HomeMy WebLinkAboutLAKE RIDGE TERRACE BLK 2 LT 11Sep CS 15 02:CCp
�ri�t:r �a�riCiJ
,1daycr
Anchc;:-& ge V'V I & ✓urry S r
X072430742
bevelopr,,ent Services Department
301din.q safety E)fvisfoll
On -,Site Water eA Wcstewafer Prtagrarr,
4700 Elmore Road
�', , Box t9665p
firC L4eC3C2.. AK 99Z'.L),'
www�_rn:m,a�ola site
1'907)2:43-7904
Pump p
W011'n—.1 Per•�l l�`raixi€zer: ��'�
?arcei.Idcratificatjars.otix
I Legal Deseriprien
2 LII
UMP 'instalx�-titrn Ddie:: `�
Date of Issue:
Pr t?per'ty O7 imer ; alne &
Te.
PtInIp Intake Depth Below Top Of wall Casing; O
rest
�Pa•trzp fvawe.
( Puxrrp Model:
-pump sine / by
kidess Adapter %rial Depth:
�� er
PiEless �ldalrtez'ti`Iu�uf3,,Yttrc.r's :tianre:
Pidess Adapter histall.r: '
Well Disinfected upon C.ur:rpletio?z?
Method rifDisinieetir�n: ' °o
Comments., cl-zle-
--2"'A-
?UMP Installer Name:
t%
/A�
L��t
`/ t f
ttf', an, The pumpinsiai
sial: provide a. ournr :nsta latiori log to the DM w;t;xic 30 bays .Fp*amp itrsl'allacic,n.
I LN
0
N
00O
ID
ca
ar j4' `• ar Ai
i
�i • •L O � (�
[� • `E 1
N
cl
w
H .
tZU
d
Cl]
di
LL
Ld
N
OR
�w o tL
w \Uy -0U
�-
wanz a
cn�-J�z�,c9�- 07
wac wWN
www0
w:30�
�z N
i- a. w w -z 0 ia
01
W
<A TWF-I--00w0
T WU T x z' U-
1-7 Ln �-[ Oa' zwWM0
W WE1.inz
F- W Vll�i,� WU��WW
w o �-
w --i-i
Uo z ncnz�TrJ
_ } Z�nW0z0(L.WW
-% 0 7.16- W n F U �_.
Ix q j' � w = o A uzj -�
W QV
_jj
l C Il..
F i- >-
-u--X-8w�:5;00W.
[ Municipality of Anchorage Page
DEPARTMENT OF HEALTH AND HUMAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744
On-Site Wastewater Disposal System and/or Well Inspection Report
Permit Number: ~;~..I ~Oo;Z Z_ PID Number: O"5't - :~ I~- - I~
Name: ~ ~-r~o Wastewater System: ~ New ~ Upgrade
Address:
~o l~ ~. ~.,~ ~s,~ ABSORPTION FIELD
' IN°'°f~e~°ms: ~ Deep Trench ~ Shallow Trench ~Bed ~Mound ~Other
Phone: ~ ~
LEGAL DESCRIPTION so,, Rating: O. ~ GPD/Sq. Ft. Total Depth from~originali grade:
Subdiv~ion: Depth to pipe bottom f[om original grade: Gravel depth beneath p pe
Township: .... ~ Range: Section: Fill added aboveo.original~l ~ grade:~ I Ft. Gravel~ J ~ length:~ ~t ~ ~ ~l)% ~ Ft.
Numberof lines: l Distance between lines:
WELL: ~ New ~ Upgrade Gravelwidth: ~{Ft. ~ ~ IO Ft.
Classification (Private, A,B,C): Total Depth: Cased To: Total absorption area: Pipe material:
Date Drilled: ~t~ticWater Levek Installer: Date installed:
Pump Set at: Casing Height Above Ground:
Yield: ~ GPM 30~ ~,. j . 2 ~,. TANK
SEPARATION DISTANCES a..septic D Holding ~S.T.E.P.
TO Septic Absorption Lift Holding Public/Private Manufacturer: Capacity in gallons:
From Tank Field Station Tank Sewer Lines ~ ~HO ~ ~K j~
Number of Compadments:
S~rf.~ -- ~ LIFT STATION
LOt Size in gallons: Manufacturer:
"Pump on" level al: "Pump off" level ~t: High water alarm at:
Pump Make & Model ~ Electrical Inspections performed by:
Drain
Remarks: -forgo o ,' ~o ~,~. ~ %" BENCH MARK
Location and Description:
~ ~ ,~ .Assumed Elevation: ]~0~ ~' pi,
I n sp.ectio n spe rfo rm ed ~& · ~tN~E~IN~ ~,,~.-~-
Department of Heal~and ,H~man Services approval '*';~, ~ ...... ,.,,~
Reviewed and approved by: tn: /~ -2~-~ '*" .....
72-013 (Rev. 9/91) MOA 25
Permit No,
SW960022 Page 2 of 2
Municipality of Anchorage
DEPARTMENT OF HEALTH 'AND HUMAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343~4744
On-Site Wastewater Disposal System and/or Well Inspection Report
Legal Description: LOT 11, BLOCK 2, LAKE RIDGE TERRACE PID No.: 051 -315-16
94.7'~
,iF//''~ ~.~/ 4~//1 ~NEW J5C'O GAL /FCO
/
25J)'
5.5'
ST1 122~' 40.0'
/
;YSTEM
T4 61,~' g9.5'
/ /
m f' ~ ~ I ~ WELL°
I
ST1 co~ ~
~ ~ I= ~0~.~, k 7~/
~,~.. [~....,~,~,
72-013 A (Rev. 9/91) MOA 25
Municipality of Anchorage
DEPARTMENT OF HEALTH & HUMAN SERVICES
825 "L" Street, Anchorage, Alaska 99502-0650
SOILS LOG -- PERCOLATION TEST
PERFORMED FOR:
LEGAL DESCRIPTION:
2
3
§
6
7
8
9
10
13
14-
15-
16-
17
18
19-
20-
Township, Range, Section:
WAS GROUND WATER
ENCOUNTERED?
S
DEPTH?IFYES'ATWHAT
E
SLOPE SITE PLAN
Depth lo Water After
Monitoring? T-.~.~
DaLe:
Gross Net Depth to Net
Reading Date Time Time Water Drop
PERCOLATION RATE
TEST RUN BETWEEN __
(minutes/inch) PERC HOLE DIAMETER __
FTAND ~'"Y'- FT
COMMENTS
PERFORMED BY: ~"zA-~,a ~.-L ~ .... = ~__ ~_-_, ~,- ~Aa I - - . CERTIFY THAT THIS TEST WAS PERFORMED IN
ACCORDANCE WI~&~Y~~AL GUIDELINES IN EFFECT ON THIS DATE. DATE: ~ ~ ~ ~
72-008 (Rev. 4185)
From : ALPINE DRILL 907 345 0202 Oct. 14. 1996 01:26 RM P01
STATE OF ALASKA
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF MINING & WATER MGMT
WATER WELL RECORD
LOCATION OF WELL
DEPTHS M~SU~ED FROM:Ocasing top Oground surface WELL DEPTh; DATE OF COMPL~ION
-" Depth of hole:_.. ,~ ~ (~ ft
BOREHOLE DATA: Depth Depth of caslno:..~/
Materiel Type and Color From
..... DEPTH TO STATIC WATER LEVEL:
M~HOD OF DRILLING: ~:~ir rotary ~ Gable tool
, ,, / .j~ ,,-, / USE OF WELL: ~domostic ~ irrlgaUon ~ m0nlt0r
Y"/' CASING STICK-UP: ,~ fl, Diem: {~. .in to~ ft
.,.. . /... ~.,/. ../7~. / ,,) ~ . . WELL INTAKE OPENING TYPE: O open end ~ screened
' ~.
"- ~ .C ..... '- ,(:? .... / ~d) ~:i, Depths of openingS: ~o ft
.. Slot/Mesh Slze= Length: ft
GROUT TYPE: Volume:
Municipality of ~nchorage , . , D~ELOPMENT U~HOO: ..
.... ~,, '11 ...... .,
,.-,..,,,~ o ,~,,, ~ vn ~ ~rvmw~ ~ ~ul ' . ~ REMARKS:
..... ' z.'/ ,...'.~
,' .~:" ':-7-~'..~-','.,~ x:~.~d~.' d;f~., ~. ,.../' ..'~-:.,:...~:.~:..~.(.. ,< . .....
.-...... , ... ,,.::.~ . ,~/::~;_ ~j~(~ PLEASE ~AIL WHITE COPY OF LOG
,. ,' ...... ~ -"_..' ,-'i~' '- "~..,.:~.;':'~ DNR/D~I$ION OF MINING & WATER
SEonature of ~ut~orized Re~regenta~ive Dele ' 360i C St, ~uite 800
A~c~o=a~e, AA 99503-5935
Ph(907)762-2538,Pa~(907)562-1384
PERMIT NUMBER:SW960022
DESIGN ENGINEER:S & S ENGINEERING
OWNER NAME:HOFSTAD STEVE E & LINDA M
OWNER ADDRESS:iS057 W LAKE RIDGE DR
CHUGIAK, ALASKA 99567
PARCEL ID:05131516
PAGE 1 OF 1
MUNICIPALITY OF ANCHORAGE ~r~ '~^~A
DEPARTMENT OF HEALTH AND HUMAN SERVICES ~'~-~-~QD
P.O. BOX 196650, 825 "L" STREET, ROOM 502 \
ANCHORAGE, ALASKA 99519-6650 ~_~L~ ~
ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT %?D~
DATE ISSUED: 2/20/96
EXPIRATION DATE: 2/20/97
LEGAL DESCRIPTION:
LAKE RIDGE TERRACE BLK
2 LT 11
LOT SIZE: 26675 (SQ. FT.)
NUMBER OF BEDROOMS: 4 THIS PERMIT: 4
THIS PERMIT IS FOR THE CONSTRUCTION OF:
DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM
ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH:
1. THE ATTACHED APPROVED DESIGN.
2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS
15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL
REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AACS0) .
3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS
PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY
CALLING 343-4744 ( 24 HOURS ) (NOT REQUIRED FOR WELL ONLY PERMIT)
4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL
ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING
WEATHER MUST BE EITHER:
A. OPENED AND CLOSED ON THE SAME DAY
B. COVERED, SEALED AND HEATED TO PREVENT FREEZING
5. THE FOLLOWING SPECIAL PROVISIONS.
!SPECIAL PROVISIONs~
!AT THE TIME O~ CONSTRUCTION THE ENGINEER SHALL PERFORM ONE~
iADDITiONAL SOILS~TEST IN THE RESERVE SITE./
'RECEivED By://- ~/~/~_/,__ ~
ISSUED BY: f~----~~ ~ ~~~
ROBERTC. COWAN, RE.
ROBERTA. SHAFER, RE.
CIVIL ENGINEERS
January 30, 1996
(907) 694-2979
FAX (907) 694-1211
HEALTH AUTHORITY
APPROVALS
SEWER&WATER
MAIN EXTENSIONS
SEWER&WATER
INSPECTION
ENGINEERING STUDIES
ANDREPORTS
WELL INSPECTION
& FLOW TEST
SITE PLANS
ROAD DESIGN
SOILTEST
PERCOLATION
TEST
STRUCTURAL &
MECHANICAL
INSPECTIONS
ON SITE
W.~ST EWATE R
DISPOSAL SYSTEM
DESIGN
MUNICIPALITY OF ANCHORAGE
Department of Health and Human Services
P.O. Box 196650
Anchorage, AK. 99519
REFERENCE: Lot 11, Block 2, Lake Ridge Terrace S/D
Request you re-issue a permit to drill a well and install
a septic system to serve the proposed four bedroom house on
the referenced property.
A test hole was excavated and percolation test performed.
The approximate location of the test hole is located on the
attached site plan.
At the time of excavation no water was encountered in the
test hole and after seven day ground water monitoring,
water was found at 10 feet.
This property has enough area for a future septic upgrade
which can be seen on the attached site plan.
We do not anticipate any adverse effects on neighboring
wells, septic systems or drainage patterns by the
installation of the proposed septic system.
If you require additional information, please contact us.
Sincerely,
Robert C'.~ Cowan, P.E.
cc/g
Enclosure
17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577
l"'s~...t£= 50' I SITE PLAN ] DESIGN
m~ ~
~mm" ~ / ~ ~2 ~ %'. ~ O>mm~
0 ~
/ z ~ ~ >~ ~ ~ m
Fq
607O
% / · o z
/
/
oo m
~o~x., x > o ....
~o~3
m
/
/
/
/
/
/
/
/
/
/ o
DESIGN DETAIL
N.T..S. J
SCALE
z
c)
SCALE
ISITE PLAN
Z
C)
oo
¼>oFo
m
z
"~ fr1
f-
/
/
I
/
/
/ r-
o
/
-- ( ,F,;i:,,I.G tN E E R'$ SEAL)
Municipal ty ol Anchorage ~ ~' ~"~ '
DEPARTMENT OF HEALTH & HUMAN SERVICES ~' '"' ~ , ........
825 "L' Street, Anchorage, Alaska 99502-0650
SOILS LOG ~ PERCOLATION TEST ~ ~~ ,~ ,...,.;.~, ,~ ....
~ ~1~ ~¢ ~wnshin Range, Section:
LEGAL DESCRIPTION.~ ~~d ~ ~ ~LOP~ SiTE PLAN
1
2
3
4
5
6
7
8
10
11
12
13
14
15
16
17
18
19
WAS GROUND WATER ~F ~ i
iF YES,TAT WHAT ~ pO~_ ~
DEPTH. ~ E~
Ge th Io Water Alter
P . Oate'~- L
Monitoring? ~ ~ ' ~ '~~
~ / - ~ Depth to Net
~ ~ Gross Net Water Drop
Readin9 Date Time Tim~
20 PERCOLATION RATE I~,~_ (minutes/Inch) PE~RC H
GOMMEN .. ~~ ~-~-- ~ .
~ ~: ~ .... ~"~ ~/__/~~ CERTIFY THAT THiS TEST WAS PE~FO
ROBERT C. COWAN, RE.
ROBERT A. SHAFER, RE.
CIVIL ENGINEERS
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION PRACTICES
and
MATERIAL SPECIFICATIONS
(907) 694-2979
FAX (907) 694-1211
HEALTH AUTHORIIY
APPROVALS
SEWER&WATER
MAIN EXTENSIONS
SEWER&WATER
INSPECTION
ENGINEERING STUDIES
AND REPORTS
WELL INSPECTION
&FLOWTEST
SITE pLANS
ROAO DESIGN
SOILTEST
PERCOLATION
TEST
STRUCTURAL&
MECHANICAL
INSPECTIONS
ONSITE
WASTEWATER
DISPOSAL SYSTEM
DESIGN
REFERENCE: Lot 11, Block 2, Lake Ridge Terrace S/D
January 30, 1996
GENERAL:
The scope of this project includes the installation of
a 1500 gallon wastewater S.T.E.P. system (septic tank)
and a five foot wide pressurized leachfield trench to
serve the proposed F~m bedroom residence located on
the referenced property.
Construction shall be in accordance with the approved
site plan and design drawings, Municipal permit with
any special provisions or conditions, and all
applicable State and Municipal Wastewater Disposal
Regulations.
The contractor shall be responsible for obtaining any
necessary underground utility locates.
Unless specifically agreed otherwise, the property
owner shall be responsible for final grading areas
subsequently depressed from soil settling.
De
Contractors installing wastewater disposal systems
must be certified by the Municipal Health Department
for system installations. Owners installing their own
systems must also receive prior approval from the
Municipal Health Department.
SEPTIC TANK INSTALLATION:
me
A septic tank is to be constructed by a certified
septic tank manufacturer. Construction shall include
two 4" cleanouts for pumping access.
The septic tank shall be sufficiently bedded to
prevent settling or shifting of the tank.
e
Ail standpipes on the septic tank shall extend a
minimum of 12 inches above final grade.
17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577
Page Two
Lot 11, Block 2, Lake Ridge Terrace S/D
January 30, 1996
e
Se
Septic tanks installed with less than 4 ft. of cover shall
be insulated.
A foundation cleanout shall be installed one to four feet
from the building foundation. In the line between the tank
and the leachfield there shall be two adjacent cleanouts
(unless an effluent pumping system exists within the septic
tank). These cleanouts shall be located on undisturbed
soil not more than 10 ft. from the tank. The first
cleanout, in line, shall be to clean toward the leachfield.
The second cleanout shall be to clean toward the septic
tank.
Final grading over the septic tank shall be such that a
positive slope exists away from the septic tank.
ABSORPTION TRENCH/DRAINFIELD INSTALLATION:
Excavate the proposed trench to the dimensions shown on the
design. The bottom of the excavation shall be within 2
inches of level. If the sidewalls of the excavation become
smeared, they must be raked or scratched (ruffed-up) before
gravel (sewer rock) placement.
Once the gravel is installed, the distribution pipe is to
be installed level with the holes faced downward. The
distribution piping is to be of PVC (ASTM D3034 or equal).
All joints are to be solvent cemented. Gravel is then to
be placed over the distribution pipe to provide a minimum
of 2 inches of cover over the pipe.
A silt barrier must be installed between the final gravel
layer and the native soil backfill. Ensure the silt
barrier covers the entire gravel surface before placing
backfill.
e
Monitor tubes shall be of four (4) inch diameter,
installed approximately in the locations shown on the
design, and extend a minimum of 12 inches above final
grade. The portion of the monitoring tube extending
through the gravel shall be perforated from the bottom of
the trench to the invert of the distribution pipe. This is
equivalent to the effective depth of the gravel as noted on
the design.
Page Three
Lot 11, Block 2, Lake Ridge Terrace S/D
January 30, 1996
Backfill over the final gravel layer must not be less than
twenty-four (24) inches. Insulation must be installed when
the backfill depth is less than thirty-six (36) inches.
The finish grade over the trench must be mounded to prevent
the formation of a depression after settling.
MINIMUM MATERIAL SPECIFICATIONS:
Any septic tank proposed for installation must be
constructed by a Municipally approved septic tank
manufacturer.
e
The following pipe materials are approved for use in septic
system installations in the Municipality of Anchorage:
Type of Pipe
Perforated Solid
Cast Iron
ASTM D3034 (PVC)
ASTM F810 (HDPE)
ASTM D2662 (ABS)
Yes Yes
Yes Yes
Yes No
Yes Yes
use of a type of pipe other than listed above must be
approved by the inspecting engineer.
Insulation shall be at least 2" thick extruded direct
burial polystyrene (Dow Chemical Company Styrofoam HI or
equal).
e
Septic tank inlets and outlets shall be fitted with
watertight couplings (Caulder, Fernco, or equal).
Be
A permeable nontoxic silt barrier (Typar 3401, Mirafi 140N,
or equal) must be installed between the final leachfield
gravel layer and the native soil backfill.
All leachfield gravel (sewer rock) shall be 0.5"-2.5"
screened gravel with less than 3% passing the %200 sieve.
When sand is being used as a filter material, its gradation
specifications must conform to current M.O.A. or D.E.C.
requirements.
Page Four
Lot 11, Block 2, Lake Ridge Terrace S/D
January 30, 1996
INSPECTIONS:
Typically there will be a minimum of three (3) inspections
required during the installation of the wastewater disposal
system. These inspections will occur as follows:
The first inspection must be conducted after the
excavation of ditches, pits, trenches, or beds and
before the installation of any gravel. A septic tank
may be set in place, but may not be backfilled before
this inspection.
The second inspection must be conducted after the
placement of the silt barrier, gravel, distribution
lines, standpipes, cleanouts, and insulation, but
before the placement of any other backfill.
J
The final inspection is to occur upon final grading of
the property.
Often there will be more than these 3 inspections required.
Especially with the installation of multiple trenches, sand
filters, pressurized distribution systems, etc. Thus, the
inspecting engineer is to be contacted at least 24 hours prior
to the start of construction. If necessary, a pre-construction
meeting will take place on-site. The inspecting engineer will
not coordinate, direct or control in any way the contractors
activities.
The owner shall contract with the contractor to perform the work
outlined in these specifications and plans and in accordance
with the attached M.O.A. permit. There will be no contractual
arrangement existing between the contractor and S & S
Engineering. S & S Engineering shall be the owner's
representative and will inspect the work as stated' above to
document the contractors activities. Final acceptance of the
contractors work rests with the owner and the M.O.A.
Page Five
Lot 11, Block 2, Lake Ridge Terrace S/D
January 30, 1996
S & S Engineering shall have no liability to the owner or to
others for acts or omissions of the contractor or any other
persons performing work on this project or the failure of the
contractor to carry out the work in accordance with these
construction documents. S & S Engineering's inspecting engineer
will not be responsible for the construction means, methods,
techniques, sequence, procedures or the safety precautions
incident to this project.
CONTRACTOR/INSTALLER
;-~icK i'ziystrom.
Mayor
Mtmicipality of Anchorage
Department of Health and Human Services
825 "L" Street
P.O. Box 196650 Anchorage, Alaska 99519-6650
343-4744
March 3, 1995
Steve E & Linda M. Hofstad
15057 W. Lake Ridge Drive
Chugiak, AK 99567
Subject: Lot 11, Block 2, Lake Ridge Terrace
Permit #SW940008, Parcel ID #051-315-16
Dear Steve & Linda Hofstad:
The subject permit, issued January 12, 1994 by this office for a single family well and/or on-site
wastewater system, has expired as of January 12, 1995.
A new permit must be obtained from this office for a well and/or on-site wastewater system NOT
installed by the expiration date.
If you have drilled the well, a well log must be sent to this office for documentation of the
installation and to close the permit.
If the on-site wastewater system has been completed and a licensed Professional Engineer has
inspected the installation of the on-site wastewater system, the original as-built inspection report
must be sent to this office for review, approval and documentation. All inspection reports must
be submitted within 30 days of construction completion.
When applying for a new permit, the fees are: $320.00 for an on-site wastewater permit; $120.00
for a well permit and $440.00 for a combined on-site wastewater and well pemfit.
If you have any questions, please call this office at 343-4744.
/S~e, rely,
~affies Cross, P.E.
Program Manager
On-Site Se~ices
JC/kb
cc: Robert C. Cowan, P.E.
PAGE
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH AND HUMAN SERVICES
P.O. BOX 196650, 825 "L" STREET, ROOM 502
ANCHORAGE, ALASKA 99519-6650
ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT
PERMIT NUMBER:SW940008
DESIGN ENGINEER:S & S ENGINEERING
OWNER NAME:HOFSTAD STEVE E & LINDA M
OWNER ADDRESS:15057 W LAKE RIDGE DR
CHUGIAK, AK 99567
DATE ISSUED: 1/12/94
EXPIRATION DATE:
PARCEL ID:05131516
LEGAL DESCRIPTION: LAKE RIDGE TERRACE BLK
11
2 LT
LOT SIZE: 27252 (SQ. FT.)
NUMBER OF BEDROOMS: 3 THIS PERMIT: 3
THIS PERMIT IS FOR THE CONTRUCTION OF:
DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM
ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH:
1. THE ATTACHED APPROVED DESIGN.
2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS
15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL
REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AACS0).
3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS
PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY
CALLING 343-4744 OR 343-4681 AFTER BUSINESS HOURS
4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL
ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING
WEATHER MUST BE EITHER:
A. OPENED AND CLOSED ON THE SAME DAY
B. COVERED, SEALED AND HEATED TO PREVENT FREEZING
5. THE FOLLOWING SPECIAL PROVISIONS.
1 OF 1
1/12/95
SPECIAL PROVISIONS:
RECEIVED BY:
DATE:
ROBERT SHAFER, P.E.
ROGER SHAFER, P.E.
December28, 1993
CIVIL ENGINEERS
(907) 694-2979
FAX 694-1211
HEALTH AUTHORITY
APPROVALS
SEWER & WATER
MAIN EXTENSIONS
SEWER & WATER
INSPECTION
ENGINEERING STUDIES
AND REPORTS
WELL INSPECTION
& FLOW TEST
SITE PLANS
ROAD DESIGN
SOILTEST
PERCOLATION
TEST
STRUCTURAL &
,MECHANICAL
INSPECTIONS
ON SITE
WASTE WATER
DISPOSAL SYSTEM
DESIGN
Municipality of Anchorage
DEPARTMENT OF HEAL TH AND HUMAN SERVICES
825 'L ' Street
P.O. Box 196650
Anchorage, Alaska 99519-6650
REFERENCE: Lake Ridge Terrace, Block 2, Lot 11
Request you issue a permit to drill a well and install a septic system to
serve the proposed three bedroom house on the referenced property.
A test hole was excavated and percolation test performed. The approximate
location of the test hole is located on the attached site plan. At the time of
excavation no water was encountered and after seven day water monitoring
waster was found at 10 feet.
This property has enough area for a future septic upgrade which can be seen on
the attached site plan. We do not anticipate any adverse effects on neighboring
properties by the installation of the proposed septic system.
If you have any questions, or require additional information for your review,
please contact us.
~' RAS/LSU/Isu
17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577
'1'-' = 50' SITE PLAN
SCALE ;
St'-II(F¢~ TILL% ,00~
o_ o
L~J ~d
Municipality of Anchorage
DEPARTMENT OF HEALTH & HUMAN SERVICES
825 "L" Street, Anchorage, Alaska 99502-0650
SOILS LOG -- PERCOLATION TEST
PER FORM ED FOR: -.~7'/~
LEGAL DESCRIPTION:
1
2
3
4
5
6
7
8
9
10-
DATE
WAS GROUND W
ENCOUNTERED?
Township, Range, Section:
SLOPE
11
13
14
15
16
17
18
19
20
COMMENTS
. !~N~G|NE'ER'S SEAL)
Gross Net Depth to Net
Reading Date Time Time Water Drop
~_:~ ~ ~% ,.
:~-I£ I0,~,,~ ~ '/~ " ~/s
TEST RUN BETWEEN ~'~ FT
CERTIFY THAT THIS TEST WAS PERFORMED IN
;T ON THIS DATE. DATE:
SITE PLAN
IF YES, AT WHAT
DEPTH?
Depth to Water After
Monitoring? Date:
E_agle River, Alaska 9g577
ON-SITE WASTEWA TER DISPOSAL SYSTEM
CONSTRUCTION PRACTICES
and
MA TERIAL SPECIFICATIONS
REFERENCE: Lake Ridge Terrace Subdivision, Block 2, Lot 11
GENERAL:
1.
3.
The scope of this project includes the installation of a 1250 gallon septic
tank effluent pumping (S. T.E.P.) system and five foot wide drainfields to
serve the proposed three bedroom residence for the referenced property.
Construction shall be in accordance with the approved site plan and design
drawings; Municipal permit with any special provisions or conditions; and afl
applicable State and Municipal Wastewater Disposal Regulations.
The contractor shaft be'responsible for obtaining any necessary
underground utility locates.
Unless specifically agreed otherwise, the property owner shaft be
responsible for final grading areas subsequently depressed from soil
settling. On all leachfield mound systems, the property owner shaft be
responsible for ensuring a satisfactory vegetation growth over the mounded
area.
Contractors installing wastewater disposal systems must be certified by the
Municipal Health Department for system installations. Owners installing
their own systems must also receive prior approval from the Municipal
Health Department.
SEPTIC TANK INSTALLATION:
1. A septic tank is to be constructed by a certified septic tank manufacturer.
Construction shaft include two 4" cleanouts for pumping access.
2. The septic tank shall be sufficiently bedded to prevent settling or shifting of
the tank.
3. Aft standpipes on the septic tank shall extend a minimum of 12 inches
above final grade.
4. Septic tanks installed with less than 4 ft. of cover shall be insulated.
Page Two
Lake Ridge Terrace Subdivision, Block 2, Lot 11
December22, 1993
A foundation cleanout shaft be installed one to four feet from the building
foundation. In the line between the tank and the leachfield there shall be
two adjacent cleanouts (unless an effluent pumping system exists within the
septic tank). These cleanouts shall be located on undisturbed soil not more
than 10 ft. from the tank. The first cleanout, in line, shaft be to clean toward
the leachfield. The second cleanout shall be to clean toward the septic
tank.
Final grading over the septic tank shaft be such that a positive slope exists
away from the septic tank.
ABSORPTION TRENCH/DRAINFIELD INSTALLATION:
Excavate the proposed trench to the dimensions shown on the design. The
bottom of the excavation shaft be within 2 inches of level. If the sidewalls
of the excavation become smeared, they must be raked or scratched
(ruffed-up) before gravel (sewer rock) placement.
Once the gravel is installed, the distribution pipe is to be installed level with
the perforations faced downward. Gravel is then to be placed over the
distribution pipe to provide a minimum of 2 inches of cover over the pipe.
A silt barrier must be installed between the final gravel layer and the native
soil backfill. Ensure the silt barrier covers the entire gravel surface before
placing backfill.
Monitor tubes shaft be of four (4) inch diameter and installed approximately
in the locations shown on the design. The portion of the monitoring tube
extending through the gravel shaft be perforated from the bottom of the
trench to the invert of the distribution pipe. This is equivalent to the
effective depth of the gravel as noted on the design.
Backfill over the final gravel layer must not be less than twenty-four (24)
inches. Insulation must be installed when the backfill depth is less than
thirty-six (36) inches. The finish grade over the trench must be mounded
to prevent the formation of a depression after settling.
Page Three
Lake Ridge Terrace Subdivision, Block 2, Lot 11
December 22, 1995
MINIMUM MA TERIAI. SPECIFICATIONS:
Any septic tank proposed for installation must be constructed by a
Municipally approved septic tank manufacturer.
The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Type of Pipe Perforated Solid
Cast Iron Yes
ASTM D3034 (PVC) Yes
ASTM F810 (HDPE) Yes
ASTM D2662 (ABS) Yes
Yes
Yes
No
Yes
Use of a type of pipe other than listed above must be approved by the
inspecting engineer.
o
Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow
Chemical Company Styrofoam HI or equal).
Septic tank inlets and outlets shall be fitted with watertight couplings
(Caulder, Femco, or equal).
A permeable nontoxic silt barrier (Typar 3401, Mirafi 140N, or equal) must
be installed between the final leachfield gravel layer and the native soft
backfill.
All leachfield gravel (sewer rock) shall be 0.5"-2.5" screened gravel with
less than 3% passing the #200 sieve.
When sand is being used as a filter material, it's gradation specifications
must conform to current M.O.A. or D.E.C. requirements.
Page Four
Lake Ridge Terrace Subdivision, Block 2, Lot 11
December 22, 1993
INSPECTIONS:
Typically there will be a minimum of three (3) inspections required during the
installation of the wastewater disposal system. These inspections will occur as
follows:
The first inspection must be conducted after the excavation of
ditches, pits, trenches, or beds and before the installation of any
gravel. A septic tank may be set in place, but may not be backfilled
before this inspection.
The second inspection must be conducted after the placement of the
silt barrier, gravel, distribution lines, standpipes, cleanouts, and
insulation, but before the placement of any other backfill.
3. The final inspection is to occur upon final grading of the property.
Often there will be more than these 3 inspections required. Especially with the
installation of multiple trenches, sand filters, pressurized distribution systems, etc.
Thus, the inspecting engineer is to be contacted at least 24 hours prior to the start
of construction. If necessary, a pre-construction meeting will take place on-site.
MUNICIPALITY OF ANCHORAGE
DEPAR rMENT OF HEALTH & HUMANSERVICES
Division of Environmental Services
On-Site Services Section
P.O. Box 196650 Anchorage, Alaska 99519-6650
343-4744
Parcel I.D. #
CERTIFICATE OF HEALTH AUTHORITY
APPROVAL FOR A SINGLE FAMILY DWELLING
1. GENERAL INFORMATION
Complete legal description
Lot 11; Block 2; Lakeridge Terrace
Location (site address or directions)
West La~eridge Drive
Eaqle River, AK
Property owner
Mailing address
Lending agency
Mailing address.
Steve Hofstad
2390 Innes Circle Anchorage,
Day phone
AK 99515
Day phone
Agent Mike Backus/ Peterson Group Day phone
Address
562-1170
Unless otherwise requested, HAA will be held for pickup.
NUMBER OF BEDROOMS: 4
TYPE OF WATER SUPPLY:
Individual well
xxx
Community well
Public water
NOTE:
- lng t6 thee legality and statbs of system.' ........... ..
TYPE OF WASTEWATER DISPOSAL: ~_-~_
Individual on-site xxx
NOTE:
If community well system, provide written confirmation from State ADEC attest-
Holding tank
Community on-site
Public sewer
If community wastewater system, provide written confirmation from State ADEC
attesting to the legality and status of system.
72-025 (Rev. 1/91) Front MOA #21
STATEMENT OF INSPECTION BY .ENGINEER. ·
As certified by my seal affixed hereto and as of the validation date shown below, I verify that my
investigation of this Health Authority Approval application shows that the on-site water supply
and/or wastewater disposal system is safe, functional and adequate for the number of bedrooms
and type of structure indicated herein. I further verify that based on the information obtained from
'[he Municipality of Anchorage files and from my investigation and inspection, the on-site water
supply and/or wastewater disposal system is in compliance with all Municipal and State codes,
ordinances, and regulations in effect on the date of this inspection.
Name of Firm S & $ ENGINEERING
17034 Eagle River Loop Road No, 204
Address Eagle River, Alaska 99577
Engineer's signature /~/- ' _~/~/~ ~~
Phone
Date
o
IDHHS SIGNATURE
,)~/ Approved for ¢
Disapproved.
Conditional approval for
bedrooms.
bedrooms, with the following stipulations:
Additional Comments
The Municipality of Anchorage Department of Health and Human Services (DHHS) issues Health Authority
Approval Certificates based only upon the representations given in paragraph 5 above by an independent
professional engineer registered in the State of Alaska. The DH HS does th is as a courtesy to purchasers of homes
and their lending institutions in order to satisfy certain federal and state requirements. Employees of DHHS do not
conduct inspections or analyze data before a certificate is issued. The Municipality of Anchorage is not
responsible for errors or omissions in the professional engineer's work.
72-025 (Rev. 1/91 ) Back MOA ~Y21
MUN~C~^UT~ Of ^~CHO~AoE
ENVIRONMENTAL SERVICES DI¥1~
Municipality of Anchorage OCT 1 G lBg8
DEPARTMENT OF HEALTH & HUMAN SERVICES
825 L Street, Room 502 · Anchorage, Alaska 99501 · (907 D
Legal Description:
A. WELL DATA
Well type
Log presenl~N)
Total depth
Sanitary seal ~0'N).
Health Authority Approval Checklist
Date of test
Static water level
Well production
WATER SAMPLE RESULTS:
Coliform C-~
Date of sample:
JJ ~Lo¢~L "Z.. L/~,~' ~lX.~-Parcel I.D.:
If A, B, or C, attach ADEC letter. ADEC water system number
Date completed ~,- I~ ~ G
Cased to ~ I Casing height (above ground)
Wires properly protected~)'N)
FROM WELL LOG
g.p.m.
AT INSPECTION
Nitrate O~ i Other bacteria
B. SEPTIC/HOLDING TANK DATA
Date installed '1
Foundation cleanout(~N).
Date of Pumping
Tank size ),~.~¢c.p Number of Compartments ~Z- Cleanouts(~/N)Y'E-~
Depression (Y~ ~,]o High water alarm ~N) "i/~
Pumper
C. ABSORPTION FIELD DATA
Date installed
Length ~'? '~'~-~,. Width
Effective absorption area "/.~o r~
Date of adequacy test ~ .~t~
Gravel thickness below pipe Total depth
Monitoring Tube present (~N). ¥~ Depression over field (Y~J~__
Results (Pass/Fail) '--"-- For ~
Soil rating (g.p.d./ft2 or fF/bdrm) O, °o Gl~O,/~3ystem type
Fluid depth in absorption field before test (in.); ~ Immediately after ~ gal. water added (in.):
Absorption rate = ~ g.p.d.
Fluid depth ~-'(ins) Minutes later:
Peroxide treatment (past 12 months) (Y/N) ~
bedrooms
If yes, give date
72-026 (Rev. 3/96)*
LIFT STATION
Date installed
Manhole/Access (~N)
Size in gallons
"Pump on" level at* ut -~ll
High water alarm level at*
Cycles tested h,' ¢ w
SEPARATION DISTANCES
SEPARATION DISTANCES FROM WELL ON LOT TO:
~e.~.pl_--~holding tank on lot
Absorption field on lot
Public sewer main
Sewer/septic service line
Joo I+
~oo
*Datum
"Pump off" level at* '.~ .--5 Il
On adjacent lots '"/~
On adjacent lots I o e ~'P
Public sewer manhole/cleanout I~//~
Lift station I
SEPARATION DISTANCES FROM~__~-'~HOLDING TANK ON LOTTO:
Property line
Surface water/drainage
Foundation
Water main/service line
SEPARATION DISTANCE FROM ABSORPTION FIELD ON LOTTO:
Absorption field E,
Wells on adjacent lots
Water main/service line
Property line i-7_ Building foundation ~Z.~~"
Surface water
Curtain drain
ENGINEER'S CERTIFICATION
Driveway, parking/vehicle storage area
Wells on adjacent lots
I certify that I have determined thru field inspections and review of Municipal records t~Er.a~b~e/s~.~/~ts are
In conformance with/MOA~HAA//'~/4/.'~'CuIdolinos.~ In effect on this date.
Signature ~~ ~~
ROBERT ~ :COWAN
Date /0 / ,S'- / e6
HAA Fee $ ¢~
Date of Payment
Receipt Number
Waiver Fee $
Date of Payment
Receipt Number
72-026 (Rev. 3/9§)*
16:09 CT&E ESI ANCHORAGE ~ 90?6941211
N0.905 ~
CT&E Environmental Services Inc.
Laboratory Division
Drinking Water Analysis Report for TOtal CGliform Bacteria ~oo w. Po,t,r or~ve
· Anchorage, AK 99518-1605
READ INSTRUCTIONS ON REVERSF, SIDE BEFORE COLL,~CTING SAMJ:'LE Tel; (907} §62-2343
O SendR~tult$ 13 Sendlnvoice
Month Day Year
SAMPLE TYPE:
)~ Routine Q Treated Water
~ wlthRepeatlabSamp}eref, rte.(fur routine sam~jle ~ Untreated Water
~ Special Purpose
Time Collected
SAMPLE LOC~TION Collected By
Comments:
Fax: (gOD 561.5301
TO ~E ~OMPLE,'rgD BY LABORATORY
a~'Shows this Water SAJ~PL£ to be:
tisfacm~
Uusatisfactory
Sample over 30 hours vid, results may
be unreliable
Sample too long in lransil; sampl* should
not be over 48 hours old at examlnadon
~o indi,ale r~liable results. Please send
new sampl, via speclal delive~mail.
Time Received I [ ~ ~ ' .
Analysis Beg~n ] ~
Amilytical Method: cO" Membrane Filter
Q MM0-MUG
* Number of colonies/100 mi.
' ~.ab Reft No. Result* Analyst
· "O~t
Sent to A.D.E,C, Anch Fb~ Jun
Date: Time:
Client notified of unsatisfactory results:
Phoned Spoke with
Date: Time;
BACTERIOLOGICAL WATER ANALYSIS RECORD
F.. Co//
BGB .
MMO-MUG Result: Total Coliform
Membrane Filter: Direct Count
· Verification: LTB
Fecal Coliform Confirmation
Final Membrane Filter Results
COLIFIRM
Colo*lles/100 mi
Coliform/100 ml
Iraxcd
[]
Faxcd
Member of the $G8 Group (SociSt& GanGrala de Surveillaneel
CT&E Environmental Services Inc.
Laboratory Division
200 w. Potter Drive
Anchorage, AK 99518-1605
Tel: (907) 562-2343
Fax: (907) 561-5301
CT&E ReL# 965419003
Client Name S & S Engineering
Project Name/# N/A
Client Sample ID Lt 11 Bk 2 Lakeridge Terr S/D
Matrix Drinking Water
Ordered By
PWSID 0
Client PO#
Printed Date/Time 10/14/96 09:36
Collected Date/Time 10/07/96 00:00
Received Date/Time 10/08/96 14:00
Technical Director: Stephen C. Ede
Released By
Sample Remarks:
Allowable Prep Analysis
Parameter Results PQL Units Method Limits Date Date Init
Nitrate-N 0.100 U 0.100 mg/L SM18 4500-NO3F 10/08/96 EM8
?otal Coliform 0 0 col/lOOmL SM18 9222B 10/08/96 TAV
TNTC OB W/O COLI
Member of the SGS Group {Soci6t6 G6n~rale de Surveillance)
ENVIRONMENTAL FACILITIES IN ALASKA, CALIFORNIA, FLORIDA, ILLINOIS, MARYLAND, MICHIGAN, MISSOURI, NEW JERSEY. OHIO, WEST VIRGINIa,
349-3231
Anchorage
LOCATION:
11/2 LAKERIDGE TERRACE
WESTLAKE RIDGE DRIVE
EAGLE RIVER, ALASKA
TO WHOM IT MAy CONCERN:
THIS LETTER IS TO VERIFY THAT THE SEPTIC LIFT STATION AT THE
ABOVE MENTIONED PROPERTY HAS BEEN WIRED BY A CERTIFIED ELECTRICIAN
PER THE NATIONAL ELECTRICAL CODE AND THE MANI~FACTURES SPEC.
IF YOU HAVE ANY QUESTIONS OR CONCERNS REGARDING THE ABOVE INFORMATION
PLEASE D0 NOT HESITATE TO CONTACT ME,GARY MOMOSOR. THANK YOU FOR
YOUR TIME AND CONSIDERATION.
RESPECTFULLY,
FUCHS ELECTRIC~ I~
CC: FILE~PETERSEN GROUP
1601A~BOT-T ROAD
ANCHORAGE, ALASKA 99507-3499