INSPECTION REPORT ON-SITE SEWAGE DISPOSAL SYSTEM
NAME
MAILING i'D,, ~), /r~,O.~ "~'-,2m9"/ PHONE
ADDRESS
LEGAL DESCRIPTION "7"/,.~/1~ /~/'~') -~'~ .?'"'~
SEPTIC TANK:
DISTANCE FROM WELL
LIQUID CAPACITY
GALLONS.
MATERIAL
INSIDE LENGTH
NUMBER OF
COMPARTMENTS
INSIDE WIDTH
LIQUID
DEPTH
SEEPAGE SYSTEM:
NUMBER OF PITS
LINING MATERIAl
NEAREST LOT LINE
SEEPAGE PIT:
OUTSIDE DIAMETER
OR WIDTH
DISTANCE FROM WELL
TOTAL EFFECTIVE ABSORPTION AREA (WALL AREA)
,LENGTH , DEPTH
BUILDING FOUNDATION
SQ. FT.
TILE DRAIN FIELD:
DISTANCE FROM WELL
NUMBER OF LINES
ABSORPTION AREA
DEPTH: TOP OF TILE TO FINISH GRADE
FOUNDATION
DISTANCE BETWEEN LINES
SQ. FT. LENGTH OF EACH LINE
, NEAREST LOT LINE.
TRENCH WIDTH
TOTAL LENGTH
OF LINES
IN. TOTAL EFFECTIVE
DEPTH OF FILTER MATERIAL BENEATH TILE
IN. ABOVE TILE
WELL:
LOT LINE
TYPE
DEPTH
NEAREST SEPTIC
, SEWER LINE , TANK.
DISTANCE FROM WATER
BUILDING FOUNDATION, SAMPLE NEAREST
SEEPAGE OTHER
, SYSTEM , CESSPOO[ , SOURCES
DISTANCES:
DIAGRAM OF SYSTEM
DATE
3500 TUDOR ROAD POUCH ~-65,0 ~ ~W ~'l~
SEWAGE DISPOSAL SYSTE~ ~ APPLICATION AND PEE~IT
NAME OF APPLICANT ~./~''~//''"~L~l''~/'~'// ~.~",,~',~.~2~-/--~/"':~.'~gJ::~'P' MA,LING ADDRESS /~/~ ~/~ PHONE
INSTALLATION OF: SEPT ~ ,~SEEPAGE PIT
TYPE AND S~ZE Of FACILITY TO BE SERVED ~/~/~ ~//~
~ TO Be INSTALLED BY ~' ~ ~ ~
FINANCED THROUGH '~'~ ...... d~M~' ~ ..... /I,~ ~ ~fl;'~,'~
SOil TEST RESULTS /~/~ NOTE= THIS PERMIT I$ NOT VALID WITHOUT ~OI~
COMPLETION DATE .ANT,CIPATED /
FINAL INSPECTION: 24 HOUR NOTICE REQUIRED.
HEALTH DEPARTMENT AUTHORITY WILL BE SUBJECT TO
SEPTIC TANK SIZE TYPE
MINIMUM DISTAbM[~, REQU~EMENTS
FOUNDATION TO SEPTIC TANK
FOUNDATION TO SEEPAGE PIt SO
SEPTIC TANK TO SEEPAGE PIT WALL
SEPTIC TANK ~/~'~"' /
TO NEAREST LOT LINE.
WELL TO SEPTIC TANK
Drain FIELD
OF ANY SYSTEM WITHOUT FINAL INSPECTION BY Ti,r.
SEEPAGE
, SEEPAGE PIT .
SEEPAGE PIT
ALSO CONSIDER AREA WELLS.
WATER MAIN TO SEPTIC TANK
DRAIN FIELD
SEPTIC Tank,~-~ SEEPAGE Pit J~:~ , DRAIN FIELD
TO RIVER, LAKE. STREAM.
DRAin FIELD
DRAIN FIELD
CAST IRON INTO AND OUT OF SEPTIC TANK AND INTO CRIB CROSSING GAP OF
EXCAVATION 5 FEET INTO UNDISTURBED SOIL.
4 INCH DIAMETER CAST IRON SIPHON PIPES ON SEPTIC TANK AND SEEPAGE Pit
FITTED WITH AIRTIGHT REMOVABLE CAPS.
GRAVEL BACKFILL
CONFORM TO BOROUGH REGULATIONS REGARDING INSTALLATION.
H ~ALTH A~THORITY
OR
LICENSED DESIGNER
I CERTIFY THAT I AM FAMILIAR WITH THE REQUIREMENTS OF GREATER A/HORACE AREA/~3~C~ ORDINANCE NO. 28-68 AND THAT TH~ ~BOVE
DESCRIBED SYSTEM IS IN ACCORDANCE WITH SAID CODE. ! // -
~eptember ~9~ ~.97~
AS-BUILT REPORT
ADDITIONAL WELL DRILLING AT CINEMA 360 THEATER
TOTAL DEPTH:
236 feet - before drilling
286 feet - after drilling
CASING SIZE:
LOCATION:
DRILLER:
OWNER:
6 inch
Cinema 360 Theater property; S.E. 1/4, S.W. 1/4, Sec. 20, T12N,
t~ 3W, S.M., Alaska
Vern's Drilling (Formerly Clemenson Drilling)
Jim Lathrop & Paul Baer
Prior to working on the well Central Alaska Utilities test pumped the existing
facility using a portable generator for power. Static water level in the casing
was 39 feet from the ground surface. The well was pumped at 25 gpm for 10
minutes with 5 feet of drawdown. Central Alaska Utilities removed the existing
submersible pump and pitless adapter m preparation for the drilling work.
The driller, under contract with CAU to do exploratory work in this ,existing
well, moved a cable tool mg on the well site July 26,1974, and began drilling
that day The 50 feet of drilling beyond the bottom of the existing well 'was completed
on July 30, 1974.
Prior to drilling, the well was bailed at approximately 20 gpm for 1 1/2
hours with 10 1/2 feet of drawdown. This was done to have a basis for comparison
should additional quantities of water be located during the drilling. The bottom
of the existing aquifer was determined to be at the 237 foot depth. Throughout
the remaining 50 feet of drilling, no measurable sources of water were found.
Drilling was quite hard at times and the material so dry that water was added
to the casing frequently to continue drilling. The materials encountered were
primarily gray silts and clays.
A~the 286 foot depth, it was decided to terminate the drilling as per the
original plans. The casing was backfilled to the 239 foot depth and cut with a
8" shaped charge. The well was then screened with 5 feet of 8 inch U.O.P. Johnson
Co. stainless steel screen with 100 slot. The screen has a bail bottom and a
K-packer top. It was determined that the gap in the casing caused by the shaped
charge was sufficiently large to allow all water available from the aquifer to enter
the well. Consequently it was not necessary to pull the casing baek..Approximately
34 hours of development time was expended surging and bailing the well after
the screen was installed.
Central Alaska Utilities reinstalled the pump and pitless adapter and conducted
another pump test. The well was pumped at 25 gpm for an hour. The water
cleared and the i/ow was verified to be equal to the original conditions. In addition,
CAU restored the surrounding ground area tO its original condition.
Attached ~s a summary of materials and conditions recorded during drilling.
The full set of drilling togs is available in the job file at DOWL Engineers.
~'~ :.~
John E Paulson
S UMMAIt Y
DRILLING LOG OF CINEMA 360 WELL
DEPTH (ft.) MATERIALS
0-236
Depth of Existing Well. Original work by
Penn Jersey Drilling.
The following drilling work is the subject of this report:
236-237
237-238
238-244
244-246
246-263
263-274
274-276
276-286
Existing aquifer
Cemented gray clay, sand & grave]
Silty sand and gravel, lenses of gray-blue clay
Gray clay and silt
Gray silt, sand, little gravel
Blue-gray clay, little sand and gravel
Blue-gray clay, very little sand
Blue-gray clay