Loading...
HomeMy WebLinkAboutKING BLK 2 LT 32,- 325' d)oO MA, L,N ADD ESS?.. LEGAL DESCRIPTION MUNICIPALITY OF ANCHORAGE DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION ENVIRONMENI'AL ENGINEERING DIVISION 825 L Street- Anchorage, Alaska 99501 Telephone 264-4720 ON-SITE SEWAGE DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT ~'~.~.~ I I UPGRADE · ! LO~'-ATI O N ' DISTANCE TO: Manufacturer ILiq. capacity in gallons IF HOME[V~ADE: D STANOE TO: IWe" 2 j. Manufacturer¢ ~~ I Well DISTANCE TO: Top of tile to finish grade Width DISTANCE TO: ~Cl~ Depth Building foundation Absorption area Inside length Dwe ng i0 Foundation Dwelling ~O. OF BEDROOMS J[~ I(~ PERMIT NO. - Material No. of compartments Width Liquid depth Nearest lot line PERMIT NO. Total length of lines Trench width Distance between lines inches Material beneath tile Total effective absorption area inches Depth PERMIT NO. Crib depth Total effective absorption area Building foundation Nearest lot line Driller Distance to lot line PERMIT NO. Sewer line Septic tank Absorption area(s) OTHER DATE LEGAL Departmenti ~ Health and Envlronmenta3 ~rotectlon 825 '~' Street, Anchorage, AK. ~501 ' Location: ~- ~ ~'~-- ~ "Fq~ Legal Description: ~ Type of Soil Absorption System Is: Trench: Drainfield: Maximum Number of Bedrooms: 264-4720 * * * HANDWRITTEN PERMIT * * * W~%~---A,N'B~Ng-ON-StTE SEWER PERMIT '~].~ ~~ Mailing Address: Phone Number: Lot Size: Seepage Be~: __ Holding Tank: Soil Rating(sq.ft/br) The Required Size of the Soil Absorption System Is:' DEPTH ~---'-' ,LENGTH GRAVEL DEPTH WIDTH The length dimension is the length(in feet) of the trench or drainfield. The depth of a trench or pit is the distance between the surface of the ground and the bottom of the excavation(in feet). There is no set width for trenches. The gravel depth is the minimum depth of gravel between the outfall pipe and the bottom of the excavation(in feet). * * REQUIRED S~=m~m~C(HOLDING) TANK SIZE = '~OCP(.-) GALLONS * * Permit applicant has the responsibility to inform this department during the installation inspections of any wells adjacent to this property and the number of residences that the well will serve. * * * TWO(2) INSPECTIONS ARE REQUIRED * * * Backfilling of any system without final inspection and approval by this department will be subject to prosecution. Minimum distance between a well and any on-site sewage disposal system is 100 feet for a private well or 150 to 200 feet from a public well depending upon the type of public well. Minimum distance from a private well to a private sewer line is 25 feet and to a community sewer line is 75 feet. Well logs are required and must be returned to this department within 30 days of the well completion. Other requirements may apply. Specifications and construction diagrams are available to insure proper installation. * * * PERMIT EXPIRES DECEMBER 1 9 8 2 * * * I certify that: (1) I am familiar with the requ'irements for on-site sewers and wells as set forth by the Municipality of Anchorage. (2) I will install the system in accordance with codes. (3) I understand that the on-site sewer system may require enlargement if the residence is remodeled to include more that 3~bedr~s. ~ica~t ~ Issued by: Date: SWP/024(Z/81) CONSTRUCTION AND OPERATION CERTIFICATE ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION. PUBLIC WATER SYSTEM APPROVAL TO CONSTRUCT Plans for the construction of public water system located , Alaska, submitted in accordance with 18 AAC 80.100 by have been reviewed and are [] approved. [] conditionally approved (see attached conditions). BY TITLE DATE If construction has not started within two years of the approval date, this certificate is void and new plans and specifications must be submitted for review and approval before construction. APPROVED CHANGE ORDERS Change (contract order no. or descriptive reference) Approved by Date The "APPROVAL TO OPERATE" section must be completed before any water is made available to the public. APPROVAL TO OPERATE ~ The construction of the public water system was completed on (date). The system is hereby granted interim approval to operate for 90 days following the cpmpletion date. BY TITLE DATE As-built plans submitted during the interim appr~)val period, or an inspection by the Department has confirmed the system was constructed according to the approved plans. The system is hereby granted final approval to operate. BY TITLE DATE