Loading...
HomeMy WebLinkAboutTract C GAAB-HD-J GRr~TER ANCHORAGE AREA BORO!~'~ DI:rARTMENT OF ENVIRONMENTAL OUALI,, 3500 TUDOR ROAD ANCHORAGE, ALASKA 99507 279-8686 INSPECTION REPORT ON-SITE SEWAGE DISPOSAL SYSTEM NAME MAILING i'D,, ~), /r~,O.~ "~'-,2m9"/ PHONE ADDRESS LEGAL DESCRIPTION "7"/,.~/1~ /~/'~') -~'~ .?'"'~ SEPTIC TANK: DISTANCE FROM WELL LIQUID CAPACITY GALLONS. MATERIAL INSIDE LENGTH NUMBER OF COMPARTMENTS INSIDE WIDTH LIQUID DEPTH SEEPAGE SYSTEM: NUMBER OF PITS LINING MATERIAl NEAREST LOT LINE SEEPAGE PIT: OUTSIDE DIAMETER OR WIDTH DISTANCE FROM WELL TOTAL EFFECTIVE ABSORPTION AREA (WALL AREA) ,LENGTH , DEPTH BUILDING FOUNDATION SQ. FT. TILE DRAIN FIELD: DISTANCE FROM WELL NUMBER OF LINES ABSORPTION AREA DEPTH: TOP OF TILE TO FINISH GRADE FOUNDATION DISTANCE BETWEEN LINES SQ. FT. LENGTH OF EACH LINE , NEAREST LOT LINE. TRENCH WIDTH TOTAL LENGTH OF LINES IN. TOTAL EFFECTIVE DEPTH OF FILTER MATERIAL BENEATH TILE IN. ABOVE TILE WELL: LOT LINE TYPE DEPTH NEAREST SEPTIC , SEWER LINE , TANK. DISTANCE FROM WATER BUILDING FOUNDATION, SAMPLE NEAREST SEEPAGE OTHER , SYSTEM , CESSPOO[ , SOURCES DISTANCES: DIAGRAM OF SYSTEM DATE 3500 TUDOR ROAD POUCH ~-65,0 ~ ~W ~'l~ SEWAGE DISPOSAL SYSTE~ ~ APPLICATION AND PEE~IT NAME OF APPLICANT ~./~''~//''"~L~l''~/'~'// ~.~",,~',~.~2~-/--~/"':~.'~gJ::~'P' MA,LING ADDRESS /~/~ ~/~ PHONE INSTALLATION OF: SEPT ~ ,~SEEPAGE PIT TYPE AND S~ZE Of FACILITY TO BE SERVED ~/~/~ ~//~ ~ TO Be INSTALLED BY ~' ~ ~ ~ FINANCED THROUGH '~'~ ...... d~M~' ~ ..... /I,~ ~ ~fl;'~,'~ SOil TEST RESULTS /~/~ NOTE= THIS PERMIT I$ NOT VALID WITHOUT ~OI~ COMPLETION DATE .ANT,CIPATED / FINAL INSPECTION: 24 HOUR NOTICE REQUIRED. HEALTH DEPARTMENT AUTHORITY WILL BE SUBJECT TO SEPTIC TANK SIZE TYPE MINIMUM DISTAbM[~, REQU~EMENTS FOUNDATION TO SEPTIC TANK FOUNDATION TO SEEPAGE PIt SO SEPTIC TANK TO SEEPAGE PIT WALL SEPTIC TANK ~/~'~"' / TO NEAREST LOT LINE. WELL TO SEPTIC TANK Drain FIELD OF ANY SYSTEM WITHOUT FINAL INSPECTION BY Ti,r. SEEPAGE , SEEPAGE PIT . SEEPAGE PIT ALSO CONSIDER AREA WELLS. WATER MAIN TO SEPTIC TANK DRAIN FIELD SEPTIC Tank,~-~ SEEPAGE Pit J~:~ , DRAIN FIELD TO RIVER, LAKE. STREAM. DRAin FIELD DRAIN FIELD CAST IRON INTO AND OUT OF SEPTIC TANK AND INTO CRIB CROSSING GAP OF EXCAVATION 5 FEET INTO UNDISTURBED SOIL. 4 INCH DIAMETER CAST IRON SIPHON PIPES ON SEPTIC TANK AND SEEPAGE Pit FITTED WITH AIRTIGHT REMOVABLE CAPS. GRAVEL BACKFILL CONFORM TO BOROUGH REGULATIONS REGARDING INSTALLATION. H ~ALTH A~THORITY OR LICENSED DESIGNER I CERTIFY THAT I AM FAMILIAR WITH THE REQUIREMENTS OF GREATER A/HORACE AREA/~3~C~ ORDINANCE NO. 28-68 AND THAT TH~ ~BOVE DESCRIBED SYSTEM IS IN ACCORDANCE WITH SAID CODE. ! // - ~eptember ~9~ ~.97~ AS-BUILT REPORT ADDITIONAL WELL DRILLING AT CINEMA 360 THEATER TOTAL DEPTH: 236 feet - before drilling 286 feet - after drilling CASING SIZE: LOCATION: DRILLER: OWNER: 6 inch Cinema 360 Theater property; S.E. 1/4, S.W. 1/4, Sec. 20, T12N, t~ 3W, S.M., Alaska Vern's Drilling (Formerly Clemenson Drilling) Jim Lathrop & Paul Baer Prior to working on the well Central Alaska Utilities test pumped the existing facility using a portable generator for power. Static water level in the casing was 39 feet from the ground surface. The well was pumped at 25 gpm for 10 minutes with 5 feet of drawdown. Central Alaska Utilities removed the existing submersible pump and pitless adapter m preparation for the drilling work. The driller, under contract with CAU to do exploratory work in this ,existing well, moved a cable tool mg on the well site July 26,1974, and began drilling that day The 50 feet of drilling beyond the bottom of the existing well 'was completed on July 30, 1974. Prior to drilling, the well was bailed at approximately 20 gpm for 1 1/2 hours with 10 1/2 feet of drawdown. This was done to have a basis for comparison should additional quantities of water be located during the drilling. The bottom of the existing aquifer was determined to be at the 237 foot depth. Throughout the remaining 50 feet of drilling, no measurable sources of water were found. Drilling was quite hard at times and the material so dry that water was added to the casing frequently to continue drilling. The materials encountered were primarily gray silts and clays. A~the 286 foot depth, it was decided to terminate the drilling as per the original plans. The casing was backfilled to the 239 foot depth and cut with a 8" shaped charge. The well was then screened with 5 feet of 8 inch U.O.P. Johnson Co. stainless steel screen with 100 slot. The screen has a bail bottom and a K-packer top. It was determined that the gap in the casing caused by the shaped charge was sufficiently large to allow all water available from the aquifer to enter the well. Consequently it was not necessary to pull the casing baek..Approximately 34 hours of development time was expended surging and bailing the well after the screen was installed. Central Alaska Utilities reinstalled the pump and pitless adapter and conducted another pump test. The well was pumped at 25 gpm for an hour. The water cleared and the i/ow was verified to be equal to the original conditions. In addition, CAU restored the surrounding ground area tO its original condition. Attached ~s a summary of materials and conditions recorded during drilling. The full set of drilling togs is available in the job file at DOWL Engineers. ~'~ :.~ John E Paulson S UMMAIt Y DRILLING LOG OF CINEMA 360 WELL DEPTH (ft.) MATERIALS 0-236 Depth of Existing Well. Original work by Penn Jersey Drilling. The following drilling work is the subject of this report: 236-237 237-238 238-244 244-246 246-263 263-274 274-276 276-286 Existing aquifer Cemented gray clay, sand & grave] Silty sand and gravel, lenses of gray-blue clay Gray clay and silt Gray silt, sand, little gravel Blue-gray clay, little sand and gravel Blue-gray clay, very little sand Blue-gray clay