HomeMy WebLinkAboutKASILOF HILLS BLK 4 LT 9oGRE'S'ER ANCHORAGE AREA BO[
Department of Environmental Quality
3330 C Street
Anchorage, Alaska 99503
'UGH
N A M E
LOCATION
INSPECTION
REPORT ON-SITE SEWAGE DISPOSAL SYSTEM
MAILING ADDRESS ,,//~,,¢~,/~'~"-
LEGAL DESCRIPTION
SEPTIC TANK:
DISTANCE
FROM WELL
INSIDE LENGTH
,~/', ~ ~ NUMBER OF
MANUFACTURER ' ~1 ('~.~---~. -- MATERIAl -/~-~:~-, COMPARTMENTS
INSIDE WIDTH LIQUID DEPTH LIQUID CAPACITY/~.~'"~'-"~ GALLONS.
SEEPAGE PIT:
NUMBER OF PITS / DIAMETER__
LINING MATERIAL'~'"F~.¢-.- I^}//'~.¢CRIB SIZE: DIAMETER
BUILDING FOUNDATION NEAREST LOT LINE
OR WIDTH _, LENGTH DEPTH C¢
DEPTH DISTANCE FROM: WELL
TOTAL EFFECTIVE
ABSORPTION AREA (WALL. AREA)
.SQ. FT.
TYPE . CONSTRUCTION
BUILDING NEAREST
FOUNDATION LOT LINE
CESSPOOL OTHER SOURCES
APPROVED DISAPPROVED
DEPTH DISTANCE FROM:
NEAREST SEPTIC SEEPAGE
SEWER LINE_ TANK SYSTEM
REMARKS
DISTANCES:
INSTALLED BY: d/4')~//~
Form No. EQ-031
DIAGRAM OF SYSTEM
GREATER ANCHORAGE AREA BOROUGH
DEPARTMENT O[~ ENVIRONMENTAL (~UAL, ITY
3330 "C" ~TREET ANCHORAGE, ALASKA 99503
TF~LEPHO NE 274-4561
SEWAGE DISPOSAL SYSTEM -- APPLiCAtION AND PE:P. MIT
NAME OF APPLICANT~A/
]NSTALLATION LOCATION
'-EGAL D SCR,PT,O. XP' ?
, PHONE
COMPLETION DATE AN': C PATED __._./.~7~/
NOTE: THiS PEr, MIT IS hlo'r VAt,ID WITHOtlT SOIL
FINAL INSPECTION: 2.4 HOUR NOTICE RECJUI~-'~ED, DACI~:FILLING OF Ar, lY L'~¥':;TEr\,I WITHOUT FINAL IN.~PEC'FION BY THE
¢
TYPE
MINIraUM DISTANCES, REOUIREMEI~.TS
FOUNDATION TO SEEPAGE Pit DRAIN FIELD
~EPTIC TANK 'FO SEEPAGE PIT WALL ._ .
, S~EPAGE PIT ~ , DRAIN
W~LL TO SEPTIC TANK ~ ~ SEEPAGE PIT
w~ ~A~ TO S~P~CTANK _~ /
GRAVEL BACKFILL
CONFORM 'i'O BOROUGH REGULATIONS REGARDING INSTALLATION.
GREATER ANCIIOId\G~
Uepartinent of Environment. a'l Quali
3330 "C" Street
Anchorage, Alaska
Dep th
Feet
5-
6 -
9-
]O.-
ll -
12-
13-
Was ground water encountered?
_PI_O_ ....... If .yes, at what. depth?
Reading Date Gross Time Net l'ime k)epth Lo Water Net
-Proposed installa~ii~--g~5~}a~e Pit Drain Field
Depth of Inlet . Depth to bottom oF pit or ~rench
Perfor, ed D3 , Ccrtified By: bate:
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH AND ENVIRONMENTAL PROTECTION
DIVISION OF ENVIRONMENTAL HEALTH
CERTIFICATE OF INSPECTION FOR HEALTH AUTHORITY APPROV/',,.L
OF ON-SITE SEWER AND WATER FACILITY
264-4720
Application Date
GENERAL INFORMATION
(a) Legal Description (include lot, block, subdivision, section, township, range)
Location (address or directions)
(b) Applicant Name ~)O&-) ~AFJg-,J~
Telephone: Home
Busi n ess - ~'A"7~ ¢ 5'5
Applicant Address I0/::~,¢'0 /¢--451Lo AVp
(c) Applicant is (check one): Lending Institution [] ; Owner/builder [] ; Buyer [] ; Otber [] (explain);
(d) Lending Institution Telephone
Address
(e) Real Estate Company and Agent
Address
Telephone
(f)
Mail tile HAA to the following address:
TYPE OF RESIDENCE
Single-Family'l~ Multi-Family []
Number of Bedrooms '~
Other
WATER SUPPLY
Individual Well J~ Community [] Public []
Note: If community well system, must have written confirmation from the State Department of Environmental Conservation
attesting to the legality and status.
4. SEWAGE DISPOSAL
Onsite ~ Public [] Community [] Flolding Tank []
Note: If community well system, must have written confirmation from the State Department of Environmental Conservation
attesting to the legality and status.
Page 1 of 2 72-025 {11/84)
ENGINEERING FIRM PROVIDI ~NSPECTIONS, TESTS, FILE SEARCH, D , AND INFORMATION
As certified by my seal affixed hereto and as of the validation d.ate shown below, I verify that my investigation of this Health
Authority Approval shows that the on-site water supply and/or wastewater disposal system is safe, functional and adequate
for the number cf bedrooms and type of structure indicated herein. I further verify that based on the information obtained
from the Municipality of Anchorage files and from my investigation and inspection, the on-site water supply and/or
wastewater disposal systero is in compliance with all Municipal and State codes, ordinances, and regulations in effect on
the date of this inspection:~
Date
[)HEP APPROVAL
Approved for '-/~-~"~-E (~?bedrooms by
A~r~ "X' Disapproved
Terms of Conditional Approval
Conditional
Date
CAUTION
The Muncipal[ty of Anchorage Department of Health and Environmental Protection (DHEP) issues Health Authority
Approval certificates based solely upon the representations given in paragraph 5 above by an independent professional
engineer registered in the State of Alaska, The DHEP does this as a courtesy to purchasers of homes and their lending
institutions in order to satisfy certain federal and state requirements. Employees of DHEP do not conduct inspections or
analyze data before a certificate is issued. The Municipality of Anchorage is not responsible for errors or omissions in the
professional engineer's work.
Page 2 of 2
72-025 (11/84)
MUNICIPALITY OF ANCHORAGE (MO.
HEALTH AUTHORITY APPROVAL (HAA)
CHECKLIST - FEBRUARY 1984
264-4720
Legal Description: /-
MUNICIPALITY OF ANCHORAG;~
DEPT. OF HEALTH &
ENVIRONMENTAl. PROTECTION
WELL DATA
Well Classification
Well Log Present (Y/N)
Total Depth '~)
Static Water Level
Casing Height Above Ground I ~ ~
Electrical Wiring in Conduit (Y/N)
Separation Distances fi'om Well:
To Septic/Holding Tank on Lot
To Nearest Edge of Absorption Field on Lot
To Nearest Public Sewer Line i.k..i/~l
Cleanout/Manhole ~k'///~
tf A, 13, C, D.E.C. Approved (Y/N)
/kJO Date Completed '~ Yield
Cased to ¢"¢O~ Depth of Grouting ~'
~' Pump Set At ~'~
Sanitary Seal on Casing (Y/N)
Depression Around Wellhead (Y/N)
; On Adjoining Lots
\ ~ ¢ ; On Adjoining Lots
To Nearest Public Sewer
_ To Nearest Sewer Service Line on Lot
Water Sample Collected by '~65'~(, ¢C¢¢S '~'~°-~"L$ ;Date
Water Sample Test Results ~ I~'~ ~-
Comments ~0 ~ ~ ~A[(~¢~ ~
B. SEPTIC/HOLDING TANK DATA
Date Installed ~'/~ '''~
Standpipes (Y/N) __ ~/
Depression over Tank (Y/N)
Size
Air-tight Caps (Y/N)
Pumping/Maintenance Contract on File (Y/N)
Holding Tank High-Water Alarm (Y/N)
Separation Distances from Septic/Holding Tank:
To Water-Supply Well
To Property Line
To Water Main/Service Line
Course ~
No. of Compartments
Foundation Cleanout (Y/N) _ y
Date Last Pumped
Temporary Holding Tank Permit (Y/N) ~v///~
To 13uilding Foundation
To Disposal Field
To Stream, Pond, Lake, or Major Drainage
Comments
Page 1 of 2
72-026(11t84)
ABSORPTION FIELD DATA
Soils Rating in Absorption Strata 150 $'~ ~(¢~'-/1~.~/~ Type of System Design ~,4~ PIT'
7¢ -
Date Installed ¢/,¢,z~ z Length of Field
Width of Field '~'~J~Uf,~$~ t 4~)' ~f¢)'C~ Depth of Field ~
:?>~x ¢/ ~< ~// ~ ~1 Gravel B.~d Thickness /~/
Square Feet of Absorption Area ~ O o¢0,/~tandpipes Present (Y/N)
Depression over Field (Y/N) ~0 Date of Last Adequacy Test
Results of Last Adequacy Test ,¢./(I/~
Separation Distance from Absorption Field:
To Water-Supply Well '¢"'/0~ To Property Line
To Building Foundation 4- '~O To Existing or Abandoned System on
Lot ~/'~ ; On Adjoining Lots -f'/~;)O /
To Water Main/Service Line ¢'~'O / To Cutbank (if present)
To Stream/Pond/Lake/or Major Drainage Course (g//~
To Driveway, Parking Area, or Vehicle Storage Area "~ ~ /
Comments ~ ~"~¢_~b'~ ~--¢JC,ldC-.~TCO/J ¢--L¢~o(-~'~
Date Installed
Size in Gallons
"Pump On" Level at
High Water Alarm Level at
Tested for
Electrical Codes (Y/N)
Dimensions
Manhole/Access (Y/N)
"Pump Off" Level at
Vent (Y/N)
Pumping Cycles during Adequacy Test. Meets MOA
Comments
** Check Permitted Bedroom Rating Against HAA Request **
I certify t ha~[,have checke, d, verified, or conformed to all MO,~ and
Signed ( ~
Receipt N . ~'~.(2~' I I' _~C°mpanYo~~) MOA No.
bate of Payment
Amount: $ 6~"~
Page 2 of 2
HAA guidelines in effect on the date of this inspection.
72-026 (11/84)
Location:
Client's Name:
Address:
BgSSE, EPP$ & POXES
2220 EAST 88 AVENUE
ANCHC~AGE, AK 99507
(907) 349-6451
WATER ~ELL TEST
Subdivision:
Lot:
Block:
loF~k9 K/~t~oF
Initial Reading on Metar:
c~r,r~Ns
:07
:1~ , ~% lq qo 0¢~4 j
prc~tm:tion ~a~.: '~7 GPM 24-Hour Capacity~2~ Callc~s
FOR
DATE
M
OF
PHONE
MESSAGE
SIGNED
N_° 3252®
",,,¢~,~ ~ ,~,.~ v ~ ~r~ SEWER AND DRAIN
®
PO. 8ox4.2847
PHONE 345-25~3
CLEANING SERVICE
ANCHORAGE, ALASKA 99509
Job Address
~ /-/Rs
PLUMBING REPAIR CHARGE
TOTAL FOOTA G ECL EANED OR THAWED~ BLaDEs USED
LINE CLEANED ~ c~_,~ ,-
GUARANTEED FOR FOLLOWING REASON
WORK ACCEPTED 8Y
R&M
C/vil Engineers
ENG dEERING 8, GEOLOGIC. .L CONSULTANTS
229 EAST 51st. AVE. - P.O. BOX 6087 - ANCHORAGE, ALASKA 99503
TELEPHONE 907-279--0483 TELEX 090--35419
Land Surveyors
JAMES W. ROONEY, P. E.
MALCOLM A. MENZIES, P.E., L.S,
JAMES H. WELLMAN, P.E.
August 11, 1973
RALPH R. MIGLIACCIO
Engineering Geologist
Messrs. Leo Sawyer and Bob Guina
Box 10105 Klatt Station
Anchorage, Alaska
Re: Test Hole and Soil Log Report for Sanitary System
Lot 9, Block 4, Kasiloff Hills Subdivision
Dear Sirs:
We are submitting herewith a description of the soil stratifi-
cation at the subject site and our comments regarding soil
conditions encountered. This investigation was performed in
accordance with your request of August 10, 1973, and those pro-
cedures outlined in a letter dated September 13, 1971 by Mr. Rolf
Strickland of the Greater Anchorage Area Borough Department of
Envirorm~ental Quality.
A single test hole was put down within the Lot 9 area for the
purpose of defining general subsurface soil conditions for the
proposed sanitary system. Excavation was accomplished with
an auger type drilling rig and the test hole was extended to
a total depth of 14 feet below ground surface. The following
stratification was determined from s~tples provided by the
driller and left at the site for subsequent inspection by R & M
personnel on August i0, 1973.
D~epths Soils
Classification
1' - 7'
7' - !4'
Organic sandy silt -
Silty fine sand trace gravel SM ~'¢~
Fine sandy silt trace gravel ML
Auger refusal was met at approximately 14 feet on a large cobble
according to the driller's oral communication of August 10, 1973.
Ground water was not encountered in the test hole,
ANCHORAGE FAIRBANKS JUNEAU
Messrs. Leo Sawyer and Bob Guina
August 11, 1973
Page 2
We appreciate being given this opportunity to be of service
to you. Should you have any questions with regard to the
above, please do not hesitate to con'~act us.
Very truly yours,
R & M ENGINEERING & GEOLOGICAL CONSULTANTS'
R~ W. Huck
Senior Staff Engineer
RWH: p h
xc: GAAB ~/
R&M ENGINEERING & GEOLOGICAL CONSULTANTS