate;
Groundwater monitored for 90 days, with last month occurring
between June 1 and October 15;
Accurate topographic map;
Slope <25% in general region of original and replacement sites;
D.E.C. approval of community system plans (if applicable);
Bedrock outcroppings or shallow depth to bedrock;
Sufficient setback from creeks, major drainages, other water bodies;
Sufficient setback from cutbank or bluff;
Sufficient setback from probable private well locations;
Sufficient setback from community well(s);
Sufficient setback from curtain drains;
Curtain drains installed and ground water monitoring results shown;
Thorough site visit (walk-through) completed;
Minimum proposed lot size meets with DHEP and Zoning criteria;
One original plus two replacement sites delineated for each lot,
while maintaining all separation distances between replacement
sites, property lines, water supplies, water bodies, probable
building structure location, cutbanks, bluffs, etc., and in areas
having less than 25% slope;
WATER SUPPLY
Public Water ~"Community Water Single-family Wells
~ ' D.E.C. approval of community water supply; Known water supply problems in the area;
Water rights applied for from DNR for community wells;
Meets all separation distances;
Sources of contamination identified (dumps, chemical storage sites,
etc.;
Adequate water supply and acceptable water quality;
Review conducted by
KB5/eJ/DI8
Date
SOILS LOG
PERFORMED FOR:
LEGAL DESCRIPTION:
1
2
3
4
5
6
7
8
9
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH AND ENVIRONMENTAL PROTECTION
825 L, Street, Anchorage, Alaskn 99501 264-4720
SOILS LOG- PERCOLATION TEST
PERCOLATION
TEST
SLOPE
SITE PLAN
10
11
12
13-
WAS GROUND WATER ~JO S ..... J .....
14-
Gross I~nt Depth to
Reading Date Time 'l'im¢ Water Drop
15
'16
17
20-
PERCOLATION RATE ~¥?¢~ __ (mh~ules/inch)
TEST RUN BETWEEN FT AND ~ f:T
.."' //¥',? ,x/ /
, x" - ""//,..~7. ,...' _ ..-
. O. 0g05 1983
SOILS LOG
I~EFIFORMED
LEGAL DESCRIPTION:
4
5
6
7
8
9
I0
11
12
13
14
15
16
PERCOLA~i ION
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF: HEALYH AND ENVIRONMENTAL PROTECTION
025 L. ~;treot, Anchorage, Alnsl~n 99501 264-4720
SOILS LOG - PERCOLATION TEST
SI._OPI~
WAS GROUND WATER
EN COLIN1-ERED?
IF YES, AT WHAT
DEPTI I?
Reading
" Not ] Depth to Not
Dato Time ITim° I Water ~._ r)r(),) I
17
18
19
2O
COMMENTS
72-008 (6/79)
PERCOLATION ltATE ..... (minutes/inch)
/,
TEST RUN BETWEEN , F'F FT
SOILS I.OG
MUNICIPALITY OF ANCHORAGE .
DEPARTMENT OF ItEALTI-I AND ENVIRONMENTAL PROTECTION
025 L. Street, Anchore~le, Alaska 99501 264-4720
SOILS LOG- PERCOLATION TEST
[-] PERCOt. ATION
TF'ST
PERFORMED FOR:_
LEGAL DEL;CFHPTION:
1
2
3
4
5
G
7
8
9
DATE P[~RFORMED:
SLOPE
SIT[! IH.AN
10
11
12
13
14
15
10
17
18
19-
20
COMMENTS
PERFORMED
WAS GROUND WATER
ENCOUNTERED?
IF YES, AT WHAT
DEPTH?
72.00[~ (G/ID)
Reading
Date Time
Not Depth to Net
Time Water Drop
PERCOLATION [:lATE ~ hurl;s/inch)
TEST I]tJH BETWEEN ..... /T AND FT
0 & E ENG'NEERING & DEVELOPMENT CO.
..ox 90. Davis St., Eagle River, Alaska 99577
694-2774 or 688-2280
Ru#all Oyater
694-2774
Performed for:
SOIL LOG
MalllngAddress: 'f'~'¢) ' i'Ve× / ~? / ,
Earl EIIla
688-2280
9
~ ,. ,. 10 ,
:il
PLOTc~LA"
12'
13
14~
15
PERC. TEST
16 ---7
Ground Water Encounte ed: Yes . No ~.,'/'" If yes, what depth.
Proposec~'~t~;latlon: "~oepag.e Pit Drain Field
Pedormed by'..._/~"~[~{~- . ~,~ ~r,/-
7-"
/
I
t