Loading...
HomeMy WebLinkAboutKNIK VIEW ESTATES BLK 3 LT 11Knik View Estates Block 3 Lot 11 #0§1-043-13 Municipality of Anchorage Page Department of Health and Human Services Division of Envir~me~tal Se~ices On-Sde Se~qces Section 825 9.' Sb'eet Room 502 P.O. Box 196650 A~chorage, AK 99519-6650 www.ct.anchorage.ak.us (907) 343-4744 ON-SITE WASlEWATER DISPOSAL SYSTEM AND/OR WELL INSPECllON REPORT Permit Number: SW010481 PlO Number: 051-043-13 Spinell Homes, Inc. WastewaterSystem: New 9210 Vanguard Drive, AK 99507 ABSORPIION FIELD ,,~,: N~,~, a ~ 5' Wide Shallow Trench 344-5678 Four (4) LEGAL DESCRIPTION 3 1! Knik View Estates 1 n. 51 Wolh Community Water 5 n. 3. Class A n.I F~ 53.0 F? ASTM D3034 PVC I ,. Spinell Homes 3./12-15/02 ¥'" c.-,, I~""'s~''F,. ic..,,~, ,~,,~.,,G,,~,~:,, TANK SEPARATION DISTANCES El Septic n Holding FI S.T.E.P. FI Other,  Sepllc Absorption Uft Holding ~ltc/Pdvate ~. Tar~ Field Station Tank S~,~U,. Anchorage Tank 3.,250 ,,,, >200' >200' N/A N/A >25' Steel Two (2) ~'~*" >3.00'>5, >100'>10, N/Agi/Agi/Agi/A / ,.,. LIFT~STAIION,~.,~,~.. - NONE ON LOT F,.~.~., >5' >3.0' N/A N/A o~.~,-,None Noted "'~"~: BENCH MARK Top o! Foundation Wall - Finished Floor. J.00.0 Engineer's Shamp Inspections peaormed by:. Tim Kimbrough Dates: 'm" 1/12/02 - / 49th ~ 3./3.5/02 Department of Health and Human S?~,rvicgs approval Municipality of Anchorage DEVELOPMENT SERVICES DEPARTMENT 4700 South Bragaw Street Anchorage, AK 99519-6650 - 343-7904 On-Site Wastewater Disposal System or Well Inspection Report Page 2 of 3 Permit Number SW010481 PID No. 051~43-13 'W Z ~ A B IS1 17.1 32.2 S2 24.4 36.5 C4 44.0 35.3 M1 36.2 43.5 M2 83.9 82.2 C5 86.9 84.5 C5 ~ltern~ Site ~H2 /~,0 t,90,00 N M1 Fou= Bedroom Ho~e KNIK VIE-W ESTATES LOT 1 1, BLOCK 40.025 S.F. PLAN AS-BUILT SCALE 1" = 4~' Municipality of Anchorage DEVEOPMENT SERVICES DEPARTMENT 4700 South Bragaw Street Anchorage, AK. 99519-6655 - 343-7904 On-Site Wastewater Disposal System or Well Inspection Report Permit Number. SW010481 _Fr ~oo.oo ,--9~.4 Page 3 of 3 PID No. 051-043-13 O~ 51.0' Municipality of Anchorage ~~r ............... Department of Health & Human Services 825 L Street, Anchorage, AK 99502-0650 ~, %.. C~ - ~.:~] SOILS LOG - PERCOLATION TEST ~'~'.~:,~'.. - .."~,?,~" Performed For: Spinell Homes Date Performed: Legal Description: Lot 11. Brock 3. Knik View Estates Subdivision 11 12 13 14 15 16 17 21 OGIOL Loose Well Graded Gravel with Sand GW ;LOPE SITE PLAN North South No See Site Plan Bottom of Hole Was Groundwater Encountered? If Yes, What Depth? Depth to Water After Monitoring Date: S L O P E Reading Date Gross Net Depth To Net Time ,Time ~ater Drop 15-Jan 10:20 1' 10:30 5 Dry 8" 10:31 1.25' 10:41 5 Dry 7.75" 10:42 1' 10:52 5 Dry 8" Perc. Rate: <1 MinJInch Perc. Hole Diameter. 6' Test Run Between 7 Ft. and 8 Ft. Comments: Te~t Cavity was Presoaked Prior to Test. More than 50% of Material Passes No. 4 Sieve. Performed By: Tim Kimbrough. I, ~ Certify That This Test Was Performed In Accordance With All State and Municipal Guidelines In Effect On This Date: 4/2?/02 ANDERSON ENGINEERING P.O. BOX 240775 ANCHORAGE, AK 99524 522-7773 522-6779 (FAX) MEMORANDUM DATE: TO: FROM: SUBJECT: Apd123,2002 Jeff Poet Mike Andemon, P.E./t~'~ Lot 11, Block 3, Knik View Estates Subdivision Septic System As-Built Certificate of Health Authority Approval The absorption trench constructed on Lot 11, Block 3, Knik View Estates Subdivision runs from west to east rather than from north to south as shown on the design. The lot is fairly fiat in the area of the new trench and once clearing of the lot was completed it became apparent the best location for the trench was in its current alignment. A third test hole was placed to verify the soil conditions near the east end of the new trench. A copy of the log is included for your review. The inspector for the construction of this septic system was new to the inspection of systems constructed under a Municipal permit. He was uncertain of the requirements to call in inspections prior to their performance apparently did not call in the inspections for this system as no record exists with the Municipality.. He is now fully aware of this requirement and has completed the task several times in the past three months, we apologize for any inconvenience this may have caused the City. MUNICIPALITY OF ANCHORAGE Development Services Department On-Site Water& Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 99519-6650 (907) 343-7904 ON-SITE WASTEWATER DISPOSAL SYSTEM PERMIT Initial Date Issued: Dec 06, 2001 Expiration Date: Dec 06, 2002 Pen'nit Number: SW010481 Legal Description: KNIKVIEW ESTATES BLK 3 LT 11 Design Engineer: 0014 Anderson Engineering Owner Name: Spinell Homes, Inc. Owner Address: 95910 Vanguard Dr. Anchorage, AK 99507- Parcel ID: 051-043-13 Site Address: 021942 REBECCA CIR Lot Size: 40025 SQ. FT. Total Bedrooms: 4 Permit Bedrooms: 4 This permit is for the construction of: [] Disposal Field [] Septic Tank [] Holding Tank [] Privy [] Private Well [] Water Storage All construction must be in accordance with: 1. The attached approved design. 2. Ail requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ). 3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling (907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ). 4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. Municipality of Anchorage Development Services Department Building Safety Division On-Site Water and Wastewater Program 4700 South Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 www.ci.anchorage.ak.us (907) 343-7904 ON-SITE SEWER/VVELL PERMIT APPLICATION · FOR A SINGLE FAMILY DWELLING Parcel I.D. Permit Number ~ Property owner(s) Spine, Homes, Inc. Mailing address (1) 9510 Vanguard Drive Anchora.qe, AK 99507 Mailing address (2) Zip Code Legal description (Lot, Block & Sub'd.) ' Lot tl, Block 3, Knik V~ew Estates Subdivision Legal description (Section. Township & Range) Lot Size 40~t31 SF Acres/Sq. Ft. Number of Bedrooms Four THIS APPUCATION IS FOR: Sewer Only Sewer and Well Sewer Upgrade THIS PROPERTY CONTAINS: Hot Tub Swimming Pool Therapy Pool Day phone 344-5678 Well Only Water Storage Jacuzzi Water Softening Unit I certify that the above information is correct. I further cedify that this application is being'made' for a Single Family Dwelling and is in accordance with applicable Municipal Codes.- (Signature of property owner or authorized agent) Pem~it Fees: Date of Payment: Receipt Number: . (Rev. 12/00) Waiver Fees: Date of Payment: Receipt Number:. ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 522-6779 (FAX), November 27, 2001 Municipality of Anchorage Development Services Department On-Site Water and Wastewater Program 4700 South Bragaw Street Anchorage, AK 99519-6650 Subject: Lot 11, Block 3, Knik View Estates Subdivision Septic System Design and Permit Application Iml~acts to Adjacent Properties Dear Onsite Services Engineer, The owner of Lot 11, Block 3. Knik View Estates Subdivision Intends to construct a new four-bedroom home on the lot. We are therefore requesting a permit be issued for the construction of a new septic system to serve the proposed home. The attached Site Plan and backup documentation identify the Ioc.ation and configuration of the new septic system and the parameters used In the design. Also identified on the plans are the location of the water service line on the lot and the test hole locations. Existing drainage patterns are shown and will not be altered by the development of the lot. The subdivision Is currently served by a community water system so no conflicts exist with wells in the area. Two test holes were placed near the location of the proposed absorption trench. These test holes indicate clean well-graded gravel with varying amounts of sand near the location of the new absorption trench. Percolation tests in the material resulted in rates of less than 1 minute per inch. The majority of the material in the hole will pass the No. 4 Sieve so no sand liner is necessary. No groundwater was found dudng the placement of the test holes and none was noted dudng the monitoring pedod. We are therefore proposing to place a 5' wide shallow absorption trench system with 4' of gravel beneath the distribution pipe. The total depth of the trench will be 7'. The distribution pipe will be placed at 3' below the ground surface to provide sufficient drop from the septic tank to the absorption trench. The total length of the new absorption trench will be 50'. The ground surface on the lot slopes as shown on the attached Site Plan with very little to no slope near the. proposed septic system site. Th.e. new absorption t. rench will be constructed on a fa~dy fiat surface In conformance with Municipal requirements and para e to ground contou.rs where possible. All components of the new septic system will be constructed a mimmum of 10' from the water service line to be constructed on the lot. If the system is constructed in accordance with our design the following statements apply: Lot 11, Block 3, Knlk View Est. Subdivision November 26, 2001 Page Two 2. 3. 4. The system, if constructed as designed, will have no adverse impact on the wells in the area or those to be constructed in the future. The system, if constructed as designed, will have no adverse impact on existing septic systems in the area or those to be constructed in the future. The system, if constructed as designed, will have no adverse impact on reserve space, either surface or subsurface, on any lots located in the area. The system, if constructed as designed, will have no adverse impact on drainage patterns In the area. The current drainage pattern will be maintained. Michael E. Anderson, P.E. Attachments JUDD Circle 2I 22 175.00 / / / / / 25 I I I I I I w I0. ,/. PROJECT / 8 /' 7 / .E -43C! 159 91 S89'56'58'£ 10' T. & E. REBECCA CIRCLE 86-113 KNIK VIEW ESTATES' LOT 11, BLOCK ,3 .. 40,025 $,F, N gO"OO'OO"E ,Lona X 5' Wide Effective Depr~z Absorption Trench Four Bedroom SITE PLAN SCALE 1" = 40' LOT ~te Site / Z RE LOT 11, BLOCK 3, KNIK VIEW ESTATES SUBDIVISION DESIGN FACTORS: Four Bedroom Home Perc. Rate: <1 MinJ1nch Application Rate: 1~. GPDISF SYSTEM REQUIREMENTS: 5' wide Trench System 1,500 Gallon Septic Tank 4' Drainfield Rock 4 Bedroom~ X 150 GPD J 1~. GPD/SF = 500 SF of Absorption Ama 500 SFI5 LF (Width)°.5 (Red. Factor) = 50 LF Trench Length Therefore: Construct a 50' Long X 5' wide X 4' Effective Depth Absorption Trench. Flowline Elevation in Trench to be 3' Below Original Ground Surface. Total ?,epth to be 7' Below Existing Ground. Mound Over Trench to Provide a Minimum of 3 of Cover or Provide 2" of Direct Bury Insulation and 2' of Cover. e. Fabric . · PVC (liol~"s ·Down) !iel~ 'Ro6k'. -' NOTE: TYPICAL WIDE TRENCH SECTION (NO SCALE). Grade Area Over Trench to Drain Away. ' Minimum 6' Separation From Bedrock. Minimum 4' Separation From Groundwater. Minimum 10' Separation From Water Service Line. 2-- 3 L, 5 7 8 9 PROJECT #: VDt33 PERFORMED FOR: Municipality of Anchorage Development Sen/ices Department/Building Safety Division Onsite Water and Wastewater Program 4700 South Bragaw Street Anch., AK 99519 SOILS LOG -PERCOLATION TEST II SPINNEL HOMES LEGAL DESCRIPTION: LOT 11, BLK 3, KNIK VIEW ESTATES SUBD TEST HOLE # t REDISH BROWN SILTY OL LOOSE WELL GRADED GRAVELS WITH SANDS - GW DATE PERFORMED: 11-01-01 18. SW LENSE LOOSE WELL GRAOED GRAVELS WITH SANDS- GW SLOPE 0 SITE PLAN SW LENSE WAS GROUNDWATER ENCOUNTERED? IF YES, WHAT DEPTH? _ DEPTH OF WATER, J~FTER MONITORING: DATE: NO S L 0 P None E 11110101 SLIGHTLY EOHPAETED GROSS NET TiME DEPTH OF NET DROP READING DATE TIME CHIN) WATER (INCHES) Start 11-01-01 g 20 12' I 9.23 3 12" Recharge 9,23 12" 2 9 26 3 12" Recharge 9 26 12" 3 9 29 3 12" SANDY GRAVELS GP BOH PERC RATE: < 1 MIN./INCH PERC. HOLE DIAMETER: 6' , '[EST RUN BETWEEN ] S FT. AND /. S FT. COHMENTS: HOLE PRESOAKED I NO IMP[RMABI, ES ENCOUNTER[O TEST PERFORMED BY: T.L. KIMBROUGH l, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORtIED IN ACCORDANCE WITH ALL STATE AND J'tUNIClPAL GUIDELINES ON THIS DATE: I 2 3 5 6 7 8-- II PROJECT #: VDt33 PERFORMED FOR: Municipality of Anchorage Development Sen, ices Department/Building Safety Division Onsite Water and Wastewater Program 4700 South Bragaw Straet Anch.. AK 99519 SOILS LOG - PERCOLATION TEST SPINNEL HOMES LEGAL DESCRIPTION: TEST HOLE REDISN DROWN SILTY OL WELL GRADED SANDS - SW DATE PERFORMED: 11-01-01 18, COMPACTED SANDY GRAVELS LOTtl, BIK3, KNIKVIEWESTATESSUBO 2 SLOPE O% ., 5%/ WAS GROUNDWATER ENCOUNTERED? NO IF YES, WHAT DEPTH';' DEPTH OF WATER AFTER MONITORING: DATE: None ~1~o/o~ SITE PLAN S L O P E '~ B0H GROSS NET TIME DEPTH OF NET DROP READING DATE TIME (MIN) WATER (INCHES) Start 11-01-01 9,&O 12' I 9 t,S 1S 3.25' Recharge 9 &S 12' 2 10 O0 15 Recharge 10 15 12" 3 10.30 15 '/.375" PERC RATE: 2 03 MIN./INCH PERC. HOLE DIAMETER: 6' TEST RUN BETWEEN 3 5 FT. AND & 5 FT. COMMENTS: HOLE PRESOAKED / NO IMP[RMA~LES ENCOUNTERED TEST PERFORt-IED BY: T.L. KIMBI~OUGH I. MICHAEL E. ANDE~ON, CERTIFY THAT THIS TEST WAS PERFOEMED IN ACCORDANCC WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION AND MATERIAL SPECIFICATIONS · SUBJECT: LOT 11, BLOCK 3, KNIK VIEW ESTATES SUBDIVISION GENERAL: 1. The scope of this project includes the procurement and placement of a new 1,250 gallon septic tank at the location shown on the Site Plan. Work also includes the construction of a new 50' long X 5' wide X 4' effective depth absorption trench at the location also shown on the Site Plan. The distribution line in the trench will be placed at 3' below the existing ground surface. Total depth of the trench will be 7' below the existing ground surface. The new absorption trench must be placed a minimum of 10' from the water service line on the lot. 2. Construction shall be in accordance with the approved site plan, design drawings, Municipal Permit with any special provisions or Conditions, and all applicable State and Municipal Wastewater Disposal Regulations. 3. The Contractor shall be responsible for obtaining all underground utility locates and for the layout of the septic system and .verification of the location of all lot lines. 4, Unless specifically agreed otherwise, the c~)ntractor shall be responsible for final grading areas subsequently depressed from soil settling. Property owner shall be responsible for revegetation of affected areas unless specifically agreed otherwise. 5. Contractors installing wastewater disposal systems must be certified by .the Municipal Department of Health and Human Services for system insta at OhS. Owners installing their own syste.ms must receive prior approval from D.H.H.S. before beginning system ,nsta ation~ SEPTIC TANK INSTALLATION .1. A new 1,2,5.0-gallon septic tank must be procured from an approved source and ,nstalled at the location shown. ......... 2~'"A' septic tank is' to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. 3. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank. 4. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 5. Tanks installed without 4' of cover shall have a minimum of 2" of direct · " burial insulation, 6. A foundation cleanout shall be installed one to four feet from the building foundation. Two cleanouts are required between the tank and the drainfield. Lot 11, Block 3, Knik View Est. Subdivision November 26, 2001 Page 2 of 3 7. Final grading over the tank shall be such that a positive slope exists away from the septic tank. 'DRAINFIELD CONSTRUCTION: 1. The drainfield shall be constructed to the dimensions shown on the design. The bottom of the trench shall be within 2" of level. 2. Distdbut on piping must be placed leve with perforations down atop a level bed of drainfield rock. Rock shou d then be placed over the pipe to provide a minimum of 2" of cover. 3. A silt barrier or geotextile fabric must be placed between the drainfield. rock and the natural soil backfill. 4. Monitor tubes must be 4" in diameter and installed at the locations shown on the design. The podion below ground must be perforated. 5. Contractor shall verify the septic tank and drainfield are a minimum 100' away from any pdvate water wells in the area, 150' from a Class 'C" Well or 200' from any community well. 6. Direct bu~3, insulation must be placed over the distribution system if less than of backfill depth is available. Finish gr.ade over the trench must be mounded to prevent settlement or depressions. 7. Grade area surrounding the absorption trench to drain away. 8. A minimum 2' of accepting soil is required below the drainfield rock for a 5' wide trench. Contractor shall vedfy this condition pdor to placement of the rock. All pockets of unacceptable materials must be removed and replaced. MATERIAL SPECIFICATIONS: 1. Septic tanks must be constructed by a municipally approved septic tank ma[~ufacturer. 2..'rhe following pipe materials are approved for use in septic sy.stem installations in the Municipality of Anchorage: ' Cast Iron (perforated and so d), ASTM D3034 or P.V.C. (perforated and solid), ASTM F810 or H.D.P.E. (perforated, but not sold) and ASTM D2662 or A.B.S. (perforated and solid). 3. Insuiation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemical Co. Styrofoam HI or equal). 4. Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Femco, or equal). Lot 11, Block 3, Knik View Est. Subdivision November 26, 2001 Page 3 of 3 5. A permeable geotext e fabric (Typar, Mirafi or equal) must be installed between the final drain rock layer and the native soil layer. 6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing the #200 sieve. INSPECTIONS: Municipal Ordinance requires a minimum of two inspectior~s. These inspections must be conducted under the supervision of a professional engineer registered in the State of Alaska. The first inspection must be conducted after the excavation of trenches, beds or pits and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled. The second inspection must be conducted after the placement of the geotextile fabdc, gravel, distribution piping, standpipes; cleanouts and insulation. No backfill should be in place at the time of inspection. Contractor shall provide a copy of all field survey layout and construction notes for use in preparing the certified as-built of the completed system. ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 522-6779 (FAX) MEMORANDUM DATE: December 5, 2001 TO: Dan Roth FROM: Mike Anderson, P.E. SUBJECT: Lot 11, Block 3, Knik View Estates Subdivision Septic System Construction Permit A dimension has been added indicating the distance between the new house and the proposed absorption trench. I have also added the water monitoring results and changed the information on Test Hole No. I to indicate the percolation rate is less than 1 minute per inch. All of your comments from our initial submittal have been addressed. We are hopeful the septic system construction permit can now be issued. Municipality of Anchorage· Development Services Department. Building Safety Division On-Site Water and Wastewater Program 4700'South Bragaw St. P.O. ,Box 196650 Anchorage, AK 99519-6650 www.ci.anchorage.ak,us (907) 343-7904 CERTIFICATE OF HEALTH AUTHORITY APPROVAL FOR A SINGLE FAMILY DWELLING Parcel I.D. 0~; 1-04;~-1 3 1. GENERAL INFORMATION HAA# ('~C) C~''~'~ Expiration Date: ~ -./? '- (~ '_5r''' Complete legal description Knik View Estates: Block 3: Lot 11 Location (sit, e address or directions) 21 94;) Rebecca Circle: Chugiak.. AK 99-=;67 Curr~nt PrbPe'rty owner(s) Randy Rose Dayphone 688-7673 Mailing address Lending agency Mailing address Real Estate Agent Mailing Address Day phone ..................... Les Raile.~- Prudential Vista Day phone 689-R464 166:~5 Centerfield Drive= Eagle River~ AK -q9~;77 · .. Unles's otherwise requested, HAA will be held by DSD for pickup. 2. NUMBER OF BEDROOMS: 4 TYPE OF WATER SUPPLY: Individual Well Individual Water Storage Community Class Public Water System Well TYPE OF WASTEWATER DISPOSAL: [] Individual On-site [] Individual Holding tank [] Community On-site [] Public Sewer The Municipality of Anchorage Development Services Department (DSD) Issues Certificates of Health Authority Approval (HAA) based only upon the representations given in paragraph 4 by an independent professional civil .engineer registered in the State of Alaska. Certificates of Health Authority Approval are required for the transfer of title (except between spouses) for properties served by a single-family on-site wastewater disposal and/or water supply system. DSD also issues HAAs upon request to homeowners. Certificates of Health Authority Approval are valid for 90 days from the date of issue for properties served by a private or Class C well and may be reissued with new water sample results. (Cedificates may be reissued for a period of up to one year with valid water samples.) Certificates are valid for one year for properties served by Class A or B wells or a public water system. The Municipality of Anchorage is not responsible for errors or omissions in the professional engineer's work. Lega, I ,Descir~ WELL DATA Well type c Date" (~ompl~ted Total depth" Dar 0f test ~ Sta{ic'wate~: level Well ProduCtion Municiphlity of Anchorage Development SerVices Department . :~ ; ' , ~ !Build!nY Safety Division : · · ' :On-Sit6 Water[& Wastewater ,,,uOrk"ram- ' " ~ :i..! ~* " ~:i;4700',South Bragaw St. ~ · '~ P.O? Box!~96650~ Anchorage, AK3 99519-6650' ' ii. ' :· HEALTH A~THORI'I'Y APPROVAL CHECKLIST ii )tion-' Knik'view Es~t~te-~' Block 3. LOt 11 ; "'l~a ,,el ID: WATER SAMPLE RESULTS: Coliform ~ , , :..'~ Arsenic: FROM WELL;LOG :. ~'i ;;' .* ': . , ~' : :i'*!. : ,. g.p. 051-043-13 Wires properly ~ i-stected (Y/N) i'i' . :CaSing heigh, t (above ground) i~,,, AT INSPECTION . ;i '~ :: ? g.p.m. !!? SEP, TICIHOLDING TANK' DATA [!i Tani< Type/Material Septic/steel t i" ,~L!", ' ' I!; i ! : ':.;i,i,, ': .' :,.:1 ' ,,, ~1~*,'ii,,,i ' "~ ~ ~'"' Cle~nouts' '~' :' "" ' i' . Tank size '=; 1;)50 . gal:, :',~ ,;; Number,0fiCom[ ~men~ Fou darien cleanout Date of pu~Ping 1' * ' '~ .... "~ '.~ ..... : [ [' " '~ ,, ' ABSORPTION FIELD DATA .... ,~ , ,,, . ,1,, : , , ~ ' ' ' ',L~:;"",~,'': { ~r .I i ;; .~ *:i."''. I I ~;~' · -' .1. t' ~" ;i ' ~'i'''~ ' Dat~ installed O1/ls/O~',,';~: :;. S0il f ~tih~ i/{g.~.d./~o~r:~/bdrm)~Ys n type Trench ~. i .... , ,..... .... . ., ....... Len'nth lot~l denth' ~0 ~ E~ abso~tion aroa 5~0'It~ Momtonn~ tubeCX: Depross~on ~ ~rf[eld ~ · [:~ Date of adequacy test; 2/Z/04' "~ :: ': ':' Resul,,~ (Pass(Fad) .Pass: .. F0rr4 bedrooms ~ Fluid depth, inabsorpti0n:'field'beo~ete~(~[n.:.~:~ .:;Wfi~r,,Added640 ~ ga!.: ' ~.. New depth 10 in. ~"~ ' ~ · ~;:~i,'~* .'~' 't" ," ~' ' : ~ ". ~' ~:~ ' :~".,' :. , , Cl.k.ga Ti~. q~ rain :i' :',:. ,,: 'Final fluid deDth~in;' '~ ,, ~{ ',,: ' ~Absorpbon rate ,, >=600 g.p.d. [,, .... . ,~:.: , : . ~ ...... 1,, ~,,,,~ _ ,~,~. , ,,,.,, ~: ,, ~...I.,, , _. An~ rejuvenat on treatment (past ,12 mo:) ~/N'& type) N ;~;:~' ..... :', ~ , ~1~ yes,,: gwe cam _ ~": : , ; ' i:' ~, ~, ~: :' [ ~ ~ ~ , ''r ! ' ;' ' ''~ -: ': ' IF ':' - " ' ' ~ ' , · ' ; : ~ . ~1 ' Municipality of Anchorage Development Services Department Building Safety Division On-Site Water and Wastewater Program 4700 South Bragaw St. CERTIFICATE OF' HF_.ALTH AUTHORITY APPROVAL FOR A SINGLE FAMILY DWELLING Parcel I.D. 051-043-13 Expiration Date: /7~ -,,~. ~ 0 3 1. GENERAL INFORMATION Complete legal description Lot 11~ Block 3, Knik View Estates Subdivision Location (site address or directions) Rebecca Circle Current Property owner(s) Spinell Homes Mailing address 9210 Van.quard Drive Lending agency Day phone 344-5678 Anchoraqe, AK 99507 Day phone Mailing address Real Estate Agent Day phone Mailing Address Unless otherwise requested. HAA will be held by DSD for pickup. 2. NUMBER OF BEDROOMS: Four(4) 3. TYPE OF WATER SUPPLY: Individual Well Individual Water Storage Community Class _.A Well Public Water System TYPE OF WASTEWATER DISPOSAL: Individual On-site ~ Individual Holding tank [] [] Community On-site [] [] Public Sewer [] The Municipality of Anchorage Development Services Department (DSD) Issues Certificates of Health Authority Approval (HAA) based only upon the representations given in paragraph 5 by an independent professional civil engineer registered in the State of Alaska. Certificates of Health Authority Approval are required for the transfer of title (except between spouses) for properties served by a single family on-site wastewater disposal and/or water supply system. DSD also issues HAAs upon request to homeowners. Certificates of Health Authority Approval are valid for 90 days from the date of issue for properties served by a private or Class C well and may be reissued with new water sample results less than 30 days old. (Certificates may be reissued for a period of up to one year with valid water samples.) Certificates are valid for one year for properties served by Class A or B wells or a public water system. The Municipality of Anchorage is not responsible for errors or omissions in the professional engineer's work. Legal Desoript~: A. WELL DATA We~ brae 6 Date comp(eted Total depth Municipality of Anchorage Development Services Department Building Safety DK-ision On-Site Water & Wastewater Program 4700 Sou~ Bragaw St. P.O. Box 196650 Anchorage, AK 99519-6650 www.d.anchomge, ak.us HEALTH AUTHORITY APPROVAL CHECKLIST Parce~ ID: 051.043-t3 Lot tl, Block 3, Knlk View Jrt. ff A, B, or C provide PWSID # Sandy se~ Cased to. tl. FROM WELL LOG weu Log (Y~N) W~es prope~y protected (Y~N), Casing height (above pound) AT INSPECTION Date of test ' Static water level Wdt pmduc~on WATER SAMPLE RESULTS: B. SEPTIC/HOLDING TANK DATA Tank Type/Material $eptlr. JSteet Tank size ti250 gal. Date of pumping C. AB~ORP"r]ON FIELD DATA Date installed 1/1~2002 Tom depm ~0 11. Date of adequacy test ft. g.p.m. g.p.m. celonies/lO0 mi. Nitrate ~ mgJI. Callected by: New depth Number of C~mpartments 2_ Depression aver tank fi/N) Pumper New Construction Date installed Cleanouts (Y/N) Y High wator alam (Y/N) N Fluid depth in absorption field before test , in. Water added gal. Elapsed Time: min. Final fluid depth in. Absorption rate >= Any rejuvermtion treatment (past 12 mo.) (Y/N & type) N Soflrating (g.p,d./fl2or~/bdrm)t.2GPO/Sl~. System type 5'WideShallowTrench ff. Width $ fl. Gravel below pipe 4 11. Eft. absorpUon area 510 · Monit~ing tube Y Depression over field N_ Results (Pass/Fail) For bedrooms in. ffyes, give date g.p.d.