Loading...
HomeMy WebLinkAboutTUXEDNI PARK BLK 1 LT 14Lel AL VOJN AILA IL( ‘0311,LIZ 1 al-W•baa"S1 Municipality 0f AnchoragePage ! ,'. of DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES diVISION P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744 On-Site Wastewater Disposal System and/or Well Inspection Report Permit Number: ~'~q½~32.1~ PID Number: Name: Wastewat~r System: ~New' [] Upgrade Address: ABSORPTION FIELD 4ahems: I No. of Bedrooms: ~C/~~ ~ ~~I ~ D Deep Trench D Shallow Trench DBed DMound DOther Soil Rating: Total Depth from original grade: LEGAL DESCRIPTION ~. ~,~s~. ~. Lot: Block: Subdiv~ion: Depth to pipe bosom from original grade: Gravel depth beneath pipe /~ / ~x~/ ~~ 2.7 Ft. ~.2 Ft. I IsectiOn: Fill added above origtnal grade: Gravel length: Townshlp~ Range:_ ' [.Z -- Z. ] Ft. ~ ~Ft. WELL: ~ew ~ Upg rude Gravel width: ~ Ft. Number of/lines: ][Distance~ ~,n lin,:Ft. Classlfi~tion (Private, A.B,C): Total Depth: Cased To: Total absorption area: Pipe material: Drille~ Date Drilled: S~ticWater Level: InstalJe~ Date installed: Yield: GPM [ Pump Set at: Ft. [ ~lng Height Above Ground:. F,. TANK S E PARATI O N D I STAN C ES ~septic ~ Ho~aing a S.T.E.P. TO Septic Abso~tion Lift Holding Publl~Private Manufacturer: Capacity In gallons: From Tank Field S~tion Tank Sewer Unes ~O~ ~ ~ WaIF /~ I /Z G I ~ _ ~ ~ Material~~__ . . :. .. Number of~Compaffments: Sudace ,+ ,. .' , . Water /~O /~ ~,. ,- ". ~ EIFT STATION Lot '+ Size In gall°ns: [ Manufacturer: ~ Line /~ ~ /0 ~ ~ - "Pump on" lev. I a~~' level at: I High water alarm at: Foundation /~/ ~ -- -- .~', ;. ~', ;. I - -~~ ~~ -~ ' ~~, -.. I Electrical inspections pedormed by: Cu~aln Drain Remarks: BENCH MARK Location and Description: I Assumed Elevation: 2nd - - ~.~ ~o~ c. COWA~ Department of Health and Human Se~ices approval ",~,<;':"~.a .........: ............. ,., Reviewed and approved by: ate://-/-~ '~' r" ~'~"~ 72-013 (Rev. 9/91) MOA 25 Permit No,Sw940213 Page 2 of 2 Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744 On-Site Wastewater Disposal System and/or Well Inspection Report .... TUXEDNI PARK SUBD., BLOCK 1 LOT 14 Legal uescnpz~on: ' PID No.: 041022;~7 i . r-91.4' co, .co . N.T.S. 81.2 ................................................................................................................................................................................................. (~.~ MT2) i 74.7' N0~ WATER FOUND ,"' 'A B FCO 39.0 9.0 :COt' 31'.~5 2~,0 C02 31.0 27.0 C03 54.5 63.0 :C04 56.0 30.0! MT1 55.0 61.5: MT2 56.5 ~1.0 72-013 A (1/93) MUNICIPALITY OF ANCHORAGE DEPARTMENT OF HEALTH AND HUMAN SERVICES P.O. BOX 196650, 825 "L" STREET, ROOM 502 ANCHORAGE, ALASKA 99519-6650 PAGE 1 OF ON-SITE WELL AND WASTEWATER DISPOSAL SYSTEM PERMIT PERMIT NUMBER:SW940213 DESIGN ENGINEER:S & S ENGINEERING OWNER NAME:GERKEN TED REV TRUST 50% & OWNER ADDRESS:P.O. BOX 228 ILLIAMNA, AK 99606 DATE ISSUED: 6/29/94 EXPIRATION DATE: 6/29/95 PARCEL ID:04102237 LEGAL DESCRIPTION: TUXEDNI PARK BLK 1 LT 14 LOT SIZE: 91032 (SQ. FT.) NUMBER OF BEDROOMS: 3 THIS PERMIT: 3 THIS PERMIT IS FOR THE CONTRUCTION OF: DISPOSAL FIELD /SEPTIC TANK / WELL SYSTEM ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH: 1. THE ATTACHED APPROVED DESIGN. 2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS 15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18AAC80). 3. THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY CALLING 343-4744 (24 HOURS) 4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL ABSORPTION SYSTEMUNDER CONSTRUCTION DURING FREEZING WEATHER MUST BE EITHER: A. OPENED AND CLOSED ON THE SAME DAY B. COVERED, SEALED AND HEATED TO PREVENT FREEZING 5. THE FOLLOWING SPECIAL PROVISIONS. SPECIAL PROVISIONS: RECEIVED BY: ISSUED By: ~/~./~~ _~j.~~ DATE: DATE: ROBERT SHAFER, P,E, ROGER SHAFER, P,E, June 06, 1994 CIVIL ENGINEERS (907) 694-2979 FAX 694-1211 HEALTH AUTHORITY APPROVALS SEWER & WATER MAIN EXTENSIONS SEWER & WATER INSPECTION ENGINEERING STUDIES AND REPORTS WELL INSPECTION & FI.OW TEST SITE PLANS ROAD DESIGN SOIL TEST PERCOLATION 'lEST Municipality of Anchorage DEPARTMENT OF HEALTH AND HUMAN SERVICES 825 'L' Street P.O. Box 196650 Anchorage, Alaska 99519-6650 REFERENCE: Tuxedni Park Subdivision; Lot 14; Block 1 Request you issue a permit to drill a well and install a septic system to servethepro~~~oomhouseonthereferencedproperty- Test holes were excavated and percolation tests performed. The approximate locations of the test holes are located on the attached site plan. The monitoring tubes within the test holes have been checked and found to be dry. This property has enough area for a future septic upgrade which can be seen on the attached site plan. We do not anticipate any adverse effects on neighboring properties by the installation of the proposed septic system. If you have any questions, or require additional information for your I ~vi~se c°ntact us' /LSU/jk STRUCTURAL & ),4ECHANICAL INSPECTIONS ON SITE WASTE WATER DISPOSAL SYSTEM DESIGN 17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER. ALASKA 99577 0 ~X z~O~ ~o GN-SITE WA~ DISPOSAL SYST~ (II~S~Rlk"~I(I~ PRACTICES and MATERIAL SPECIFICATIONS ~: Tuxedni Park Subdivision; Lot 14; Block 1 1. The scope of this project includes the installation of a 1000 gallon septic tank and a leachfield trench to serve the proposed three bedroom residence located on the referenced property. 2. Construction shall be in accordance with the approved site plan and design drawings, Municipal permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 3. The contractor shall be responsible for obtaining any necessary underground utility locates. 4. Unless specifically agreed otherwise, the property owner shall be responsible for final grading areas subsequently depressed from soil settling. On all leachfield mound systems, the property owner shall be responsible for ensuring a satisfactory vegetation growth over the mounded area. 5. Contractors installing wastewater disposal systems must be certified by the Municipal Health Department for system installations. Owners installing their own systems must also receive prior approval from the Municipal Health Department. 1. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. 2. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank. 3. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 4. Septic tanks installed with less than 4' of cover shall be insulated. Page Two Tuxedni Park Subdivision; Lot 14; Block 1 June 06, 1994 5. A foundation cleanout shall be installed one to four feet from the building foundation. In the line between the tank and the leachfield there shall be two adjacent cleanouts (unless an effluent pumping system exists within the septic tank). These cleanouts shall be located on undisturbed soil not more than 10' from the tank. The first cleanout, in line, shall be to clean toward the leachfield. The second cleanout shall be to clean toward the septic tank. 6~ Final grading over the septic tank shall be such that a positive slope exists away from the septic tank. 1. Excavate the proposed trench to the dimensions shown on the design. The bottom of the excavation shall be within 2 inches of level. If the sidewalls of the excavation become smeared, they must be raked or scratched (roughed-up) before gravel (sewer rock) placement. 2. Once the gravel is installed, the distribution pipe is to be installed level with the perforations faced downward. Gravel is then to be placed over the distribution pipe to provide a minimum of 2 inches of cover over the pipe. 3. A silt barrier must be installed between the final gravel layer and the native soil backfill. Ensure the silt barrier covers the entire gravel surface before placing backfill. 4. Monitor tubes shall be of four (4) inch diameter and installed approximately in the locations shown on the design. The portion of the monitoring tube extending through the gravel shall be perforated from the bottom of the trench to the invert of the distribution pipe. This is equivalent to the effective depth of the gravel as noted on the design. 5. Backfill over the final gravel layer must not be less than twenty-four (24) inches. Insulation must be installed when the backfill depth is less than thirty-six (36) inches. The finish grade over the trench must be mounded to prevent the formation of a depression after settling. MINIMUM~ SPECIFICATIONS: 1. Any septic tank proposed for installation must be constructed by a Municipally approved septic tank manufacturer. Page Three Tuxedni Park Subdivision; Lot 14; Block 1 June 06, 1994 2. The following pipe materials are approved for use in septic system installations in the Municipality of Anchorage: Type of Pipe Perforated Solid Cast Iron Yes Yes ASTM D3034 (P¥C) Yes Yes ASTM F810 (HDPE) Yes No ASTMD2662 (ABS) Yes Yes Use of a type of pipe other than listed above must be approved by the inspecting engineer. 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Company Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Fernco, or equal). 5. A permeable nontoxic silt barrier (Typar 3401, Mirafi 140/N, or equal) must be installed between the final leachfield gravel layer and the native soil backfill. 6. All leachfield gravel (sewer rocK) shall be 0.5"-2.5" screened gravel with less than 3% passing the #200 sieve. 7. When sand is being used as a filter material, its gradation specifications must conform to current M.O.A. or D.E.C. requirements. Typically there will be a minimum of three (3) inspections required during the installation of the wastewater disposal system. These inspections will occur as follows: 1. The first inspection must be conducted after the excavation of ditches, pits, trenches, or beds and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled before this inspection. 2. The second inspection must be conducted after the placement of the silt barrier, gravel, distribution lines, standpipes, cleanouts, and insulation, but before the placement of any other backfill. Page Four Tuxedni Park Subdivision; Lot 14; Block 1 June 06, 1994 3. The final inspection is to occur upon final grading of the property. Often there will be more than these 3 inspections required, especially with the installation of multiple trenches, sand filters, pressurized distribution systems, etc. Thus, the inspecting engineer is to be contacted at least 24 hours prior to the start of construction. If necessary, a pre-construction meeting will take place on-site. The inspecting engineer will not coordinate, direct or control in any way the contractor's activities. The owner shall contract with the contractor to perform the work outlined in these specifications and plans and in accordance with the attached M.O.A. permit. There will be no contractual arrangement existing between the contractor and S & S Engineering. S & S Engineering shall be the owner's representative and will inspect the work as stated above to document the contractor's activities. Final acceptance of the contractor's work rests with the owner and the M.O.A. S & S Engineering shall have no liability to the owner or to others for acts or omissions of the contractor or any other persons performing work on this project or the failure of the contractor to carry out the work in accordance with these construction documents. S & S Engineering's inspecting engineer will not be responsible for the construction means, methods, techniques, sequence, procedures or the safety precautions incident to this project. CONTRACTOR/INSTALLER (ENGINEER'S SEAL) SOILS LOG -- PERCOLATION TEST PERFORMED FOR: p L /~wnship, Range. Section' 1 2 3 4- Municipality o! Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES 825 "L" Street, Anchorage, Alaska 99502-0650 SLOPE SITE PLAN WAS GROUND WATER ENCOUNTERED? 6 7 8 9 10 11 12 13 14 15 16 17 IF YES, AT WHAT DEPTH? Depth to Water After ..~ Monitoring? ~'1~, Dat~ S L O P E Gross Net Depth to Net Reading Date Time Time Water Drop la: o~ --- g" .-- :/~ Io,,~. 3~1~" ~ 20 PERCOLATION RATE TEST RUN BETWEEN~~/AND . ~.~_~ FT / / COMMENTS ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELI~~T ON THIS DATE. DATE: 72~8 (Rev. 4/~) Municipality of Anchorage DEPARTMENT OF HEALTH & HUMAN SERVICES · LEGAL DESCRIPTION: ~!~, ~ [, Township, Range, Section: 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SLOPE SITE PLAN WAS GROUND WATER ENCOUNTERED? S L IF YES, AT WHAT ~ O DEPTH? p E M0nilorino? L,)~-,V Date: Gross Net Depth to Net Reading Date Time Time Water Drop :lZ ~0~ =~" lY~" :~ to ' ~ ~/q~' ) PERCOLATION RATE /3 (minutes/inch) PERC HOLE DIAMETER TEST RUN BETWEEN 6,,-Z~AND "~t'-.~' FT COMMENTS E le RI~ , _ .......... (/) . THAT THIS TEST WAS PERFORMED IN 72~ (Rev. 4/~)