HomeMy WebLinkAboutALYESKA BASIN #6 BLK 6 LT 10
Municipality
of
Anchorage
3000 ARCTIC BOULEVARD
ANCHORAGE, ALASKA 99503
(907) 277-7622
GEORGE M. SULLIVAN,
MAYOR
July ll, 1978
DEPARTMENT OF ENTERPRISE ACTIVITIES
Sewer & Water Utility
Hope Homecrafters
Box 31
Hope, Alaska 99605
Attention: Steve Gates
Subject: Sewer Availability Within Girdwood
Dear Mr. Gates:
This department has Lot l0 Block 6 Alyeska Basin Subdivision Unit VI
(corner of Vail Drive and Vail Circle) and we find that you are near
the upstream end of the Girdwood Lateral Improvement District 60-1
Schedule I system. This project is now being advertised and this
department plans to have the contract awarded and under construction
by the first part of September, 1978. Since there are three (3)
downstream tie-ins, we cannot tell which one the contractor will
start with. The only time frame that I can give is that the total
system is scheduled for completion the end of construction 1979.
This construction also includes service connects to the property line.
Your service is proposed to be located 15 feet south of your north
line on Vail Drive.
If you intend to construct and/or occupy this property prior to the
sewerage system being completed, please contact the Municipal Health
Department for their requirements and/or stipulations.
Sincerely,
Engineering Technician IV
Anchorage Water & Sewer Utilities
JGT:nrs
TO
MESSAGE
DATE
REPLY
Redi~)rm® 4S 471
SIGNED DATE//
SEND PARTS I AND 3 WITH CARBON INTACT - Potv ~^K Iso S~TS~ ,,~ ,.7~
PART 3 WILL BE RETURNED WITH REPLY.
DETACH AND FILE FOR FOLLOW-UP