HomeMy WebLinkAboutEAGLE CREST #1 TR A LT 36Eagl
Crest
T act A
Lot 36
#050-303-35
Permit Number:
Tax Code Number:
Work Type:
On-Site Water & Wastewater System Permit
OSPl11252
05030335000
WellSeptic
MUNICIPALITY OF ANCHORAGE
Development Services Department
On-Site Water & Wastewater Program
4700 Elmore Road, PO Box 196650
Anchorage, AK 99519-6650
Telephone: (907) 343-7904
Initial
Permit Effective Dates: September 20, 2011 to September 19, 2012
Design Engineer: NORTH RIM ENGINEERING
Subdivision: EAGLE CREST #1
Site Legal Address: EAGLE CREST #1 TR ALT 36 G:0055
Owner/Address: MICHAEL QUINN CONSTRUCTION INC
PO BOX 772641 EAGLE RIVER AK 995772641
Site Mailing Address: 19409 SECOND ST, Eagle River
Lot Size in Sq Ft: 17820
Total Bedrooms: 3
This permit is for the construction of:
Y Disposal Field Y SepticTank N Holding Tank N Privy Y Private Well N Water Storage
All construction must be in accordance with: 1. The attached approved design.
2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater
Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80).
3. The wastewater code requires inspections during the installation. The engineer must notify the Development Services
Department at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 (24 hours).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must either:
A. Open and Close on the same day.
B. Covered, sealed, and heated to prevent freezing.
Date: ~,/'~ ~/~/
Date: ~/~//~/~ ~//
UN!C!PALiTY OF ANCHORAGE
Community Development Department
Development Services Division
On-Site Water & Wastewater Program
Phone: 907-343-7904 Fax: 907-343-7997
Mayor Dan Sullivan
ON-SITE SEWER/WELL PERMIT APPLICATION
FOR A SINGLE FAMILY DWELLING
Parcel I.D. _.(~_50 30 :~ ~_~ _
Mailing address ~,O. ~O¢ ~2 ¢[ / ~ ~¢~ ....... ~/ ~A
Site address ~' ~g S¢¢~¢ ' '
Legal description (Subd., Block & Lot) ~ ~ :.~~~[ z_Z2~~ ~ S~
Legal de~ription (Township, Range & Section)___
Lot Size. / ~ ¢~8 .Sq. Ft. Number of Bedrooms ~
THIS APPLICATION
(1~ ~ll that apply)
Absorption Field
Septic Tank
Holding Tank
Privy
Private Well
Water Storage
iS FOR:
THIS APPLICATION IS AN:
Inidal ~
Upgrade []
Renewa~ []
THIS APPLICATION INCLUDES A VARIANCE / WAIVER REQUEST FOR:
I certify that the above information is COrrect. I further certify that this application is being made
for a Single Family Dwelling and is in a~rdance with applicable Municipal Codes.
(Signatur~erfy owner or aUtho/~ed agent)
,' PermiV~ush Fees:
~of Payment: "
Receipt Number: ~
Pe~Jt No. :-~.,..,
Waiver Fees:
Date of Payment:
Receipt Number:
Waiver No,
G:'¢uildir~\On Site\Forms\Client Forms~ermit App.10411 ,doc
(Rev. 1/I1)
On-Site Water & Wastewater System Permit
MUNICIPALITY OF ANCHORAGE
Development Services Department
On-Site Water & Wastewater Program
4700 Elmore Road, PO Box 196650
Anchorage, AK 99519-6650
Telephone: (907) 343-7904
Permit Number: OSP101026
Tax Code Number: 05030335000
Work Type: WellSeptic Initial
Permit Effective Dates: June 04, 2010 to June 04, 2011
Design Engineer: STEVE ENG
Subdivision: EAGLE CREST #1
Site LegalAddress: EAGLE CREST#1 TR ALT 36 G:0055
Owner/Address: MICHAEL QUINN CONSTRUCTION INC
PO BOX 772641 EAGLE RIVER AK 995772641
Site Mailing Address: 19409 SECOND ST, Eagle River
Lot Size In Sq Ft: 17820
Total Bedrooms: 3
This permit Is for the construction of:
Y Disposal Field Y Septic Tank N Holding Tank N Privy Y Private Well N Water Storage
All construction must be in accordance with: 1. The attached approved design.
2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska Wastewater
Disposal Regulations (18AAC72) and Drinking Water Regulations (18AAC80).
3. The wastewater code requires inspections during the installation. The engineer must notify the Development Services
Department at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 (24 hours).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must either:.
A. Open and Close on the same day.
B. Covered, sealed, and heated to prevent freezing.
Date:
Municipality of Anchorage
Development Services Department
Building Safety Division
On-Site Water and Wastewater Program
4700 Elmore Road
P.O. Box 196650
Anchorage, Alaska 99507
www.muni.org/onsite
(907) 343-7904
ON-SITE SEWER/VVELL PERMIT APPLICATION
C~pIZ)t~; 4, FOR A SINGLE FAMILY DWELLING
Parce 09tg--Z Og- g ¢'
Property owner(s) /~t' ~'~-
Mailing address
Site address
Legal description (Sub'd., Block & Lot) ,~"~Z~ ~'&~' ~...~/~'5 7" ~z./;
Legal description (Township, Range & Section)
Lot Size .Sq. Ft. Number of Bedrooms
Day phone
Zip Code
Zip Code
THIS APPLICATION IS FOR ([~ all that apply):
Absorption Field
Septic Tank
Holding Tank
Privy []
Private Well ~
Water Storage
THIS APPLICATION IS AN:
Initial
Upgrade '~
[] Renewal []
I certify that the above information Is correct. I further certify that this application is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes.
(Signature of properly owner or a~odzed agent)
Permit/Rush Fees:
Date of Payment:
Receipt Number:
(Rev. 11/05)
7c7
Waiver Fees:
Date of Payment:
Receipt Number:.
MEMO
Steve Eng, PE, PH
P.O. Box 770724, Eagle River AK 99577
(907) 694-7028 tel
northrimeng@aol.com
Date: 6/3/10
To: MOA On-Site Services
Subject: Eagle Crest #1, Tract A, Lot 36
Septic System Design
Number of Pages: 6
A new house and wastewater system are planned for the subject lot. The building site on this lot
has extensive fill, but the septic system site is native ground. The test hole shoxved no bedrock,
and groundwater was monitored at 12.5' on 10/30/09. However the MOA measured groundwater
~ 8.2' during May, 2010. This highest water level is being used for design. The design calls for a
new trench, new septic tank & private sewer lines. Private water wells serve the area lots and are
shown in drawings. A new water well is also proposed. Although there is not much room for a
septic system on this lot, we were able to size a system so as not to conflict with other lots in the
area.
Please review the wastewater system design for the single family home. I have included design
plans & specs, design guidelines, & soil tests. If there is need for additional information or
clarification please give me a call.
Thanks-Steve
Eagle Crest #1, Tract A, Lot 36
SPECIFICATIONS & DESIGN GUIDEI,INES
Wastewater System Sizing: This is a new 3-bedroom, single family home. The existing
subdivision lots are tightly constrained for well & septic systems, as can be seen from the
drawing. The existing lot can be sen'ed by the attached design. A 4' deep trench will be
excavated with new septic tank. Cover material will be required to obtain the required 3'
cover. Water wells are located on the drawings. No adverse impacts are expected from
septic system placement in this location. No conflicts to the other lots will take place by
this septic system construction. The easements are located on the drawing and are not
encroached upon. A conventional septic system will be used, application rate of 1.2
GPD/FT~. Trench Length = 375 FTV5'x .5 = 37.5' trench, (4' effective)
Specification Requirements: All components and work must comply with the Municipality
of Anchorage Specifications (AMC) & State of Alaska Drinking Water Regulations and
Wastewater Regulations.
· Two compartment, 1000 gallon septic tank. Watertight couplings on inlet & outlet.
· 5' minimum between the tank and bed. 10' to property lines.
· 3' ofcover or insulation is required for trench; an equivalent of I" insulation for each foot
soil cover.
· Tank & solid pipe must be set on well compacted, stable soil.
· 4 inch diameter cleanouts with airtight caps are required I' to 4' from foundation wall,
prior to any 90 degree bend in 4 inch line, in each tank compartment, and two adjacent
opposing cleanouts between the tank and the absorption field, not more than 10' from tile
tank positioned to provide cleanout access towards tile tank and towards the absorption field.
· All cleanouts must extend to at least ground level.
· In solid pipe runs, ASTM D-3034 may be used in lieu of cast iron.
· Trench to be placed level, minimum of 4' to groundwater, 6' to bedrock from drain-rock.
· Drain rock to be ½ inch to 2 ½ inch screened. Drain rock to be distributed uniformly
throughout the trench.
· Perforated pipe to be installed level with perforations down.
· Silt barrier (filter fabric) to be installed above the drain rock.
· Smeared trench sides must be raked or scarified before drain rock placement.
· Backfill over drain rock must not be less than 36".
· The finish grade must be mounded to promote drainage over the trench.
· Insulation must be placed over any pipe installed under driveways or parking areas.
· Approved pipe materials include cast iron, PVC ASTM D3034, PVC ASTM F789, ABS
ASTM D266 I,
· Sewer Service Line is minimum 2% slope.
· Septic Tank to be pumped every two years or when required.
· Insulation board to be extruded direct burial polystyrene (Dow Styrofoam Ill or equal)
_
DESIGN NOTES:
1. Total Depth of Trench is 4'.
Excavate Below Fill Slope, Into Native Soil.
2. Sewer Service Line minimum 2% slope.
3. Clean Fill Material Required To Obtain Minimum 3' Cover Over Trench.
11 30× 11
Neighbor
Well
Al'ternocte
Trench
×/
57.
easement
tt 57. \\11 5x \\
57.
Level Si't;,
I Proposed
Well
2nd Street
C.O.'s
New 1000 Gcxtton
~p'tic Tctnk
Lever
NOR THRIM
ENGINEERING
907. 694. 7028
EAGLE CREST
TRACT A, 36
SEPTIC SYSTEH
TANK & TRENCH
1' = 40'
WASTEWATER
LAYBUT
6/1/10 1~¢' 3
0
c-
~J
.o_
0
OW
b.
xr 0
U
C
0
0
0
I--
0
E~_~_~N E E RI N G
SOILS LOG - PERCOLATION TEST
Date PerFormed: 10/15/09
PerFormed For: Mike Quinn
Legat Description: EaDte Crest ~1 Subdivision, Tract A, Lot 36
1
~ -
3-
4 -
5 -
6 -
7 -
8 -
9-
10 -
11 -
18 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
80 -
DEPTH
(FEET)
~--/-/-/-//~
;'".: b,O. -:
:~ .'.'.'%',. ~
Organic
GP
Sandy Graver
w/ Low Sitt
T.H, Location:
See Attached :Design
MBA 5/10
10/30/09
Groundwater? Ye5
Depth 15'
Wa~er Depth 8.~' MBA Monitor In May/8010
AFter Moni~orinq. 12.5' Da~e: 10/30/09
Da~e Gross TIMe Ne~ TiME Depth Ne~ Drop
ll/lO 0 -- 11° --
11/I0 10 lO Min, 16' 5'
I1/10 18 -- 11' __
11/10 88 10 Min. 16' 5'
11/10 85 -- 11. __
11/10 35 10 Min. 16' 5'
11/10 37 -- 11' __
11/10 47 10 Min. 16' 5'
11/10 50 -- 11' __
11/10 60 10 Min. 16' 5'
Percota~ion Ra~e 8 Min./inch Perc Hate Diameter 6'
Tes¢ Run Between 4' and 5'
COMMeO~$:
PerFormed By--g, I ~ ' CERTIFY THAT THIS TEST WAS
PerFormed in Accordance with Att State/Municipat Guidetines in EFFect
ON THIS DATE. DATE, 11/10/09