Loading...
HomeMy WebLinkAboutSHAWN LT 2l toT 8 stra RI° 8 . , t"~ MUNICIPALITY OF ANCHORAGE  DEPARTMENT OF HEALTH & ENVIRONMENTAL PROTECTION J ENVIRONMENTAL ENGINEERING DIVISION 825 L Street- Anchorage, Alaska 99501 Telephone 264-4720 ,ON-SITE SEW/~ DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT LEGAL DESCRIPTION LOCATIO~ U NO. OF BEDROOMS L~ I~allon$ IF HOME,DE: Inside length W~dth Liquid depth ~ -- ~ Manufacturer Material ) Liquid ca,city in ~llons ~ Well Foundation Nearest lot hne PERMIT NO. No. of lines Length o Total length of lines Trench width Distance ~t~en lines inches ~ ~ ~ Top ol tile to finish grade Material beneath tile Total efl~ti~ absorption area m Building foundation ;e~r llne Septic tank AbSorption areals) ~ DISTANCE TO: REMARKS .,7 "' ' ' '5. _.,~o~¢ " ~- I1' ' '~._ ~/d~~ Rev. 3/78) PERMIT NO. MI_I~I I [~: I AL I TY OF A~l¢l-. .~RAGE DEPARTMENT OF HEALTH AND EN¥IRONMENTAL PROTECTION 625 'L' STREET, ANCHORAGE, AK. 99501 ON--S I TE SE&dER PERM X T ( 8209~ ) APPLICANT LOCATION LEGAL ROBERT POOLE T15NRIW S8 L8 TYPE OF SOIL ABSORPTION SYSTEM IS: BOX 994 WASILLR 99687 376-5472 LOT SIZE 999999 SQUARE FEET DRRINFIELD ~--~ ~ MAXIMUM NUMBER OF BEDROOMS SOIL RATING THE REQUIRED SIZE OF THE SOIL ABSORPTION SYSTEM IS: DEPTH= 5 LENGTH= :1_05 GRAVEL DEPTH= THE LENGTH DIMENSION IS THE LENGTH (IN FEET> OF THE TRENCH OR DRRINFIELD. THE DEPTH OF A TRENCH OR PIT IS THE DISTANCE BETWEEN THE SURFACE OF THE GROUND A~qD THE BOTTOM OF THE EXCAVATION (IN FEET>. THE TREI'4C:H t~IDTH IS 5. 000 FEET. THE GR~VEL DEPTH IS THE MINIMUM DEPTH OF GRAVEL BETWEEN THE OUTFALL PIPE AND THE BOTTOM OF THE EXCAVATION (Itt FEET>. REQUIRED :~;EPTI¢ Ti=INK SIZE= 1750 GRLLO~I$ P. ERMIT APPLICANT HAS THE RESPONSIBILITY TO INFORM THIS DEPARTMENT DURING THE INSTALLATION INSPECTIONS OF ANY WELLS ADJACENT TO THIS PROPERTY AND THE NUMBER OF RESIDENCES THAT THE WELL WILL SERVE. TWO (2 > I ~ISPECT IONS ARE REQU I RED BACKFILLING OF ANY SYSTEM WITHOUT FINAL INSPECTION AND APPROVAL BY THIS DEPARTMENT WILL BE SUBJECT TO PROSECUTION. MINIMUM DISTANCE BETWEEN A WELL AND ANY ON-SITE SEWAGE DISPOSAL SYSTEM IS 100 FEET FOR A PRIVATE WELL OR i50 TO 200 FEET FROM A PUBLIC WELL DEPENDING UPON THE TYPE OF PUBLIC WELL. MINIMUM DISTANCE FROM R PRIVATE WELL TO R PRIVATE SEWER LINE IS 25 FEET AND TO R COMMUNITY SEWER LINE IS 75 FEET. OTHER REQUIREMENTS MAY APPLY. SPECIFICATIONS AND CONSTRUCTION DIAGRAMS ARE AVAILABLE TO INSURE PROPER INSTALLATION. PERM I T EXP T RES DECEMBER ~-. ~-~c~$2 I CERTIFY THAT i: I AM FAMILIAR WITH THE REQUIREMENTS FOR ON-SITE SEWERS AND WELLS AS SET FORTH BY THE MUNICIPALITY OF ANCHORAGE. 2: I WILL INSTALL THE SYSTEM IN ACCORDANCE WITH THE CODES. ~: I UNDERSTAND THAT THE ON-SITE SEWER SYSTEM MAY REQUIRE ENLARGEMENT IF THE S I GNED: .................... ISSUED BY_____.___~' TE___ ~ V4. 0 ~ SOILS LOG ,/- MUNICIPALITY OF ANCHORAGE r-I PERCOLATION DEPARTMENT OF HEALTH AND ENVIRONMENTAL PROTECTION TEST 825 I.* Street, Anchorage, Alaska ~9501 264-4720 SOILS LOG -- PERCOLATION TEST 6 7 8 9 10 11 13- 14- -15- 16- 17- 18- 19- 20 SLOPE SITE PLAN WASGROUNDWATER ~ ~"~ 0 E.COUNTEREO, Gross Net Depth to Net Reading Date Time Time Water Drop PERCOLATION RATE ~%//~.//~ (minutes/inch) .' TEST RUN BETWEEN ~ FT/~.~ FT .... '~' ~ ~ -- ~ ' DATE~ PERFORMED BY:'" _.~[~ ~.,~ '~ CERTIFIE 72~08 (6~9) CONSTRUCTION AND OPERATION CERTIFICATE ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION. PUBLIC WATER SYSTEM APPROVAL TO CONSTRUCT Plans for the construction of. public water system located - , Alaska, submitted in accordance with 18 AAC 80.100 by. ,have been reviewed and are approved. BY [3 conditionally approved (see attached conditions). DATE If construction has not started within two years of the approval date, this certificate is void and new plans and specifications must be submitted for review and approval before construction. APPROVED CHANGE ORDERS Change (contract order no. Approved by Date The "APPROVAL TO OPERATE" section must be completed before any water is made available to the public. APPROVAL TO OPERATE The construction of the ,public water system was completed on. (date). The system is hereby granted interim approval to operate for 90 days following the cpmpletion date. As-built plans submitted during the interim approval period, or an inspection by the Department has confirmed the system was constructed according to the approved plans. The system is hereby granted final approval to operate. BY TITLE DATE