Reference: Lot 81, Section 25, T15N, R2W
JUN 1 1999
Health & Humn~ ~'- ~.O
This is to advise you that you are in violation of Anchorage Municipal Code
15.65. i50 which states "within thirty working days from the date of the final
inspection of an on-site wastewater disposal system, an inspection report, including
but not limited to the information described in subsection F of this section, shall be
submitted to the department by the owner or his agent". We completed the final
inspection on January 5,1999 and submitted the required insp6ction report to the
Department Of Health and HUman Services (Municipality of Anchorage) on
January 8, 1999.
Since you have refused to pay our bill for these services (invoice #25971), we have
retracted the inspection report from the Municipality of Anchorage and will hold it
until we are paid. Attached is out' price list which was available to you at the time
the work was performed. We did not indicate to you at any time that the septic
system installation inspections and report would be flee.
Please forward $350.00 and we will resubmit the inspection report to the
Department of' Health and Human Services.
Sincerely,
Robert C. Cowan, P.E.
RCC/skh
XC: DHHS w/o attachments
Attachments
17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577
Rick Mystrom,
Mayor
Municipality of Anchorage
Department of Health and Human Services
825 %" Street
P.O. Box 196650 Anchorage, Alaska 99519-6650
343-4744
June 12, 1997
Vernon J Orr
5710 Tonga Street
Anchor~ag~,f~Ata~ka 99507 1858
Subject: T15N R2W Section ~L~5~Lot 81
Permit #SW960113, PID #051-202-27
The subject permit, issued June I1, 1996 by this office for a
single family well and/or on-site wastewater system, has
expired as of June 11, 1997.
A new permit must be obtained from this office for a well
and/or on-site wastewater system NOT installed by the
expiration date.
If you have drilled the well, a well log must be sent to
this office for documentation of the installation and to
close the permit.
If a licensed Professional Engineer has inspected the
installation of the on-site wastewater system, the original
as-built inspection report must be sent to this office for
review, approval and documentation. Ail inspection reports
must be submitted within 30 days of construction completion.
When applying for a new permit, the fees are: $320.00 for an
on-site wastewater permit; $120.00 for a well permit and
$440.00 for a combined on-site wastewater and well permit.
If you have any questions, please call this office at 343-4744.
'Sin~rely' ~ ~
pJ~rSamCr~aSnS;geP;E'~. - -,
On-site Services
enc: Copy of Permit
cc: S & S Engineering
HEALTH AUYHORIIY
APPROVALS
SEWER&WATER
INSPECTION
WELL INSPECTION
& FLOWTEST
SOILiEST
PERCOLATION
TEST
STRUCTURAL&
MECHANICAL
INSPECTIONS
ROBERTC. COWAN, RE.
ROBERTA. SHAFER, EE.
Date
CIVIL ENGINEERS
(907) 694-2979
FAX (907) 694-1211
Municipality of Anchorage
DEPARTMENT OF HEALTH AND HUMAN SERVICES
825 L Street
P.O. Box 196650
Anchorage, Alaska 99519-6650
ODI~JOUOUV ,~0 All~ed!elunl~
REFERENCE:
The septic inspections for thE.referenced property, w~re
performed on ~&/~ and ~/7/9~ . Prior to submitting
the On-site Wastewater Disposal System and/or Well Inspection
Report we are waiting for the ~=,~ to be
completed.
If we may be of further service please contact us.
Sincerely,
17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH AND HUMAN SERVICES
P.O. BOX 196650, 825 "L" STREET, ROOM 502
ANCHORAGE, ALASKA 99519-6650
PAGE 1 OF 1
ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT
PERMIT NUMBER:SW960113
DESIGN ENGINEER:S & S ENGINEERING
OWNER NAME:ORT VERNON J
OWNER ADDRESS:5710 TONGA STREET
ANCHORAGE, ALASKA 99507
DATE ISSUED: 6/11/96
EXPIRATION DATE: 6/11/97
PARCEL ID:05128227
LEGAL DESCRIPTION:
. T15N R2W SEC 25 LT 81
LOT SIZE: 108900 (SQ. FT.)
NUMBER OF BEDROOMS: 3 THIS PERMIT: 3
THIS PERMIT IS FOR THE CONSTRUCTION OF:
DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM
ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH:
1. THE ATTACHED APPROVED DESIGN.
2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS
15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL
REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AAC80) .
3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS
PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY
CALLING 343-4744 ( 24 HOURS ) (NOT REQUIRED FOR WELL ONLY PERMIT)
4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL
ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING
WEATHER MUST BE EITHER:
A. OPENED AND CLOSED ON THE SAME DAY
B. COVERED, SEALED AND HEATED TO PREVENT FREEZING
5. THE FOLLOWING SPECIAL PROVISIONS.
~EcIAL PRO~ISIONS~
IF THE FiRsT WELL CONSTRUCTED DOES NOT PRODucE WATER THEN/
~THE FIRST WELL SHALL BE PERMANENTLY ABANDONED WHEN THE
[SECOND WELL IS CO T U ~.
RECEIVED BY: ~ ·
/ ,-
DATE.'
SEWER&WATER
INSPECTION
ENGINEERING STUDIES
AND REPORTS
WELL INSPECTION
& FLOWTEST
SITE PLANS
ROAO DESIGN
SOJLTEST
PERCOLATION
TEST
STRUCTURAL&
MECHANICAL
INSPECTIONS
ROBERT C. COWAN, RE,
ROBERTA, SHAFER, RE.
CIVIL ENGINEERS
May 17, 1996 (907)694-2979
FAX (907) 694-1211
MUNICIPALITY OF ANCHORAGE
Department of Health and Human Services
P.O. Box 196650
Anchorage, AK. 99519
REFERENCE: Lot 81, T15N, R2W, Sec. 25
Request you issue a permit to drill a well and install a
septic system %0 serve the proposed three bedroom house on
the referenced property.
A test hole was excavated and percolation test performed.
The approximate location of the test hole is located on the
attached site plan.
At the time of excavation no water was encountered in the
test hole and after seven day gorund water monitoring, the
monitoring tube within the test hole was found to be dry.
At the owners request, we have provided two well locations.
The first proposed well location is the owners preferred
location. However, if unable to find water in the first
well location, then the second proposed well location will
be used and the first well will be properly abandoned.
This property has enough area for a future septic upgrade
which can be seen on the attached site plan.
We do not anticipate any adverse effects on neighboring
wells, septic systems or drainage patterns by the
installation of the proposed septic system.
There are no points of contamination within the proposed
well radius which can be seen on the attached site plan.
If you require additional information, please contact us.
Sincerely,
Robert C. Cowan~ P.E.
RCC/gk
Enclosure
17034 NORTH EAGLE RIVER LOOP ° SUITE204 · EAGLE RIVER, ALASKA 99577
" '~;~ALE= 60' SITE PLAN DESIGN
/ O'
~ PUBLIC USE EASEMENT
ROBERT C. COWAN, RE.
ROBERTA. SHAFER, RE.
SEWER&WATER
INSPECTION
ENGINEERING STUDIES
AND REPORTS
WELL INSPECTION
& FLOWTEST
ROAD DESIGN
SOILTEST
PERCOLATION
TESI
STRUCTUP~L&
MECHANICAL
INSPECTIONS
REFERENCE: Lot
May
GENEraL:
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION PRACTICES
and
MATERIAL SPECIFICATIONS
CiViL ENGINEERS
(907) 694-2979
FAX (907) 694-1211
81, T15N, R2W, Sec. 25
17, 1996
The scope of this project includes the installation of
a 1000 gallon septic tank and a five foot wide
drainfield to serve the proposed three bedroom
residence located on the referenced property.
Construction shall be in accordance with the approved
site plan and design drawings, Municipal permit with
any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal
Regulations.
The contractor shall be responsible for obtaining any
necessary underground utility locates.
Unless specifically agreed otherwise, the property
owner shall be responsible for final grading areas
subsequently depressed from soil settling.
Contractors installing wastewater disposal systems
must be certified by the Municipal Health Department
for system installations. Owners installing their own
systems must also receive prior approval from the
Municipal Health Department.
SEPTIC TANK INSTALLATION:
A septic tank is to be constructed by a certified
septic tank manufacturer. Construction shall include
two 4" cleanouts for pumping access.
The septic tank Shall be sufficiently bedded to
prevent settling or shifting of the tank.
3. Ail standpipes on the septic tank shall extend a
minimum of 12 inches above final grade.
17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577
Page Two
Lot 81, T15N,
May 17, 1996
R2W, Seo. 25
Septic tanks installed with less than 4 ft. of cover shall
be insulated.
A foundation cleanout shall be installed one to four feet
from the building foundation. In the line between the tank
and the leachfield there shall be two adjacent cleanouts
(unless an effluent pumping system exists within the septic
tank). These cleanouts shall be located on undisturbed
soil not more than 10 ft. from the tank. The first
cleanout, in line, shall be to clean toward the leachfield.
The second cleanout shall be to clean toward the septic
tank.
Final grading over the septic tank shall be such that a
positive slope exists away from the septic tank.
ABSORPTION TRENCH/DRAINFIELD INSTALLATION:
Excavate the proposed trench to the dimensions shown on the
design. The bottom of the excavation shall be within 2
inches of level. If the sidewalls of the excavation become
smeared, they must be raked or scratched (ruffed-up) before
gravel (sewer rock) placement.
e
Once the gravel is installed, the distribution pipe is to
be installed level with the perforations faced downward.
Gravel is then to be placed over the distribution pipe to
provide a minimum of 2 inches of cover over the pipe.
A silt barrier must be installed between the final gravel
layer and the native soil backfill. Ensure the silt
barrier covers the entire gravel surface before placing
backfill.
Monitor tubes shall be of four (4) inch diameter,
installed approximately in the locations shown on the
design, and extend a minimum of 12 inches above final
grade. The portion of the monitoring tube extending
through the gravel shall be perforated from the bottom of
the trench to the invert of the distribution pipe. This is
equivalent to the effective depth of the gravel as noted on
the design.
Page Three
Lot 81, T15N,
May 17, 1996
R2W, Sec. 25
Backfill over the final gravel layer must not be less than
twenty-four (24) inches. Insulation must be installed when
the backfill depth is less than thirty-six (36) inches.
The finish grade over the trench must be mounded to prevent
the formation of a depression after settling.
MINIMUM MATERIAL SPECIFICATIONS:
Any septic tank proposed for installation must be
constructed by a Municipally approved septic tank
manufacturer.
The following pipe materials are approved for use in septic
system installations in the Municipality of Anchorage:
Type of Pipe
Perforated Solid
Cast Iron Yes Yes
ASTM D3034 (PVC) Yes Yes
ASTM F810 (HDPE) Yes No
ASTM D2662 (ABS) Yes Yes
Use of a type of pipe other than listed above must be
approved by the inspecting engineer.
Se
Insulation shall be at least 2" thick extruded direct
burial polystyrene (Dow Chemical Company Styrofoam HI or
equal).
e
Septic tank inlets and outlets shall be fitted with
watertight couplings (Caulder, Fernco, or equal).
A permeable nontoxic silt barrier (Typar 3401, Mirafi 140N,
or equal) must be installed between the final leachfield
gravel layer and the native soil backfill.
All leachfield gravel (sewer rock) shall be 0.5"-2.5"
screened gravel with less than 3% passing the #200 sieve.
When sand is being used as a filter material, its gradation
specifications must conform to current M.O.A. or D.E.C.
requirements.
Page Four
Lot 81, T15N, R2W,
May 17, 1996
Sec. 25
INSPECTIONS:
Typically there will be a minimum of three (3) inspections
required during the installation of the wastewater disposal
system. These inspections will occur as follows:
The first inspection must be conducted after the
excavation of ditches, pits, trenches, or beds and
before the installation of any gravel. A septic tank
may be set in place, but may not be backfilled before
this inspection.
e
The second inspection must be conducted after the
placement of the silt barrier, gravel, distribution
lines, standpipes, cleanouts, and insulation, but
before the placement of any other backfill.
The final inspection is to occur upon final grading of
the property.
Often there will be more than these 3 inspections required.
Especially with the installation of multiple trenches, sand
filters, pressurized distribution systems, etc. Thus, the
inspecting engineer is to be contacted at least 24 hours prior
to the start of construction. If necessary, a pre-construction
meeting will take place on-site. The inspecting engineer will
not coordinate, direct or control in any way the contractors
activities.
The owner shall contract with the contractor to perform the work
outlined in these specifications and plans and in accordance
with the attached M.O.A. permit. There will be no contractual
arrangement existing between the contractor and S & S
Engineering. S & S Engineering shall be the owner's
representative and will inspect the work as stated above to
document the contractors activities. Final acceptance of the
contractors work rests with the owner and the M.O.A.
Page Five
Lot 81, T15N,
May 17, 1996
R2W, Sec. 25
S & S Engineering shall have no liability to the owner or to
others for acts or omissions of the contractor or any other
persons performing work on this project or the failure of the
contractor to carry out the work in accordance with these
construction documents. S & S Engineering's inspecting engineer
will not be responsible for the construction means, methods,
techniques, sequence, procedures or the safety precautions
incident to this project.
CONTRACTOR/INSTALLER
Municipality of Anchorage
DEPARTMENT OF HEALTH & HUMAN SERVICES
825 "L" Street, Anchorage, Alaska 99502-0650
SOILS LOG -- PERCOLATION TEST
PERFORMED FOR: ~'~ (~ ~""~
LEGAL DESCRIPTION:~I::7~\ ~_~-../_.~.'Z~' t '[~l~"e'~ ~ ¢-'~'1 Township, Range, Section:
SLOPE SITE PLAN
1
2
3
4
6-
7-
8-
9-
13-
14-
15-
16-
17-
18-
19-
20-
WAS GROUND WATER
ENCOUNTERED?
4 s
L
IF YES. AT WHAT
DEPTH? ~ pO
E
Depth (o Waler After
Monitoring?
I
Gross Net Depth to Net
Reading Date Time Time Water Drop
2.- ~, ,5' ~,.) ~'/,-" ~,"
?.- 4?,.-
PERCOLATION RATE ~ (minutes/inch) PERC HOLE DIAMETER L~
TEST RUN BETWEEN 4 FT AND ~ FT
COMMENTS
$ & S ENGINEERING
PERFORMED BY: 17034. I=agie River L~,p ~.v.v~ ,%'c,. 264 w. ~ o CERTIFY THAT THIS TEST WAS PERFORMED IN
ACCORDANCE WiTH ~t.~T~tt~.,~N~l~l(~-~TG UIDELINES IN EFFECT ON THiS DATE. DATE:
72-008 (Rev. 4/85)