Loading...
HomeMy WebLinkAboutBLACKTREE LT 3Blacktree Lot 1 #015-271-72 Municipality of Anchorage Page 1 of 4 DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES) DIVISION P.O. Box 196650 • Anchorage, Alaska 99519-0650 0 Telephone: 343-4744 On -Site Wastewater Disposal System andjor Well Inspection p Report Permit Number: SW9801 52 Pib Number. 015-271-74 Name: The Petersen Group Wastew4ter System: bPNew ❑ Upgrade Address: 3820 Lake Otis, Suite 204 ABSORPTION FIELD Phone: 562-1170 No. of Bedrooms: Five ❑Deep Trencch hallow Trench ❑ Bed ❑ Mound ❑ Other LEGAL DESCRIPTION Soil Rating: Total Depth from original grade: • 1.7i GPD/Sq. Ft. ^V1 g, s Lot: Bloc ' ��� ��SubLLdivision: tl//�I\Tr�f Depth to pipe bottom from original grade: AVG. •7 Ft. Gravel depth beneath pipe �� 4:2. Township: Range: Section: Fill added above original grade: , Ft. Gravel length: A'�7 • L• 7 Ft. Ft. • WELL: - C1ew Upgrade Gravel width: Number of lines: Distance between lines: Classification (Private, A,B,C): Total ,{Depth: Cased To: ►rJ V ��/ �L'4'r 7 Ft. Total absorptio, area: G'i ( Ft. Pipe material: 46TH i5 -3o34, Ft. FL Drill Date Drilled: Static water Level: 116 'prfi SO. Ft. Installer. l Date installed:,. Yield: Pump Set at: > /0 Casing Height Above Ground: TANK GPM Ft IFc. SEPARATION DISTANCES ❑ Septic ❑ Holding OfT.E.P. To From Septic Tank Absorption Litt Holding ate Manufacturer. Capacity in gallons: Field Station Tank Sewer lines Tan2 000 Welt, N i _ /r?Co N , —l29 ��' �� , 7� Material: Steel Number of Compartments: Two & L.S. Watters i50' } lya' .�- -�-' > 150' LIFT STATION Lotw Line t t 2d �r t 77 - r• , i7 Size in gallons: � �-+oo Manufacturer: May` r/14K aKii1Go ,rs Foundation 22 ' ti /_7 ' _ f "Pump on" level at:. "Pump off" level at: High water alarm at: Curtain Orain N — Pump Make & Modbl Electrical Inspections performed by: L L 144:1 Remarks: BENCH MARK Location and Description: Assumed Elevation: ENGINEER'S SEAL Aar rq�, . Inspections performed by:,, -Dates: 1 st &/S If ♦ejeaeeoe• e°OLVVAP ee° •� 2nd !3- 0 0 0 0 • .e °� Department of Health and Human Services aproval �0�� •• ° ° • eQy�-= Reviewed and approved by: Date: l Z' ° • ° ° . ° ° Permit No. SW9$01 52 Page 2 of 4 Municipality of Anchorages DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 • Anchorage, Alaska 0_9519-6650 a Telephone: 343-4744 On -Site Wastewater Disposal System and/or Well Inspection Report Legal Description: Lot 3, Blacktree Subd. PID No.: 015-271-74 ' 1 A B SP1 29.2 47.3 MH 42.8 57.8 M1 96.4 89.8 M2 95.2 73.0 M3 119.7 98.0 Iwo e T3�•^ ...... MOMEL �oo om oo oseo o. a oo oo([ppys��.�.e .E.ANDERSON p! ° �- W 5 Bedroom House B jra r ' J b b •b � w4o-1 SPI 2,000 5a ,.S PLAN AS -BLT S.T.E.P P2 1" = 20' Mx , TH A 37' x 5' W MT2 ab so ption trench �test pit �ahsorption 6 ' x 5'W trench T1 LEGEND P1 Septic Pump, compartment 1 P2 n n of 2 Clean Out T Monitor Tube 40 O . O A B SP1 29.2 47.3 MH 42.8 57.8 M1 96.4 89.8 M2 95.2 73.0 M3 119.7 98.0 Iwo e T3�•^ ...... MOMEL �oo om oo oseo o. a oo oo([ppys��.�.e .E.ANDERSON p! ° �- W 5 Bedroom House B jra r ' J b b •b � w4o-1 SPI 2,000 5a ,.S PLAN AS -BLT S.T.E.P P2 1" = 20' Mx , TH A 37' x 5' W MT2 ab so ption trench �test pit �ahsorption 6 ' x 5'W trench T1 LEGEND P1 Septic Pump, compartment 1 P2 n n of 2 Clean Out T Monitor Tube Permit No. SW9801 52 Page 4 of 4 Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 a Anchorage, Alaska 99519-6650 • Telephone: 343-4744 On -Site Wastewater Disposal System and/or Well Inspection Report Legal Description: Lot 3, Blacktree Subdivision PID No.: 019-271-74 10' T E. ESMT. r— — — — — — — — — — — — — — — — — I I o I WELL I � I I I U> L'i I wI d �I 1 "=50' I _ _______ 20' 30' W V) Z I O N of Z I I 'J MICHIGAN 4BR — — 64.5' EAST AVENUE house 69.2. 20.00' �e 2,000 gal. S.T. E.P. I5 W absorption -r trenches MT` e u� N N e oil • • e,� e�,o�e e e . Dose See ew. ".9 LE. NNEd�: 4301-E •'rA •sees•° 4 Permit No. SW9801 52 Page 3 of 4 Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196660 * Anchorage, Alaska 99519-6660 • Telephone: 343-4744 On -Site Wastewater Disposal System and/or Well Inspection Report 4 Legal Description: Lot 3, Blacktree Subd. PID No.: 015-271-74 j C Ma geotextile fabric ,o 00 •� septic �• • o. rock bo 4�. o e•o�p �• o�� • 5' 62 LF x 5' w trench 0 _ 105.9 geotextile fabric eo • • ,. e . . . septic ° ° rock x 5 W trench 0 101i� 27 LEGEND ELEVATION AS -BLT 1" = 1o' SP1 Septic Pump, compartment 1_ SP 2 of a 1$ 2 C Clean Out MT Monitor Tube 11 01r°1. n o•• ;o e e X 10 51 93.1 BOH Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG — PERCOLATION TEST PERFORMED FOR: Darrell Black DATE PERFOR LEGAL DESCRIPTION: LT 3, Blacktree S/D Township, Range, Section: prp�y� SLOPE SITE PLAN 2 L_ N 3 4 0tion sYst� sePtlC ab s 5 � (� see � e AS_Built I � t FIE 8 e g C, • 12- 13- 14'- 273 14 o 15- 16 ' Jj WAS GROUND WATER ENCOUNTERED? _S IF YES. AT WHAT C DEPTH? P E Depen b Wmw Akr NWAK lq? ' Det 20 -{ I�JI PERCOLATION RATE < t (mmutevmch) PERC HOLE DIAMETER/'� -TEST RUN BETWEEN � FT AND -7 FT COMMENTS %�� /'"7�+SGA"—y -T:"' 0'i- ry `fir Reading Date Gross Time Net Time Depth to Water Net Drop jr :0 2•o I r2,o I r3 PERFORMED BY: 11 1 x a' f • Y THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: IZ,/T If 6 72-008 (Rev. 4/85) e Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650. SOILS LOG — PERCOLATION TEST PERFORMED -FOR: Darrell Black DATE PERF LEGAL DESCRIPTION: LT 3, Blacktree S/D Township, Range, Section: 2- 3 3 4 / s; 7 D 9- 10- 11 011 ' 12- 13- 14- 15 2131415 16- 17- 18- 19- 20- WAS 617181920 SLOPE WAS GROUND WATER ENCOUNTERED? S IF YES. AT WHAT L 0 DEPTH? P E Depth to Writ/ After mum"? brit SITE PLAN PERCOLATION RATE (minutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN SFT AND 1 FT -�--r - I COMMENTS / �j Y� /� , f �iL��t T 7�' Sor.+�//O'a . /� i �G� /� CAME. 1 j_ rjj0t C A10, T. PERFORMED BN(. 1 FY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE z k b 72-008 (Rev. 4i85) ■■NEMEM E. EEE N E • ' • . ■. MEMO i NEEMMENEME ■MiEMEEMEME EnEEE PERCOLATION RATE (minutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN SFT AND 1 FT -�--r - I COMMENTS / �j Y� /� , f �iL��t T 7�' Sor.+�//O'a . /� i �G� /� CAME. 1 j_ rjj0t C A10, T. PERFORMED BN(. 1 FY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE z k b 72-008 (Rev. 4i85) 9075638453 PARKWAY ATRIUM BUILG 103 P02 DEC 02 198 15:56 STATE OF ALASKA DEPAF�IVIENT OF NATURAL RESOURCES �y DIVI$I,ON OF* MINING & WATER MGMT LOCATION OF WELL�%1 I Q9a I_41!�OL s1 •C"9(' -v -7,l WATER WELL RECORD BOROUGH BUBOIVI$ION LOT BLOCK SMMN (TRS a SECTION TDVIINSNIP RANGE MERIDIAN ED El D ❑W LOCATIONfSKETCH: WELL OWNER: I DEPTHS MEASURED FRO casing top ❑ground surface WELL DEPTH: DATE OF COMPLETION Depth of hole: y/. ft: Depth of casing:. AU tt; _ �I I BQFiIEHOLE DATA.,Depth Material Type and COlor From To DEPTH TO STATIC WATER LEVEL; ft belo 7 ? top of; casing ❑ ground surface YU R METHOD OF DRILLING: air iotary ❑ cable tool ❑ other USE OF WELL: Wdomestic E3 'irrigation ❑ monitor -,, 725 supply :0 other r► r CASING STIC -.Ij ft. Diam: b in, to ft Casing type: in. to ft '^r * Iz WELL INTAKE 004IENING TYPE. open end ❑ $greened 97 ❑ perforated ❑ open hole Depths of openings: � to - ft SCREEN TYPE- Mam: in. Slot/Mesh Size: Lehgth: ft GRAVEL PACK TYPE: Volume used: Dbpth to top: GROUT Type- I Depth: from ft to ft DEVELOPMENT METHOD: Duration: MurtiC� 19 it PUMPING LEVEL AND YIELD: C� ft after_' „- rrrs pumping �ii� gpm HUrTI Owe Service PUMP INTAKE D�PTH: � � ft Horsepower: _ 'rI"C;TtD UPON COMpLE'TION? 'Q YES ❑ NO CONTRACTOR TION: REMARKS: c2 PLEASE r0AIL WHITE; COPY OF LOG TO: ..-L�40 DNR/DIVil'SION OF MINING & WATER MOMT ate 3601 C St, uite 800 OCHORAGE A . 99503-6935 Phone (307)269.8639; Fax (9071562-1384 I MEMORANDUM Date: December 4, 1998 To: Donna Mears, MoA/D,,H� qHS From: Mike Anderson, P.E. r V `� Subject: Lot 3, Black Tree Subdivision Attached is the as -built and application for a Certificate of Health Authority Approval for Lot 3, Black Tree Subdivision. As you may recall the system was redesigned on August 18, to allow for a 2,000 gallon STEP Tank and pressure system. The absorption trench was sized based on Testhole No. 4 which indicated a percolation rate of 3 minutes per inch. During construction of the trench we found the soils in the area not consisten with the 3 minutes per inch and extended the trench accordingly. Our submittal on August 18 called for a trench 64' in length. The constructed trench is a composite total of 99' in length to compensate for the slower percolation rate and inconsistent soils encountered. The majority of the trench is in the 1.2 gallons per square foot per day soil. Some however, is in the slower .6 gallons per square foot per day area. We are confident the constructed absorption trench is more than capable of absorbing the septic effluent generated in the five bedroom home. - `j �?: 3 � PAGE 1 OF 1 MUNICIPALITY OF ANCHORAGE ? cu 'ncl I DEPARTMENT OF HEALTH AND HUMAN SERVICES r P.O. BOX 196650, 825 "L" STREET, ROOM 502' ANCHORAGE, ALASKA 99519-6650 ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT PERMIT NUMBER:SW980152 DESIGN ENGINEER:ANDERSON ENGINEERING OWNER NAME:THE PETERSON GROUP,INC OWNER ADDRESS:3820 LAKE OTIS PARKWAY,SUITE 204 ANCHORAGE AK. 99508 PARCEL ID:01527174 LEGAL DESCRIPTION: BLACKTREE LT 3 LOT SIZE: 102366 (SQ. FT.) NUMBER OF BEDROOMS: 5 THIS PERMIT: 5 THIS PERMIT IS FOR THE CONSTRUCTION OF: DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH: DATE ISSUED: 6/04/98 EXPIRATION DATE: 6/04/99 1. THE ATTACHED APPROVED DESIGN. 2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS 15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AAC80). 3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY CALLING 343-4744 ( 24 HOURS ) . (NOT REQUIRED FOR WELL ONLY PERMIT) 4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING WEATHER MUST BE EITHER: A. OPENED AND CLOSED ON THE SAME DAY B. COVERED, SEALED AND HEATED TO PREVENT FREEZING 5. THE FOLLOWING SPECIAL PROVISIONS. SPECIAL PROVISIONS: RECEIVED BY: DATE: ISSUED BY: �• d-� DATE: '�' a clC,, C, vac May 23, 1998 Municipality of Anchorage Department of Heath & Human Services 825 "L" Street Anchorage, AK 99502-0650 Subject: Lot 3, Black Tree Subdivision Septic System Design Impacts to Adjacent Properties Dear Onsite Services Engineer: The owner of Lot 3, Black Tree Subdivision intends to construct a 5 bedroom home on the property. We are therefore applying for a permit to construct a new well and septic system. The attached site plan and backup documentation identify the size and location of the new septic system to serve the home. The well location is also identified and the 100' protective radius is shown. All septic systems serving adjacent lots or within 200' of the new well are also shown. Testholes were placed on the property in September of 1996 during the subdivision phase. Silty gravel was found uniformly throughout the area with percolation rates ranging between 16 and 30 minutes per inch. We have designed a deep trench absorption system with 6' of effective depth. The trench will be placed perpendicular to the slope, but at different elevations. A flow splitter will be installed to assure equal dispersion of the septic effluent. No groundwater was noted recently in Testhole No. 1 , but the trenches will be a total depth of 7.5' below existing ground as further insurance against groundwater intrusion. Grading will be required to add fill over the trenches to provide a minimum of 3' of cover and to prevent surface water accumulation during periods of heavy runoff. Similary, grading will be required should the reserve area ever be used to prevent accumulations of water during snowmelt and runoff. The surface of the lot slopes as shown on the site plan. The house will be constructed on the knoll and the system will take advantage of the gravity flow from the house. Lot 3, Black Tree Subdivision May 23, 1998 Page Two If the system is constructed as designed the following statements apply: 1. The system, if constructed as designed, will have no adverse impact on the wells in the area or those to be constructed in the future. 2. The system, if constructed as designed, will have no adverse impact on existing septic systems in the area or those to be constructed in the future. 3. The system, if constructed as designed, will have no adverse impact on reserved space, either surface or subsurface, on any lots located in the area. 4. The system, if constructed as designed, will have no adverse impact on drainage patterns in the area. The current drainage pattern w i I I be maintained. Sincerely, Michael E. Anderson, P.E. Attachments M1C 1 Eh E. 4331 �E / L Systems within 200' of new well .are shown. Lot 2 Lot 1 existing septic absorption trent � I L71�I ' •`� � ' �� ion'/ _-�� g� i �� - 1 house,. - -� N 7 \ i (.proposed) - 00 -Gal. septic ,,t!Lnk y -glow S litte rpt iT reserve THz1 _ (2`') absor�ptlon trench area i y = 54 LF x 61 E. D. TS ® 1! ' IA 49— t , k' ° ,, ° 433 n ,W NOTE: This drawing is a conceptual plan.' .The house and septic system component locations may SITEPLAN vary. Locations will be deter- mined in the field. SCALE 1" = 50' SYSTEM PLAN SCALE 1" = 20' 43331.. on k alve Depth (2) LOT 3, BLACK TREE SUBDIVISION DESIGN FACTORS: SYSTEM REQUIREMENTS: Five Bedroom Home Deep Trench System Perc. Rate: 16 - 30 Min./Inch 1,500 Gallon Septic Tank Application Rate: .6 GPD/SF 6' Drainfield Rock 5 Bedrooms X 150 GPD / .6 GPD/SF = 1,250 SF of Absorption Area 1,250 SF/12 SF/ LF of Trench = 104.25 LF Trench Length Therefore: Construct a Deep Absorption Trench System With Two Laterals Each 53' in Length with 6' of Drainfield Rock Beneath the Lateral. Distribution Pipe in Trench Placed at 1.0' Below the Original Ground Surface. Flow Splitter Required to Evenly Distribute Effluent to Each 3'-0" I � TYPICAL DEEP TRENCH SECTION (NO SCALE) �a NOTE: Grade Area Over Trench to Drain Away. 17 Minimum 3' of Cover over Septic System. Minimum 4' Separation From Groundwater. Minimum 10 Separation From Lot Line. ! i• 4 88i. YF S' \ 4 Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L•' Street, Anchorage, Alaska 99502-0650 SOILS LOG — PERCOLATION TEST . ............ M10 HAELEANDIMSM PERFORMED FOR: ---.1A,,,) yr -4 DATE PERFOR�I� LEGAL DESCRIPTION: LT l / Township, Range, Section: DE�/jp�o5Ls0 8` Cft- Sus SLOPE SITE PLAN fS� 1 2 - N 5 6 7 8 9 10 11 • T Taw Ah, •d . s►A M 12 '• �; ` SOME Ca►'1 QV G1... 13 14 �'.r. Net Time Depth to Water 15 Z L ; ZD — 6V 16-- 35' /5 17 f BV AA or-' 90'x 18 19 WAS GROUND WATER /� O ENCOUNTERED? �y IF YES, AT WHAT L DEPTH? O P E Depth to water - Monitoring) ryO /VLD Dam f z9 9t'i A Reading Date Gross Time Net Time Depth to Water Net Drop t!F ! Z L ; ZD — 6V zh 35' /5 535 s • 1205, iS L'$ S " #S T- : LD / S SI u 20 -{ I L it IL_ JI PERCOLATION RATE (minutes/inch) PERC HOLE DIAMETER --� TEST RUN BETWEEN_ FT AND FT COMMENTS �ESr�� � SbA�'F� J�iU(?�► 'TO -77"S77/4�+ PERFORMED BY: -- A, 1-14244A iRTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: 72-008 (Rev. 4/85) T Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG — PERCOLATION TEST �n4 J+.a.°,�,�Jry ��9n .�¢pqC ep'�• fF,i+fi:`M9 t a T»✓ 4 PERFORMED FOR: 4.477 CSN DATE PERFORMEk v,�s LEGAL DESCRIPTION: �-OT !I Township, Range, Section: P2oP051-'4 84ACJ4. SVQ , SLOPE SITE PLAN �FE1 1 17 -- ��2- 3- 4- 5- 6- 7 3 45 -7, ST*DL.—r SM 5\J 9070M OF- 14o L4C WAS GROUND WATER w 1 D ENCOUNTERED? ' l+ S IF YES, AT WHAT L O DEPTH? P E neo to �� OL9 b(. R Reading Date Gross Time Net Time Depth to Water Net Drop l 4 ZZ : Js -- 51/9" #Z- / 3a / S 577/4's `/ S 75- 4%/s• rj u #y z:vu 15 -7 v b„ /5 UPERCOLATION RATE (minutesnnch) PERC HOLE DIAMETER T TEST RUN BETWEEN FT AND 9 FT COMMENTS / EST /%Dl.G F11-' S'DAe'0 nW (;'L TD -7- COMMENTS L PERFORMED BY:A • ��� 1 THAT T IS TPT WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE DATE. 7/ r 72-008 (Rev. 4/85) /110 Municipality of Ancho DEPARTMENT OF HEALTH & HUMAN SERVICES 9� .'4 9 dd s� �� 825 "L" Street, Anchorage, Alaska 99502-0650'. ° ° ° ° SOILS LOG — PERCOLATION TEST °' ° ..°° ° ° ° ° ° ' 4 MlI EL E �ANii� RG011 PERFORMED FOR: I�fFM �EGN DATE PER FOR�kd.'m ° Zj° LEGAL DESCRIPTION: ��" %/ Township, Range, Section: 120f�05L'a 8f.14"UL, sV� . SLOPE SITE PLAN 2 o, 3 : + e 4 4J, ; 5- 8- 9 - lo 8 9 10 11 19 SM 50rACC GAA415L I�o4vlC A]0. 3 swIG-p o rz go LC WAS GROUND WATER Al0 ENCOUNTERED? , y S IF YES, AT WHAT L O DEPTH? P E 090 to;MVa 0 L9 9L 20 -{ UPERCOLATION RATE /Z (mmuteslinch) PERC HOLE DIAMETER T TEST RUN BETWEEN FT AND FT COMMENTS ,FSTA'm jV1LC9-D'440 PWO& —M �7'CS '7-1N/+ S PERFORMED BY: A' 1-1-424 iA 1 --1:1" ^- � OEM IFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE. 71�i, 72-008 (Rev. 4/85) ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION AND MATERIAL SPECIFICATIONS SUBJECT: LOT 3, BLACK TREE SUBDIVISION GENERAL: 1. The scope of this project includes the furnishing and installation of a new 1,500 gallon septic tank. It also includes the construction of two new 53' long by 3' wide by 6' effective depth absorption trenches at the location shown on the site plan. The distribution piping must be placed at 1.0' below the ground surface. Grading will be required over the trenches to provide a minimum of 3.0' of cover. In addition, a flow splitter valve will be required to assure effluent from the septic tank flows evenly to each trench. 2. Construction shall be in accordance with the approved site plan, design drawings, Municipal Permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 3. The Contractor shall be responsible for obtaining a I I underground utility locates and for the layout of the septic system and verification of the location of all lot lines. 4. Unless specifically agreed otherwise, the contractor shall be responsible for final grading areas subsequently depressed from soil settling. Property owner shall be responsible for revegetation of affected areas unless specifically agreed otherwise. 5. Contractors installing wastewater disposal systems must be certified by the Municipal Department of Health and Human Services for system installations. Owners installing their own systems must receive prior approval from D.H.H.S. before beginning system installation. SEPTIC TANK INSTALLATION 1. A new 1,500 gallon septic tank must be procured from an approved source and installed outside the 100' protective radius from the existing well. Lot 3, Black Tree Subdivision May 23, 1998 Page Two 2. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. 3. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank. 4. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 5. Tanks installed without 4' of cover shall have a minimum of 2" of direct burial insulation. 6. A foundation cleanout shall be installed one to four feet from the building foundation. Two cleanouts are required between the tank and the drainfield. 7. Final grading over the tank shall be such that a positive slope exists away from the septic tank. DRAINFIELD CONSTRUCTION: 1. The drainfield shall be constructed to the dimensions shown on the design. The bottom of the trench shall be within 2" of level. 2. Distribution piping must be placed level with perforations down atop a level bed of drainfield rock. Rock should then be placed over the pipe to provide a minimum of 2" of cover. 3. A silt barrier or geotextile fabric must be placed between the drainfield rock and the natural soil backfill. 4. Monitor tubes must be 4" in diameter and installed at the locations shown on the design. The portion below ground must be perforated. Lot 3, Black Tree Subdivision May 23, 1998 Page Three 5. Contractor shall verify the septic tank and drainfield are a minimum 100' away from any private water wells in the area, 150' from a Class "C" Well or 200' from any community well. 6. Direct bury insulation must be placed over the distribution system if less than 3' of backfill depth is available. Finish grade over the trench must be mounded to prevent settlement or depressions. 7. Grade area surrounding the absorption trenches to drain away. 8. A minimum 2' of accepting soil is required below the drainfield rock for a 5' wide trench. Contractor shall verify this condition prior to placement of the rock. All pockets of unacceptable materials must be removed and replaced. MATERIAL SPECIFICATIONS: 1. Septic tanks must be constructed by a Municipally approved septic tank manufacturer. 2. The following pipe materials are approved for use in septic system installations in the Municipality of Anchorage: Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and ASTM D2662 or A.B.S. (perforated and solid). 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Co. Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Fernco, or equal). Lot 3, Black Tree Subdivision May 23, 1998 Page Four 5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed between the final drain rock layer and the native soil layer. 6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the #200 sieve. INSPECTIONS: A minimum of two inspections are required by Municipal Ordinance. These inspections must be conducted under the supervision of a professional engineer registered in the State of Alaska. The first inspection must be conducted after the excavation of trenches, beds or pits and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled. The second inspection must be conducted after the placement of the geotextile fabric, gravel, distribution piping, standpipes, cleanouts and insulation. No backfill should be in place at the time of inspection. Contractor shall provide a copy of all field survey layout and construction notes for use in preparing the certified as -built of the completed system. MEMORANDUM DATE: August 18, 1998 TO: Donna Mears, MOA- DHHS FROM: Mike Anderson, P.E. M Fa.- SUBJECT: Lot 3, Black Tree Subdivision RECEIVED AUG 18 1998 Municipality of Anchorage Dept. Health & Human Services The placement of the house on Lot 3, Black Tree Subdivision will not allow gravity flow to the absorption trench. A lift station and pressure system is therefore required for the treatment and absorption of septic effluent. We have modified the design of the system for placement of a 2,000 gallon STEP Tank and a pressure distribution system. A copy of that design is attached for your review. Please modify the design for the system on Lot 3 to allow the pressure system. A testhole was placed at a higher elevation on the lot which revealed clean gravel materials with a percolation rate of 3 minutes per inch. The absorption trench has been moved to this new location. No groundwater was found in the testhole nor is any suspected over the monitoring period. Results of the water monitoring will be forwarded with the as -built for the system. BY DATE---___ CLIENT. CHKD. BY DESCRIPTION tr. o SHEET--___ OF JOB NO. c 2,000 Gallon - -.- STEP Tank 1.5" Distribution Line Monitor Tube 64' Long X 5' Wide X 4' Effective Depth Absorption Tren h Property Line f� SYSTEM PLAN ( f`' NO SCALE ,i EN 1S (10/78) 156' to Property Line LOT 35 BLACKTREE SUBDIVISION DESIGN FACTORS: Five Bedroom Home Perc. Rate: 3 Min./Inch Application Rate: 1.2 GPD/SF SYSTEM REQUIREMENTS: 5' Wide Trench System 2,000 Gallon STEP Tank 4' Drainfield Rock 5 Bedrooms X 150 GPD / 1.2 GPD/SF = 625 SF of Absorption Area 625 SF/5 LF (Width) X .5 (Red. Factor) = 62.5 LF Trench Length Therefore: Construct a 5' Wide Absorption Trench System With One Lateral 64' in Length with 4' of Drainfield Rock Beneath the Lateral. Distribution Pipe in Trench Placed 5' Below Original Ground. 5' � E TYPICAL WIDE TRENCH SECTION (NO SCALE) NOTE: Grade Area Over Trench to Drain Away. Minimum 3' of Cover over Septic System. Minimum 10' Separation From Lot Line. Minimum 4' Separation From Groundwater. E 0 1t /6 C1 w 7,1 Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES r o 825 "L" Street, Anchorage, Alaska 99502-0650 f SOILS LOG — PERCOLATION TEST F PERFORMED FOR: Petersen Group DATE PERFORMi"� LEGAL DESCRIPTION: Lot 3, Black Tree Township, Range, Section: q SLOPE SITE PLAN 0: ff "F# 1 2- 3- 4 3 4 � 5 �. �6 0 ,♦ V 7 a t ' 8- 9-4 9 a 10- 11 0 11 C 12 p U 13 ` Q. 14- 15- 16- 17 41516 17 18 19 Ale] OL/SM TESTHOLE No. 4 GW/GP WAS GROUND WATER NO Trace Silt ENCOUNTERED? S IF YES, AT WHAT L 0 DEPTH? P E Depth to Water After monitoring? None Dam 8 /18 9 8 2 Bottom of Hole 11111■■A■1 MIMMMMEMHMMI Depth to Water Net Drop T WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: 3Lt l8 !3' 8" G LN" MIMEMEENE 3 t I 2 MEMIMMEMEME ■EMMUMM■n NEEMENE MIMEMEEMOME MEMO IMMEM! Reading Date Gross Net Time Time Depth to Water Net Drop T WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: 3Lt l8 !3' 8" G LN" I. 3 t I 2 20 1 I n u PERCOLATION RATE 3 (minutes/inch) PERC HOLE DIAMETER 8 TEST RUN BETWEEN 6 FT AND 7 FT COMMENTS Test Cavity Presoaked Prior to Test. PERFORMED BY: /H 1 4-4'tl LA 1C TIFY THAT T IST T WAS PERFORMED IN ACCORDANCE WITH ALLSTATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: &11,6 72-008 (Rev. 4/a5) 20 OSI 15 HHF - 9 W $109im LTJ 200.00 u z 150.00 OR 100.00 - 7 strife EFFLUENT PUMPS 1/2H to 11/2 Hp SINGLE-PHASE, 60HZ 115/230 VOLT PC#2 O 9 05 HHF - .4... 6 7-7-- YV 30.00 40 OSI 05 HH 2 st :1y a ... ....... ... ........... ... .......... . . ......... ......... .. .............. .. ... ...... .. ..... .............. .. ...... .. . .. ... ........ ....... .. .. ......... ......... ... ;.4 ....... ... ... ... ... . . ....... ... .. al ........... .. ... ... 20 OSI 05 HHF - 5 stage w 1/4" flowcontroller ................ 0.00 0.00 5.00 10-00 15-00 20-00 25-00 30.00 35.00 40.00 45.00 30-00 27, 2-1 NET DISCHARGE, GPM LLORENCZ'SYSTEMS,INC2826 COLONIAL ROAD ROSEBURG, OR 97470 (SM) 673-019 oil sm, aamm= .4... 6 7-7-- YV 30.00 40 OSI 05 HH 2 st :1y a ... ....... ... ........... ... .......... . . ......... ......... .. .............. .. ... ...... .. ..... .............. .. ...... .. . .. ... ........ ....... .. .. ......... ......... ... ;.4 ....... ... ... ... ... . . ....... ... .. al ........... .. ... ... 20 OSI 05 HHF - 5 stage w 1/4" flowcontroller ................ 0.00 0.00 5.00 10-00 15-00 20-00 25-00 30.00 35.00 40.00 45.00 30-00 27, 2-1 NET DISCHARGE, GPM LLORENCZ'SYSTEMS,INC2826 COLONIAL ROAD ROSEBURG, OR 97470 (SM) 673-019 JOB _ �-O 7' �. ,J LAGtG ANDERSON ENGINEERING P.O. Box 240773 SHEET NO. OF Q� ANCHORAGE, AK 99524 CALCULATED BY • DATE vQAd ! 4 (907) 563-7155 (907) 337-8855 CHECKED BY DATE SCALE . SEpn� ........ �avrp . - ........ . . ............. . ............. LAIF ... .......... ..... ........ ... ... ............... ... C ��2"z•bfidg9S TDk i�S g� .... .... 6 Z���-`�� /3D � + s s /F z � L-........ S G .. ... . f w,Z ........... . ................... ............. ................... . .....-7............. .....�........... ............. ............... .............. ............. ............. . ...... .... IT ........... ....... .............. .................. . ... ..................... .............. .............. ............... ............ .........................:.............. ........... ............. .............. :7 .............. .......... .............. 0 .... ............. ........... ... ........ ....... ..... ................. .......... ............. .............. .............. . . ...... ................ ..................... .......... ................. ............................... .. ........... .............. ........................................... ............. �* .............. .............. .............. : .................. ............. . ... _............................�r.? .8 .. X ._ . . Z9 .... .... . ...,. .......... ... .................. .............. ............. .... ........ ..... ..,... G . . ... .... .......................... C ��2"z•bfidg9S TDk i�S g� t- .oiRZ. Z���-`�� /3D � + - j:SJ y.B7 .......................................................... ... . ... ........... ....... ;. s.,. �} 1 . n ............ ..... -':...... . .. -, ... ........ ............. ...,....... ........... .......... ......... -......: ',.... .....:.. ;... T' 7. (:' ` !,1 4 _,rte ......... ....... rl: c n MUNICIPALITY OF ANCHORAGE • '� DEPARTMENT OF HEALTH & HUMAN SERVICES Division of Environmental Services On -Site Services Section cam P.O. Box 196650 Anchorage, Alaska 99519-6650 343-4744 CERTIFICATE OF HEALTH AUTHORITY APPROVAL FOR A SINGLE FAMILY DWELLING Parcel I.D. # 01 5-271 -7ay HAA #_ >14�1 2) 1. GENERAL INFORMATION Complete legal description Lot 3. Black Tree Subdivision Location (site address or directions) Property owner ' T -fie Petersen Group Day phone -962-1170 Mailing address. 3820 -Lake Otis Parkway, Suite 204 Anch. , AK 99508 Lending agency Mailing address Agent Address Day phone ' Day phone Unless otherwise requested, HAA will be held for pickup. 2. NUMBER OF BEDROOMS: Five (5 ) 3. TYPE OF WATER SUPPLY: Individual well xxx Community well Public water NOTE: If community well system, provide written confirmation from State ADEC attest- ing to the legality and status of system. 4. TYPE OF WASTEWATER DISPOSAL: Individual on-site xxx Holding tank Community on-site Public sewer NOTE: If community wastewater system, provide written confirmation from State ADEC attesting to the legality and status of system. 72-025 (Rev. "1) Front MOA #21 5. STATEMENT OF INSPECTION BY ENGINEER As certified by my seal affixed hereto and as of the validation date shown below, I verify that my investigation of this Health Authority Approval application shows that the on-site water supply and/or wastewater disposal system is safe, functional and adequate for the number of bedrooms and type of structure indicated herein. I further verify that based on the information obtained from the Municipality of Anchorage files and from my investigation and inspection, the on-site water supply and/or wastewater disposal system is in compliance with all Municipal and State codes, ordinances, and regulations in effect on the date of this inspection. Name of Firm Anderson Engineering Phone 522-7773 Address P.O. Box 240773 Anchor AK 99524 Engineer's signature �c�c.z�� Date 12/4/98 6. DHH£ SIGNATURE _ 1I v/ Approved for �y bedrooms. Disapproved. Conditional approval for Additional Comments By: 4UTW bedrooms, with the following stipulations: Date 12-498 The Municipality of Anchorage Department of Health and Human Services (DHHS) issues Health Authority Approval Certificates based only upon the representations given in paragraph 5 above by an independent professional engineer registered in the State of Alaska. The DHHS does this as a courtesy to purchasers of homes and their lending institutions in orderto satisfy certain federal and state requirements. Employees of DHHS do not conduct inspections or analyze data before a certificate is issued. The Municipality of Anchorage is not responsible for errors or omissions in the professional engineer's work. 72-M (Rev.1/91) Back MOA 821 e Municipality of Anchorage RECEIVED DEPARTMENT OF HEALTH & HUMAN SERVI&S 1999 Environmental Services Division Munr' akt�ta 825 L Street, Room 502 Anchorage, Alaska 995(pt(Ighj hh'' u��rriia��n ���p �a Health Authority Approval Checklist Legal Description: Lot IF Blank mrPP S ,hd i vi s i on Parcel I.D.: 01 5-271 -74 A. WELL DATA Well type Private If A, B, or C, attach ADEC letter. ADEC water system number Log present (Y/N) Y Date completed 9/17/98 Total depth 241 ' Cased to Sanitary seal (Y/N) Date of test Static water level Well production W4 241 ' FROM WELL LOG 9/17/98 147' 40 g.p.m. WATER SAMPLE RESULTS: Coliform Date of. sample: 0 12/2/98 B. SEPTIC/HOLDING TANK DATA Casing height (above ground) Wires properly protected (Y/N) AT INSPECTION Y 2' Nitrate Non Detect Other bacteria 0 Collected by: MEA Date installed 8 / 18 / 9 8 Tank size 2.0 0 0 Number of Compartments 2 Cleanouts (Y/N) Y Foundation cleanout (Y/N) Y Depression (Y/N) N High water alarm (Y/N) Date of Pumping New Pumper Construction C. ABSORPTION FIELD DATA Y Date installed 8 /18 / 98 Soil rating (g.p.d./ft2 or ft2/bdrm) 1 .2 / . 6 System type 5 ' Wide Trench Length 99, Width 5 ' Gravel thickness below pipe 4.2' Total depth 11 ' Effective absorption area 980` SF Monitoring Tube present (Y/N). Y Depression over field (Y/N) N Date of adequacy test New Const. Results (Pass/Fail) pa s s For r i 370 bedrooms Fluid depth in absorption field before test (in.); Immediately after gal. water added (in.): Fluid depth (ins) Minutes later: Absorption rate = a.p.d. Peroxide treatment (past 12 months) (Y/N) If yes, give date 72-026 (Rev. 3/96)* D. LIFT STATION Date installed 8/18198 Size in gallons 2.,000 sTFp Manhole/Access (Y/N) Y "Pump on" level at* 45" "Pump off" level at* A5" High water alarm level at* 47" Cycles tested New . Construction E. SEPARATION DISTANCES *Datum Bottom of Tank SEPARATION DISTANCES FROM WELL ON LOT TO: Septic/holding tank on lot Absorption field on lot >100' >100' On adjacent lots >100, On adjacent lots >100' Public sewer main N/A Public sewer manhole/cleanout N/A Sewer /septic service line >251 Lift station _>9>I a a I SEPARATION DISTANCES FROM SEPTIC/HOLDING TANK ON LOTTO: Foundation >51 Property line >51 Absorption field > g; ' Water main/service line > 2 9_ Surface water/drainage >1001 Wells on adjacent lots > 1 SEPARATION DISTANCE FROM ABSORPTION FIELD ON LOT TO: Property line > 10 ' Building foundation > 10 ' Water main/service line > 2 5 ' Surface water >100, Driveway, parking/vehicle storage area > F n , Curtain drain None on r.ot Wells on adjacent lots >100' F. ENGINEER'S CERTIFICATION I certify that I have determined thru field inspections and review of Municipal recur _>r Stems are in conformance with MOA HAA guidelines in effect on this date. Signature Of ° Engineer's Name Mi _hael R- An rmr f sn.n P E ." 12/4/98'�'°��� Dated' ° 4381-E .° Ilk HAA Fee $ in, ice( `. Waiver Fee $ Date of Payment i QL-1- I �i Date of Payment Receipt Number nl-A 1 ! k � _ Receipt Number 72-026 (Rev. 3/96)*