Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ROSEBUD HILLS BLK 1 LT 5
bud Hill Block ! Lot 5 #017-381-36 © Municipality of Anchorage ? Development Services Department Building Safety Division On-Site Water and Wastewater Program, 4700 Eimore St. '~ P.O. Box 196650 Anchorage, AK 99519-6650 Page www.ci.anchorage.ak.us (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTIQN REPORT Permit Number: .J'Z.z/O¢ (.~ ! 2-.0/' PID Number: O ! '2' - '~! Name Address Phone: Number of Bedrooms: ~ '""~ ~ ~// "~...._<~ O/"""' /.~ ~aeepTrench f-I Shallow Trench F1 Bed [] Mound [] Other: Sod Rating: Total Depth from orig hal grade LEGAL DESCRIPTION o.~ GpDiFt2 lt. ,,~ Ft. Block Lot Subdlvmlon: Depth to pipe bottom from original grade: Gravel depth beneath pipe' Township Range: Section: Fill added above odgina~ grade: Gravel Length: O. ff' Ft. ¥'L' +'ft.' = Well: [] New [] Upgrade ~,evelw, dth. N,mberof~ines D,stanoe bet .... Class fi cat,p ¢' ¢ ~ on (Pr,v ate. A.B.C) Total D epth~ Ft., C asedl,~to: FL Total a~a: ~O'' ' ~ Ft2Pipe Mater, al. 0-~O'~ Dr I er Date Drilled: Stabc Water Level:Installer: Date Installed' Y~eid GPM Pump Set at. Ft. Casing Height Above Ground: ] ~,~ + ~,, TANK SEPARATION DISTANCES ~ Septic ~ H~lding ~ S.TE.P, ~ Other: T~ To Septic Absorption Lift Holding ~ublic/Private Manufacturer. Capacity: Tank Field Station Tank Sewer Line ~~¢~ ~ ~ I ~%~ Gal. Materiak Number of Compa~ments. Foundat.on ,,' ,,' -- _ // ~ "Pump °n" level at "Pump °~' level at: in High water alarm at: Pump Make & Model Electrical Inspections pedormed by. Remarks BENCH MARK Lo.rich and Description: Assumed Elevation Engineer's Stamp Inspections performed by: ~1~$~ Te~ ~ Dates: 1st ~1 I~1~? Development Semites Depa~ment Approval , ., .:~ Reviewed and approved by: ~ ' PERMIT NO: SW 090126 PID NO: SWING TIES: 017-381-36 FROM: COR. "A" TO: FDN C.O. "C" 18.5' S.T.C.O. "D" 21' S.T.C.C. "E" 25.5' DBL. C.C. "F" 28.5' SPLITTER "G" 30' TR. C.C. "H" 16' TR. M.T. "1" 35.5' TR. C.C. "J" 56' TR. C.C. "K" 29' TR. M.T. "L" 45' TR. C.C. "M" 48' COR. "B" 24' 42' .i.~/ 41' 57.5' 75' 24.5' 58' "L" TBM FLOW SPLIq-FER PAGE 2 OF 2 1250-GALLON SEPTIC TANK __.,t/ ~qNO 12) 42'-LONG ~------,'~OIL ABS. TR. w. ---'' ,~7.t EFF. G~VEL PLAN VIEW RIDGEVIEW DRIVE SCALE: 1" = 30' GROUND SURFACE DRIVE ELEV. 97.( 2" INSULATION Bol-rOM TH #3 MONITOR TUBE -- ELEV. 79.0' NO GROUNDWATER INV. 1250-GALLON INV. INV. 93.6 TANK 93.7' 16' SEVVER GRAVEL BOT. TR. ELEV. 85.0' PROFILE VIEW NOT TO SCALE LOT 5, BLOCK 1, ROSEBUD HILLS SEPTIC SYSTEM INSTALLATION AS-BUILT INSPECTION REPORT FLATTOP TECHNICAL SERVICES SCALE: AS NOTED 14530 ECHO CANYON ROAD DRAWN BY TFM ANCHORAGE, ALASKA 99516 NOVEMBER, 2009 Alpine Drilling & Enterprises Well Log Permit Number: #SW000126 Date of Issue: 7-27-09 Parcel Identification Number: 017-381-36 Date Started: 8..1~-09 Date Completed: 8-18-09 Is well located at approved permit location? x Yes [] No Legal Description: Rosebud Hills Block 1 Lot 5 Property Owner Name & Address: Borehole Data: Mike & Sharon Webster 2308 Stonebridge Circle Anch( Alaska 99516 Depth Soil Type, Thickness & Water Strata From To Stick-up 0 2 Orgw~ics & silt 2 3 silt 3 5 gravelly silt 5 3 silo' gravel 31 52 silt 52 58 gravelly silt 58 97 silty gravel 97 118 sandy gravel moist 118 122 silty gravel I22 127 bedrock t 27 406 1-120 360 37(2 Method ofDrilling x air rotary' [] cable tool Casing type: ~ Wall ~ickness: .Z inches Diameter: _6 inches Depth: 130 feet Liner Type: _ Diameter: inches Depth: ~ feet Casing stickup above ground: _2 feet Static water level (from ground level): 127.feet Pumping level: 406 feel after _4 hours pumping _3 gpm Recover,;,, Rate: _3 b~m Method of Testing: air t¢ Well Intake Opening Type: [] Open End x Open Hole [] Screened Start feet Stopped [] Perforations Start ~ feet feet Stopped _ feet Grout Type: bentonite granu&s Volume: 2 bgs Depth: Start _0 feet Stopped _? feet Pump size hp Brand Name Well Disinfected Upon Completion? x Yes [~] No Method of Disinfection: chlorine tablets Comments: Well Driller: Alpine Drilling & Enterprises PO Box 110496 Anchorage AK 99511 Mark Begich Mayor Development Services Department Building Safety Division on-site Water & Wastewater P~ogram 4700 Br'agaw Street P.O. Box 1.96650 Anchorage, AK 99519-6650 : w~w.muni.orq/or~Jte (907~ Pump Installation Log Well Drilling Permit Number: SW Date of Issue: Parcel Identification Number: Legal Description 11,11 Pump Installation Date: Property Owner Name & Address: Pump Intake Depth Below Top of Well Casing: E c76 feet Pump Manufacturer's Name: Pump Model: ~/'~,~J~'/"~ Pump Size / hp Pitless Adapter Burial Depth: // feet Pitless Adapter Manufacturer's Name: Pitless Adapter Tn.gtaller: ~ c?/~ ffe r ~' Well Disinfected Upon Completion? ~] Yes [] No Method of Disinfection: ~ ~f ~ c ~ Comments: Pump ln~gtaller Name: Company Name Mailing dddress cay ~ z~p Attention: The pump installer shall provide a pump installation log to the DSD within 30 days of pump installation. MUNICIPALIT~ OF ANCHORAGE Development Services Department On-Site Water & Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM I WATER SUPPLY PERMIT Initial Date Issued: Jul 27, 2009 Expiration Date: Jul 27, 2010 Permit Number: SW090126 Legal Description: ROSEBUD HILLS, BLOCK 1, LOT 5 Design Engineer: 0019 FLATTOP TECHNICAL SERVICES Owner Name: MIKE & SHARON WEBSTER Owner Address: 2308 STONEBRIDGE CIRCLE ANCHORAGE, A 99507- Parcel ID: 017-381-36 Site Address: NHN RIDGEVIEW DRIVE Lot Size: 0 SQ. FT. Total Bedrooms: 0 Permit Bedrooms: 4 This permit is for the construction of: [] Disposal Field [] Septic Tank [] Holding Tank [] Privy [] Private Well [] Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.55 and the State of Alaska Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ). 3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: ^. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. Received Issued Date: Municipality of Anchorage Development'Services Department Building Safety Division On-Site Water and Wastewater Program 4700 Elmore Road P.O, Box 196650 Anchorage. Alaska 99507 www.muni.org/onsite (907) 343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING ParcelI.D. 6 Propertyowner(s) ~/;~,, ~ Mailing address 'Z30~ Site address ~N ~,~¢ Legal description (Sub'd., Block & Lot) Legal description (Township, Range & Lot Size ~ :~ Sq. Ft. Day phone, ~'?--~ - ~'/ Zip Code Zip Code Number of Bedrooms THIS A. PPLICATION IS FOR (~;~ all that apply): THIS APPLICATION IS AN: Absorption Field · J~ Initial [] Septic Tank [] Upgrade [] Holding Tank [] Renewal [] Priw [] OK ~ o~,' '~' ~. Private Well [] Water Storage [] I certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. (Signature of property owner or authorized agent) Permit/Rush Fees: Date of Payment: '~/~ J~/O0 Receipt Number: Wai~er Fees: Date of Payment: Receipt Number: ', LATTOP : FiECHNICAL sERV lCE CML & ENVIRONMENTAl. ENGINEERING * ENERGY CONSERVATION & ANALYSIS TED MOORE, P.E. PHJFAX: (907)345-t355 E-Mail: tgmoore~gcl.net July 9, 2009 14530 ECHO CANYON ROAD ANCHORAGE, AK 99516 M.O.A. DSD P.O. Box 19-6650 Anchorage, AK 99519 Dear Sirs: The purpose of this letter is to provide the required design narrative in support of our application for a permit to construct water supply and wastewater disposal systems on Lot 5, Block I, Rosebud tlills S/D, located at NHN Ridgeview Drive. A soils log, pere test results, a site plan, design drawings and specifications are enclosed for your review. The proposed system will be constructed in the vicinity oftest hole # 3. Two other test holes excavated on the north side of the proposed residence encountered dense, silty gravel that pore'ed more slowly than 60 minutes per inch. As can be seen from the soil log for test hole #3, the native material between 5.0 and I 1.5 feet below ground level is a dry silty gravelly sand with a measured pert rate of 12 minutes per inch. A clean sand lens overlies this material between 4.0 and 4.5 feet below ground level. Using a somewhat conservative soil application rate of 0.6 gpd/sq, fl. this proposed 4-bedroom residence would require (4 x 150)/0.6 -- 1000 square feet ofeffeetive absorption area. The proposed two parallel 42-foot long soil absorption trenches with 7 feet of effective gravel has been conservatively sized with an effective absorption area of 1176 square feet. As illustrated on the site plan, the topography of the lot in the area ofproposed construction slopes down towards the west at approximately 4%. Nowhere within 50 feet of the proposed system do natural slopes exceed 25%. A site for an ATS replacement system is designated on the site plan. The proposed system will have no significant impact on present or future water supply and wastewater disposal systems serving adjacent properties, nor will it have any significant impact on reserved space-surface and subsurface, or on drainage. Please give me a call at 345-I 355 if you have any questions on this submittal. Sincerely, Ted Moore, P.E. '. .' LOT 2, CONTOUR ACRES :' ' LOT 6 LOT 4 .' ' (VACANT) .- LOT 5, BLOCK 1 '. ,' ROSEBUD HILLS S/D /41 ~ r WELL-- ,' HOUSE , R = 100' , ' ~PROP ' ~ ...... ' T.H. ' I'~ o - , #1 ~ WELL , ~ ,' SEPTIC ',, T.H. ~i~ AREA INSTALL '.. ~"P'-R~'-~. ..-' 1250..GALLON -- ,-4.-B_DRM ~ .-o' SEPTICTANK ~ I HOU~' ~ T.H. ! L '"' CONSTRUCT TWO (2) " " " 42-FOOT LONG SOIL ;1~[ SITE FOR ABSOR.TIO. T.E.C.ES -./_. _. "~ATS.EP.. ,,,. ?.O' E.F. ,~.,',WL TRENCH betw. 4.5' & tl.5' B.G.L ..- 4% RIDGEWEW DRIVE LOT 3 ~ ........................ BLOCK~' ' ~."/"/.-J.. ~. "'~-,- ......... -.~ d'~.,....~'.~,...w;~l~'~ FLAI-rOP TECHNICAL SERVICES 1 INCH = 50 FEET [m4',., oc.?' e m,,., e'. s * ~ LOT4 ,.~ ~ . T~c-ooo~mr. mwoo~ o ..~ .. 14530 £CIIOCANYON ROAD DRAWN BYTFM WITHIN100') ,'~g, % ,-.c ~,,~¢, -' -.~"~ BLOCK2 ~ 'r. ~'~. · ,.,~. -,.,oo~ , ~' ~ ANCIIORAGE, ALASKA 99516 JULY, 2009 ~ ~ ~ ~t~l~ NOTE: THIS IS NOT A SURVEYED PLAT. ALL LOCATIONS SHOWN ARE APPROXIMATE. 4' D-3034 FROM FDN. C.O. INSTALL 1250-GALLON SEPTIC TANK 510 PERF PIPE DOUBLE CLEANOUT PLAN VIEW SCALE 1" = 10' 42 42 FLOW SPLITTER CONSTRUCT TWO (2) PARALLEL TRENCHES w. 7.0' EFFECTIVE GRAVEL BETWEEN 4.5' AND 11.5' BELOW GROUND LEVEL MONITOR TUBE MOUND BACKFILL 15 ORIGINAL GROUND -- FILTER FABRIC -- 4' DI~ F-810 PERF. PIPE SEWER GRAVEL 15 CROSS~ECTION "A - A" SCALE: 1" = 5' LOT 5, BLOCK i, ROSEBUD tlILLS PROPOSED SEPTIC SYSTEM PLAN AND CROSS-SECTION Fl Al'FOP TECl INICAL SERVICES 14530 ECIIO CANYON ROAD ANCIIORAGE, AY~ 99516 SCALE: AS SIIOWN DRAWN BY: TFM JULY, 2009 ITESTHOLE#3 I LEGAL DESCRIPTION: .Lot 5, Block J ~ Rosebud Hills $/D DATE PERFORMED: _October 22~ 2008 PERFORMED FOR: __Mike and Sharon Webster Pt SM Reddish sandy loam (feet) 2 3 -- 4 10- 11 12 13- 14- 15- 16' 17' 18- 19- 20- GP/GM Silty sandy gravel Loose. dry ML Sandysilt SP Clean sand lens GNUML Sih'y gravel Some cobbles Dry COMMENTS: FLATTOP TECHNICAL SERVICES 14530 ECHO ST. ANCHORAGE. ALASKA 99516 SOILS LOG - PERCOLATION TEST SLOPE SITE PLAN Depth toOroundwater Date ~_~ N 6'~ ~n-dv~a te r 'J0/22/08 __ Monitor tube dry --10/29/08 -- .... Monitor~tube dry _?/7/09 -- MI/GM Gravelly silt [_ ~-~--~ _ _. Clock Net Tune Percomete' Net Harder d aa no ! .... I Time (minutes) Reading (inches) [ ..... ~dw-~iTFa~tart --t:38 ............ ~'3/8-- -- I--{ -'- #1 - '-2:08 .... 30 ..... 20 314 -- --2 5~8 [---I -Add~ater -2:08:20 ........ 23 3/8 ~ -- #2 -2:38:20 ....... -30 ...... 20 3/4 2'5~8 { _ J -Add ~vater 2:38:40 ..... 23 3/8 B.H. -' #3 '-3:08:40 PERCOLATION RATE TEST RUN BETVVEEN 12 (minutes/inch) PERC HOLE DIAMETER 6" 6.5 _ FT AND__?.0 Il' PERFORMED BY FLATroP TECHNICAL SERVICES. I__F,,4.~ ~ I ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. I CERTIFY THAT THIS TEST WAS PERFORMED IN DATE: ~FFattop Tee~nica£$ervices 14530 Wxf~o Can.)~n q~mf, Andwratte, AK 99516 Pbon~ (907) 345-1355 Lot 5, Block 1, Rosebud llills SID NIIN Rldgeview Drive Waste~vater disposal system Specifications (Revised 7/27/09) 1.0 General: I.I The scope ofthe project consistsofinstallinganew 1250-gallon scptic tank that discharges effluent into two parallel 42-foot long soil absorption trenches with an effective gravel depth of 7.0 feet. 1.2 Construction shall be as depicted on the approved site plan and design drawings. Minor deviations from these drawings may be allowed or required by the engineer conducting the inspections. All construction procedures and material specifications shall conform to Municipal and State requirements. All separation distances shall be in conformance with Municipal requirements, unless specifically waived. 1.3 The contractor shall be responsible to obtain any necessary utility locates, and to work around any buried utilities. 1.4 Unless agreed otherwise, the contractor shall be responsible for any tree clearing and grubbing necessary to complete the project. 1.5 The contractor shall provide adequate cover material and rough grading over all system components to ensure that proper drainage is achieved after settlement and that there are no residual depressions. Insofar as possible the contractor shall minimize damage to trees and existing lawn areas. 1.6 Unless specifically agreed otherwise, the homeowner shall be responsible for finish grading after the soil is compacted, as well as placement oftopsoil and reseeding all areas disturbed by the construction. 2.0 Septic Tank: 2.1 Thenew 1250-gallon, 2 compartment septic tank shallbe Municipally approved and shall be set level on undisturbed soil. Each compartment shall be equipped with a watertight manhole cover and a 4" cleanout. If the tank is buffed less than 4 feet, it shall be insulated with 2 inches of approved burial type, rigid insulation. The septic tank shall be located no closer than 5 feet from the absorption trenches. 2.2 All pipe connections to the tank shall be equipped with waterproof mechanical couplings. The waste line from the residence to the septic tank shall have a minimum slope of 1/4'" per foot. A foundation cleanout shall be installed within 4 feet ofthe building foundation and a double cleanout within 5 feet downstream of the septic tank. An approved flow splitter valve shall be installed to divide the septic tank effluent evenly between the two trenches. 3.0 Soil absorption system: 3.1 The soil absorption system shall be constructed by excavating two (2) parallel 42-foot long trenches to a depth of ! 1.5 feet below ground level in the vicinity oftest bole//3, as illustrated on the site plan and plan view drawing. The trenches shall be spaced to retain 15 feet of undisturbed native soil between them. The long axes of the excavations shall parallel existing contours. Particular care shall be taken to erasure that the trenches are located no closer than lO feet from either the property line or the hott~e, and that the tank is no closer than 5feet from the house. 3.2 The bottom of the excavations shall be level. Any compacted or smeared surfaces shall be raked to allow proper infiltration. 3.3 A total of 7.5 feet of approved sewer gravel shall be placed in the bottom ofthe excavations with the perforated distribution pipe laid level such that the pipe invert is no less than 7.0 feet above the bottom ofthe sewer gravel. Sewer gravel shall be 0.5" - 2.5" screened gravel, with less than 3% passing the//200 sieve. 3.4 The distribution pipes shall be 4" diameter perforated F-8 i 0 or D-3034. Monitor tubes and cleanout pipes shall be of 4" diameter and installed in the locations shown on the design drawings. The portion of the monitor tube extending through the sewer gravel shall be perforated. 3.5 Approved filter fabric shall be placed over the entire top surface of the sewer gravel. Ifthe soil cover thickness is less than 3 feet, two inches of figid, burial type insulation is to be placed over the entire top surface ofthe gravel, in addition to the filter fabric. 3.6 The top surface ortho cover material shall be raised a minimum of 6 inches higher than the surrounding terrain to allow for subsequent settlement, and shall be graded to smooth contours. Fill slopes shall be no steeper than 3:1. 3.7 Unless specifically agreed otherwise the homeowner shall be responsible for arranging to have thc site finish graded after the backfill material has stabilized, and for placement of adequate topsoil and seed to promote rapid revegetation of all areas disturbed by the construction. 4.0 Inspections: 4.1 A total of 4 engineering inspections will be required during the course ofthe project: (I) initial stakeout with the contractor to establish the location of the system and to discuss the plans, specifications and construction procedures, (2) after the native material has been excavated to expose the infiltrative surface to ensure that it is level and at the fight elevation, and conforms with the soil test information, (3) after the sewer grovel is in place and the distribution pipes have been laid and connected up to the septic tank, but prior to placement of insulation or filter fabric, and (4) after rough backfill and grading is complete. 4.2 The installer shall coordinate the timing of the inspections with the engineer sufficiently far in advance to ensure the availability ofthe engineer.