Loading...
HomeMy WebLinkAboutTOWER ESTATES BLK 1 LT 2 Municipality of Anchorage Page / of DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744 On-Site Wastewater Disposal System and/or Well Inspection Report Permit Number: ,~"¢'-27"/~/~ PID Number: ~¢'' ? ~// ~/,~_ ~/~./~.~..¢~ Wastewater System: ~New Q Upgrade Address: '~ ~'~"~ '~ ~"~'~7 ~ ABSORPTION FIELD Phone: ~¢ ¢~_~¢ ¢¢ Ne. of B ems: ~ Deep Trench ~ Shallow Trench ~Bed ~ Mound ~ther Total Depth from original grade: LEGAL DESCRIPTION ~o~,.~t~.~: ~',¢' ~.~'. · .~..~'/~:'~'/:/ Lot: ~ Block: Subdiv~ion: ~epth to pipe bottom from original grsde: Gravel depth beneath pipe Township:~ Range:~ Section: ~Fill added~,above ori~ inal ~grade: Ft.-~Gravel /~ / ~len th: ~ Ft. Gavel width: WELL: ~ New ~ Upgrade ~ / Number of lines:lD~stancebetweenlfnes: Classification~.~5~(Private, A,B,C): Total~Depth: Ft. Cased /~T°: Ft. ~T°tal ~abs°rpti°n~ ~area:~?'''b~ SQ. Ft. ~v~ ~ - ~/~Pipe~'~m~terial: Oriller:.~/~¢ ~/~¢/~ Date Dr. illed: ~ ~¢¢ Static Water Level:~ Ft.Installer: ~/~/¢ /~¢~ ~ z~ 2'~/~.. Date installed: SEPARATION DISTANCES u Septic ~ Holding ~.T.E.P. Wel~ /,~ /~/~ / /~ ,~ ~ ~aterial: ~7~ ~ Water /~¢'¢' z¢-'+ ~,"* - '- LIFT STATION ¢/~/. e ' "Pump on" level at: I "Pump off" level at: IHigh water alarm at: Foundation /~,, ¢ / ~,/ ,. ~ / ~ ~ ~/~ ,, ~/ ~ ,, Remarks: ~ ~/,,_~,,~, ¢~y ~¢,,¢~¢~ BENCH MARK '-~~I, ~'. ~W.49'I I?~ .¢~ /'~¢ ~J ¢¢~¢~ Dates: ~ st ~7~¢/~ 4.. ~,. ';' ~"' '/" ..... *" Inspections performed by~ ~, x~- ~,¢ 2nd ¢/~.'~/~/ ~ ~. BO~e~ST. Department of Heal~ and Huma.~ervices approval ~,~z.. ,, Reviewed and approved by: ~~ ~ Dato:J-2~-~ 72-013 (Rev. 9/91) MOA 25 Permit NO, 5W940100 Page 2 of Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICE8 ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 · Anchorage, Alaska 99519-6650, Telephone 545-4744 On-Site Waetewater Disposal System and/or Well Inspection Report Lot 2, Block 1, Tower Estates Subdivision Legal Description: PID No.: 017-411-27 ;~,~,-- ,, . · : · ! / . (~ ~ x x ~ . ~ / /' --x '~ ~ Zll ~;~ '/ · · i · .>' · ¥';'/,,' ; ~'ll 72-015 A (2/91) MOA 25 Permit No. 5 SW940100 Page 5 of Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICE8 ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 · Anchorage, Alaska 99519-6650° Telephone 545-4744 On-Site Wastewater Disposal System and/or Well Inspection Report Legal Desc~!pti,on:_ Lot 2, Block 1, Tower Estates Subdivision / x \' " · / \ ~ PID No.: 017-411-27 g:~ 72-013 A (2/91) MOA 25 Permit No. SW940100 Page 4 of 5 Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICE8 ENVIRONMENTAL SERVICE8 DIVISION P.O. Box 196650. Anchorage, Alusk~ 99519-6650. Telephone 545-4744 On-Site Wastewater Disposal 8yetem and/or Well Inspection Report Legal Description: Lot 2, Block I, Tower Estates Subdivision PlD No.: 017-411-27 72-015 A (2/91) MOA 25 EN~NEE FI'8 SEAL Permit No. SW940100 Page 5 of 5 Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICE8 ENVIRONMENTAL SERVICE8 DIVISION P.O. Box 196650. Anchorage, Alaska 99519-6650. Telephone 545-4744 On-Site Wastewater Disposal System ,~nd/or Well Inspection Report Description: Lot 2, Block 1, Tower Estates Subdivision PID No.: 017-411-27 72-01,3 A (2/91) MOA 25 @EAL 0CT-05-1994 09:30 FROM LOCATION OF WELL .BOROUGH 8ueoIvtE40N LOCATION/SKETCH: STATE OF ALASKA DEPARTMENT OF NATURAL RI:SOURCES DIVISION OF WATER WA't'Elt WELL RECORD I!;E~TION TOWNgNLo I:I~PTHS MEASURED FROM:l--i~ing top I~groufl~ surface 1]OREHOLIE DATA: .....D~p.t'~.. Mhtefial TYp~n~ Color From To WELL .DEPTH; (~pth ~f. hole: . ._~_~ft Depth of ca.~g:.L./_~ .ft DATE OF COMPLETION DEPTH TO STATIC WATER LEVEL: ~ O ft below ~[~ top of ce$~ng Date: I-I ground sudaoe METHOD OF DRILLING: [~.air rotary [] ~ble tool I-1 other __ USE OF WELL: [~' domestic D Ir~ioetton [] monitor [] public, supply I-1 otl~r C:A~IG I~rlCK-UP~ ft, Diem: Casing tp WELL INTAKE,OPENING TYPEF [] open end ~ s~reened [] perfocated .[~ open hole ~ D~pths of opanlngs: to ft SCREEN TYPE: __ Diem: ..... in Slot/Mesh Size: . Length: ft GRAVEL PACK TYPE: Voltl~le used; ' -- ~epth 't(~ top,~' - ' ' GROUT TYPE: Volume: Depth: from ft to ...... ft PUMPING LEVEL AND YIELD: ~g~TP, AOTDR INI;I",~HMAY i..u~, ~ · iI~MAI~ £, Busines~ Nome ' / Authorized R~pro~ative .T~' ' ' ~ ' DNR/DIVISION OF WATER ~.::~' ~.:-- TOTRL F',O~ PAGE 1 OF 1 MUNICIPALITY OF ANCHOP~AGE DEPARTMENT OF HEALTH ~_ND HUMAN SERVICES P.O. BOX 196650, 825 "L" STREET, ROOM 502 ANCHORAGE, ALASKA 99519-6650 ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT PERMIT NUMBER:SW940100 DESIGN ENGINEER:DOUGLAS T. KENLEY, P.E. OWNER NAME:VAISSIERE SHARON K OWNER ADDRESS:12600 TOILSOM HILL DRIVE ANCHOP~AGE, AK 99516 DATE ISSUED: 4/28/94 EXPIRATION DATE: 4/28/95 PARCEL ID:01741127 LEGAL DESCRIPTION: TOWER ESTATES BLK 1 LT 2 LOT SIZE: 174313 (SQ. FT.) NUIVK~ER OF BEDROOMS: 4 THIS PERMIT: THIS PERMIT IS FOR THE CONTRUCTION OF: DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH: 1. THE ATTACHED APPROVED DESIGN. 2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS 15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AAC80). 3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY CALLING 343-4744 OR 343-4681 AFTER BUSINESS HOURS 4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING WEATHER MUST BE EITHER: A. OPENED AND CLOSED ON THE SAME DAY B. COVERED, SEALED AND HEATED TO PREVENT FREEZING 5. THE FOLLOWING SPECIAL PROVISIONS. SPECIAL PROVISIONS: RECEIVED BY: ,~ ~'3 DATE: PAGE 1 OF 1 MUNICIPALITY OF ANCHORAGE DEPARTMENT OF HEALTH AND HUMAN SERVICES P.O. BOX 196650, 825 "L" STREET, ROOM 502 ANCHORAGE, ALASKA 99519-6650 ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT PERMIT NUMBER:SW940100 DESIGN ENGINEER:DOUGLAS T. KENLEY, P.E. OWNER NAME:B S W LIMITED PARTNERSHIP OWNER ADDRESS:1534 HIDDEN LANE ANCHORAGE, AK 99501 PARCEL ID:017411~',~-A~ LEGAL DESCRIPTION: TOWER ESTATES BLK DATE ISSUED: 4/28/94 EXPIP~ATION DATE: 4/28/95 LOT SIZE: 174313 (SQ. FT.) NUMBER OF BEDROOMS: 4 THIS PERMIT: 4 THIS PERMIT IS FOR THE CONTRUCTION OF: DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH: 1. THE ATTACHED APPROVED DESIGN. 2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS 15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AACS0). 3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY CALLING 343-4744 OR 343-4681 AFTER BUSINESS HOURS 4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING WEATHER MUST BE EITHER: A. OPENED AND CLOSED ON THE S~4E DAY B. COVERED, SEALED AND HEATED TO PREVENT FREEZING 5. THE FOLLOWING SPECIAL PROVISIONS. SPECIAL PROVISIONS: DouglaS' T,l~nley, P.E. IICOI Box 6034, Palmer, Alaska 99645 (907) 746-1073 February 1, 1994 Municipality of Anchorage Health & Human Services On-site Services Re: Percolation Test Results and General Site Investigation Report of Lot.4-;"Block 1, Tower Estates Subdivision. Owner: Mike McPhaden Site Characteristics On November 28, 1993 the above referenced 4.8 acre site was inspected in conjunction with soil perk tests being performed for application and approval for installation of an on-site waste water disposal system.. The site is located on the hillside on Tower Estates Circle which is off Toilsome Hill Drive in Anchorage, Alaska. The system is being installed for a four bedroom home scheduled for construction in the spring of 1994. The leach field will be a bed type system with a 1,250 gallon septic tank/lift station combination. The site is on the west side of Tower Estates Circle with a gradual slope ranging from approximately 1% to 5% in the east-west direction and basically flat in the north-south direction. The immediate area that has been selected for the waste water disposal system has an average slope of 1%. The site is moderately treed with birch, spruce, and alders. It appears that there are no obstructions that would prevent surface water runoff. On-site observation and physical survey shows that there are no water wells nor private waste water disposal systems within a 100' radius of the proposed system. Consultation with the only owner of neighboring property revealed that adjacent waste water disposal systems are performing adequately. No surface water was observed at the time of the inspection and it appears that there is no potential for contamination of future water wells. Several percolation tests were taken at the site in determining an adequate location for the waste water disposal system. Initially, three tests pits were dug towards the east side of the lot where the depth to bedrock was found to be between 3-7 feet deep. Percolation rates towards the east side were also found to be unacceptable. On a second visit to the site an acceptable location was found as shown on the enclosed site plan. Due to the fact that a pressure system will be installed the secondary site was selected approximately 200 feet to the north as shown on the site plan. In general, the depth to bedrock was found to vary between 3-7 feet over the entire site. The primary and secondary sites were positioned at locations that were found to have depths to bedrock of approximately 7'. The anticipated system will be a bed type with the distribution piping located at grade. On site material excavated during construction of the home will be placed over the top of the distribution network for a minimum cover of 24 inches with insulation. Lot 1, Block 1 Tower Estates 02/21/94 The results and number of test pits performed are described as follows: Test Pit 1: Test pit 1 was dug to a depth of 5 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 4 feet of dense silt with some sand and some gravel. Due to the shallow depth to bedrock a percolation test was not pel'fol~ed. Test Pit 2: Test pit 2 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be over 60 minutes per inch with no pre-soak period. Test Pit 3: Test pit 3 was dug to a depth of 3 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 2 feet of dense silt with some sand and some gravel. Due to the shallow depth to bedrock a percolation test was not performed. Test Pit 4 (Primary Site): Test pit 4 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially and 30 minutes per inch after the required 24 hour presoak period. Test Pit 5 (Primary Site): Test pit 5 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially. A second test after pre- soak was not performed as this test pit was for the confirmation of soil type. Test Pit 6 (Primary Site): Test pit 6 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially and 15 minutes per inch after the required 24 hour presoak period. Test Pit 7: Test pit 7 was dug to a depth of 5 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 4 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially. Due to the shallow depth to bedrock no further percolation test were performed at this location. Page 2 Lot 1, Block 1 Tower Estates 02/21/94 Test Pit 8 (Secondary Site). Test pit 8 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially and 20 minutes per inch after the required 24 hour presoak period. Test Pit 9 ( Secondary Site): Test pit 9 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. No percolation test was performed at this location, the test pit was dug to confirm the depth to bedrock and the soil type. If there should be any questions concerning the percolation rates or characteristics of the site please call Doug Kenley at 746-1073 Sincerely,i Douglas Tx'. Kenley, P. C.E. #8176 Page 3 aON:3OIg:~ ':ald':alggVA NO~VHS "i? N~]OVHdOl"l Z gON:~CII~gEI 3~J:qI$SVA NOE~VH$ ~ N:~OVHdO~ ~)~[~ z E~ 0 5'T t.'4e,, u ~ , z ,?.~1 Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST DATE PERFORMED: LEGAL DESCRIPTION: (~C(/ ~lIC I,/ ~/~l,~ ~',' ,~.~; Township, Range, Section: ~¥l¢~ , SLOPE SITE PLAN 6 7 8 9 10 11 12 13 14 15 16- 17 18 19- 20- 2 3 5 ENCOUNTERED? DEPTH? IF YES, AT WHAT Oeplhto WaterAft~r . o ,:, ~ / Monitoring? Reading Date Gross Net Depth to Net Time Time Water Drop Il, 7 /1. ?~'J 0 o PERCOLATION RATE ~ ~ (minutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN 6(,~ FT AND f~' ~ FT COMMENTS AOCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. CERTIFY THAT THIS TEST WAS PERFORMED -z.~ .~q DATE; 72-008 (Rev. 4/85) Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST LEGAL DESCRIPTION: [,~, I, 1~16- I! TD'~v~,'''- ~.4),,.',{~Tpwnship, Range, Section: / ' SITE PLAN DEPTH 2 4 WAS GROUND WATER ENCOUNTERED? 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O s OegthMonitoring?t° Water Alter,,.., d~._t gate: Gross Net Depth to Net Reading Date Time Time Water Drop //, 2 "/ ,p ~-'~ ~-/~ ~ ~o /O PERCOLATION RATE I ~- (minutes/~nch) PERC HOLE DIAMETER __ TEST RUN BETWEEN ti' ~'~ FT AND ~'t' ¢FT COMMENTS PERFORMED. : , CERT,,¥ THAT THiS ',ES,- WAS PERFORMED ,N ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS lilATE. DATE: 72-008 (Rev. 4/851 Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST 1 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20- N t -/~'-'-~C~ ~ Township, Range, Section: SITE PLAN ENCOUNTERED;' ~"J o IF YES, AT WHAT Depth lo Water After Menitoriflg? ~) ~'vL~. Date: Gross Net Depth to Net Reading Date Time Time Water Drop II, ~-? /~.~ ~ -/'~. II, 'Z~ o o IO (o II,z. Vo /o PERCOLATION RATE '~(~ (minutes/inch) PERC HOLE DIAMETER __ TEST RUN BETWEEN t' '~ ET AND x(, ~ FT COMMENTS ?2-008 (Rev. 4185) IN CHAPTER 5 Dosing and Distribution System Design The purpose of Iow-pressure dosing is to spread effluent evenly over the mound absorption area. Distribution network The distribution network is a system of perforated PVC pipes laid over the absorption area. They are usually spaced three feet apart, and are set back at ]east 1.5 feet from the sides and ends of the distribution area. Step 1, Determine the number of distribution lines. Divide the ~vidth of the distribution area by the line spacing. Ignore any remainder from the division. This will give the number of iines that will meet the 1.5-foot setback limits from the edge of the distribution area. Humber of lines = width/line spacing Example: For a 15-ft wide distribution area with 3-ft line spacing: Number of fines = 15 ft/3 ft Step 2. Calculate the length of each distribution line, Subtract the 1.5-foot setback requirement from each end of the distribution area to find the length of the distribution lines. Line length = distribution area length - 2 (1.5 fO Example: For a 40-foot long distribution area: Line length = 40 ft - 2(1.5 ft) ~ 37 ft Step 3. Determine the total length of lines. Total length = number of lines x line length Example: For five 37-foot fines: Total length = 5 x 37 ft = 185 ft Step 4. Draw a sketch of the distribution network and save for reference. Dosing rate The dosing rate depends on the total length of the distribution lines, the size and number of holes in the lines, and the pressure head supplied bythe pump. Holes must be at least ~/.-inch in diameter and can be spaced from 2.5 feet to four feet apart. Pressu~t-e head Is best set between two and four feet (0.9 to 1.7 psi). Lower pressures do not provide uniform delivery of effluent. Higher pres- sures cause local scouring of the gravel and mound fill, Suggested starting values for design calculations are a 5/32~inch hole diameter, three-foot hole spacing and three feet of pressure head. Table 3. Flow rate as a function of pressure head and hole diameter in drilled PVC pipe. Pressure Hole diameter (in.) Head 3~32 1/8 $/32 3/16 7/32 ft 3 4 psi Flow rote 0.43 0.10 0.t 8 0.~9 0.42 0.56 0,87 0.1 S 0.26 0.41 0.59 0.80 1,30 0,18 0,32 0.50 -" 0.72 0.98 1.73 0.21 0.37 0.58 0.83 t.13 2.16 0.23 0.41 0,64 0.94 1,26 10 / Step 1, Calculate number (no,) of holes. ./ .No, holes: length of line/hole spacing Example: For a system with 34t hole spacing and five 37- ft lines: No. holes/line = 37 ft/3 ft per hope = 12 holes/line Total holes = 12 hoPes/line x 5 lines = 60 holes t6 18 19 25 3O 35 4O 4S SO 6O 7O 8O 9O 100 Step 2. Determine the flow rate per hole. This is calculated from the bole size and pressure head using Table 3. Example: For 3-ft pressure head and 5/32-in. boles: Flow rate = 0.S0 gal per minute (gpm) (Table 3) Table 4. Friclion loss per 100 feel of PVC pipe. 2 0.28 0.07 3 0.60 0.16 4 1.01 0.25 5 1.52 0.39 6 2.14 0.55 7 2.89 0.76 8 3.63 0.97 9 4,57 1.21 10 5.50 1.46 12 2.09 2.42 2.74 3.06 3.49 3.93 4.37 4.81 5.23 Slep 3. Calculate total dosing rate, Example: Flow rate/hole = 0,50 gpm Flow rate/line = 0.50 x 12 holes = 6.0 gpm Total flow rate = 0.50 x 60 holes = 30 gpm When the mound is located downhill from the pump, a Y4-inch ~iphon-breaker hole must be drilled in the supply line in the pumping tank, This hole will prevent inadvertent siphoning of the contents of the pump tank into the field. An extra two gallons per minute must be added to the pumping rate to co npensate for flow through the siphon-breaker hole. Example: For a system with 30 gpm flow rate and a siphon-breaker bole: Total flow rate = 2,0 gpm + 2 gpm = 32 gpm Pipe diameter (in.) 1'~ 2 - Friction loss fft) ~ 0.07 0.12 0.18 0.25 0.36 0.46 0.58 0.70 0.84 1.33 1.45 1.86 2.07 2.28 2.46 3.75 5.22 0.07 0.14 0.17 0.25 0.30 0.35 0.39 0.44 0.07 0.5O 0.08 0.56 0.09 0.62 0.10 0.68 0.11 0.74 0.12 LIO 0.16 1.54 0.23 2.05 0.30 0.07 2.62 0,39 0.09 3,27 0.48 0.12 3.98 0.58 0.16 0.81 0.21 1,08 0,28 1.38 0.37 1.73 0.46 2.09 0.55 Douglas T, Kenley, P.E, IICOI Box 6034, Pabner, Alaska 99645 (907) 746-1073 March 28, 1994 Municipality of Anchorage Health & Human Services On-site Service.s Re: Percolation Test Results and General Site Investigation Report of Lot 1, Block 1, Tower Estates Subdivision. Owner: Mike McPhaden Site Characteristics On November 28, 1993 the above referenced 4.8 acre site was inspected in conjunction with soil perk tests being performed for application and approval for installation of an on-site waste water disposal system.. The site is located on the hillside on Tower Estates Circle which is off Toilsome Hill Drive in Anchorage, Alaska. The system is being installed for a four bedroom home scheduled for construction in the spring of 1994. The planned system will include a 1,250 gallon insulated septic tank, a 10-foot by 36-foot intermittent sand filter with pump basin manufactured by Orenco Systems, Inc. and a 15 foot x 50 leach field. The Orenco sand filter will include a cold weather package and an air injection system. The site is on the west side of Tower Estates Circle with a gradual slope ranging from approximately 1% to 5% in the east-west direction and basically flat in the north-south direction. The immediate area that has been selected for the waste water disposal system has an average slope of 1%. The site is moderately treed with birch, spruce, and alders. It appears that there are no obstructions that would prevent surface water runoff. On-site observation and physical survey shows that there are no water wells nor private waste water disposal systems within a 100' radius of the proposed system. Consultation with the only owner of neighboring property revealed that adjacent waste water disposal systems are performing adequately. No surface water was observed at the time of the inspection and it appears that there is no potential for contamination of future water wells. Several percolation tests were taken at the site in determining an adequate location for the waste water disposal system. Initially, three tests pits were dug towards the east side of the lot where the depth to bedrock was found to be between 3-7 feet deep. Percolation rates towards the east side were also found to be unacceptable. On a second visit to the site an acceptable location was found as shown on the enclosed site plan. Due to the fact that a pressure system will be installed the secondary site was selected approximately 200 feet to the north as shown on the site plan. In general, the depth to bedrock was found to vary between 3-7 feet over the entire site. The primary and secondary sites were positioned at locations that were found to have depths to bedrock of approximately 7'. The anticipated system will be a bed type with the distribution Lot 1, Block 1 Tower Estates 04/13/94 placed over the top of the distribution network for a minimum cover of 24 inches with insulation. The results and number of test pits performed are described as follows: Test Pit 1: Test pit 1 was dug to a depth of 5 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 4 feet of dense silt with some sand and some gravel. Due to the shallow depth to bedrock a percolation test was not performed. Test Pit 2: Test pit 2 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be over 60 minutes per inch with no pre-soak period. Test Pit 3: Test pit 3 was dug to a depth of 3 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 2 feet of dense silt with some sand and some gravel. Due to the shallow depth to bedrock a percolation test was not performed. Test Pit 4 (Primary Site): Test pit 4 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially and 30 minutes per inch after the required 24 hour presoak period. Test Pit 5 (Primary Site): Test pit 5 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially. A second test after pre- soak was not performed as this test pit was for the confirmation of soil type. Test Pit 6 (Primary Site): Test pit 6 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes pet' inch initially and 15 minutes per inch after the required 24 hour presoak period. Page 2 Lot 1, Block I Tower Estates 04/13/94 Test Pit 7: Test pit 7 was dug to a depth of 5 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 4 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially, Due to the shallow depth to bedrock no fi~rther percolation test were performed at this location. Test Pit 8 (Secondary Site): Test pit 8 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. The percolation rate was determined to be 10 minutes per inch initially and 20 minutes per inch after the required 24 hour presoak period. Test Pit 9 ( Secondary Site). Test pit 9 was dug to a depth of 7 feet before bedrock was reached. The soils consisted of approximately 12" of organic material over 6 feet of dense silt with some sand and some gravel. No percolation test was performed at this location, the test pit was dug to confirm the depth to bedrock and the soil type. If there should be any questions concerning the percolation rates or characteristics of the site please call Doug Kenley at 746-1073 Sincerely, Douglas T. Kenley, C.E. #8176 Page 3 ~[$SVA NOt~VHS ~ N~(]VHdOY~ ~l~ / xx\ 04/11/94 15:U6 ~004 Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG m PERCOLATION TEST L.EGAL DESCRIPTION: ~, t, ;F~lC 1 2 8 9- 10- DEPTH 11- 12- 13 14 15 16 17' 18- 19- 20- I,, ,T~'w-(~ ~_~-~wnship, Range, Section: SLOPE __ T~O pocl~-,'/~.o, SITE PLAN WAS GROUND WATER ENCOUNTERED? IF YES, AT WHAT Gross Net Depth to Net Reading Date Time Time Water Drop {/' 2 ~ P~'~-"' ~ I~-2~ 0 ~ to t o ~/~ ~o to I" PERCOLATION RATE ~" tminutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN ~' ~ FT AND '~' '~ FT COMMENTS ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFF~C; ON THIS I~ATE. CERTIFY THAT THIS TEST WAS PERFORMED IN DATE: ~_~ · C~ · ~ '~ 1 2 3 6 7 8 9- 10- 11- 12 13 14 15 16- 17- 18- 19- 20 Municipality o! Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG ~ PERCOLATION TEST Township, Range, Section: ~L~. SLOPE WAS GROUND WATER ENCOUNTERED? S IF YES, AT WHAT / ~) DEPTH? ~J, ~ . P E SITE PLAN Gross Net Depth to Net Reading Date Time Time Water Drop IO I o ~o Io ~1~ ~ io Yz PERCOLATION RATE ~ tminutes/inch) PERC HOLE DIAMETER . ~:~" TEST RUN BETWEEN C{ .'~"" FT ANO '~' ~'~ ~T COMMENTS q NTHI DATE ATE' ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFEC~ ~HIS OATE. ~A3 · Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SOILS LOG -- PERCOLATION TEST LEGAL DESCRIPTION: ~'~(I ~f~ [/ TO'u<4 ~--~q~¢'¢ ~' Township, Range, S~ction: ~v~,~ . SLOPE SITE PLAN WAS GROUND WATER ( ,,j ENCOUNTERED? Q S IF YES, AT WHAT ¢~j/~ OL DEPTH? P E Oepth to Water A~r. _ t ~, - ~DEPTH 7- 8- 9- 10 11 12 t3 18 19 20 Gross Net Depth to Net Reading Date Time Time Water Drop 2~ /o ~{~ PERCOLATION P.~TE TEST RUN BETWEEN (minutes/~nch) PERC HOLE DIAMETER FTAND c~, ~"- FT COMMENTS ACCORDANCE ~,TH ALL STATE AND MUNICIPAL GUIDELINESIN EPFEO[/T ON THIS DA'c)E' CERTIFY THAT THIS TEST WAS PERFORMED IN DATE: SPECIAL PROVISIONS INTERMITTENT SAND FILTER INDEX SECTION 90.01 SECTION 90.02 SECTION 90.03 SECTION 90.04 SECTION 90.05 SECTION 90.06 SECTION 90.07 SECTION 90.08 Article 8.1 8.2 8.3 SECTION 90.09 Article 9.1 9.2 9.3 9.4 SECTION 90.10 Article 10.1 10.2 10.3 10.4 SECTION 90.11 Article 11.1 11.2 11.3 GENERAL STATEMENT AND EXTENT OF WORK ............................. 3 SPECIFICATIONS, CODES, ORDINANCES AND STANDARDS ................... 3 TIME OF COMPLETION ..... ' .............. , ..... 3 SITE INVESTIGATION ........................... 3 ADDITIONS/DELETIONS TO STANDARD SPECIFICATIONS ..................... 4 CONSTRUCTION SEQUENCE ...................... 9 REQUIRED INSPECTIONS ........................ 9 SEWER PIPE General ..................................... 10 Materials .................................... 10 Construction .................................. 10 SEPTIC TANK/LIPT STATION General ..................................... i 1 Materials .................................... 12 Construction .................................. 14 Inspection and Testing ......... · .................. 14 SAND FILTER General ..................................... 15 Materials ............................. 15 co..,~ctio..., i.. i ...... ii .......... ii ..... 116 Inspections · 16 SAMPLE COLLECTION BASIN General ...................................... 17 Materials .................................... 17 Construction .................................. 17 SECTION 90.12 LEACHFIELD . 17 · General Article 12.1 ..................................... 12.2 Materials .................................... 12 3 Construction .................................. 1.7 SECTION 90.13 Article 13.1 13.2 13.3 WATER METER General ..................................... 1.8 Materials .................................... 18 Construction .................................. 18 Page SPECIAL PROVISIONS SECTION 90.01 GENERAL STATEMENT AND EXTENT OF WORK the work covered by these specifications and the plans which accompany them consists of furnishing all labor, materials, tools, transportation, and equipment necessary to complete an intermittent sand filter system as described herein and on the attached drawings. SECTION 90.02 SPECIFICATIONS, CODES, ORDINANCES AND STANDARDS The Municipality of Anchorage's Standard Specifications for Streets - Drainages - Utilities - Parks, dated 1984 (MASS) are hereby referenced, incorporated in and become a part of the contract documents for this Work. The Standard Specifications are available for purchase at the Municipality of Anchorage, Purchasing Office, 619 13. Ship Creek Ave., Anchorage, Alaska 99501. All work under this contract shall comply with the latest edition and addenda to all applicable codes, ordinances and standards including MOA-DHHS septic installation guidelines. SECTION 90.03 TIME OF COMPLETION MASS Section 10.16 - Control of Work A~icleS.22-Time for Completion of Work The Contractor shall complete all work under this contract within · thirty (30) consecutive calendar days after receipt of a notice to proceed. SECTION 90.04 SITE INVESTIGATION By submitting a bid, the Contractor declares that he has carefully examined the contract documents, has full knowledge thereof, has investigated the site, and is satisfied with the conditions affecting the work. Conditions include, but are not limited to those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and uncertainties of weather, physical conditions at the site including all underground utilities, the conformation and conditions of the ground, the character of equipment and facilities needed preliminary to and during prosecution of the work. The Contractor further declares that he is satisfied with the character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including ali prior exploratory work, as well as from information presented by the plans and specifications made a part of this contraot. Any failure by the Page 3 Contractor to become acquainted with the av. ailable information will not relieve him/her from responsibility for estimating properly the difficulty or cost of successfully performing the work. SECTION 90.05 ADDITiONS/DELETIONS TO STANDARD SPECIFICATIONS MASS Section 10.02, - Bidding Requirements and Condltions Article 2.4 Bid Guarantee Delete entire section. MASS Section 10.02 - Bidding Requirements and Conditions Article 2.5 Equal Etnploymen, t Opportunity (EEO), and Minority Business Enterprise (MBE) requirements. Delete entire section. MASS Section 10.03 - Award and Execution of Contract Article 3.3 Bidder Qualification Add the following between first and second paragraph: The bidder must be MOA-DHHS certified to perform septic system installation. MASS Section 10,03 - Award and Execution of Contract Article 3.4 Action on Bids Delete the second, third and fourth paragraphs and substitute the following: Award shall be made to the responsible bidder who submits the lowest responsive Bid. MASS Section 10.03 - Award and Execution of Contract Article 3.5 Bonds, Insurance, EEO and D/WBE Forms Add the following between the first and second paragraphs: For projects less than $100,000, the requirements for Performance and Payment Bonds is deleted. Delete the second paragraph. Add the following paragraph: Page The successful bidder shall furnish the pumhasing officer a certificate of insurance pursuant to the provisions of Article 6.9. The bidder shall exercise positive efforts to comply with the Equal Employment Opportunity (EEO) and Disadvantaged/Women Business Enterprise (D/WBE) requirement policies of the Municipality of Anchorage. The bidder shall familiarize himself with the Equal Opportunity's special provisions and Disadvantaged/Women Business Enterprise's specification for municipal contracts, including submittal requirements for bids, prior to award and after award. The Municipality of Anchorage has established a total participation goal of one percent for Disadvantaged Business Enterprise and Women's Business Enterprise for this project. MASS Section 10.03 - Award and Execution of Contract Article 3.6 Execution of Contract Delete first paragraph and substitute the following: The Bidder whose Bid is accepted shall execute the Contract and furnish the required bonding and insurance within 10 working days after Notice of Award of the Contract is issued. The Contract shall be considered executed by the successful Bidder when two copies of the Contact, signed by an authorized representative of the Contractor, the Bond if required, and insurance certificates are received by the Purchasing Officer. Failure or neglect of the Contractor to execute the Contract within the time specified may result in a forfeiture of the Bid Guarantee and award of the Contract to the next lowest bidder. MASS Section 10.04 ~ Scope of Work Article 4.6 Temporary Utilities Delete last sentence of second paragraph. MASS Section 10.04 - Scope of Work Article 4.13 Utilities Delete the first and second paragraph and replace with the following: Locations of utilities shown on the plans are not exact. Above ground utilities have been field located. Below ground utilities are shown as depicted on "as-built" plans. The Owner shall not be held liable for damages to utilities incurred during construction due to deficiencies or omissions on the plans or in these provisions. At least 24 hours prior to commencing work, the Contractor shall contact all local utility companies to obtain underground utility locates. The Contractor shall exert due care to prevent damage to utilities. Should a utility be damaged, the Contractor shall notify the utility company Page 5 .. and shall have repaired at his own expense any damage resulting from failure of the Contractor to request an underground utility locate or to exert due care. If any utility company determines that a utility has to be temporarily raised, lowed, moved, guyed, shored, braced or otherwise protected during construction, it shall be done at the expense of the Contractor to the satisfaction of the .utility company. MASS Section 10.05 - Control of Work Article 5.2 Prosecution of Work Change ten (i0) to twenty (20). MASS Section 10.05 - Control bf Work · Article 5.3 Constructiou Progress. Schedule Delete entire article. MASS Section 10.05 - Control of Work Article 5.4 Unusual Working Hours, Hblidays, Saturdays and Sundays Delete this Section and substitute the following: The Contractor shall not work nights, Sundays or holidays, or anytime outside the usual working hours (unless of an 'emergency nature), and in no ease shall the Contractor perform any such emergency work without first notifying the Engineer to allow arrangements for proper inspection. MASS Section 10.05 - Control of Work Article 5.5 Shop Drawings Delete entire article. MASS Section 10.05 - Control of Work Article 5.6 Product Data Change six (6) copies to one (1) copy in first paragraph. Pag~ 6 MASS Section 10.05 - Control of Work Article 5.15 Inspection Add a second paragraph as follows: Mandatory inspections are to be performed as outlined in the supplemeutal specifications, Section 90.07. The Engineer is to be notified 48 hours prior to mandatory inspections. MASS Section 10.05 - Control of Work Article 5.22 Time for Completion of Work Delete first and second paragraph and replace with the following: Time is of the essence in the Contract. Therefore, the Work to be done under the Cohtract shall be completed in it entirety by August 31, 1993. The Contractor shall furnish such manpower, materials, facilities, and equipment and shall work the required hours as may be necessary to insure the completion of the Work within the time specified. MASS Section 10.05 - Control of Work Article 5.25 Final Trimming of Work Add the following paragraphs to this article: All landscaping, fences, sidewalks, paving, driveways, utility markers and other improvements, removed to facilitate the Contractor's operations shall be fully restored to their original condition and location by the Contractor unless otherwise directed by the Engineer. Items damaged by the Contractor during removal, storage, or restoration, shall be repaired or replaced in kind by the Contractor. All survey monuments and property comers removed or damaged during construction shall be replaced, under the direction of a registered Land Surveyor licensed in the State of Alaska. A copy of the land surveyor's license along with the survey notes shall be sent to the Engineer upon completion of the project. This work shall be considered incidental to the contract. No separate payment shall be made for final trimming of work. Page 7 MASS Section 10.05 N Control of Work Article 5.27 Liquidated Damages Change five hundred dollars ($500.00/day) to fifty dollars ($50.00/day). MASS Section 10.06 - Legal Relations and Responsibilities Article 6.12 Certified Payroll Delete entire section. MASS Section 10,06 - Legal R~latlons and Responsibilities Article 6.15 State of Alaska Pr{~vailing Wage Scale Delete entire section. MASS Section 10.07 - Measurement and Payment Article 7.4 Advance on Materials Delete entire section. SUPPLEMENTAL SPECIFICATIONS SECTION 90.06 CONSTRUCTION SEQUENCE In order to insure proper inspection procedure the system is to be installed in the following order: 1. Sewer line from house to tank 2. Septic tank/lift station 3. Sand filter 4. Sampling Basin 5. Leachfield Construction of the sand filter is to be completed prior to August 31, 1993 or a heated structure is required over construction area. SECTION 90.07 REQUIRED INSPECTIONS Inspection of work in progress may be made by the Engineer and MOA ~ DHHS at any time. The following schedule of required inspections is to be adhered to. 48 hour notice is required prior to each inspection. Inspections can only be arranged during weekdays, and during normal working hours. The following inspection schedule is to be strictly adhered to: 1. Septic tank/lift station is in place, but not backfilled. Sewer piping from building to tank is complete, properly bedded and backfilled, and ready for pressure testing. 2. Sand filter pit is excavated and prepared for filter construction. Prior to placement of filter liner material. 3. Engineer to be 'notified with Contractor's schedule during actual construction of the sand filter to allow spot inspection during construction. Any deviation from reported schedule is to be reported to the Engineer. 4. Final inspection of the sand ,filter with all pressure piping in place, but prior to placement of cover material. Flow testing of, pressure piping at this time will require completion of lift station wiring prior to this inspection. 5. Inspection of open trench excavation of leaching trench as per MOA Code. 6. Inspection of leaching trench prior to final backfill with all Piping in place. 7. Inspection of final grading. Pago 9 SECTION 90.08 SEWER PIPE Article 8.1 General The Work under this Section consists of the performance of all operations pertaining to furnishing and installing pipe for sanitary sewer systems. Article 8.2 Material General: All piping shall be in accordance with the Contract Drawings conforming to the size and classification shown and specified. PVC Pipe: PVC pipe shall confqrm to requirements of ASTM 3034 for solid pipe, and ASTM 3350 for leach pipe, ASTM D-2241, Schedule 40 for pressure lateral pipe. Polyethylene Pipe: Polyethylene pipe shall conform to ASTM F-810 for leach pipe. Polyethylene pipe shall conform to ASTM D2239-74 at 160 psi for pressure sewer. - Article 8.3 Construction Pipe Grade and Alignment: Variance of individual pipe sections from established line and grade shall not be greater than 0.02 feet, providing that such variance does not result in a level or reverse sloping invert. During the progres~ of the Work, the Contractor shall provide instruments such as transits, or levels, for transferring grades from offset hubs or other construction guides from the control points and bench marks provided to the Contractor by the Engineer. The Contractor shall provide qualified personnel to use such instruments and who shall have the duty and responsibility for placing and maintaining such construction guides: Pipe Laying: All pipe shall be laid with Class C Bedding, free of large stones and organic matter. Each section of pipe shall be handled Carefully and placed accurately; the spigot end shall be Fully inserted pointing in the direction of flow and glued in place to make a watertight seal. Each section of pipe shall be properly supported to insure true alignment and an invert which is smooth and free from roughness or irregularity. At all times, when Work is not in progress, open ends of pipe and fittings shall be securely and satisfactorily closed so that no undesirable substance will enter the end of the pipe or fittings. Pago 10 Bedding of Pipe for Sewer Lines: ',~'he pipe should be bedded with Class C Bedding materials compacted to 95 pei:cent to above the spring line of pipe. Native materials may be used as backfill material above the spring line of the pipe, provided it is free of large stones and organic matter to a point one foot above the top of the pipe. Testing: The Contractor shall clean and flush all sanitary sewer pipe installed prior to testing and inspection. Exfiltration Test (Using Water) On completion of the section of sewer line between house and tank, the Engineer shall require that the pipe be plugged at the tank end and at the pipe section inside the house foundation above grade, and the pipe subjected to a hydrostatic pressure. All testing is to be conducted after complete backfilling of the sewer line, but prior to tank backfilling. The end of the sewer service pipe at the tank shall be plugged or capped and the plug or cap shall be securely fastened to withstand the internal test pressures. Such plugs or caps shall be readily removable. A minimum head of six (6) feet of water above the crown at the upper end of the test section (in extended eleanout) shall be maintained for a period of four (4) hours during which time it will be presumed that full absorption of the pipe body has taken place and thereafter for a further period of one (1) hour for the actual test of leakage. During this one hour l~efiod the measured loss shall not exceed the rate of 50 gallons per inch diameter per mile per 24 hours, or a 2.2" drop in a four inch diameter riser pipe in one hour. Exfiltration in greater amounts will be cause for rejection of the sanitary sewer and all repairs necessary to meet these requirements and re-testing shall be at the expense of the Contractor. All testing shall be considered a obligation under Furnish and Install Pipe and extra payment will not be allowed for this portion of Work. SECTION 90.09 SEPTIC TANK/LIFT STATION , .~ Article 9.1 General The work under this Section consists of the performance of all operations pertaining to furnishing and installing the septic tank/lift station and piping to the sand filter. Page 11 Article 9.2 Materials Tank for Lift Systems: Septic tank should be a 1250 gal. two compartment steel tank specifically for the use of Orenco Systems Inc. for their patented lift station assembly Orenco//4200. bo The tanks shall be designed for soil loading conditions as required by municipal and State regulations. The design or analysis shall be in accordance with accepted engineering practice and local regulatory agencies: Risers: All welding shall be in accordance with applicable codes and standards. ' First compartment shall have a separate 6" pumpout riser with a Thermistor mounted at mid depth level in. tank from a one inch Schedule 40 PVC pipe secured to riser, Thermistor wiring to top of riser. The second compartment shall have a separate four inch pumpout riser. An additional second compartment outlet riser shall be 12 gauge sheet steel, and shall extend 12 inches (minimum), above surface grade, shall have a minimum nominal diameter of 24 inches, and shall be capable of being equipped with the following: 1. ^ junction (Nema 4x) box or equal, bonded or attached to the riser. 2. UL listed electrical cord grips, installed in the J-box. A lid - shall be furnished with the riser. It shall be Constructed of fiberglass or equivalent aggregate finish. Meet H-10 loading requirements and have a latching mechanism. ' Riser installation - each riser shall be sealed or welded to the top of the tank in such a manner as to prevent infiltration of ground water. Insulation - four inch rigid extruded polystyrene shall be placed in the riser directly below and attached to the lid. Insulation - two inch sprayed shop applied urethane on circumference of riser with 46465 Tnemee coating. Thermistor - a Thermistor device capable of recording temperature in the range of 40-60° F at an accuracy of :t:0.2°C as measured with a Fluke 77 Multimeter, Page 12 .h. and being resistant to corrosion in a primary sewage tank environment. YSI4007 or aplSroved equal Thermistor strings are to be prefabricated and calibration checked and recorded by the manufacturer. Thermistor Cable - Teflon/Teflon Coated 24 AWG copper conductor with 3-M connector utilizing a mastic lined polyolefin heat shrink. Effluent Pumping Assembly: a. Effluent pumping assembly shall be Orenco systems (TM) model 20-OSI-05-HHF series consisting of following: 1. 1/2 H.P. 110 volt or equal U.L. listed effluent pump. 2. Screened pump vault (U.S. patent//4439323) 59 inches deep, 3/16 inch thick high-density PVC cylinder houses the.pump, level controls and screen and serves as a baffle to prevent the screen from clogging. Fifteen 1-1/2 inch diameter holes are drilled in the vault at a level that places them at about the midway point in the depth of the septic. Flap check: Allows the vault to drain when removing from tank. Screen: 15 inch diameter cylinder of high-density polyethylen, e 1/8 inch mesh. 3. All piping shall be PVC or other non-corroding material. Pump controls and alarm system Control shall be Orenco systems SICTETMRO I10 volt with following options consisting of: 1. Event counter. 2. Elapsed time meter. 3. Program timer. 4. 10 watt heater. 5. Remote alarm panel option with a minimum of 80 DB sound pressure at 24-inches, operating temperature -30AC to 65AC, continuous sound to be located in the home. 6. Oil-tight visual alarm with push-to-silence feature. Automatic audio-alarm reset. 7. 15 amp motor rated toggle switch, double pole, double-throw with three positions; manual (man), Automatic (auto), And center (off) (H.O.A.) 8. Nema 4x-rated, fiberglass, or equ~, enclosure.with hinged cover. 9. All controls to be installed as per manufacturers recommendations. 10. Control panel to be installed on outside wall of home within sight of septic tank/lift station. Page 13 eo Level control floats shall be Orenco systems (TM) mercury floats on adjustable PVC Stem which' attaches to vault. Designed for use in septic effluent. Alarm float shall be positioned above "On/Off' pump switch. A Thermistor device as previously described is to be secured at the end of PVC vault control pipe stem with wires routed to top of manhole. Piping from. the septic tank to the sand filter is to be PVC schedule 40 solvent weld piping properly bedded as described in Section 50.08, Article 8.3 and sloped to drain back to the septic tank. Insulation board 2" thick and 2' wide centered over the pipe is to be placed where soil cover is less than 4' depth. Article 9.3 Construction Installation. All pumping services shall be installed in accordance with the manufacturer's recommendations and standards. Electrical installation is to be to code by licensed electrical contractor, with Municipal inspection where required. If MOA inspection not required, a licensed electrician is to provide letter to the Engineer stating that the system meets or exceeds all applicable Codes. Excavation: a. Excavate to proper depth to allow graviiy flow, install tank level, tolerance 0.01 foot, on undisturbed or compacted to 95 percent classified sand fill material. Line excavated tank pit walls with two inches +35 PSI burial foam full depth of tank. Backfill between tank and foam with sand material and compact, in a manner to prevent damage to tank surface coating. Create a level sand surface over tank and add two inches burial foam +35 PSI directly over tank. Mound unclassified soil over tank location to a depth of two feet above finished grade to allow positive drainage away from tank and 'counteract buoyancy. Connections: All connections to be as per MOA - DHHS and U.P.C. requirements P.V.C. 3034 piping with caulder or equivalent couplings for inlet riser pipes. · b. All tank connections are to be completely water tight. Article 9.4 Inspection and Testing Pag~ 14 The tank is to be left empty for 48 hours to allow for infiltration testing. Any infiltration of ground water into the tank during this test period will require the Contractor to correct any deficiency and retest at the expense of the Contractor. Water from sewer line testing is not to be discharged into the tank until after infiltration test is completed. SECTION 90.10 SAND FILTER Article 10.1 General The work under this Section consists of the performance of all operations pertaining to furnishing and installing the sand filter. Article 10.2 Materials Sand Filter: a, Liner - Orenco Model LI or equivalent. 30 mil PVC cut and fabricated to provide water tight enclosure of filter sand volume. Seams to be permanent as per Manufacturer's recommendations. All connections, such as boot flanges, through sand filter to be permanently bonded to liner. b. Manifold Assembly - Orenco Model SFM 1036 or equivalent with orifice shields and flushing assembly. All drilled holes to be cleaned of burrs and pipes flushed prior to assembly. Flushing valve to include riser to + 12 inches above finish grade with extension handle provided to operate globe valve from ground surface. c. Filter Fabric - Orenco Model LIFF or equivalent. d. Filter Sand - Sand to meet ASTM C-33 Concrete Sand specifications with the additional requirement that all materials passing the #100 sieve shall be removed. A sample of proposed filter sand must be submitted to the Engineer for testing two weeks prior to construction. A sample will be taken from the sand bed during construction; if this does not meet specifications all sand will be removed and replaced at Contractor's expense. e. Pea Gravel - Pea gravel is to be washed material containing no fines (0 percent < #100) and a maximum size of 1/4 inch diameter. f. Round Rock - Round rock is to be washed gravel with rounded edges well graded with maximum diameter of 1/2 inch. Page 15 Insulation - Two inches high density +35 PSI extruded polystyrene foam rated for di'rect burial. Thermistor - a Thermistor device capable of recording temperature in the range of 40-60° F at an accuracy of -+_0.2°C as measured with a Fluke 77 Multimeter, and being resistant to corrosion in a primary sewage tank environment. YSI4007 or approved equal Thermistor strings m'e to be prefabricated and calibration checked and recorded by the manufacturer. Thermistor Cable - Teflon/Teflon Coated 24 AWG copper conductor with 3-M connector utilizing a mastic lined polyolefin heat shrink. Sample Basin - Available as special fabrication from Orenco Systems, Inc. - no model number available. Linear Air Difuser Line - Available from Orenco Systems, ][nc. - no model number available. Feed line from house to filter is HDPE Artic Insulated Pipe 3/4"-2" SDR-11 Maskell-Robbins or equiv. Article 10.3 Construction Sand filter construction is to follow procedures as outlined in the Orenco Installation Manual as applicable to this design. Care is to be taken to protect the integrity of the sand filter PVC liner material. This includes careful placement of soil material into liner. Any perforation of the PVC liner material, will require patching in a method that exceeds original manufacturer's strength. Rock, pea gravel, and filter sand are to be hand leveled to proper depth (tolerance within 0.01 feet) in filter, taking care not to allow mud or fine soil material in'to the filter or rock layers. This would include any soil material picked up by excavation machinery buckets while loading specified material. Contractor should estimate filter materials volumes such that allowance is made for wastage of material in contact with ground at site. Work on the sand filter may be suspended at 'Engineer's discretion due to inclement weather conditions such as rainfall. The sand filter and material stockpiles will be completely covered by a tarp overnight during construction until finished. Filter internal construction should be accomplished in one day's time. Contractor is to consult Engineer:as 'necessary to install Thermistor temperature probes in sand filter bed and septic tank. Thermistor string is to be prefabricated and installed to level as shown on drawings. Article 10.4 Inspections Page 16 The dralnfield and filter are to be located in positions shown on site plan. The b'ottom of the dralnfield shall be level, plus or minus 1.5" or 0.13'. Sand filter outlet elevation is to be planned so that the total depth of the leachfield does not exceed 4' from ground surface at leachfield location. The 4" effluent pipe is to be level in leachfield, overall tolerance 0.02' or ',4". The drainfield gravel is to be completely covered with typar fabric material. Insulate or mound soil cover to 3' equivalent depth over leachfield and sand filter with 3:1 side slopes. The area over the drainfield and sand filter is to be finish graded to prevent pending of surface water ranoff. Topsoil 6" and seed both areas. SECTION 90.13 WATER METER Article 13.1 General A water meter is to be installed in the residence to measure water quantity from the well into the home. Meter is to be located after pressure tank, but prior to any inside home supply runs. Article 13.2 Mate~'ials Water meter is to be Sensus Model No. SRII */a" x g" with tail piece conversion outfitted with a GTR remote sensor, or equivalent capable of accurate flow measurement from 1/o to 15 gpm. Article 13.3 Construction Meter is to be installed as per AWWU guidelines for domestic water meter installation. Remote sensor is to be installed outside of home in location readily accessible to reading. Page 18