Loading...
HomeMy WebLinkAboutALYESKA BASIN #6 BLK 6 LT 10 Municipality of Anchorage 3000 ARCTIC BOULEVARD ANCHORAGE, ALASKA 99503 (907) 277-7622 GEORGE M. SULLIVAN, MAYOR July ll, 1978 DEPARTMENT OF ENTERPRISE ACTIVITIES Sewer & Water Utility Hope Homecrafters Box 31 Hope, Alaska 99605 Attention: Steve Gates Subject: Sewer Availability Within Girdwood Dear Mr. Gates: This department has Lot l0 Block 6 Alyeska Basin Subdivision Unit VI (corner of Vail Drive and Vail Circle) and we find that you are near the upstream end of the Girdwood Lateral Improvement District 60-1 Schedule I system. This project is now being advertised and this department plans to have the contract awarded and under construction by the first part of September, 1978. Since there are three (3) downstream tie-ins, we cannot tell which one the contractor will start with. The only time frame that I can give is that the total system is scheduled for completion the end of construction 1979. This construction also includes service connects to the property line. Your service is proposed to be located 15 feet south of your north line on Vail Drive. If you intend to construct and/or occupy this property prior to the sewerage system being completed, please contact the Municipal Health Department for their requirements and/or stipulations. Sincerely, Engineering Technician IV Anchorage Water & Sewer Utilities JGT:nrs TO MESSAGE DATE REPLY Redi~)rm® 4S 471 SIGNED DATE// SEND PARTS I AND 3 WITH CARBON INTACT - Potv ~^K Iso S~TS~ ,,~ ,.7~ PART 3 WILL BE RETURNED WITH REPLY. DETACH AND FILE FOR FOLLOW-UP