Loading...
HomeMy WebLinkAboutT15N R1W SEC 18 LT 214 , ~ MUNICIPALITY OF ANCHORAGE DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION ENVIRONMENTAL ENGINEERING DIVISION  825 L Street- Anchorage, Alaska 99501 Telephone 264-4720 ON-SITE SEWAGE DISPOSAL SYSTEM AND/OR WELl. INSPECTION REPORT ~ UPGRADE MAILING ADDRESS LOCATION NO. OF BEDROOMS Well ~ L~q. c~acity in g , ~ Welt Dwelling PERMIT NO, ~ Class ~¢~ // Depth Driller Distance to lot line PERMIT NO. ~ DISTANCE TO: Building foundation Sewer line Septic tank Absorption area(s) OTHER PIPE MATE I LS SOILTESTRATING/~ ,,}t ~ INSTALLER [ ~ ~' REMARKS ' ~ ~ ~ ED ~ ' DATE LEGAL 3178) Permit ~ Applicant: ~ MUNICIPALITY OF ANCHORAGE. ~ Department Health and Environments ~o~~~ ~/~ 825 ~ Street, Anchorage, AK. ~5~_~~) %+ 264-4720 i /I,~%~ - ~g~.~ * * * HANDWRITTEN~R~IT * * *~--~,~ / WELL AND/OR ON~I~ER PERMIT Location: Legal Description: ~,~/ ~/~;3/~ Type of Soil Absorption System Is: Trench: Drainfield: Phone Number: Seepage Bed: ,,ct si=e: /- Holding Tank: Maximum Number of Bedrooms: ~ Soil Rating(sq.ft/br) The Required Size of the Soil Absorption System Is: DEPTH ,~,~('-I LENGTH 12b-~ GRAVEL DEPTH · . WIDTH ,.,- The length dimension is the length(in feet) of the trench or drainfield. The depth of a trench or pit is the distance between the surface of the ground and the bottom of the excavation(in feet). There is no set width for trenches. The gravel depth is the minimum depth of gravel between the outfall pipe and the bottom of the excavation(in feet). * * REQUIRED SEPTIC(HOLDING) TANK SIZE = __ GALLONS * * Permit applicant has the responsibility to inform this department during the installation inspections of any wells adjacent to this property and the number of residences that the well will serve. * * * TWO(2) INSPECTIONS ARE REQUIRED * * * Backfilling of any system without final inspection and approval by this department will be subject to prosecution. Minimum distance between a well and any on-site sewage disposal system is 100 feet for a private well or 150 to .200 feet from a public well depending upon the type of public well. Min~-~---~is~an6e from a private well to a private sewer line is 25 feet and to a community sewer line is 75 feet. Well logs are required and must be returned to this department within 30 days of the well completion. Other requirements may apply. Specifications and construction diagrams are available to insure proper installation. * * * PERMIT EXPIRES DECEMBER 31, 1 9 8 3 * * * I certify that: (1) I am familiar with the requirements for on-site sewers and wells as set forth by the Municipality of Anchorage. (2) I will install the system in accordance with codes. (3) I understand that the on-site sewer system may r~quire enlargement if the~sidence~~is remodeled to include more t~~ S iqne~: '7~/~~-~-~--~-'~-'- Issued by: SWP/024 (1/8I) SOILS LOG MUNICIPALITY OF ANCHORAGE DEPARTMENT OF HEALTH AND ENVIRONMENTAL PROTECTION 825 L. Street, Anchorage, Alaska 99501 264-4720 SOILS LOG - PERCOLATION TEST PERCOLATION TEST 4 5 6 7 9 SLOPE SITE PLAN-/~ IAI I,I I IIIII I',~Jl IIII 10 12 13 14 15 16 17 18 19 20 WASGROUNDWATER S ENCOUNTERED? A/r~ L 0 E IF YES, AT WHAT DEPTH? Gross Net Depth to Net Reading Date Time Time Water Drop PERCOLATION RATE (minutes/inch) TEST RUN BETWEEN FT AND FT COMMENTS-~/-o/~'~ /~- /O/~' '~--' ~--~ ~'~ ~ ~ ~o ~/~c~ 72~OO8 (6/79) CONSTRUCTION AND OPERATION CERTIFICATE ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION PUBLIC WATER SYSTEM APPROVAL TO CONSTRUCT Plans for the construction of Lc-J-' by ..... '~ <~0 ~:~ approved. public water system located , Alaska, submitted in accordance with 18 AAC 80.100 have been reviewed and are E] conditionaJly approved (see attached conditions). If construction hal~ not started within two years of the approval date, this certificate is void and new plans and specifications must be submitted for review and approval before construction. APPROVEDCHANGEORDERS Change (contract order no. Approved by Date or descriptive reference) The "APPROVAL TO OPERATE" section must be completed before any water is made available to. the public. APPROVAL TO OPERATE The construction of the public water system was completed on (date). The system is hereby granted interim approval to operate for 90 days following the cpmptetion date. As-built plans submitted during the interim approval period, or an inspection by the Department has confirmed the system was constructed according to the approved plans. The system is hereby granted final approval to operate. BY TITLE APPLIC' -IT FILLS OUT UPPER HAL '3NLY Property Owner ~/?/4~'/~ ~'/ /~'/~' ~ ~ ~'I Phone Buyer /'-~ ~ ~,~ ~,/-,,~'' / ~¢- ~ Address ,/.' ~ ~,~ ~/, ~ ~ Zip Code Address /~ ~ ~.. Zip Code ~ltiple Family No. of Bedrooms ~ ~[~dlvldual Year Individual Installed: / ~ ~" ~ Time Time Time Date Date Date Inspector Inspector Inspector Field Notes: (Z.~) APPROVED BEDROOMS ( ) DISAPPROVED N~UNJCIPALITY OF ANCHORAGE DEPT. OF t~,SALTH ~' ENVIRONM,SNTAL pp, oE EcTION RECEIVED *CONDITIONS OF APPROVAL CO DITIONAL APPROVAL* DATE Soils Rating Date Sewer Installed Well To Absorption Area Well to Tank OC~? Well Log Received Septic Tank Size <~ 0 (D(~) ' EXCAVATION ROBERT A. SHAFER WORK CIVIL ENGINEER 694-2979 September 14, 1983 Municipality of Anchorage Department of Health and Environmental Protection 825 L Street Anchorage, Alaska 99501 Reference: Lot 214: Section 18: T15N~ R1W The well located on the referenced property was inspected. A sanitary seal has been placed on the top of the well casing and the wiring is in conduit. The well casing extends above the ground and the ground around the casing slopes away from the well. A water sample was taken and submitted to Chemical and Geological Laboratories of Alaska for Coliform bacteria analysis. The results of this test were satisfactory. If we may be of further service, to call. please do not hesitate SRB 196X EAGLE RIVER, ALASKA