Loading...
HomeMy WebLinkAboutVIKDAL LT 3Vi'O k d a I Lot 3 #051-161-36 Municipality of Anchorage a , 4- Development Services Department Building Safety Division s On -Site Water and Wastewater Program, 4700 S. Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 Page of www.ci.anchorage.ak.us (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT Permit Number: SWO90158 PID Number: 051-161-36 Name: TAREK WETZEL Wastewater System: ® New ❑ Upgrade Address: 19827 DOTIES DRIVE CHUGIAK AK 99567 ABSORPTION FIELD Phone: Number of Bedrooms: ❑ Deep Trench ® Shallow Trench ❑ Bad ❑ Mound ❑ Other LEGAL DESCRIPTION Soil Rating: Total Depth from original grade: Block: Lot Subdivision: 3 VIKDAL Depth to pipe bottom from original grace, Gmvel depth beneath pipe: Township: Range: Section: 1.91-1.99 Ft. 4.09-4.ol Ft Fill added above original grade: Gravel Length: 0.11-1.22 F . 170 Ft. Well: ® New ❑ Upgrade Grael width: Numberof lines: Distance between lines: Clas®rxation (Private, A, B, C): Total Depth: Cased to: 1 5 Ft. Total absorption area: 2 10 Ft. Pipe Material: Private 164 Ft. 164 Ft. 1700 Fe D3034 Driller: Data Drilled: Static Water Level: Installer: Data Installed: SULLIVAN 8/27/2009 1 75 Ft. Owner—Tarek Wetzel 9/172009 Yield:Pump Set at Casing Height Above Ground: 30 GPM Ft. 2 Ft TANK SEPARATION DISTANCES ® Septic 0 bolding ❑ S.T.E.P. 0 Other: To ep IC Absorption I o Ing ublic/Pr'Ivate Manufacturer: Capacity: From Tank Field Station Tank Sewer Line Anchorage Tank 1500 Gat well 1001 1001+ 1001+ NA 251+ Material: Number of Compartments: Steel 2 Surface water 1001+ 1001+ 1001+ NA LIFT STATION Lot Line 51+ 101+ 51+ NA Srza: Manufacturer: Gal. Foundation $1+ 101+ 51+ NA "Pump on"level at: ..Pumpo level at High water alarm at: n. in. in. Curtain Drain NA 1` 501+ NA NA Pump Make& Model Electrical Inspections performed by Remarks: None known. 7 -day+ monitoring showed no ground water. BENCH MARK Tank and field Insulated. Location and Description: Bottom of siding Assumed Davation: 100 Ft. Engineer's Stamp All OF Inspections performed by: ArcTerra Dates: 1ST &2ND 9/15-9/17/2009 l 3RD 06/02/2011 Development Services Department Approval�,� w ` Reviewed and approved by: C Date: (Rev. 12M) "«�"'�• . 58ig1 >� AS-BUILT SYSTEM DETAILS/SITE PLAN Permit SW090158 VIKDAL LOT 3 PID# 051-161-36 LOT 68 i9,3,5" S 8 95" 1Z0.% TH09-2 TH09-1 co .fes 1 R RVE — ADVANCED S T 1 GPD/SF M co H W� Z D 40. 2 GRA L XI IN N �' o D ILDING 3Q 4 A 40.2' g O� h FCO G h E COco F NEW 1500/ N T"J GAL. S.T. � O M 07-2 SCALE, 1' = 40' A-E=29' N 100,2 loos 100.1 B-E=15 R_fp. TTOR TUBE MONUOR TUB °LEST crwauT� Na FINAL GRADE 99,20 99.0 A-F=53' B-F=15 K C DIRUL�TBH 11 FILTER FAIR / INNI�TM 1 VM DR GRM GRRBE o A-G=53' no 1500 GAL B—G=13' Nw SEPTIC 97,17 97.14 C—H=14' m TANK SEWER ROCK 09• MD-H=49' 0 98.58 98.60 92.99 TRENCH 1 93,05 C-I=14' Bs g f° D-I=41' DNITOR TUBE FINAL GRADE 99'24 MONITOR TUBE C ENY T 98.00 98.11 SCALES NTS w 03 / BIfLLATIDN FLLTER FABRIC\111 - ORIQNRL mnoc VNiD:S 96.03 96,01 T y PAGE 1 OF 2S EWER ROCK TRENCH 2 2 92.02 92,00 �\ 85.00 BD w 9 �F / 1 PREPARED es FOR: SCALE- NTS �� �' ` /i/)�'y TAREK WETZEL C E AR R� 8 �/ 19827 DOTIES DRIVE Ez * ; L� TH * CHUGIAK, AK 99567 / S / FIELD BOOKS CDOPUTED: CE-7116 .'.� MUN'A13C ORA": � x z � BMW \ m ti� 1 { "• �' STARRIG ABC ABBOILT: D1ea®: KMD DATE: o Y n� ' ° Py/ " EEE \\ SsIO�= JLS 5 31 11 9"�F o \� Mr. RLe GM NW1255 cl,�G90^, R'o, SUITING N E: O ACRD FAD jm Ma: 0928 • eQ fR• AK. 99577'20 AS-BUILT SYSTEM DETAILS/SITE PLAN Permit SW090158 VIKDAL LOT 3 PID# 051-161-36 DI 69 LOT 68 S8 9'5" E. 1 0.4� ,�.• l . mus-z � � iH09-i }iµ+. '�` M g' ti K- ADVANCED 5 T 1 GPD SF M G H 4/ D 40. OR XI IN o D ^ ILDING a 3Q Oe A 40.2' h FCO G 0E h CO F Do A'J GAL S.T. O M D7-z T 94 RADIUS LOT 3 LOT 2 � N O M n 2 _ Z s j .n WELL N 3 a ro s J V a 15' T EASEMENT i ut Scale: 1'= 40' a y Ab. PAGE 2 OF 2 iOF `��T C. 1 PREPARED FOR: 9 1 �*, TAREK WETZEL 19827 DDTIES DRIVE gcTEjz � i TH CHUGIAK, AK 99567 / m FIELDBOOKS VI at '. KE $ `, CB-7118 CpiUlEO: ` DRAWN: BMW BOUNDART:OUNDARY Af o �\ STMOM STAKING oemo: KMD o \ ssi0�= A=KT: JLS DATE5/31/11 's�F OftFWE GRA: NW1255 ut `__ R'`oo ACAD FWE FILE 'w Ne.: 09028 FR AK. 99577-g7}6l to CUERRq . �9 ARCTFRRA CONSULTING, INC 212 E. 51' Ave, Anchorage, AK. 99503 "r- Office (907) 868-3791, Fax (907) 868-3793 SOILS PERCOLATION TEST Performed for: M. 711 Project: VIKDAL LOT 3 TEST HOLE # TH 09-1 Depth -� Feet SEE ATTACHED SITE PLAN 1- I ORG/oL FOR HOLE LOCATION SM/GM w/ occ. boulders < 2' HOLE PRESOAKED 20- PRIOR TO TEST Was Ground water encountered? NO What depth? NA Depth to water after monitoring? DRY Date? 9/14/09 Reading Date Gross Time Net Time Depth to Water Net Drop 1 09/11/09 1:00 6" 2 1:30 30 min 5" 1" 3 1:30 5" - 4 2:00 30 min 315/16" 11/16" 5 2:00 3 15/16" - 6 2:30 30 min 2 15/16" 1" 7 8 9 10 11 12 * Water Added Percolation Rate 30 (min/in) Perc Hole Diameter 6" Test Run Between 3.5 feet and 4.5 feet I, Kenneth M. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in effect on this date. a �RCIEgRq k ApcTmax CONSULTING, INC 5 212 E. 51" Ave, Anchorage, AK. 99503 Office (907) 868-3791, Fax (907) 868-3793 SOILS PERCOLATION TES' Performed for: Tarek Wetzel Date Project: VIRAL LOT 3 TEST HOLE # TH 09-2 1 Depth SEE SEE ATTACHED SITE PLAN t ORG/oL FOR HOLE LOCATION 13- 14- 15- 16- 17- 18- 19- 20- SWGM w/ occ. boulders < 2' B.O.H. HOLE PRESOAKED PRIOR TO TEST Was Ground water encountered? NO What depth? NA Depth to water after monitoring? DRY Date? 9/14/09 Reading Date Gross Time Net Time Depth to Water Net Drop 1 09/11/09 1:00 6" - 2 1:30 30 min 414/16" 12/16" 3 1:30 414/16" - 4 2:00 30 min 3 13/16" 1 1 1/16" 5 2:00 3 13/16" 6 2:30 30 min 2 12/16" 1 1/16" 7 8 9 10 11 12 * Water Added Percolation Rate 28 (min/in) Perc Hole Diameter 6" Test Run Between 3.5 feet and 4.5 feet I, Kenneth M. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in effect on this date. 68 SULLIVAN WATER WELLS Domestic - Commemlel - Geothermal .. - Powe 907000.3759 www.wllhanwaterwetia.eem -. . Well Log Permit Number: #SW 09o156 Date of Issue wwoog Parcel Identification Number: 061-161-36 Date Started: 8 /2 612 0 0 9 Date Completed: 8/27/2609 Is well located at approved permit location? X❑Yes ❑No Property Description VIKDAL Lot 3 Block Section: Town: Range: Property Owner Name & Address: TAREK W ETZEL 24817 THUNDERBIRD DR. CHUGIAK, AK 99567 Borehole Data: Depth Method of Drilling �j air rotary cable tool Soil Type, Thickness & Water Strata From To Casing type: Casing Stickup 0 2 Wall thickness 0.25 _inches Diameter 6 inches Total- 164 feet Overburden 2 4 Liner type: Sand 4 6 Diameter inches Depth: feet Sand & Gravel 6 37 Casing stick-up above ground: 2 feet Static Water Level(from top of casing) 75 feet Blue Slit 37 39 Sand & Gravel 39 46 Pumping Level: feet after Blue Sift 46 47 1 hours pumping gpm Recovery Rate 30 gpm Silt & Sand 47 50 Method of Testing: Air Silt Sand Gravel 50 74 Well Intake Opening Type Clay Silt Gravel 74 80 - _ Open End X� Open Hole Blue Clay - - 80 -- 147 Screened Start feet Stopped feet Shale 147 156 Perforations Start feet Stopped feet Grout Type: Bentonite dry granular Volume: 50 Pou Sandstone 156 200 Depth 44 Start 0 feet Stopped 44 feet Pump Intake Depth: feet Pump size: HP brand name Well disinfected upon Completion? X Yes No Method of disinfection CHLORINE 50ppm Comments: Well Driller: Water Sample Results: Cole Sullivan Sullivan Water Wells Arsenic: ug/I P.O. Box 670272 Nitrates mg/I Chugiak, AK 99567 Total Coliform Bacteria colonies/100ml, (907)688-2759 Other bacteria: col/100ml, Attention: The property owner shall provide this log to DSD (onsite) and DNR within 30 days of completion. ARCTIC PUMP & WELL INC. Jim Sullivan Box 770197 amm an Eagle River, AK 99577 wuemm - (9(9 07)688-25x08-2510 (907)258-2510 (907) 745-2510 apw@gci.net Pump Installation Lou Well Drilling Permit Number: SW090158 Parcel Identification Number: 051-161-36 Date Of Issue: 8/21/2009 ,5londalS August 15, 2011 Legal Description Vikdal Property Owner Name Address: Tarek Wetzel Lot: 3 24817 Thunderbird Dr Block: Chugiak AK 99567 Pump Installaicn Date: 9/15/2009 Pump Intake Depth Below Top of Well Casin 159 Pump Manufacturer's Name Franklin Pump Model: 7JS05S4 2W230 Pump Size: 1/2 Pitless Adapter Burial Depth: 12 Feet Pitless Adapter Manufacturer's Name baker Pitless Adapter Installer: U/K Well Disinfected Upon Completion? Yes Method of Disinfection: Chlorine Comments: Pump Install erName: Arctic Pump & Well, Inc. ,5londalS August 15, 2011 MUNICIPALITY OF ANCHORAGE Development Services Department On -Site Water & Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ONSITE WASTEWATER DISPOSAL SYSTEM / WATER SUPPLY PERMIT Initial Date Issued: Aug 21, 2009 Expiration Date: Aug 21, 2010 Permit Number: SW090158 Parcel ID: 051-161-36 Legal Description: VIKDAL Lot 3 Design Engineer: 0070 ARC TERRA ENGINEERING & SU Site Address: 19827 DOTIES DRIVE Owner Name: TAREK WETZEL Lot Size: 0 SO. FT. Owner Address: 24817 THUNDERBIRD DRIVE Total Bedrooms: 0 Permit Bedrooms: 4 CHUGIAK , A 99567 - This permit is for the construction of: ❑ Disposal Field ❑✓ Septic Tank ❑ Holding Tank ❑ Privy ❑ Private Well ❑ Water Storage All construction must be in accordance with: 1. The attached approved design. 2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ). 3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 (24 hours). ( Not required for a Water Supply Permit only). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. 5. The following special provisions. Project approved for the owner, Tarek Wetzel, to do an owner installation. Received Issued By: Date: Z y 0 AIZWA/21Date: % Municipality of Anchorage --� Development Services Department Building Safety Division On -Site Water and Wastewater Program 4700 Bragaw Street P.O. Box 196650 Anchorage, Alaska 99519-6650 www.muni.org/onsite (907)343-7904 ON-SITE SEWER/WELL PERMIT APPLICATION FOR A SINGLE FAMILY DWELLING Parcel I.D. 1957-/611-4, -210-411s) Property owner(s) %(JEK WF_72EL Day phone ZyC- y43y Mailing address 27q817 '/WPPX&va or. CWe144 A K Zip Code 917SXJ Site address /`tV7_7 Da71ed .1g. cey610; 41r- Zip Code 7 Legal description (Sub'd., Block & Lot) Vl Ka ft u 1 3 Legal description (Township, Range & Section) Lot Size S-5,763 Sq. Ft. THIS APPLICATION IS FOR (® all that apply): Absorption Field 0 Septic Tank ❑ Holding Tank ❑ Privy ❑ Private Well Water Storage ❑ Number of Bedrooms q THIS APPLICATION IS AN: Initial Upgrade ❑ Renewal ❑ certify that the above information is correct. I further certify that this application is being made for a Single Family Dwelling and is in accordance with applicable Municipal Codes. (Signature of propeny-oI94ror authorized agent) Permit/Rush Fees: $730,— Waiver Fees: Date of Payment: 9 ' / 9 " 0 y Date of Payment: Receipt Number: 0 /,�r / 3 Ci Receipt Number: (Rev. 11105) �FtCTERRq i AI2CTERRA CONSUIMINO, INC 212 E. 51° Ave, Anchorage, AK. 99503 , r� Office (907) 868-3791, Fax (907) 868-3793 4 ,.;;i June 22, 2009 Municipality of Anchorage Development Services Department On -Site Water & Wastewater Program P.O. Box 196650 Anchorage, AK 99519-6650 Subject: New sewerhvell permit— Vikdal Lot 3 Gentlemen: The owner has requested we proceed forward to obtain a septic and well permit on the subject lot. On May 1, 2007 one testhole was performed for the proposed preliminary plat. The plat was subsequently recorded and we are using this testhole for the design. An additional perc test will be performed at time of construction. The results of this test are attached. The general slope of this lot is from south to north at a grade of approximately 2-5%. We have designed our system utilizing the existing testhole that was excavated for the proposed 4 -bedroom house. The lot will be served by an individual well, located on the southeastern portion of the lot. We propose to install two 5' wide shallow trenches. Water was not encountered during the excavation or monitoring. There are no public or private wells within 200' of our proposed system location except as noted. There is no surface water within 100' of the proposed system and there are no known curtain drains within 50'. We do not expect there to be any adverse effect on adjacent lots by the development of this system. If you have any questions, please contact me at 696-6111/FAX 696-8111. Respectfully submitted, ArcTerra Consulting, Inc. Kenneth M. u , Attachments: On -Site Well and Sewer Application Wastewater Absorption System DetaiWSite Plan Soils Log/Percolation Test - copy Owner/Contractor Specs WASTEWATER DISPOSAL SYSTEM DETAILS VIKDAL SUBDIVISION LOT 3 PROPOSED o 48R HOUSE PREPARED FOR: TAREK WETZEL 24817 THUNDERBIRD DRIVE CHUCIAK. AK 99567 907-240-4931 FIELD BOOKS I CCWUTM. n�N QTH07-2 TD.D. Co MT 0 t�1� rn C m DOUnDMC JLSDRAY BMW a xllc STAKING C+ca11� KMD "seine ASQUILT DATE 06/23 D.C. nXF- cm NW125 ^`L 09028 J08 «a 09028 n�N �CY) C\/.- Scale, V Scale, 1'= 30' PAGE 2 OF 2 l/ii.'7��11�11 Uj \<z- / / Q cor� / cc I coj / SPLITTE O J PROPOSED o 48R HOUSE PREPARED FOR: TAREK WETZEL 24817 THUNDERBIRD DRIVE CHUCIAK. AK 99567 907-240-4931 FIELD BOOKS I CCWUTM. n�N QTH07-2 TD.D. Co MT 0 t�1� rn C m DOUnDMC JLSDRAY BMW a xllc STAKING C+ca11� KMD "seine ASQUILT DATE 06/23 D.C. nXF- cm NW125 ^`L 09028 J08 «a 09028 n�N �CY) C\/.- Scale, V Scale, 1'= 30' PAGE 2 OF 2 l/ii.'7��11�11 \<z- / / Q Q / / cc I coj / SPLITTE 1250 CAL. S.T. / / PROPOSED o 48R HOUSE PREPARED FOR: TAREK WETZEL 24817 THUNDERBIRD DRIVE CHUCIAK. AK 99567 907-240-4931 FIELD BOOKS I CCWUTM. n�N QTH07-2 TD.D. Co MT 0 t�1� rn C m DOUnDMC JLSDRAY BMW a xllc STAKING C+ca11� KMD "seine ASQUILT DATE 06/23 D.C. nXF- cm NW125 ^`L 09028 J08 «a 09028 n�N �CY) C\/.- Scale, V Scale, 1'= 30' PAGE 2 OF 2 l/ii.'7��11�11 WELL & WASTEWATER DISPOSAL SYSTEM DETAILS / SITE PLAN PID: 051-161-36 VIKDAL SUBDIVISION LOT 3 / LOT* CCC/ 1 i O LOT" / 1 GRAPHIC SCALE L0 LO S 0 100 200 SCALE:1 "=200' #7 1 / ' O / LOTS / / / / DESIGN DETAILS 4 BDRM X 150 GPD = 600 GPD 600 GPD/0.45 GPD PER SO. FT. (27 MIN/IN.)= 1334 SO. FT (1334/5'(W)) X 0.5(RF) (4.0' GRAVEL) = 133 FT. TRENCH USE 2 TRENCHES - 67' (L) X 5' (W) X 4'(D) Total depth of system Is 6.0' max from original grade. Total depth of gravel below distribution pipe Is 4.0' . NOTES: LOT FLAG ALL WELL RADII, EASEMENTS & LOT LINES PRIOR TO CONSTRUCTION NO PUBLIC WELLS WITHIN 200' OF PROPOSED SYSTEM. NO PRIVATE WELLS WITHIN 200' OF PROPOSED SYSTEM EXCEPT AS NOTED. NO SEPTIC SYSTEMS WITHIN 200. OF PROPOSED NEIL EXCEPT AS NOTED. 1. INSTALL 1250 GAL SEPTIC TANK. INSULATE TANK IF (4' COVER. 2. INSULATE TRENCHES WITH 2' HD BURIAL FOAM IF ( 3' OF COVER .(MIN 2' COVER W/ INSUL) 3. CONTRACTOR WILL ENSURE ALL OTHER SEPARATIONS TO ADJACENT WELLS" SEPTICS. LOT LINES. FOUNDATIONS & ALL OTHER SETBACKS. 4. CONTRACTOR WILL ENSURE MINIMUM 2% SLOPE INTO SEPTIC TANK. OF A.Lq �1 9 Tx *.0 .. KE'D AW AV \ 4$FrSSIo;� PREPARED FOR: TAREK WETZEL 24817 THUNDERBIRD DRIVE CHUGIAK. AK 99567 FIELD BOOKS COWU D: 11OUNDARt ORAML Rmw S'' NAD_ AS""Ll' DALE: DR& nr. deoc I.IMH'lGG m"D F' ' 09028.dwg I" "': 09028 PAGE 1 OF 2 OF s RCIERRA Js .: *g a ENGINEERING AND SURVEYING, INC. E; ti Kerno,n N •�•t wa,+,�• IJ �•. CEJ71 SOILS PERCOLATION TEST �!1`OP oFEsv Performed for: IeffVikdal Date Performed: 05/01/2007 4/P�L� V1IG0AL L—OT 3 Project: (T15 N R 13Y SEC 7 LOT Sl TEST ROLE Y TI107-2 Dcpth ORG/OL SM/GM w/ occ. boulders <2' 13.0.11. HOLE PRESOAKED 20- PRIOR TO TEST SEE ATTACHED SITE PLAN FOR HOLE LOCATION Was Groundwater encountered? NO What depth? NA Depth to water after monitoring? DRY Date? 5/8/07 Reading Date Gross Net Depth to Net Time Time Water Dro 1 5/2107 1:00 6" 2 1:30 30 min 4 14/16" 1 2/16" 3 1:30 4 14/16" 4 2:00 30 min 3 13/16" 1 1/16- 5 2:00 313/16" . 6 2:30 30 min 2 11/16" 12/16- 2116"7 7 8 9 10 I 12 ' Water Added Percolation Rate 27 (min/in) Perc Hole Diameter 6 Test Run Between 3 feet and 4 feet I, Kenneth M. Duffus, certify that this test was performed in accordance with all State and Municipal guidelines in effect on this date. Tarek Wetzel 24817 Thunderbird Dr Chugiak, AK 99567 August 18, 2009 Municipality of Anchorage Development Services Department On -Site Water & Wastewater Program P.O. Box 196650 Anchorage, AK 99519-6650 Subject: Owner Installation – Vikdal Subd. Lot 3 Gentlemen: I, Tarek Wetzel, will be performing my own excavation and installation of the septic tank and leachfield of the above subject permitted septic design at my single-family residence. Per MOA requirements, a MOA approved engineer—ArcTerra Consulting, Inc, will inspect the installation. I have extensive excavation and construction experience. If you have any concerns or questions, please contact me at (907) 240-4931. Respectfully, Tarek Wetzel Cc ArcTerra Consulting, Inc File a P'�CTER�,q i ArzcTrRrzn CONSULTING, INC 212 E. 51° Ave, Anchorage, AK. 99503 b, „N/Office (907) 868-3791, Fax (907) 868-3793 ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION PRACTICES AND MATERIAL SPECIFICATIONS LEGAL DESCRIPTION: VIKDAL LOT 3 GENERAL: 1. The scope of this project includes the installation of a septic tank and/or drainfield to serve a single-family residence on the referenced property as delineated on the attached Municipality of Anchorage (MOA) permit and site plan. Construction shall be in accordance with the approved site plan and design drawings; MOA permit with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 2. ArcTerra Engineering & Surveying, Inc. (ArcTerra) assumes no responsibility of the accuracy of the as -built survey provided by the owner or owner's representative. 3. The owner or contractor is responsible to notify the engineer of any discrepancies noted on the design plans or drawings prior to commencing work. These discrepancies could be, but not limited to, possible encroachments, surface water, varying soils, unplatted easements, types or use of dwellings on or adjacent to property, nearby public wells, etc. 4. The contractor shall be responsible for locating any necessary underground utilities, easements, property lines and surface water. The owner and/or contractor shall ensure, if deemed appropriate, that a registered land surveyor prior to construction flags all setbacks. The contractor shall be responsible for verifying all pertinent separation distances and component layout. 5. Unless specifically agreed otherwise, the property owner shall be responsible for final grading areas subsequently depressed from soil settling. On all leachfield mound systems, the property owner shall be responsible for ensuring a satisfactory vegetation growth over the mounded area. 6. The MOA Development Services Department On -Site Water & Wastewater Program must certify contractors installing wastewater disposal systems. Owners installing their own systems must also receive prior approval from said MOA Department. SEPTIC TANK/IIOLDING TANK/ LIFT STATION INSTALLATION: 1. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. 2. The septic tank shall be sufficiently bedded with proper material and compacting to prevent damaging, settling or shifting of the tank. 3. All standpipes on the septic tank shall extend a minimum of 12 inches above the final grade. Vikdal Lot 3 June 22, 2009 Page 2 of 4 4. Septic tanks installed with less than 4 foot of cover shall be insulated. The contractor will ensure that the fill over the tank does not exceed the burial depth rating. 5. A foundation cleanout shall be installed one to four feet from the building foundation. In the line between the tank and the leachfield there shall be two adjacent cleanouts (unless an effluent pumping system exists within the septic tank). These cleanouts shall be located on undisturbed soil not more than 10 feet from the tank. The second cleanout, in line, shall be to clean toward the septic tank. 6. Final grading over the septic tank shall be such that a positive slope exists away from the septic tank. 7. All H.D.P.E. tanks shall have a vertical length of 4 -inch perforated drainpipe besides the tank extending to the bottom of the tank to above grade to monitor ground water. 8. All tanks shall be anchored when there is not enough adequate soil cover to resist buoyancy forces in high -groundwater areas. 9. All holding tanks and lift stations shall have an audible and visual alarm inside the residence. 10. All lift stations shall be wired in compliance with the Uniform Electrical Code and all MOA guidelines. 11. The contractor shall remove the old tank, or abandon it in compliance with the Uniform Plumbing Code. The contractor is solely responsible for the abandonment procedure. ABSORPTION TRENCIVDRAINFIELD INSTALLATION: 1. Excavate the proposed trench to the dimensions shown on the design. The bottom of the excavation shall be within 2 inches of level. If the sidewalls of the excavaction become smeared, they must be raked or scratched (roughed -up) before gravel (sewer rock) placement. 2. Once the sewer rock is installed, the distribution pipe is installed level with the perforations facing downward. Gravel is then to be placed over the distribution pipe to provide a minimum of 2 inches of cover over the pipe. 3. A silt barrier must be installed between the final gravel layer and the native soil backfill. Ensure the silt barrier covers the entire gravel surface before placing backfill. 4. Monitoring tubes shall be four- (4) inch diameter, installed approximately in the locations shown on the design, and extend a minimum of 12 inches above final grade. The portion of the monitoring tube extending through the gravel shall be perforated from the bottom of the trench to the invert of the distribution pipe. This is equivalent to the effective depth of the gravel as noted on the design. 5. Backfill over the final gravel layer must not be less than twenty-four inches. Insulation must be installed when the backfill depth is less than thirty-six (36) inches. The finish grade over the trench must be mounded to prevent the formation of a depression after settling. 6. All advanced technology waste water disposal systems (Advantex, Biocycle, Intermittent Dosing Sand Filter, etc...) shall be constructed, installed, maintained and monitored per manufacturer's specifications and MOA requirements. 20441 PTARMIGAN BLVD • EAGLE RIVER, AK 99577-8736 • PH (907) 868-3791 • FAX (907) 868-3793 Vikdal Lot 3 June 22, 2009 Page 3 of 4 MINIMUM MATERIAL SPECIFICATIONS: 1. A MOA approved septic tank manufacturer must construct any septic tank proposed for installation. 2. The following pipe materials are MOA approved for use in septic system installations: Type of Pine Perforated Solid Cast Iron Yes Yes ASTM D3034 (PVC) Yes Yes ASTM F810 (HDPE) Yes No ASTM D2662 (ABS) Yes Yes 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Company Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Femco, or equal). 5. A permeable nontoxic silt barrier (Typar 3401, Mirafi 140N, or equal) must be installed between the final leachfield gravel layer and the native soil backfill. 6. All leachfield gravel (sewer rock) shall be 0.5"-2.5" screened gravel with less than 3% passing the #200 sieve. If deemed necessary, a sieve analysis should be performed. 7. When sand is being used as a filter material, its gradation specification must conform to current MOA or ADEC requirements. INSPECTIONS: Typically there will be three (3) inspections required during the installation of the wastewater disposal system. These inspections will occur as follows: 1. The first inspection must be conducted after the excavation of ditches, pits, trenches, or beds and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled before this inspection. 2. The second inspection must be conducted after the placement of the sewer rock, distribution lines, standpipes, and cleanouts, but before the placement of the silt barrier, insulation, or any other backfill. 3. The final inspection is to occur upon final grading of the property. Often there will be more than these 3 inspections required, especially with the installation of multiple trenches, sand filters, pressurized distribution systems, etc. The inspecting engineer is to be contacted at least 24 hours prior to the start of construction. If necessary, a pre -construction meeting will take place on-site. The inspecting engineer will not coordinate, direct or control in any way the contractor's activities. The owner shall contract with the contractor to perform the work outlined in these specifications and attached plans and in accordance with the attached MOA permit. All materials, components, and construction practices shall comply with the MOA's and the State of Alaska's latest ordinances, regulations, or policies regarding wells and septic systems. The failure of the inspecting engineer to notice a material or construction non- compliance does not relieve the contractor of his/her responsibility to correct such deficiency. There will be no contractual arrangement existing between the contractor 20441 PTARMIGAN BLVD • EAGLE RIVER, AK 99577-8736 • PI1(907) 868-3791 • FAX (907) 868-3793 VikdalLot 3 June 22, 2009 Page 4 of 4 and ArcTerra. ArcTerra shall be the owner's representative and will inspect the work as stated above to document the contractor's activities. Final acceptance of the contractor's work rests with the owner and the MOA. ArcTerra shall have no liability to the owner or to others for acts or omissions of the contractor or any other persons performing work on this project or the failure of the contractor to carry out the work in accordance with these construction documents. ArcTerra's inspecting engineer will not be responsible for the construction means, methods, and techniques, sequence, procedures or the safety precautions incident to this project. BY PROCEEDING FORWARD WITH THE INSTALLATION OF THE WATER AND/OR WASTEWATER SYSTEM (S), THE PROPERTY OWNER, CONTRACTOR, AND WELL DRILLER ACKNOWLEDGE RAVING READ AND ACCEPTED THESE SPECIFICATIONS. 20441 PTARMIGAN BLVD • EAGLE RIVER, AK 99577-8736 • Pit (907) 868-3791 • FAX (907) 868-3793