Loading...
HomeMy WebLinkAboutSTORCK Project TA94/1/j November 1, 1982 Colonel H.A. Froehle Director of Engineering and Housing Department of the Army Headquarters 172d Infantry Brigade(Alaska) Fort Richardson, Alaska 99505 Subject: Septic System FacilJ_ties for Ammo Storage Area Project #TA94/1/J The Department of Health and Environmental Protection has reviewed the design with the soils log and percolation information as submitted. The department finds the septic system design will meet with conditions this department is concerned with. If there are any further questions, please call this office at 264-4720. Sincerely, John W. Lynn Environmental Specialist JWL/ljw AFZT-EH-E DEPARTMENT OF THE ARMY HEADQUARTERS, 172D INFANTRY BRIGADE (ALABKA) FORT RICHARDSON, ALABKA 99505 14 OCT SUBJECT: Install Latrine Facilities, Fort Richardson, Alaska Project No. TA~¢~94/1/J Ammo Storage Area, Municipality of Anchorage Environmental Health Division 825 L Street Anchorage, Alaska 99501 ~4UNICIpALITY OF ANCHORAGE :ION Gentlemen: Forwarded in accordance with GAAB Code of Ordinances Disposal Practices 16.45.100 are drawings and. design pertaining to the proposed subject project (Incl 1) . Sewage analysis There are no wells within 200 feet of the system. The water supply is to be piped from Building 55804 as indicated in drawing. This design proposes the construction of latrine facilities in Building 55805, installing a septic tank and construction of a seepage bed. Your early review and approval of this matter will be appreciated. A written reply will be necessary in order to install the system. 1 Incl as stated Sincep~iy, ~ / / A. FROE , Director of Engineering and Housing {. CZt21 {z:~-o') ~ (. z '.-3g'D e { z'. '-/z"- s'Z ) e/, i" 0: o~-'°] ® ,4£ I /