Loading...
HomeMy WebLinkAboutFERGUSON LT 1'1,'1 MUNICIPALITY OF ANCHORAGE Department -,If Health and Environmente 825 ~ Street, Anchorage, AK. 264-4720 Protection ~9501 Permit ~ ~<~,.~'~ Applicant: ~ ~U ~~--/%/ Location:~/~ ~/ Z~ / ~/~ ~ Legal Description: ~3/~ ~_~ ;0 7-/~-X] Type of Soil Absorption System Is: * * * HANDWRITTEN PERMIT * * * 4N,~B'8'm~e~%ON-SITE SEWER PERMIT Mailing Address: ...Phone Number:~ ,9"',~ U~X~_/./ _~~ 4/~ LOt Size: U~ 6~ Trench: / Drainfield: Seepage Bed: Holding Tank Maximum Number of Bedrooms~,~ Soil Rating (sq. ft/br) The Require~'~lSize of the Soil Absorption System Is: DEPTH ~ LENGTH ~i~i.'~ GRAVEL DEPTH ,~' WIDTH The length dimension is the length(in feet) of the trench or drainfield. The depth of a trench or pit is the distance between the surface of the ground and the bottom of the excavation(in feet). There is no set width for trenches. The gravel depth is the minimum depth of gravel between the outfall Pipe and the bottom of the excavation(in feet). ~~ * * REQUIRED SEPTIC(HOLDING) TANK SIZE = ~5~ GALLONS * * Permit applicant has the responsibility to inform this department during the installation inspections of any wells adjacent to this property and the number of residences that the well will serve. * * * TWO(2) INSPECTIONS ARE REQUIRED * * * Backfilling of any system without final inspection and approval by this department will be subject to prosecution. Minimum distance between a well and any on-site sewage disposal system is 100 feet for a private well or 150 to 200 feet from a public well depending upon the type of public well. Minimum distance from a private well to a private sewer line is 25 feet and to a community sewer line is 75 feet. Well logs are required and must be returned to this department within 30 days of the well completion. Other requirements may apply. Specifications and construction diagrams are available to insure proper installation. * * * PERMIT EXPIRES DECEMBER 31, 1 g 8 3 * * * I certify that: (1) I am familiar with,.the requirements for on-site sewers and wells as set forth by the Municipality of Anchorage. (2) I will install the system in accordance with codes. (3) I unders~nd that the on-site sewer system may_~/_~re3~q~ire enlargement if the re~/i~ence is remodeled to inslude more tha~/bedrooms.// Signe~: A~~~'¢'~'~/~)Date:ISsued by:~/~,~~4~~~ ~ - SWP/024 (1/81) OErE Russell Oyster 694-2774 Soils ~ Foundations Performed for: Name: GEO..:CHNICAL 8- DEVEL,.,PMENT Box 90, Davis St., Eagle River, Alaska 99577 694-2774 or 688-2280 Hatltng Address: Legal Description: Depth (feet) SOIL LOG Tel. No. Soil Gh~rqcterlstlc) CO. Earl Ellis 688-2280 Land Development 1]~ 12 .... 14 Ground Water Encountered: Yes__ Proposed Installation: Seepage Pit~ No__ If yes, what depth Drain Fte~d Comments'. Performed by: Date: CONST__RJJ , JJ; AND OPERATION CERTIFICATE ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION PUBLIC WATER SYSTEM APPROVAL TO CONSTRUCT Ptans for the construct(on of by ~j~ ,'~ public water system located ., Alaska, submitted in accordance with 18 AAC 80.100 have been reviewed a nd are [] approved. [] conditionally approved (see attached conditions). If construction has not started within two years of the approval date, this certificate is void and new plans and spe£ifications must be submitted for review and approval before construction. APPROVED CHANGE ORDERS Chon ge (contract a raer no. or descriptive reference) Approved by Date The "APPROVAL TO OPERATE" section must be completed before any water is made available to the public. APPROVAL TO OPERATE The construction of the. public water system was completed on. -granted interim approval to operate for 90 days following the cpmpletion date, (date). The system is hereby BY TITLE DATE As-built plans submitted during the interim appr~)val period, or an inspection by the Department has confirmed the system was constructed according to the approved plans. The system is hereby granted final approval to operate. eY TITLE DATE