Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
KNIK VIEW ESTATES Blocks 1-3 S-6155
Ruasell OyM~ 69~2774 Performed for: Legal Description: O & E ENGINEERING & DEVELOPMENT CO. Box 90, Davis St., Eagle RiVer, Alaska 99577 694-2774 or 688-2280 SOIL LOG Mailing Address: ~" ~ Earl Ellis 688-2280 Depth (feet) Sell 0 1 2~ 3~ 4 5__ 6 7 8__ 9~ 10 11 12 13 Ground Water Encountered: Yes No j''// If yes, what depth. Proposed Installation: Seepage Pit__ Drain Field Comments: PLOT PLAN PERC. TEST Date: O & E ENgiNEERING & DEVELOPMENT CO. Box 90, Davis St;; Eagle River, Alaska 99577 694-2774 or 688.2280 Rummll Oyster 694-2774 Performed for: Legal Description: Earl Ellis SOIL LOG 688-2280 Name: -~7'~'1/'~-/~/' ~' -~/~/~ ~ $ L/~-ff.~:~/V3 7;4~, Tel. No. ~ - ~-'~/ Depth (feet) Soil Charaeterlstl~ 0 1__ 2__ 3__ 4 5 6__ 7__ 8__ 9__ 10__ 11__ 12__ 13__ 14__ 15 16__ Ground Water Encountered: Yes Proposed Installation: Seepage Pit Comments: No /~ If yes, what depth Drain Field PLOT PLAN PERC. TEST pedOrmedby: Date: O & E ENGiNEERING&DEVELOPMENT CO, Box 90, Davis St., Eagle Rtve¢, ~ 99577 694-2774 or 688-2280 Ru~ell Oyster 694-2774 Performed for: Legal Description: Depth (feet) EaH Ellis SOIL LOG 688-2280 Name' ~'7-~'V',~'/J' ~/. 5/('~q~-~,$ ~,4/'~)-~, Tel. No. ~-~/ Mailing Addr~: ~ ~' ~ ~ D / ~ 0 ~/~/~ / ~ ~, ~ 7 8oll Characte~tlee 0 1 2 3 4 5 6 7 8 9-- 10 AH_ PLOT PLAN 11 12 13 14 15 16 Ground Water Encountered: Proposed Installation: Seepage Pit Comments: Performed by: PERC. TEST I I yes, what depth 0 & E ENGINEERING.,.& DEVELOPMENT, CO. Box 90, Davis St.. Eagle River, Alaska 99577 694-2774 or 688-2280 Ru~ell Oy~t~ 694-2774 Performed for: Name' Mailing Address: Legal Description: Earl Ellis SOIL LOG Depth (feet) Soil Cham~--terl~tk:~ 0 1 2 3 4 5 6 7 8__ 9__ 10 11 12 13 14 15 16 Ground Water Encountered: Yes Proposed Installation: Seepage Pit Comments: Performed by Drain Field PLOT PLAN PERC. TEST O & E ENGINEERING & DEVELOPMENT CO. Box 90, Davis St., Eagle River, Aleska 99577 694-2774 or 688-2280 Earl Ellis Russell Oyster 694-2774 SOIL LOG 688-2280 -~/v.3//~, Tel. No. Performed for: Name: ~-~-l/~:~:'/'J' Z~, ~/~4:~-~ .~ ~':' --'~ ~ ~ ~ ~: ~j Depth (feet) Soil Characterlltlc$ 0 1 2__ 3__ 5__ 6__ 7 8__ 9__ 11__ PLOT PLAN 12__ 13__ 14 15__ 16 Ground Water Encountered: Yes Proposed Installation: Seepage Pit Comments: No ~ If yes, what depth Drain Field PERC. TEST ,.,I O & E ENGINEERING & DEVELOPMENT CO. Box 90, Davis St,, Eagle River, Alaska 99577 694-2774 or 688-2280 Russell Oyster 694-2774 SOIL LOG Performedfor: Name: ~ ~'-~F~ Mailing Address: Legal Description: H ~vV' Y4! Earl Ellis 688-2280 Depth (feet) Soil Characteristics 0 1 2__ 3 4__ 5__ 6 7__ 8__ 10__ 11__ 12__ 13__ PLOT PLAN PERC, TEST 14__ 15__ Ground Water Encountered: Yes Proposed Installation: Seepage Pit Comments: Performed by: No /~ If yes, what depth Drain Field.__ Date:--~/~/~ ~-' Rul~ell Oyster 694-2774 Performed for: Legal Description: Depth (feet) O & E ENGINEERING & DEVELOPMENT CO. Box 90, Davis St., Eagle River, Alaska 99577 694-2774 or 688-2280 SOIL LOG Name: _~ Mailing Address' p' Earl Ellis 688-2280 i,, _~/.~//::) F_~ $ ~JA)'-,Tel. NO, ~'~" ? ~ ' Soil Characterlltlcs 0 2 3__ 4__ 6 7__ 8__ 9__ PLOT PLAN 12 13__ 14__ 15 16__ Ground Water Encountered: Yes Proposed Installation: Seepage Pit Comments: Performed by: No ~ If yes, what depth Drain Field PERC. TEST Date: '~/~/S~- O & E ENGINEERING & DEVELOPMENT CO. Box 90, Davis St., Eagle River, Alaska 99577 694-2774 or 688~2280 Earl Ellis Russell Oyster 694-2774 SOIL LOG 688-2280 Performed for: Name: -~-~'I[/'~'A[ /--' ~'~J~"~ (...~/t/.~/. Tel. No ~.'~ '~-:~ / Depth (feet) Soil Characterlatlc~ 6__ 7 8__ 9__ 10 12__ 13__ 14__ 15__ 16 Ground Water Encountered: Yes Proposed InstallatiOn: Seepage Pit No ~ If yes, what depth Drain Field.__ Comments; PLOT PLAN PERC. TEST Date: '~/~./~ '~ O & E ENGINEERING & DEVELOPMENT CO. Box 90, Davis St., Eagle River; Alaska 99577 694-2774 or 688-2280 Ru~ell Oyster Earl Ellis 694-2774 SOIL LOG 688.2280 Depth (feet) 0 1 Soil Characteristics ..... 12__ 13__ 15 16__ Ground Water Encountered: Yes Proposed Installation: Seepage Pit Comments: ./ No ~'~ If yes, what depth Drain Field PLOT PLAN PERC. TEST ~ ~ %.... ..... ~.~ · E~rl P.