HomeMy WebLinkAboutROLLING HILLS VIEW ESTATES BLK 4 LT 5
Municipality of Anchorage Page
DEPARTMENT OF HI:ALTH AND HUMAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-474.4
On-Site Wastewater Disposal System and/or Well Inspection Report
Permit Number: -"~'~b)~ ~ ~ PIE Number:_
Name: ~b ~/~ Wastewater System: ~New D Upgrade
AddresS:p~o~ ETI~I~ E~;a~ ~5~7 ABSORPTION FIELD
Phone: ¢q¢--06'7/J of Bedroorns:~ D Deep Trench ~ShallowTrench DBed DMound ~Other
LEGAL DESCRIPTION SoilRating: J'~ GPD/Sq. Ft. Total Depth from original grade: ~,
LOt:5, Block: ~.¢~ Ill., ~' [~ V;~ ~,~ 8ub~iv~i°": Depth to pipe bottom lmm original g,ad& [ Ft.
Township:J~,,.:~o,id,: Fil]addedaboveoriginalgrade:~.~ Ft. GraveJlength: ~7 Ft.
Number of lines: J Distance between lines:
WELL: ~.New Q Upgrade Gravelwidth: ~ Ft. ~ '~-- Ft.
Pi e material:
Classificatio~Pri~ate,r~' U'~AIB'c); Total~ooDepth: Ft. Cased~,,o.¢~To: Fi. Total absorption area:soo SQ. Ft.
Casing Height Above Ground:
~'~'d: ¢. 6'7 ~.MIP"~pse'~t: ~t.J~ ~Ft. TANK
SEPARATION DISTANCES aseptic D Holding D S.T.E.P.
To Septic Absorption Lift Holding Pub,ic/Privat( Manufacturer: Capacity in gallons:
Fro~ Tank Fie~d Station Ten~ Sewer Li~es
[~ ~ ~ [ Number of Compartments: ~
s;~ ~00'+ ~0~ J LIFT STATION
LOt~ Size in gallons:
Line ~ Manufacturer:
Foundation j~, .~71 "Pump on" ,eve, atdp,eve, at: J High water a,arm at:
Cu~ai~Drai, .... ~" e ~-, ~a-- ---- ~ Electrioallnspeclions ,edormed by:
Remarks: gooS& fio¢~¢~rl~,o ~eP ~. BENCH MARl(
Location and Description:
· & S ~NGINEERING
~..,..~¢,,¢ ,,/,,,),..~/ ...... u.,,.,,
Inspections performed by:
Department of Health and Human Services approval ,,
Reviewed and approved by:~~ ~ ~Date: ¢'3/'
.//
72-013 (Rev. 9/91) MOA 25
PERMIT NO. SW950298 PaCE 2 OF 3
Municip. a[i-~ oF Anchor'aQe
DEPARTMENT OF HEA~_THAND HUlVrAN SERVICES
ENVIRONMENTAL SERVICES DIVISION
P,O. Box 196650 ·anchop~ge, ALaska 99519-6650 · Tetephone: 343-4744
ON-SITE WASTEWATER DISPOSAl_ SYSTEN AND/OR WELL INSPECTION REPORT
LF, CAL LOT 5, BLOCK 4, ROLLING HILL VIEW EST, P.[.~. NO.
050--522--11
DRIVEWAY
TBM
1850 GALLBN
SEPTIC TANK
lO' MIN,
50' SETBACK TH
RBAD CUTBANI<
SCALE: 1" = 40'
UPPER
McCRARY
C. COWAN
t,t . , ...........
PERMrF NO SW95298 PAGE 3 OF 3
DEPARTMENT OF HEALTH AND HUMAN SERVICES
IENVlRONIVlENTAL SERVICES DIVISION
P,I], Box 196650 IAnchoro. ge, Alaska. 99519 66501Telephone: 343-4744
ON-SITE WASTEWATER DISPOSAl_ SYSTEM AND/OR WELl. INSPECTION REPORT
LEGAL LOT 5, BLOCK 4, ROLLING HILL VIEW EST. P.[.D. NO. 050-322-11
82.9'
FINAL
GRADE
NEW ~
1250 GAl_,
SEPTIC 78.2'
TANK
CO1
C02
CO1 69,6'
CO2 = 70,7'
GRADE
MT1
A B
FCO 89.0' 165.0'
ST1 103.5' 162.0'
ST2 108.5' 156.0'
DBL1 110.0' 155.0'
DBL2 111.5' 155.0'
C01 143.5' 176.5'
MT1 141.5' 176.0'
C02 103.5' 103.0'
MT2 102.0' 105.0'
INSULATION
MT1
- 66.3
6?.4'
67.4'
MT2 66.4'
·
NO WARPER FOUND
6~,t B.O.H.
aUG-la-99 H0N 18:05
P, O1
SULLIVAN WATER WELLS
P.O, OOx OTW2?~, CH UGIAK~ ALASKA ~3567, TELEPHONE
AO~RF.~S .... STAT{C L~V~, OF WATER f'r..~(~
KIND OF FORMATION:
~rom ...... ~:t, to ~ Ft. . 0 O~ Fro.~ ...... Ft,~o~
.-,~.~.~,~,,,._~.,.~ ~4~ ~ ~<~__~x,,o_ ~, ................
Frora. ~'t, to ......
Frnm .... Ft, to .... FI,_ .
From ...... FI, to ...... Ft._
~'rorll ........ F(. to .... I~'~ ....
MISC[,. INFORMATION:
Front Ft, to__~V! .............
From ~l~t. lo-- Ft .......................
1From _FI, ro~,~}:t, . ...........
From .... Ft. ~ Ft, ..: .........
.......
AUB 50 1999
MurdoJpa ty ot ^ncnorage
Dept. HeaLth & Human Serv ces
WELLINSPEOIION
& FLOWTEST
ROAD DESIGN
801LIEST
PERCOLATION
VEST
STRUCTURAL&
MECHANICAL
INSPECTIONS
ROBERTC. OOWAN, EE.
ROBERTA. SHAFER, RE.
Date: J O ' -! ' *'l-~
CIVIL ENGINEERS
(907) 694-2979
FAX (907) 694-1211
R 'CEIVED
Municipality of Anchorage
DEPARTMENT OF HEALTH AND HUMAN SERVICES
825 L Street
P.O. Box 196650
Anchorage, Alaska 995].9-6650
OCT 8 1996
MLmlclpali~y ol
Dept. Health & Human Ser~'ice.~i
The septic inspections for the referenced property were
performed on ~.'~-~ and ~.,~&.-'J~ . Prior to submitting
the On-site Wastewater Disposal System and~or Well Inspection
Report we are waiting for the ~og;IO~Tio. J to be
completed.
If we may be of further service please contaot us.
Sincerely,
Robert C. Cowan, P.E.
17034 NORTH EAGLE RIVER LOOP , SUITE 204 · EAGLE RIVER, ALASKA 99577
PAGE 1 OF
MUNICIPALITY OF ANCHORAGE
DEPARTMENT OF HEALTH AND HUMAN SERVICES
P.O. BOX 196650, 825 "L" STREET, ROOM 502
ANCHORAGE, ALASKA 99519-6650
ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT
PERMIT NUMBER:SW950298
DESIGN ENGINEER:S & S ENGINEERING
OWNER NAME:GILES HERBERT E
OWNER ADDRESS:18910 UPPER SKYLINE DR
CEUGIAK, ALASKA 99567
DATE ISSUED: 9/28/95
EXPIRATION DATE: 9/28/96
PARCEL ID:05032211
LEGAL DESCRIPTION:
ROLLING HILLS VIEW ESTATES BLK
4 LT 5
LOT SIZE: 36590 (SQ. FT.)
NUMBER OF BEDROOMS: 4 THIS PERMIT: 4
THIS PERMIT IS FOR THE CONSTRUCTION OF:
DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM
ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH:
1. THE ATTACHED APPROVED DESIGN.
2. ALL REQUIREMENTS SPECIFIED lin ANCHORAGE MUNICIPAL CODE CHAPTERS
15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL
REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AAC80) .
3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS
PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY
CALLING 343 4744 ( 24 HOURS ) (NOT REQUIRED FOR WELL ONLY PERMIT)
4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL
ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING
WEATHER MUST BE EITHER:
A. OPENED AND CLOSED ON THE SAME DAY
B. COVERED, SEALED AND HEATED TO PREVENT FREEZING
5. THE FOLLOWING SPECIAL PROVISIONS.
SPECIAL PROVISIONS:
RECEIVED BY: DATE
ISSUED BY: DATE
wno,, it May Concern:
J nave over ,..,uu t~ours experience operr~fillfl_ _ brj,_-.'Khoes., loaders,. ,a du,,_er~.~ ~or AIL,
i~-'~' ~""'" r'- ~'-': : ' ' ' " 'lOBS' ' d-'"g d"-_u _ dl'aliia' e, _- - ' ..... '-
COilff'Ocfors, ~_ j]SI'SOIlOI obi ~ d y Onu
.... l,¢Ild.~llUH, pFIVOTO IICrib:S, g
ROBERT C. COWAN, RE.
ROBERTA. SHAFER, RE.
HEALTH AUTHORI~¢
APPROVALS
SEWER&WAfER
INSPEC]'IDN
ENGINEERING STUDIES
AND REPORTS
WELLINSPECTION
& FLOW TEST
ROAD DESIGN
SOILTEST
PERCOLATION
TEST
STRUCTURAL&
MECNANICAL
INSPECTIONS
ON SITE
W,%STEWAT E R
DISPOSAL SYSTEM
DESIGN
September 13, 1995
CIVIL ENGINEERS
(907) 694-2979
FAX (907) 694-1211
MUNICIPALITY OF ANCHORAGE
Department of Health and Human Services
P.O. Box 196650
Anchorage, AK. 99519
REFERENCE: Lot 5, Block 4, Rolling Hills
Request you issue a permit to drill a well and install a
septic system ~o serve the proposed four bedroom house on
the referenced property.
Two test holes were excavated and percolation tests
performed. The approximate location of the test holes are
located on 'the attached site plan.
At the time of excavation no water was encountered in the
test holes and after seven day ground water monitoring,
the monitoring tubes were found to be dry.
This property has enough area for a future septic upgrade
which can be seen on the attached site plan.
We do not anticipate any adverse effects on neighboring
wells, septic systems or drainage patterns by the
installation of the proposed septic system.
There are no points of contamination within the proposed
well radius which can be seen on the attached site plan.
If you require additional information, please contact us.
Sincerely,
Cowan, P.E.
RCC/gk
Enclosure
17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577
1' = 50,
8GALE
0
SITE PLAN I DESIGN
0
.~¼
OO
mO
Municipality of Anchorage
DEPARTMENT OF HEAL'I-H & HUMAN SERVICES
825 "L" Street, Anchorage, Alaska 99502-0650
SOILS LOG -- PERCOLATION TEST
PERFORMED FOR:
LEGAL DESCRIPTION:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16-
17
18
19-
20-
COMMENTS
~ ~o~ c. cow*. ] ~E
Township, Ranoo, Soction:
~lg~ ~ SLOPE SITE PLAN
WAS GROUND WATER
ENCOUNTERED?
IF YES, AT WHAT ~'~ A pO
DEPTH?
E
Deplh to Water After
Monilorin§? _ ~'¢
Gross Net Depth to Net
Reading Date Time Time Water Drop
PERCOLATION RATE . __ (mmutes/~nch) PERC HOLE DIAMETER
TEST RUN BETWEEN ~ FT AND "~ FT
5 & S ENGINEEr~ING
PERFORMED BY: ~ ~,.~,~.4 ~ I ~¢~,V,4~ .._~ CERTIFY THAT THIS TEST WAS PERFORMED iN
ACCORDANCE WITH A~¢~k~UIDELINES IN EFFECT ON THIS DATE, DATE:
72-008 (Rev. 4/85)
SOILS LOG -- PERCOLATION TEST
~.~
DATE
LEGAt_ DESORIPTION:~% ~ ~"W~ ¢~O~"4h Township, Range, Section:
A~ ~t~ ~¢~LOPE SITE PLAN
2
3
ENCOUNTERED?
5
6
7
8
9
10
11
12
13
14-
15-
16-
17
18
19-
20-
COMMENTS
DEPTH? ,/~ pO
Deplh lo Water A~,~
Monilaring? . '~'f"'~
Reading Date Gross Net Depth to Net
Time Time Water Drop
PERCOLATION RATE ~ (mmutes/~nch) PERC ROLE DIAMETER ~
TES'r RUN BETWEEN .---.~.~__ FT AND '~ __ FT
$
ENGINEERING
~c~.~,(~ ~,.~, ) ~-~ . CERTIFY THAT THIS TEST WAS PERFORMED IN
PERFORMED BY: I
1/C~a4 Eagle River Loop Roa~l No, 204--~ ~..~ ,~ .~ ~
ACCORDANCE WITH J~at~JJ~T~i'/~i~tr, j~J~J&4J~I~f~j~jt~3UIDELINES IN EFFECT ON THIS DATE. DATE:
72-008 (Rev, 4/85)
ENGINEERING STUDIES
AND REPORTS
WELL INSPECTION
& FLOWTEST
SiTE PLANS
ROAD DESIGN
SOILTEST
PERCOLATION
TEST
STRUCTURAL&
MECHANICAL
INSPECTIONS
ROBERT C. COWAN, RE.
ROBERT A. SHAFER, RE.
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION PRACTICES
and
MATERIAL SPECIFICATIONS
CIVIL ENGINEERS
(907) 694-2979
FAX (907) 694-1211
REFERENCE= Lot 5, Block 4, Rolling Hills
September 13, 1995
GENERAL=
1.
The scope of this project includes the installation of
a 1250 gallon septic tank and a five foot wide
drainfield to serve the proposed four bedroom
residence for the referenced property.
Construction shall be in accordance with the approved
site plan and design drawings, Municipal permit with
any special provisions or conditions, and all
applicable State and Municipal Wast·water Disposal
Regulations.
The contractor shall be responsible for obtaining any
necessary underground utility locates.
Unless specifically agreed otherwise, the property
owner shall be responsible for final grading areas
subsequently depressed from soil settling. On all
leachfield mound systems, the property owner shall be
responsible for ensuring a satisfactory vegetation
growth over the mounded area.
Contractors installing wastewater disposal systems
must be certified by the Municipal Health Department
for system installations. Owners installing their own
systems must also receive prior approval from the
Municipal Health Department.
SEPTIC TANK INSTALLATION:
A septic 'tank is to be constructed by a certified
septic tank manufacturer. Construction shall include
two 4" cleanouts for pumping access.
The septic tank shall be sufficiently bedded to
prevent settling or shifting of the tank.
3. Ail standpipes on the septic tank shall, extend a
minimum of 12 inches above final grade.
17034 NORTH EAGLE RIVER LOOP ° SUITE 204 . EAGLE RIVER, ALASKA 99577
Page Two
Lot 5, Block 4, Rolling Hills
September 13, 1995
Septic tanks installed with less than 4 ft. of cover shall
be insulated.
A foundation cleanout shall be installed one to four feet
from the building foundation. In the line between the tank
and the teachfleld there shall be two adjacent cleanouts
(unless an effluent pumping system exists within the septic
tank). These cleanouts shall be located on undisturbed
soil not more than 10 ft. from the tank. The first
cleanout, in line, shall be to clean toward the leachfield.
The second cleanout shall be to ·lean toward the septic
tank.
Final grading over the septic tank shall be such that a
positive slope exists away from the septic tank.
ABSORPTION TRENCH/DRAINFIELD INSTALLATION:
Excavate the proposed trench to the dimensions shown on the
design. The bottom of the excavation shall be within 2
inches of level. If the sidewalls of the excavation become
smeared, they must be raked or scratched (ruffed-up) before
gravel (sewer rock) placement.
Once the gravel is installed, the distribution pipe is to
be installed level with the perforations faced downward.
Gravel is then to be placed over the distribution pipe to
provide a minimum of 2 inches of cover over the pipe.
A silt barrier must be installed between the final gravel
layer and the native soil backfill. Ensure the silt
barrier covers the entire gravel surface before placing
backfill·
Monitor tubes shall be of four (4) inch diameter,
installed approximately in the locations shown on the
design, and extend a minimum of 12 inches above final
grade. The portion of the monitoring tube extending
through the gravel shall be perforated from the bottom of
the trench to the invert of the distribution pipe. This is
equivalent to the effective depth of the gravel as noted on
the design.
Backfill over 'the final gravel layer n~st not be less than
twenty-four (24) inches. Insulation must be installed when
the backfill depth is less than thirty-six (36) inches·
The finish grade over the trench must be mounded to prevent
the formation of a depression after settling.
Page Three
Lot 5, Block 4, Rolling Hills
September 13, 1995
Any septic tank proposed for installation must be
constructed by a Municipally approved septic tank
manufacturer°
The following pipe materials are approved for use in septic
system installations in the Municipality of Anchorage:
Type of Pipe
Perforated Solid
Cast Iron Yes Yes
ASTM D3034 (PVC) Yes Yes
ASTM F810 (HDPE) Yes No
ASTM D2662 (ABS) Yes Yes
Use of a type of pipe other than listed above must be
approved by the inspecting engineer°
Insulation shall be at least 2" thick extruded direct
burial polystyrene (Dow Chemical Company Styrofoam HI or
equal).
Septic tank inlets and outlets shall be fitted with
watertight couplings (Caulder, Fernco, or equal).
A permeable nontoxic silt barrier (Typar 3401, Mirafi 140N,
or equal) must be installed between the final leachfield
gravel layer and the native soll backfill.
Ail leachfleld grave]. (sewer rock) shall be 0.5"-2.5"
screened gravel with less than 3% passing the ~200 sieve.
When sand is being used as a filter material, its gradation
specifications ~ust conform to current M.O.A. or D.E.C.
requirements.
Page Four
Lot 5, Block 4, Rolling Hills
September 13, 1995
INSPECTIONS=
Typically there will be a minimum of three (3) inspections
required during the installation of the wastewater disposal
system. These inspections will occur as follows:
The first inspection must be conducted after the
excavation of ditches, pits, trenches, or beds and
before the installation of any gravel. A septic tank
may be set in place, but may not be backfilled before
this inspection.
The second inspection must be conducted after the
placement of the silt barrier, gravel, distribution
lines, standpipes, cleanouts, and insulation, but
before the placement of any other backfill.
Se
The final inspection is to occur upon final grading of
the property.
Often there will be more 'than these 3 inspections required.
Especially with the installation of multiple trenches, sand
filters, pressurized distribution systems, etc. Thus, the
inspecting engineer is to be contacted at least 24 hours prior
to the start of construction. If necessary, a pre-construction
meeting will take place on-site. The inspecting engineer will
not coordinate, direct or control in any way the contractors
activities°
The owner shall contract with the contractor to perform the work
outlined in these specifications and plans and in accordance
with the attached M.O.A. permit. There will he no contractual
arrangement existing between the contractor and
S & S Engineering. S & S Engineering shall be the owner's
representative and will inspect 'the work as stated above to
document the contractors activities. ]Final acceptance of the
contractors work rests with the owner and the M.O.A.
S & S Engineering shall have no liability to the owner or to
others for acts or omissions of the contractor or any other
persons performing work on this project or the failure of the
contractor to carry out the work in accordance with these
construction documents. S & S Engineering's inspecting engineer
will not be responsible for the construction means, methods,
techniques, sequence, procedures or the safety precautions
incident to this project.