HomeMy WebLinkAboutRECREATION CENTER S-7748
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION
Environmental Health Division
CASE REVIEW WORKSHEET
CASE NUMBER: DATE RECEIVED: COMMENTS DUE BY:
S-7748 July 18, 1984 August 3, 1984
SUBDIVISION OR PROJECT TITLE:
Tracts Bi, B2, B3 Recreation Center Subdivision
Lots ~ Block 2, Act 7B Block 3 Fire Lake, Alaska Subdivision
~z~ ~PU~L,C WATER AV^,L^BLE , UBL,CSEWERAVA,,AB,E
~,/t~ COMMUNITY WATER AVAILABLE
COMMENTS:
CHECKLIST
WASTEWATER DISPOSAL C~o~nn
Public Sewer ity 0nsite Sewer __Single-family Onsite
t ta ed by engineer, signed, dated, identified, etc.;
~Sufftcient soil tests to characterize minimum of 50% of subdivision
in probable absorption field areas;
~Soil test locations accurately identified;
Perc test data adequate;
Groundwater monitored for 90 days, with last month occurring
AcetWeen June 1 and October 15;
curate topographic map;
/ Slope <25% in general region of original and replacement sites;
D.E.C. approval of community system plans (if applicable);
Bedrock outcroppings or shallow depth to bedrock;
Sufficient setback from creeks, major drainages, other water bodies;
Sufficient setback from cutbank or bluff; .
~gufficient setback from probable private well locations,
~ Sufficient setback from community well(s);
~ Sufficient setback from curtain drains;
~ Curtain drains installed and ground water monitoring results shown;
~ Thorough site visit (walk-through) completed;
~ Minimum proposed lot size meets with DHEP and Zoning criteria;
One original p us two reCaeement sites delineated for each lot,
~ while maintaining all separation distanc~s~ replacement
sites, property lines, water supplies, water bodies, probable
building structure location, cutbanks, bluffs, etc., and in areas
having less than 25% slope;
WATER SUPPLY C~o~u
Public Water nity Water Single-family Wells
o .E.C. approval of community water supply;
wn water supply problems in the area;
__~ter rights applied for from DNR for community wells;
~.~-'Meets all separation distances;
~ S.o~ces of contamination' identified (dumps, chemical storage sites,
/etc.;
~.z Adequate water supply and acceptable water quality;
Review conducted by
KB5/ej/D18
Date
DOWL ENGINEERS ~
4040 "B" Street
r ANCHORAGE, ALASKA 99503
(907) 562-2000
Telecopier Phone (907) 563-3953
RE:
WE ARE SENDING YOU ~,.Attached [] Under separate cover via the following items:
[] Shop drawings [] Prints [] Plans [] Samples [] Specifications
',~Copy of letter [] Change order []
COPIES DATE NO. DESCRIPTION
THESE ARE TRANSMITTED as checked below:
[] For approval
~ For your use
[] As requested
[] For review and comment
[] FOR BIDS DUE
[] Approved as submitted
[] Approved as noted
[] Returned for corrections
[]
19
[] Resubmit
[] Submit
[] Return
copies for approval
copies for distribution
corrected prints
__ [] PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPY TO.
SIGNED:t ~'/~, ~
If enclosures are not as noted, kindly notify us ~'nce.
SOUTHCENTRAL REGIONAL OFFICE
437 "E" STREET, SUITE 200
ANCHORAGE, ALASKA 99501
September ll, 1984
BILL SHEFFIELD, GOVERNOR
274-2533
DOWL Engineers
4040 "B" Street
Anchorage, Alaska
99501
Dear Sir:
Subject: Fire Lake School Sewer System
8521-DA-044
We have reviewed the plans and specifications for the subject project.
The project is hereby approved for construction for the items with which
this Department is concerned. This letter constitutes the permit required
by A.S. 46.03.720(a) for approval of sewerage systems.
It should be remembered that final approval will necessitate the submission
of Engineer As Built Plans. This will consequently mandate that a private
professional engineer conduct basic inspection of this project so as to be
able to sign off on as built plans. Arrangement for this inspection work
is the responsibility of the developer.
~Sincerely' ~
Environmental Engineer
BEE/msm
Enclosure
MUNICIPALITY OF ANCHORAGE
Platting Board Meeting
Summary of Action
August 8, lP84
(continuation of August 1, 1984 meeting)
1. BOARD MEMBERS PRESENT: Strom, Tyler, Ransom, Kendall,
Barry, Brown, Leslie, Parker
BOARD MEMBERS EXCUSED: Gillespie
STAFF MEMBERS PRESENT:
Weaver, Winn, Brower, Paraoan,
Lynn
6. NEW BUSINESS
A. Public Hearing
1. S-7755 WHALEY PARK SUBDIVISION
The plat was postponed pending:
1o Areawide rezoning.
2, Assuring each lot meets slope chart
requirements.
3. Resolving soils with DHEP.
4. Clarification of the density of the
Comprehensive Plan with Community Planning.
5. Resolving water availability and obtaining
approval of the community water system with
AWWU, DHEP, and DEC.
2. S-7748 RECREATION CENTER SUBDIVISION
The plat was approved subject to:
1. Resolving utility easements.
2. Resolving drainage and drainage easements
with Public Works Engineering.
3. Resolving access with Traffic Engineering.
4. Entering into a subdivision agreement for
the following:
a. to construct the 60' access road to
urban access standards from the existing
paving; ~
b. to construct McClaren Street cul-de-sac
to gravel standards;
Platting Board Meeting
Summary of Action
August 8, 1984
Page 2
c. street lights, street name signs, and
traffic control devices to be resolved;
and
d. landscaping along the Old Glenn Highway
and 30' screening to Tracts B-1 and B-2
to be approved by UDC and Community
Planning.
5. Obtaining a wetlands permit, if required.
6. Providing a 65' creek maintenance easement
and development setback width to be resolved
with Community Planning.
7. Showing the floodplain limits.
8. Resolving the need for a floodplain hazard
permit with Public Works Engineering.
9. Obtaining approval of the community on-site
sewer system from State DEC and DHEP.
10. Indicating the 100' creek setback for the
on-site sewer system. ~
]1. Resolving soils with DHEP
12. Placing a note on the plat prohibiting
direct vehicular access to the Old Glenn
Highway.
13. Providing a 30' screening easement along the
common lot line of Tract B-] and B-2 with
location to be resolved with the Community
Planning Department.
14. Providing a lO' vegetative screening buffer
adjacent to the Old Glenn Highway.
15. Extending Tract B to the Old Glenn Highway.
]6. Tracting out the Eagle River Recreation
Center with the boundary to be resolved with
the Community Planning Department and
Property Management.
~7. Providing pedestrian access from McClaren to
Tract B.
3. S-7744 RIPLEYS SUBDIVISION
The plat was approved subject to:
1. Resolving utility easements.
2. Resolving drainage and drainage easements
with Public Works Engineering.
TO
DOWL ENGINEERS'~ '~
4040 "B" Street
ANCHORAGE, ALASKA 99503
(907) 562-2000
Telecopier Phone (907) 563-3953
WE ARE SENDING YOU ,.~Attached [] Under separate cover via
[] Shop drawings '~Prints [] Plans
[] Copy of [etter [] Change order []
the following items:
[] Samples [] Specifications
COPIES DATE NO. DESCRIPTION
THESE ARE TRANSMITrED as checked below:
~;1~ For approval
[] For your use
[], As requested
[] For review and comment
[] FOR BIDS DUE
REMARKS ~-~/-~ ?°~/-?o -~L~'
[] Approved as submitted
[] Approved as noted
[] Returned for corrections
[]
[] Resubmit__
[] Submit
[] Return
copies for approval
copies for distribution
corrected prints
19 [] PRINTS RETURNED AFTER LOAN TO US
COPY TO_
T=43
TEST PI T 42
LOCATION=97*II N, i92+7t E
ELEVATION=393.4
DEPTH
R!IL_. AN~D PE___AT] SURFAC.~___E ORGANIC~S 0.2
SANDY GRAVELLY SILT, NONPLASTiC, DRY,
N S-~NDY G'~RAVEL. CLE~AN, POORL~GR~DED~ '''
TEST PiT COMP~ETEO '26/84
NO GROdNDWATE~ OBSERCED WHILE~CACAT;N6 --
KEY
MA = MECHANiCAu ANALYSIS
LL = LiOUiD LiMiT
Pi = PLASTIC iNDEX
PR = POCKET PENETROMETER (TSF)
T¢ = TORVANE (TSF)
[] = GRAB SAMPLE
[] = SPf SAMPLE
[] = SHELBY TUBE-PUSHED
[] = 2.5" i.D. SPOON SAMPLE
340# WEIGHT, 30" FALL
T : SAMPLE TEMPERATURE (?F) PROBABLY
AFFECTED BY SAMPLING PROCEDURE
DOWL ENGINEERS
LOG OF PIT
LOGCED BY P.MCBETH
W.O. 051393
FIGURE
T=46
MA/FC
SEE
SHEET
TEST BORING 39
LOCAl'iON=96+TS N, 193+13 E .
ELEVATi 0N=393.6
DEPTH
F4, TOPSOIL AND PEAT, SURFACE ORGANICS
O.S
F4, OLIVE SANDY GRAVELLY SILT. NONPLASTiC. DAMP.
IRM 1.O
GREY SANDY GRAVEL, CLEAN. WELL GRADEO,
GRAVEL, COBBLES TO 8", DRY, MEDIUM DENSE
GRAB SAMPLE FROM PERCOLATION TEST PiT
PERCOLATION RATE LESS THAN I MINUTE PER iNCH
__6.0
NFS, GREY GRAVELLY SAND, CLEAN, POORLY GRAOED,
SUBANGULAR TO SUBROUND GRAVEL TO 2". OAMP. MEDIUM
DENSE
~Z GROUNDWATER LEVEL WHILE DR{LL)NG
(i4.2
~ GROUNDWATER AT ;4.5' ON 7/25/84
3. BROWN SiLTY SANDY GRAVEL, ABOUT JOX LOW
PLASTiCiTY FINES, SUBAN~ TO 2", SAT-
]OR_~T½~. 2E_? it L~R2 ~L~_ _ _ 2~
TEST BORING COMPLEFED 7/21/84
PERFORATED PVC PiplE INSTALLED i N/ZBORiNO
mERCOLATiON TEST P~ET EAST
KEY
MA : MECHANICAL ANALYSIS
LL = LIOUIO LIMIT
PI : PLASTIC INDEX
PP = POCKET PENETROMETER ITSF)
TV = TORVANE (TSF)
[] = CRA8 SAMPLE
[] = SPT SAMPLE
[] = SHELBY TUBE-PUSHED
[] = 2.5" i.D. SPOON SAMPLE
340# WEIGHT. 50" ~ALL
T = SAMPLE TEMPERATURE (~F) PROBABLY
AFFECTED BY SAMPLING PROCEDURE
DOWL ENGINEERS
LOG OF BORING
LOGGED BY P.MCBETH
W.O. OS1393
FIGURE
TO
DOWL ENGINEERS
4040 "B" Street
ANCHORAGE, ALASKA 99503
(907) 562-2000
Telecopier Phone (907) 563-3953
,:m ~,,f L y, v//
RE: .
WE ARE SENDING YOU '-~Attached [] Under separate cover via the following items:
[] Shop drawings [] Prints )~, Plans [] Samples [] Specifications
[] Copy of letter [] Change order []
COPIES DATE NO. DESCRIPTION
THESE ARE TRANSMITTED as checked below:
[] For approval
[] For your use
[] As requested
[] For review and comment
[] FOR BiDS DUE
[] Approved as submitted
[] Approved as noted
[] Returned for corrections
[]
19
[] Resubmit.__
[] Submit
[] Return
copies for approval
copies for distribution
corrected prints
[] PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPY TO.
// ~./
If enclosures are not as noted, kindly notify usher once.
ELEVATION
LOGGED aY
DRILLING CONTRACTOR
EQUIPMENT
SAMPLER ~ ~ 1"'
'SOIL DESCRIPTION
COMMENTS
I Z''/
FIELD LOG
DRILLING CONTRACTOR ~,~
~ILLER
SOIL DESCRIPTION
~,.~ NO. ~/
Ti~E FmNm~H [].'/~
WATER LEVEL --TIME--
S.EETI oF I
COMMENTS
ELEVATION
FIELD LOG
LOGGED ~y
DRILLING CONTRACTOR
,DRILLER
.EQUIPMENT C~
SOIL. DESCRIPTION
COMMENTS
ELEVATI*
FIELD LOG
DRILLING CONTRACTOR
DRILLER
SOIL DESCRIPTION
'~K ORDER NO.
DATE
TIME STAI~T /O. ~
TIME FINISH ~
WATER LEVEL ~ TIME
SHEEr I
COMMENTS
FIELD LOG
: CUENT
LOGGED By ~
DRILLING CONTRACTOR ~. ~.~
ORILLER ~O)e "
EQUIPMENT ~/~
SAMPLER J' P')"
SOIL DESCRIPTION
WORK ORDER NO.
DATE
TIME START
TIME FINISH
WATER LEVE[_~ c/% TIME
SHEET ioFI
COMMENTS
ELEVATIC
FIELD LOG
~.O~EO ~y
E~IPM~NT ~0
.~AMPLER
SOIL DESCEleTION
SHEET ) OF/
COMMENTS
FIELD LOG
LOGGED
DRILLING
SAMPLER
SOiL DESCRIPTION
.~om.e .o. '¢,,'c ¢ :, 'h t
worx ORO~R .o.
TIME START
WATER LEVE ~OE/TiME
SHEET )OF I
COMMENTS
ELEVATION
FIELD LOG
LOGGED ~y
DRILLING CONTRACTQR
DRILLER
EQUIPMENT
SAMPLER
SOIL DESCRIPTION
BORING NO. ~:
TIME START
TIME FINISH
WATER LEVEL TIME
SHEET OF
~+7~"
~o
>{y. oo~,/ ADo+DoE
ELEVATION
FIELD LOG
BORING NO./-~,~
LOGGED ~ly
DRILLING CONTRACTOR ,~,'e',~.J~
DRILLER
EQUIPMENT
SOIL DESCRIPTION
ORDER NO. ~)J-]
TIME START
TIME FINISH
WATER LEVEL~"~/TIME
SHEET
COMMENTS
ELEVATION
FIELD LOG
cUE.T
LOGGED BY
DRILLING
~ILLER
~U~gNT
SAMPLER
SOIL DESCRIPTION
w~. ORDER NO.
DATE "7/.~./,/~l' ~'
TIME FINISH
WATER L~EL TIME
SHEET t oF I
COMMENTS
FIELD LOG
LOGGED BY
DEILLING CONTRACTOR
TIME ~TART '
DRILLER
EqUiPMENT
SAM.LE. ~,~'~'
SOIL DESCRIPTION
TIME FINISH [/,.~0
WATER gEVEL TIME------'
SHEET I OFI
COMMENTS
ELEVATION
FIELD LOG
LOGGED BY
DRILLINe CONTRACTOR
DRILLER ~'~
SAMPLER
SOIL DESCRIPTION
TiME START
TIMI~ FINISH
WATER LEVEL
I
COMMENTS
ELEVATION
FIELD LOG
CUE.T _--C'_~Z'- ~,.,-¢/.o
LOGGED I~y ~c:~/f,4 (
DRILl. lNG CONTEACTOR ~¢¢,~
DRILLER ~
SAMPLER ~e ~
SOIL DESCRIPTION
aoR~n6 .o. Y 7
T~ME FINISH
WATER L~EL ~tME ~
SHEET } OFt
COMMENTS
ELEVATION
FIELD LOG
CL, ENT ~'C--T--H¥~/~ ,,'~//~.
DRILLING CONTRACTOR /~C"¢~L
DRILLER '~,'~.~,
SAMPLER
SOIL DESCRIPTION
[~K~RING NO.
WORK OROER~O.
DATE
TIME START
TIME FINISH
WATER LEVELT e/TIME~:
SHEET~ OF J
COMMENTS
FIELD LOG
LOGGED By /~/~ C
DmLU,G CO,?RAC'rO, ~"~'¢/.
DRILLER ~
SAMPLER
SOIL DESCRIPTION
~M~RK ORDER NO,.~,~/3
TIMZ START 2 ,'~0
TI~E FINISH
WATER L~EL] ~/TIME
SHEET]OF
COMMENTS
ELEVATION
FIELD LOG
(~LII~'NT
LOGGED ~ly ~/'v~ C.
DRILLING CONTRA~;TOR
DRILLER -'~ ,,,,~,
SAMPLER
SOIL DESCRIPTION
_BORING NO.
~,~K OROER NO.
TIME START Z. '.
T~ME FINISH
WATER LEVEI..JO $/' TIME
SHEET I OF/
COMMENTS
DEPT. OF EN¥1RONMENT. AL CONSERYATION
SOUTHCENTRALIREGIONAL OFFICE
William M. Smith
Skilling, Helle, Christiansen,
Robertson, Barkshire, Inc.
430 West Seventh Avenue
Anchorage, Alaska 99501
437 E. Street
SECOND FLOOR
ANCHORAGE, ALASKA 99501
(907) 274-2533
P.O. BOX 515
KODIAK, ALASKA 99615
(907) 48~-3350
P.O. BOX 1207
SOLDOFNA, ALASKA 99669
(907) 262-5210
P.O. BOX 1709
VALDEZ, ALASKA 99686
(907I 835-4698
P.O. BOX 1064
WASILLA, ALASKA 99687
(907) 376-5O38
SUBJECT: Eagle River/Chugiak Recreation Center
{8321-FA-048) & (8321-DA-023)
Dear Mr. Smith:
We have reviewed the plans and specifications for the subject project.
· ' eb a roved f~~which
The project is her y- pp
this Department is concerned./q~s letter constitutes the permit/Yrequired
by A.S. 46.03.720(a)for appr~S.~
Enclosed with this letter,, is~a~ C~rtt ~f'cate,, To Construct'~for the drinking'
water system. The Apprp~ to Operate section of the. c~rtif~cate must
be comp!eted by a representative of this Departmen~.prlor to placing the
system in operation.
Sincerely,
Environmental Engineer
BEE/msm
Enclosure
18-O9LH
attached cond~bon$); I~' w,~ k.'..-t,.~;~,.; .~ ..... · ·
;>3: . . .;..>;:~."' ;;;:.': _~ .
.-. ; .':~...,: .... ,.-..~.::.~:~;,;~:~':.,_:..:...-?:%:.},::~..~:~ .- ...-.~.:,
has'not ~t~'d within two'gear~
and spoc~hcabon~ mu~t be ~ubm trod for rev ow and approval ~fore con~trucbon.- ~-:,:: ~-~5~:?;' ~-.:c- .:- ~,; - - ~ -.
a ~ i~;h'{ra~t~¢~e;:h~." -',.':~:,..;;' - . :. '; ~p'pi~¢ed by :?'L"; '. Date ' '. ....
.... or descriptive reference) ' .
SOUTHCENTRAL REGIONAL OFFICE
437 "E" STREET, SUITE 200
ANCHORAGE, ALASKA 99501 274-2533
September ll, 1984
DOWL Engineers
4040 "B" Street
Anchorage, Alaska
99501
Dear Sir:
Subject: Fire Lake School Sewer System
8521-DA-044
We have reviewed the plans and specifications for the subject project.
The project is hereby approved for construction for the items with which
this Department is concerned. This letter constitutes the permit required
by A.S. 46.03.720(a) for approval of sewerage systems.
It should be remembered that final approval will necessitate the submission
of Engineer As Built Plans. This will consequently mandate that a private
professional engineer conduct basic inspection of this project so as to be
able to sign off on as built plans. Arrangement for this inspection work
is the responsibility of the developer.
Environmental Engineer
BEE/msm
Enclosure
NOV b 1984
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION
Environmental Health Division
CASE REVIEW WORKSHEET
CASE NUMBER: DATE RECEIVED: COMMENTS DUE BY:
S-7748 June 27, 1984 July 16, 1984
SUBDIVISION OR PROJECT TITLE:
Recreation Center Subdivision
i~? PUBLIC WATER AVAILABLE
) COMM UNITY WATER AVAILABLE
COMMENTS: '
(~) PUBLIC SEWER AVAILABLE
/ / --
S 7 7/-I. 8 AUI~ 0 '1.. 1984
R~¢ R E~TIOM
SCHOOL BOARD
William Fdck
President
Bettye Davis
Vice President
Past President
1985-86
Carol Stolpe
Clerk
D a~q'l Jordan
Treasurer
Beth/Rruckrnan
Jean Buchanan
Past President
1986-87
Sharon Richards
SUPERINTENDENT
William Coats, Ph.O.
~,ugust 3, 1989
Municipality of Anchorage ~/~'~
Department of Economic Development and Planning
P.O. Box 196650
Anchorage, AK 99519-6650
Attention: Jerry Weaver, Platting Officer
Subject: ~/~Rec~;ation Center Subdivisio~
iD/'~' /)~ ,~eaNO.e~r Mr. W''~'''b''~'~ ver -~4-118 (5-'77~/~',/ Agreement,
ANCHORAGE
SCHOOL DISTRICT
DIVISION OF FACILITIES,
MAINTENANCE AND OPERATIONS
Planning and Design 348-5125
Construction Management 348-5174
1301 Labar Street
Anchorage, Alaska 99515
Public Works File
In 1985 the Anchorage School District entered into a Subdivision Agreement with
the Municipality to provide improvements for the Recreation Center Subdivision in
conjunction with construction of the Fire Lake Elementary School. All
improvements required under this agreement have been completed, except for Item
4.02 of Article IV, construction of a 41.5 foot radius cul-de-sac at the end of
McLaren Drive.
After several years of operation of Fire Lake Elementary School, the District
administration has reviewed the need to construct the cul-de-sac. Conslruction of
the cul-de-sac would result in the following detrimental effects on the Recreation
Center Subdivision:
Construction of the cul-de-sac would encourage increased traffic on
McLaren Drive which would negatively affect pedestrian access to
the school. Increased traffic will also negatively impact the rural
characteristic of the existing roadway and neighborhood.
Construction of the cul-de-sac would allow secondary access for
parent pick-up which would reduce the ability of the school staff to
control and monitor school access. The additional access would not
provide additional emergency vehicle access because of grade changes
on the playground.
Construction of the cul-de-sac would encourage snow storage at the
end of McLaren Street which would run-off through existing
playground facilities. Construction would also remove very large
birch frees which provide buffer and esthetic qualities,
Please reconsider the requirement to construct the McLaren Slreet cul-de-sac
under this agreement so that this agreement can be completed.
Rick Arndt
Director oi~ Facilities
RA/NZ/nmc
NZ,04
co: E, Louis Overstreet
Norm Ziesmer
6~0
MUNICIPALITY OF ANCHORAGE
Platting Board Heectng
Summaz7 o£ Action
August 8, 1984
(continuation of August I, 1984 meeting)
BOARD MEHBERS PRESENT:
BOARD HEMBERS EXCUSED:
STAFF MEMBER$ PRESENT:
NEW BUSINESS
Strom, Tyler, Ransom, Kendall°
· Barry, Brown, Leslie, Parker
Ctlleepie
~eaver, ~lnn, Brower, Paraoan,
Lynn
A. Public Hearing
1, S-775§ WHALE¥ PARK SUBDIVISION
'The plat vas postponed pending,
Areawtde resoningo
Assuring each lot meets slope chart
requirements,
Resolutes soil. vfch qHEP.
Clarification of the oens£cy off the
Comprehensive Plan vith Community Planntngo
Resolving water availability and obtaining
approval .off the community water system vich
AWWU, DHEP, and DEC.
~ECREATXOS CENTER SUBDXVXSXON
T~e plat was approved subject to:
I. Resolving utility easements.
~.' 'Resolving drainage and drainage easpmencs
with Public Works Engineering.
~. Resolving access with Traffic Engineering.
Entering into a subdivision agreement for
the following:
a. co construct the 60' access road to
urban access standards from che existing'
paving;
b. to construct McClaren Street cul-de-sac
co gravel standards;
Platting Board Meeting
Summary o~ Act[on
August 8, 1984.
Page 2
c;' street lights, street na~e signs, and
traf£ic control devices to be resolved;
and
landscaping along the Old Glenn Highway
and 30' screening to Tracts B-1 and B-2
to be approved by UDC and Community
Planning,
~ Obtaining a wetlands permit, if required.
Providing a 65' creek maintenance easement
and development setback width to be resolved
with Community Planning.
7. Showing the floodplain
..8 £esolvin8 the need for a floodplain hazard
Pemit with Public Works Engineering.
9. Obtaining approval o£ the community on-site
sewer system from State DEC and
10, Indicatin8 the 100' creek setback for the
on-site sewer ayste~.
11. Resolving soils ~ith D~
I~~ on £he plat prohibiting
direct vehicular access Co the Old Glenn
Highway. ' .
Providing a 30' screening easement along the
common lot line ok Tract B-1 and B-2
location to be resolved with the Community
Planning Depar~nent.
Providing a 10' vegetative screening buffer
adjacent to the Old Glenn High~ay.
Ex:endin& Tract B to the Old Glenn Highway.
Tracttng out the Eagle River Recreation
Center with the boundary to be resolved wi~h
the Community Planning Department and
Property Management.
Providing pedestrian access from acClaren
Tract B.
1.5.
16.
17.
3. S-7744 RIPLEYS SUBDIVISION
The plat was approved subject to:
1. Resolving utility easements.
2. Resolving drainage and drainage
with Public Works Engineering.
easements